RU2527434C1 - Bottomhole zone treatment method for horizontal well - Google Patents
Bottomhole zone treatment method for horizontal well Download PDFInfo
- Publication number
- RU2527434C1 RU2527434C1 RU2013122522/03A RU2013122522A RU2527434C1 RU 2527434 C1 RU2527434 C1 RU 2527434C1 RU 2013122522/03 A RU2013122522/03 A RU 2013122522/03A RU 2013122522 A RU2013122522 A RU 2013122522A RU 2527434 C1 RU2527434 C1 RU 2527434C1
- Authority
- RU
- Russia
- Prior art keywords
- pipe string
- horizontal well
- acid solution
- pulsator
- wellhead
- Prior art date
Links
Images
Landscapes
- Physical Or Chemical Processes And Apparatus (AREA)
- Extraction Or Liquid Replacement (AREA)
- Cleaning In General (AREA)
Abstract
Description
Изобретение относится к нефтяной промышленности и может найти применение при обработке призабойной зоны в горизонтальных стволах скважин, пробуренных в залежи битумов, разрабатываемых термическим методом.The invention relates to the oil industry and may find application in the processing of the bottom-hole zone in horizontal wellbores drilled in deposits of bitumen developed by the thermal method.
Известен способ поинтервальной обработки призабойной зоны горизонтальной скважины (патент RU №231899, МПК E21B 43/27, опубл. в бюл. №7 от 10.03.2008 г.), включающий поинтервальную закачку через колонну насосно-компрессорных труб в скважину раствора кислоты, продавку раствора кислоты в пласт, проведение технологической выдержки и свабирование, в колонну насосно-компрессорных труб размещают в обсаженной вертикальной части скважины, внутри колонны насосно-компрессорных труб размещают безмуфтовую трубу колтюбинга, определяют зоны горизонтального не обсаженного ствола скважины с различными нефтенасыщенностью и проницаемостью, конец трубы колтюбинга размещают напротив зоны пласта с минимальными нефтенасыщенностью и проницаемостью, закачивают в скважину через безмуфтовую трубу колтюбинга раствор кислоты, поднимают безмуфтовую трубу колтюбинга в обсаженную зону скважины, продавливают по колонне насосно-компрессорных труб раствор кислоты в пласт, далее размещают конец безмуфтовой трубы колтюбинга последовательно по зонам пласта с возрастающими нефтенасыщенностью и проницаемостью, напротив каждой зоны закачивают в скважину через безмуфтовую трубу колтюбинга раствор кислоты, поднимают безмуфтовую трубу колтюбинга в обсаженную зону скважины и продавливают по колонне насосно-компрессорных труб раствор кислоты в пласт, при этом продавку раствора кислоты ведут с расходом 3-4 м3/ч при давлении на устье скважины 1-3 МПа.A known method of interval processing of the bottom-hole zone of a horizontal well (patent RU No. 231899, IPC E21B 43/27, published in Bulletin No. 7 of 03/10/2008), including interval pumping of an acid solution through a tubing string into an acid well, sale acid solution into the formation, holding technological exposure and swabbing, in the tubing string are placed in the cased vertical part of the well, the sleeveless coiled tubing is placed inside the tubing string, horizontal zones of fossilized wellbore with various oil saturation and permeability, the end of the coiled tubing pipe is placed opposite the formation zone with minimal oil saturation and permeability, an acid solution is pumped into the well through a sleeveless coiled tubing pipe, the sleeveless coiled tubing pipe is raised into the cased zone of the well, the pump is pumped through the column in the reservoir, then place the end of the sleeveless coiled tubing pipe sequentially along the zones of the reservoir with increasing oil saturation and permeability , opposite each zone, an acid solution is pumped into the well through a sleeveless coiled tubing pipe, a sleeveless coiled tubing pipe is lifted into the cased zone of the well and the acid solution is pushed into the formation along the tubing string, while the acid solution is forced to flow 3-4 m 3 / h at a wellhead pressure of 1-3 MPa.
Недостатками данного способа являются:The disadvantages of this method are:
- во-первых, сложный технологический процесс, связанный с привлечением двух колонн труб: колонны НКТ и безмуфтовой трубы колтюбинга;- firstly, a complex technological process associated with the involvement of two pipe columns: tubing string and a sleeveless pipe coiled tubing;
- во-вторых, большая продолжительность технологического процесса обработки призабойной зоны горизонтальной скважины, обусловленная тем, что напротив каждой зоны закачивают в скважину через безмуфтовую трубу колтюбинга раствор кислоты. На залежи битумов паровая камера имеет температуру свыше 100°C, что ускоряет процесс течения реакции кислотного раствора, поэтому время на проведение технологических операций по закачке кислотного раствора и технологическую выдержку на реакцию в горизонтальных скважинах, пробуренных в залежи битумов, разрабатываемых термическим методом, снижается в разы;- secondly, the long duration of the technological process for treating the bottom-hole zone of a horizontal well, due to the fact that, in front of each zone, an acid solution is pumped into the well through a sleeveless coiled tubing pipe. On bitumen deposits, the steam chamber has a temperature above 100 ° C, which accelerates the reaction process of the acid solution, therefore, the time for carrying out technological operations for pumping the acid solution and technological exposure to the reaction in horizontal wells drilled in the bitumen deposits developed by the thermal method decreases in times;
- в-третьих, поинтервальная обработка не обеспечивает сплошную и равномерную обработку призабойной зоны горизонтальной скважины по всей протяженности фильтра горизонтальной скважины.- thirdly, the interval processing does not provide continuous and uniform processing of the bottom-hole zone of a horizontal well over the entire length of the filter of a horizontal well.
Наиболее близким по технической сущности и достигаемому результату является способ поинтервальной обработки призабойной зоны горизонтальной скважины (патент РФ №2278966, МПК E21B 43/27, опубл. 27.06.2006 г., опубл. в бюл. №18), включающий поинтервальную закачку в призабойную зону раствора кислоты, при этом очередность обработки устанавливают от дальнего интервала к интервалу, ближайшему к вертикальному стволу скважины, закачку ведут через колонну насосно-компрессорных труб, при обработке очередного интервала ступенчато перемещают конец колонны насосно-компрессорных труб к обрабатываемому интервалу на протяжении длины фильтра горизонтальной скважины, после закачки раствора кислоты в каждый обрабатываемый интервал закачивают водный раствор эмульгатора, закачку растворов кислоты и эмульгатора проводят с расходом 24-35 м3/сут и при давлении на устье на колонне насосно-компрессорных труб 0,8-1,5 МПа, после чего проводят технологическую выдержку в течение 3 ч и выполняют свабирование до депрессии на забое скважины не ниже 3 МПа.The closest in technical essence and the achieved result is a method of interval-wise processing of the bottom-hole zone of a horizontal well (RF patent No. 2278966, IPC E21B 43/27, published on June 27, 2006, published in bulletin No. 18), including interval-wise injection into the bottom-hole the acid solution zone, while the processing sequence is set from the far interval to the interval closest to the vertical wellbore, injection is carried out through the tubing string, during the processing of the next interval, the end of the string is moved stepwise clear tubing to be treated during an interval of the horizontal well filter length, after pumping the acid solution in each interval being processed is pumped an aqueous solution of an emulsifier, injecting acid solutions and emulsifier performed at a rate of 24-35 m 3 / day and at a pressure at the mouth of the pump on the column -compressor pipes 0.8-1.5 MPa, after which they carry out technological exposure for 3 hours and perform swabbing until depression at the bottom of the well at least 3 MPa.
Недостатками данного способа являются:The disadvantages of this method are:
- во-первых, большая продолжительность технологического процесса обработки призабойной зоны горизонтальной скважины, обусловленная применением колонны насосно-компрессорных труб и технологической выдержкой в течение 3 ч. На залежи битумов паровая камера имеет температуру свыше 100°C, что ускоряет процесс течения реакции кислотного раствора, поэтому время на проведение технологических операций по закачке кислотного раствора, а также технологической выдержки на реакцию в горизонтальных скважинах, пробуренных в залежи битумов, разрабатываемых термическим методом, снижается в разы;- firstly, the long duration of the technological process for treating the bottom-hole zone of a horizontal well, due to the use of a tubing string and technological holding for 3 hours. On the bitumen deposits, the steam chamber has a temperature above 100 ° C, which accelerates the process of the acid solution reaction, therefore, the time to carry out technological operations for the injection of an acid solution, as well as technological exposure to the reaction in horizontal wells drilled in bitumen deposits, was developed thermally reduced, decreases significantly;
- во-вторых, закачка эмульгатора производится после закачки раствора кислоты с целью временной блокировки интервала закачки раствора кислоты, что ухудшает коллекторские свойства призабойной зоны горизонтальной скважины и снижает эффективность обработки призабойной зоны горизонтальной скважины;- secondly, the emulsifier is injected after injection of the acid solution in order to temporarily block the interval of injection of the acid solution, which affects the reservoir properties of the bottom-hole zone of a horizontal well and reduces the efficiency of processing the bottom-hole zone of a horizontal well;
- поинтервальная обработка не обеспечивает сплошную и равномерную обработку призабойной зоны горизонтальной скважины по всей протяженности фильтра горизонтальной скважины.- interval processing does not provide continuous and uniform processing of the bottom-hole zone of a horizontal well over the entire length of the filter of a horizontal well.
Технической задачей изобретения является сокращение продолжительности технологического процесса осуществления способа и повышение эффективности обработки призабойной зоны горизонтальных скважин, пробуренных в залежи битумов и разрабатываемых термическим методом.An object of the invention is to reduce the duration of the technological process of implementing the method and increase the efficiency of processing the bottom-hole zone of horizontal wells drilled in bitumen deposits and developed by the thermal method.
Способ обработки призабойной зоны горизонтальной скважины, включающий закачку раствора кислоты через колонну труб в призабойную зону от дальнего интервала к интервалу, ближайшему к вертикальному стволу скважины на протяжении длины фильтра горизонтальной скважины, после чего проводят технологическую выдержку.A method of processing a bottomhole zone of a horizontal well, comprising injecting an acid solution through a pipe string into the bottomhole zone from a far interval to an interval closest to the vertical wellbore over the length of the horizontal well filter, after which technological exposure is carried out.
Новым является то, что на устье скважины нижний конец колонны труб, в качестве которой применяют безмуфтовую трубу колтюбинга, оснащают сначала клапаном, состоящим из седла и корпуса с отверстиями, герметично перекрытыми седлом, зафиксированным срезным штифтом относительно корпуса, а затем импульсным пульсатором жидкости с насадкой на конце, спускают колонну труб до упора насадкой импульсного пульсатора жидкости в забой горизонтальной скважины, заполняют колонну труб кислотным раствором и производят закачку раствора кислоты в импульсном режиме под давлением не более 18 МПа и одновременным перемещением колонны труб со скоростью 50 м в минуту от забоя к устью на длину фильтра горизонтальной скважины, причем на расчетном расстоянии прекращают перемещение колонны труб и закачку кислотного раствора, устанавливают пробку в колонну труб с устья, возобновляют перемещение колонны труб и продавливают пробку технологической жидкостью, при этом в тот момент, когда импульсный пульсатор переместится в интервал конца фильтра, близкого к устью скважины, пробка садится на седло клапана, вследствие чего возрастает гидравлическое давление в колонне труб, происходит разрушение срезного штифта, при этом седло смещается вниз и открываются отверстия в корпусе клапана, сообщающие внутренние пространства колонны труб и межколонного пространства горизонтальной скважины, при этом пробка герметично отсекает импульсный пульсатор жидкости, далее проводят технологическую выдержку в течение 1 ч, при этом в процессе технологической выдержки доспускают колонну труб до упора импульсного пульсатора жидкости в забой горизонтальной скважины, затем в три цикла поочередно, то в колонну труб, то в межколонное пространство скважины закачивают по 0,5 м3 технологической жидкости, по окончании времени выдержки вымывают продукты реакции обратной круговой циркуляцией в полуторакратном объеме скважины.What is new is that at the wellhead the lower end of the pipe string, which is used as a sleeveless coiled tubing pipe, is equipped first with a valve consisting of a seat and a body with holes sealed by a seat, fixed with a shear pin relative to the body, and then a pulsed fluid pulsator with a nozzle at the end, lower the pipe string to the stop with the nozzle of a pulsed fluid pulsator into the bottom of the horizontal well, fill the pipe string with an acid solution and pump the acid solution into the pulse at a pressure of not more than 18 MPa and at the same time moving the pipe string at a speed of 50 m per minute from the bottom to the well at the filter length of the horizontal well, and at the estimated distance stop the movement of the pipe string and pumping the acid solution, install the plug in the pipe string from the mouth, they resume the movement of the pipe string and push the plug through the process fluid, while at the moment when the pulse pulsator moves to the interval of the end of the filter close to the wellhead, the plug sits on the valve seat on, as a result of which the hydraulic pressure in the pipe string increases, the shear pin is destroyed, while the saddle moves down and openings in the valve body open, communicating the internal spaces of the pipe string and the annular space of the horizontal well, while the tube hermetically seals the pulsed fluid pulser, then carry out technological exposure for 1 h, while in the process of technological exposure the column of pipes is pulled all the way to the stop of the pulsed liquid pulsator in the face horizontally well, then in three cycles alternately, then 0.5 m 3 of process fluid is pumped into the pipe string, then into the annulus of the well, at the end of the soaking time, the reaction products are washed by reverse circular circulation in the well’s half volume.
Предлагаемый способ осуществляется следующим образом.The proposed method is as follows.
На фиг.1, 2, 3 схематично представлен способ обработки призабойной зоны горизонтальной скважины.Figure 1, 2, 3 schematically shows a method of processing bottom-hole zone of a horizontal well.
Колонну труб 1 (см. фиг.1) на устье горизонтальной скважины 2 оснащают сначала клапаном 3. Клапан состоит из седла 4 и корпуса 5 с отверстиями 6. Отверстия 6 корпуса 5 изнутри герметично перекрыты седлом 4, зафиксированным относительно корпуса 5 срезным штифтом 7. Затем к клапану 3 присоединяют импульсный пульсатор жидкости 8 с насадкой 8'.At the mouth of a
В качестве колонны труб 1 применяют безмуфтовую трубу колтюбинга (ТУ 14-3-1470-86) диаметром D=50,8 мм с толщиной стенки 3,0 мм производства АО ″Уральский научно-исследовательский институт трубной промышленности″ (″УралНИТИ″).As a
В качестве импульсного пульсатора жидкости 8 может быть применено устройство для импульсной закачки жидкости в пласт, описанное в патенте на изобретение RU №2400615, МПК E21B 28/00, опубл. в бюл. №27 от 27.09.2010 г. или патенте на изобретение RU №2241825, МПК 8 E21B 43/18, опубл. в бюл. №34 от 10.12.2004 г.As a
Насадка 8' за счет отверстий, выполненных в ней, позволяет равномерно распределить поток жидкости по периметру горизонтальной скважины 2 в процессе закачки кислотного раствора.The nozzle 8 'due to the holes made in it, allows you to evenly distribute the fluid flow around the perimeter of the
Спускают колонну труб 1 до упора импульсного пульсатора жидкости 8 в забой 9 горизонтальной скважины 2.Lower the
С устья горизонтальной скважины 2 с помощью насосного агрегата 10, например марки ЦА-320, при открытых центральной 11 и межколонной 12 задвижках заполняют колонну труб 1 кислотным раствором, например, в качестве кислотного раствора применяют 8%-ную соляную кислоту, ингибированную с дозировкой 0,1% СНПХ-1004.From the mouth of a
Производят закачку раствора кислоты в импульсном режиме под давлением не более 18 МПа, например с расходом 2 л/с под давлением 15 МПа и одновременно перемещают колонны труб 1 со скоростью 50 м в минуту от забоя 9 к устью на длину фильтра 13 горизонтальной скважины 2. На расчетном расстоянии до достижения конечного интервала 15 фильтра 10 (близкого к устью) горизонтальной скважины 2 прекращают перемещение колонны труб 1 и закачку кислотного раствора.The acid solution is injected in a pulsed mode under a pressure of not more than 18 MPa, for example, with a flow rate of 2 l / s under a pressure of 15 MPa and at the same
Устанавливают пробку 14 в колонну труб 1 с устья горизонтальной скважины 2 и возобновляют перемещение колонны труб 1 со скоростью 50 м в минуту и продавливают пробку 14 закачкой технологической жидкости со скоростью 2 л/с в колонну труб 1.Install the
В момент, когда импульсный пульсатор жидкости 8 переместится в конечный интервал 15 фильтра 10 (близкого к устью) горизонтальной скважины 2, пробка 14 садится на седло 4 клапана 3, при этом закачку технологической жидкости со скоростью 2 л/с в колонну труб 1 продолжают.At the moment when the
В результате возрастает гидравлическое давление в колонне труб 1 и происходит разрушение срезного штифта 7, например, при давлении 9,0 МПа, при этом седло 4 перемещается слева направо, и открываются отверстия 6 в корпусе 5 клапана 3, сообщающие внутреннее пространство 16 колонны труб 1 с межколонным пространством 17 горизонтальной скважины 2.As a result, the hydraulic pressure in the
Вследствие применения импульсного пульсатора жидкости 8 осуществление способа упрощается и сокращается его продолжительность, а за счет применения клапана 3 сокращается количество спуско-подъемных операций, что приводит к снижению стоимости и продолжительности обработки призабойной зоны горизонтальной скважины.Due to the use of a
Пробка 11 герметично отсекает импульсный пульсатор жидкости 8. Далее проводят технологическую выдержку в течение 1 ч, при этом в процессе технологической выдержки доспускают колонну труб 1 до упора импульсного пульсатора жидкости 3 в забой 9 горизонтальной скважины 2 (см. фиг.2). Затем через межколонную задвижку 12 обвязывают второй насосный агрегат 18 с межколонным пространством 17.The
Далее поочередно в три цикла, то во внутреннее пространство 16 колонны труб 1 с помощью насосного агрегата 10 через открытую центральную задвижку 11, то в межколонное пространство 17 с помощью второго насосного агрегата 18 через межколонную задвижку 12 горизонтальной скважины 2 закачивают технологическую жидкость в объеме по 0,5 м3.Then alternately in three cycles, then into the
По окончании времени выдержки (1 ч) отсоединяют насосный агрегат 10 и обвязывают центральную задвижку 11 с желобной емкостью 19 (см. фиг.3), при этом всасывающую линию второго насосного агрегата 18 обвязывают с желобной емкостью 19 и вымывают продукты реакции обратной круговой циркуляцией в полуторакратном объеме горизонтальной скважины 2.At the end of the holding time (1 h), the
Предлагаемый способ позволяет эффективно обработать призабойную зону горизонтальной скважины, пробуренную в залежи битумов и эксплуатирующуюся термическим методом за счет того, что закачка кислотного раствора на всем протяжении фильтра происходит в динамике, кроме того, в процессе технологической выдержки, которая составляет не более 1 ч, производится кислотное «полоскание», что позволяет вымыть выпавшие на фильтр в процессе эксплуатации отложение соли, накипь и прочие загрязнения, снижающие пропускную способность фильтра.The proposed method allows you to effectively treat the bottom-hole zone of a horizontal well drilled in bitumen deposits and operated by the thermal method due to the fact that the acid solution is pumped throughout the filter in dynamics, in addition, during technological exposure, which is no more than 1 hour, acid "rinse", which allows you to wash deposited on the filter during operation, salt deposits, scale and other impurities that reduce the filter throughput.
Достигается сокращение продолжительности технологического процесса осуществления способа за счет применения колонны гибких труб с одновременной закачкой кислотного раствора в процессе перемещения колонны труб.A reduction in the duration of the technological process of implementing the method is achieved through the use of a string of flexible pipes with the simultaneous injection of an acid solution in the process of moving the pipe string.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2013122522/03A RU2527434C1 (en) | 2013-05-15 | 2013-05-15 | Bottomhole zone treatment method for horizontal well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2013122522/03A RU2527434C1 (en) | 2013-05-15 | 2013-05-15 | Bottomhole zone treatment method for horizontal well |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2527434C1 true RU2527434C1 (en) | 2014-08-27 |
Family
ID=51456525
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2013122522/03A RU2527434C1 (en) | 2013-05-15 | 2013-05-15 | Bottomhole zone treatment method for horizontal well |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2527434C1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111520093A (en) * | 2020-04-16 | 2020-08-11 | 黑龙江旭得通石油技术开发有限公司 | Air-controlled foam liquid plug stuck-releasing and blockage-removing auxiliary drainage blockage-removing system and process for stratum |
CN112302586A (en) * | 2020-10-30 | 2021-02-02 | 中国石油天然气股份有限公司 | Production process for putting speed pipe column with choke at tail end into well |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5207778A (en) * | 1991-10-24 | 1993-05-04 | Mobil Oil Corporation | Method of matrix acidizing |
US5291950A (en) * | 1992-08-27 | 1994-03-08 | Petrosakh U.S.A. | Method of well treatment |
RU2278966C1 (en) * | 2005-07-18 | 2006-06-27 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method for horizontal well bottom zone interval treatment |
RU2283946C2 (en) * | 2003-10-22 | 2006-09-20 | Открытое акционерное общество Научно-производственное объединение "Буровая техника" (ОАО НПО "Буровая техника") | Method for low-permeable productive formation treatment |
RU2296215C1 (en) * | 2006-03-29 | 2007-03-27 | Открытое акционерное общество "Елабуганефть" | Method for well bottom zone treatment |
RU2322578C2 (en) * | 2006-05-26 | 2008-04-20 | Общество с ограниченной ответственностью Когалымский научно-исследовательский и проектный институт нефти (ООО "КогалымНИПИнефть") | Method for dynamic bottomhole zone treatment in high-temperature low-permeable reservoirs |
-
2013
- 2013-05-15 RU RU2013122522/03A patent/RU2527434C1/en not_active IP Right Cessation
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5207778A (en) * | 1991-10-24 | 1993-05-04 | Mobil Oil Corporation | Method of matrix acidizing |
US5291950A (en) * | 1992-08-27 | 1994-03-08 | Petrosakh U.S.A. | Method of well treatment |
RU2283946C2 (en) * | 2003-10-22 | 2006-09-20 | Открытое акционерное общество Научно-производственное объединение "Буровая техника" (ОАО НПО "Буровая техника") | Method for low-permeable productive formation treatment |
RU2278966C1 (en) * | 2005-07-18 | 2006-06-27 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method for horizontal well bottom zone interval treatment |
RU2296215C1 (en) * | 2006-03-29 | 2007-03-27 | Открытое акционерное общество "Елабуганефть" | Method for well bottom zone treatment |
RU2322578C2 (en) * | 2006-05-26 | 2008-04-20 | Общество с ограниченной ответственностью Когалымский научно-исследовательский и проектный институт нефти (ООО "КогалымНИПИнефть") | Method for dynamic bottomhole zone treatment in high-temperature low-permeable reservoirs |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111520093A (en) * | 2020-04-16 | 2020-08-11 | 黑龙江旭得通石油技术开发有限公司 | Air-controlled foam liquid plug stuck-releasing and blockage-removing auxiliary drainage blockage-removing system and process for stratum |
CN112302586A (en) * | 2020-10-30 | 2021-02-02 | 中国石油天然气股份有限公司 | Production process for putting speed pipe column with choke at tail end into well |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2490442C1 (en) | Method for well completion | |
RU2512216C1 (en) | Treatment method of bottomhole zone | |
RU2531775C1 (en) | Seam hydro frac in well | |
US20130220618A1 (en) | Method and system for cleaning fracture ports | |
US20130014951A1 (en) | Applying treatment fluid to a subterranean rock matrix | |
RU2520221C1 (en) | Treatment method of bottomhole zone | |
RU2527434C1 (en) | Bottomhole zone treatment method for horizontal well | |
RU2599156C1 (en) | Method of interval treatment of bottom hole zone of horizontal well shaft | |
RU2630938C1 (en) | Method for cleaning and treating bottomhole zone of horizontal well in bitumen deposit | |
RU2610967C1 (en) | Method of selective treatment of productive carbonate formation | |
RU2520989C1 (en) | Bottomhole zone treatment method for horizontal well | |
RU2018136772A (en) | A method of processing a near-wellbore zone of a low-permeable formation and a device for its implementation | |
RU2535765C1 (en) | Treatment method of bottomhole zone | |
RU2506421C1 (en) | Development method of bottom-hole zone | |
RU2534555C1 (en) | Interval isolation method of brine water influx in horizontal wells | |
RU2483200C1 (en) | Method of hydrodynamic action on bottom-hole formation zone | |
RU2599155C1 (en) | Method of treatment of bottom-hole zone of the horizontal shafts of boreholes, opening carbonate collector | |
CN111852422B (en) | Compact single-layer sectional treatment method and treatment device for high-pressure water under-injection well | |
RU2537430C1 (en) | Method of cleaning of near wellbore region of injection wells | |
RU2560018C1 (en) | Water flow isolation technique in uncased horizontal borehole section of producing well | |
RU115402U1 (en) | DEVICE FOR PULSE LIQUID PUMPING INTO THE LAYER | |
RU2534373C1 (en) | Method for shutoff of stratal water influx | |
RU2541986C1 (en) | Well completion method | |
RU2511167C1 (en) | Treatment method for bottomhole zone of well equipped with bottom-hole oil pump | |
RU2451176C1 (en) | Method of formation bottomhole zone acid treatment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20200516 |