RU2494232C1 - Operating method of production well of high-viscosity oil - Google Patents

Operating method of production well of high-viscosity oil Download PDF

Info

Publication number
RU2494232C1
RU2494232C1 RU2012144465/03A RU2012144465A RU2494232C1 RU 2494232 C1 RU2494232 C1 RU 2494232C1 RU 2012144465/03 A RU2012144465/03 A RU 2012144465/03A RU 2012144465 A RU2012144465 A RU 2012144465A RU 2494232 C1 RU2494232 C1 RU 2494232C1
Authority
RU
Russia
Prior art keywords
well
upper perforated
tubing string
connection pipe
rod
Prior art date
Application number
RU2012144465/03A
Other languages
Russian (ru)
Inventor
Наиль Габдулбариевич Ибрагимов
Илгиз Мисбахович Салихов
Роберт Рафаэлевич Ахмадуллин
Александр Александрович Иванов
Анвар Хайдаргалиевич Шайахметов
Ленар Фазыйлович Фаррахов
Original Assignee
Открытое акционерное общество "Татнефть" им. В.Д. Шашина
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Открытое акционерное общество "Татнефть" им. В.Д. Шашина filed Critical Открытое акционерное общество "Татнефть" им. В.Д. Шашина
Priority to RU2012144465/03A priority Critical patent/RU2494232C1/en
Application granted granted Critical
Publication of RU2494232C1 publication Critical patent/RU2494232C1/en

Links

Images

Landscapes

  • Reciprocating Pumps (AREA)

Abstract

FIELD: oil and gas industry.
SUBSTANCE: according to the proposed method, a layout consisting of the following in upward direction is lowered to the well: a lower perforated connection pipe, a valve, a drain valve, a packer, a bottom-hole pump, a tubing string, an upper perforated connection pipe and a line of rods. The bottom-hole pump is brought into operation under action of movements of the line of rods. Supply of high-viscosity oil is performed to the well head via the tubing string and through upper perforated connection pipe via inter-tube space. Periodic straight flushing is performed by pumping of flushing liquid via the tubing string, sampling is performed through upper perforated connection pipe and inter-tube space and back flushing is performed by lifting the pump above upper perforated connection pipe. Pumping of flushing liquid is performed via inter-tube space and sampling is performed through upper perforated connection pipe and tubing string.
EFFECT: providing the possibility of bringing bottom-hole equipment to working position at sticking of the line of rods by straight or back flushing of the well without lifting that equipment from well.
1 ex, 1 dwg

Description

Изобретение относится к нефтяной промышленности и может найти применение при эксплуатации скважины, через которую добывают высоковязкую нефть.The invention relates to the oil industry and may find application in the operation of a well through which highly viscous oil is produced.

Известен штанговый насос, который содержит цилиндр, верхний и нижний перемещающиеся полые плунжеры, всасывающий и нагнетательный клапаны, фильтр с отверстиями. Верхний и нижний плунжеры выполнены одинакового диаметра. Насос дополнительно снабжен полой штангой, которая расположена между верхним и нижним плунжерами одинакового диаметра. Полая штанга обоими концами соединена при помощи переходников с отверстиями со штоком, который проходит через полости верхнего и нижнего плунжеров. Верхний конец штока, расположенный над верхним концом верхнего плунжера, и нижний конец штока, расположенный ниже нижнего плунжера, выполнены с расширяющимся конусообразным утолщением и образуют с концами плунжеров клапаны. Нижний клапан выполняет функцию нагнетания и всасывания. На штоке между полой штангой, верхним и нижним плунжерами установлены шайбы с отверстиями. В середине верхнего и нижнего плунжеров одинакового диаметра установлены шайбы-ограничители отклонения штока с отверстиями. Верхний и нижний плунжеры выполнены из эластичного материала (Патент РФ №2289724, опубл. 20.12.2006 г.).Known sucker rod pump, which contains a cylinder, upper and lower moving hollow plungers, suction and discharge valves, a filter with holes. The upper and lower plungers are made of the same diameter. The pump is additionally equipped with a hollow rod, which is located between the upper and lower plungers of the same diameter. The hollow rod at both ends is connected by means of adapters with holes to the rod, which passes through the cavity of the upper and lower plungers. The upper end of the rod located above the upper end of the upper plunger and the lower end of the rod located below the lower plunger are made with an expanding cone-shaped thickening and form valves with the ends of the plungers. The bottom valve has the function of discharge and suction. Washers with holes are installed on the rod between the hollow rod, upper and lower plungers. In the middle of the upper and lower plungers of the same diameter, rod deflection washers with holes are installed. The upper and lower plungers are made of elastic material (RF Patent No. 2289724, publ. December 20, 2006).

Наиболее близким к предложенному изобретению по технической сущности является способ работы штанговой насосной установки, описанный в патенте РФ №2161268, опубликовано: 27.12.2000 - прототип. Установка снабжена насосом с двухступенчатым цилиндром, в котором расположены два полых плунжера разных диаметров, связанных между собой и образующих рабочие камеры. Нижняя ступень плунжера утяжелена грузом, расположенным вне насоса ниже его приемной части, и имеет больший диаметр на длине, равной длине хода плунжера.Closest to the proposed invention in technical essence is the method of operation of a sucker rod pump installation described in the patent of the Russian Federation No. 2161268, published: 12/27/2000 - prototype. The installation is equipped with a pump with a two-stage cylinder, in which two hollow plungers of different diameters are located, interconnected and forming working chambers. The lower stage of the plunger is weighted with a load located outside the pump below its receiving part, and has a larger diameter at a length equal to the stroke length of the plunger.

Недостатком известных способов является зависание колонны штанг и невозможность приведения колонны штанг в рабочее положение прямой или обратной промывкой скважины.A disadvantage of the known methods is the freezing of the rod string and the inability to bring the rod string to the working position by direct or reverse flushing of the well.

В предложенном изобретении решается задача обеспечения приведения в рабочее положение при зависании колонны штанг прямой или обратной промывкой скважины без подъема из скважины глубинно-насосного оборудования.The proposed invention solves the problem of ensuring putting into working position when the rod string hangs by direct or reverse flushing of the well without lifting the pumping equipment from the well.

Задача решается способом эксплуатации добывающей высоковязкую нефть скважины, включающим спуск в скважину компоновки, состоящей снизу вверх из нижнего перфорированного патрубка, клапана, сбивного клапана, пакера, штангового насоса, колонны насосно-компрессорных труб, верхнего перфорированного патрубка и колонны штанг, приведение в работу штангового насоса под действием перемещений колонны штанг, подачу высоковязкой нефти к устью скважины по колонне насосно-компрессорных труб и через верхний перфорированный патрубок по межтрубному пространству, периодическую прямую промывку закачкой промывочной жидкости по колонне насосно-компрессорных труб и отбором через верхний перфорированный патрубок и межтрубное пространство и обратную промывку путем подъема насоса над верхним перфорированным патрубком, закачки промывочной жидкости по межтрубному пространству и отбора через верхний перфорированный патрубок и колонну насосно-компрессорных труб.The problem is solved by a method of operating a highly viscous oil producing well, including a descent into the well of an arrangement consisting of a bottom perforated nozzle, a valve, a relief valve, a packer, a rod pump, a tubing string, an upper perforated nozzle and a rod string, putting the rod into operation the pump under the action of displacements of the rod string, the supply of highly viscous oil to the wellhead through the tubing string and through the upper perforated pipe along the annulus space, periodic direct flushing by pumping flushing fluid through the tubing string and withdrawal through the upper perforated nozzle and annular space and backwashing by lifting the pump above the upper perforated nozzle, injecting flushing fluid through the annular tubing and withdrawing through the upper perforated tubing and pump tubing compressor pipes.

Сущность изобретенияSUMMARY OF THE INVENTION

При добыче высоковязкой нефти наблюдается зависание колонны штанг, обрыв штанг, снижение или полное отсутствие подачи нефти. Данные факторы приводят к увеличению реанимационных мероприятий по восстановлению работы скважин, потерям нефти, увеличению затрат на реанимационные мероприятия и подземный ремонт скважин. Существующие технические решения не позволяют в полной мере устранить отрицательные факторы. В предложенном изобретении решается задача обеспечения приведения в рабочее положение при зависании колонны штанг прямой или обратной промывкой скважины без подъема из скважины глубинно-насосного оборудования. Задача решается следующим образом.When producing highly viscous oil, the rod string hangs, the rod breaks, and the oil supply is reduced or completely absent. These factors lead to an increase in resuscitation measures to restore well operation, oil losses, an increase in the cost of resuscitation measures and underground well repair. Existing technical solutions do not fully eliminate the negative factors. The proposed invention solves the problem of ensuring putting into working position when the rod string hangs by direct or reverse flushing of the well without lifting the pumping equipment from the well. The problem is solved as follows.

В скважину спускают компоновку, представленную на фиг.1.The arrangement shown in FIG. 1 is lowered into the well.

Компоновка состоит снизу вверх из нижнего перфорированного патрубка 1, клапана 2, сбивного клапана 3, пакера 4, вставного штангового насоса 5, колонны насосно-компрессорных труб 6, верхнего перфорированного патрубка 7 и колонны штанг 8. Компоновка размещена в эксплуатационной колонне 9 скважины, вскрывшей продуктивный пласт 10.The layout consists from bottom to top of the lower perforated pipe 1, valve 2, the relief valve 3, the packer 4, the insert rod pump 5, the tubing string 6, the upper perforated tubing 7 and the rod string 8. The layout is located in the production casing 9 of the well that opened reservoir 10.

Компоновка работает следующим образом.The layout works as follows.

С устья скважины от станка-качалки (не показана) приводят в возвратно-поступательное движение колонну штанг 8, посредством которой приводят в работу штанговый насос 5, который высоковязкую нефть из продуктивного пласта 10 через нижний перфорированный патрубок 1, клапан 2, мимо сбивного клапана 3, через пакер 4 подает в верхний перфорированный патрубок 7 и колонну насосно-компрессорных труб 6. В верхнем перфорированном патрубке 7 высоковязкая нефть разделяется на два потока. Один поток высоковязкой нефти направляется по колонне насосно-компрессорных труб 6 к устью скважины, другой поток через верхний перфорированный патрубок 7 перетекает в межтрубное пространство между колонной насосно-компрессорных труб 6 и эксплуатационной колонной 9 и по межтрубному пространству направляется к устью скважины.From the wellhead from a rocking machine (not shown), a rod string 8 is driven back and forth by means of which a rod pump 5 is brought into operation, which is a highly viscous oil from the reservoir 10 through the lower perforated pipe 1, valve 2, past the knockdown valve 3 through the packer 4 feeds into the upper perforated pipe 7 and the tubing string 6. In the upper perforated pipe 7, high-viscosity oil is divided into two streams. One highly viscous oil flow is directed along the tubing string 6 to the wellhead, another flow through the upper perforated nozzle 7 flows into the annulus between the tubing string 6 and production string 9 and is routed through the annulus to the wellhead.

В случае зависания колонны штанг 8 проводят прямую или обратную промывку. Промывка способствует освобождению колонны штанг 8 и переводу в подвижное состояние.In the event of a freezing of the rod string 8, forward or backwash is carried out. Flushing helps release the rod string 8 and translates into a mobile state.

При прямой промывке промывочную жидкость подают по колонне насосно-компрессорных труб 6, выдавливают через верхний перфорированный патрубок 7 в межтрубное пространство и далее к устью скважины.With direct flushing, flushing fluid is supplied through the tubing string 6, squeezed through the upper perforated pipe 7 into the annulus and further to the wellhead.

При обратной промывке поднимают вставной штанговый насос 5 над верхним перфорированным патрубком 7 и подают промывочную жидкость в межтрубное пространство. Промывочная жидкость проходит через верхний перфорированный патрубок 7, через поднятый насос 5 и колонну насосно-компрессорных труб 6 к устью скважины.When backwashing, the plug-in sucker rod pump 5 is raised above the upper perforated nozzle 7 and the flushing fluid is fed into the annulus. The flushing fluid passes through the upper perforated pipe 7, through the raised pump 5 and the tubing string 6 to the wellhead.

В результате промывки удается освободить колонну штанг и вернуть компоновку в рабочее положение.As a result of washing, it is possible to free the rod string and return the layout to its working position.

Пример конкретного выполненияConcrete example

Эксплуатируют нефтедобывающую скважину, вскрывшую продуктивный пласт на отметках 1007,9-1017,3 м. Скважина обсажена эксплуатационной колонной диаметром 146 мм. В скважину спущена компоновка согласно фиг.1. В качестве вставного штангового насоса применен насос марки 25-175-RHAM-14-4-4. Компоновка спущена на колонне насосно-компрессорных труб диаметром 73 мм. Добываемая нефть имеет вязкость 472 сст, обводненность нефти составляет 8%. Дебит по нефти составляет 1,62 т/сут.An oil producing well is exploited that has uncovered a productive formation at elevations of 1007.9-1017.3 m. The well is cased with a production string of 146 mm in diameter. The layout according to FIG. 1 is launched into the well. A pump of the brand 25-175-RHAM-14-4-4 was used as an insert rod pump. The layout was launched on a tubing string with a diameter of 73 mm. The produced oil has a viscosity of 472 cst, and the water cut of oil is 8%. The oil production rate is 1.62 tons / day.

При зависании колонны штанг скважину промывают прямой и обратной промывкой. В качестве промывочной жидкости используют товарную нефть. Время промывки составляет 3 часа. После промывки зависание штанг устраняется. Скважину запускают в работу.When the rod string hangs, the well is washed with direct and reverse flushing. As a washing liquid, salable oil is used. The flushing time is 3 hours. After washing, boom freezing is eliminated. A well is put into operation.

Применение предложенного способа позволит обеспечить приведение в рабочее положение при зависании колонны штанг прямой или обратной промывкой скважины без подъема из скважины глубинно-насосного оборудования.Application of the proposed method will ensure bringing into working position when the rod string hangs by direct or reverse flushing of the well without lifting the pumping equipment from the well.

Claims (1)

Способ эксплуатации добывающей высоковязкую нефть скважины, включающий спуск в скважину компоновки, состоящей снизу вверх из нижнего перфорированного патрубка, клапана, сбивного клапана, пакера, штангового насоса, колонны насосно-компрессорных труб, верхнего перфорированного патрубка и колонны штанг, приведение в работу штангового насоса под действием перемещений колонны штанг, подачу высоковязкой нефти к устью скважины по колонне насосно-компрессорных труб и через верхний перфорированный патрубок по межтрубному пространству, периодическую прямую промывку закачкой промывочной жидкости по колонне насосно-компрессорных труб и отбором через верхний перфорированный патрубок и межтрубное пространство и обратную промывку путем подъема насоса над верхним перфорированным патрубком, закачки промывочной жидкости по межтрубному пространству и отбора через верхний перфорированный патрубок и колонну насосно-компрессорных труб. A method of operating a highly viscous oil producing well, including a descent into a well of an arrangement consisting of a bottom perforated nozzle, a valve, a knockout valve, a packer, a rod pump, a tubing string, an upper perforated nozzle and a rod string, putting the rod pump under the action of the rod string movements, the supply of highly viscous oil to the wellhead along the tubing string and through the upper perforated pipe along the annulus, period direct rinsing by pumping flushing fluid through the tubing string and withdrawing through the upper perforated pipe and annular space and backwashing by lifting the pump above the perforated tubing; injecting flushing fluid through the tubing and sampling through the upper perforated pipe and tubing string .
RU2012144465/03A 2012-10-19 2012-10-19 Operating method of production well of high-viscosity oil RU2494232C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2012144465/03A RU2494232C1 (en) 2012-10-19 2012-10-19 Operating method of production well of high-viscosity oil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2012144465/03A RU2494232C1 (en) 2012-10-19 2012-10-19 Operating method of production well of high-viscosity oil

Publications (1)

Publication Number Publication Date
RU2494232C1 true RU2494232C1 (en) 2013-09-27

Family

ID=49254081

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2012144465/03A RU2494232C1 (en) 2012-10-19 2012-10-19 Operating method of production well of high-viscosity oil

Country Status (1)

Country Link
RU (1) RU2494232C1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2597304C1 (en) * 2015-07-21 2016-09-10 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Method of operating high-viscosity oil producing wells
RU2603866C1 (en) * 2016-02-24 2016-12-10 Публичное акционерное общество "Татнефть" им. В.Д. Шашина Method of removing deposits from well equipped with bottom-hole pump
RU2626484C1 (en) * 2016-04-26 2017-07-28 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Operating method of high-viscosity oil recovery downhole
RU181061U1 (en) * 2018-01-11 2018-07-04 Общество с ограниченной ответственностью "Пермская компания нефтяного машиностроения" Well sucker rod pump

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU347450A1 (en) * В. Д. Шашин DEEP PUMPING INSTALLATION
SU102968A1 (en) * 1955-03-22 1955-11-30 Н.В. Андрианова The method of obtaining solid thermoplastic resins
SU1590651A1 (en) * 1988-11-10 1990-09-07 А.В.СергиеБГ,ий Valve unit of downhole rod pump
SU1601352A2 (en) * 1988-10-31 1990-10-23 Научно-исследовательский и проектный институт "Гипроморнефтегаз" Method of well operation
RU2161268C2 (en) * 1999-03-11 2000-12-27 Открытое акционерное общество "Акционерной нефтяной компании Башнефть" Sucker-rod pump unit
US20050269134A1 (en) * 2004-06-04 2005-12-08 Strazhgorodskiy Semen I Underbalanced drilling method and apparatus
RU2321772C1 (en) * 2006-09-14 2008-04-10 ООО "ЛУКОЙЛ-Коми" Oil-well sucker-rod pump
RU102968U1 (en) * 2010-11-11 2011-03-20 Сергей Викторович Яшечкин AUTONOMOUS ENERGY GENERATING SYSTEM

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU347450A1 (en) * В. Д. Шашин DEEP PUMPING INSTALLATION
SU102968A1 (en) * 1955-03-22 1955-11-30 Н.В. Андрианова The method of obtaining solid thermoplastic resins
SU1601352A2 (en) * 1988-10-31 1990-10-23 Научно-исследовательский и проектный институт "Гипроморнефтегаз" Method of well operation
SU1590651A1 (en) * 1988-11-10 1990-09-07 А.В.СергиеБГ,ий Valve unit of downhole rod pump
RU2161268C2 (en) * 1999-03-11 2000-12-27 Открытое акционерное общество "Акционерной нефтяной компании Башнефть" Sucker-rod pump unit
US20050269134A1 (en) * 2004-06-04 2005-12-08 Strazhgorodskiy Semen I Underbalanced drilling method and apparatus
RU2321772C1 (en) * 2006-09-14 2008-04-10 ООО "ЛУКОЙЛ-Коми" Oil-well sucker-rod pump
RU102968U1 (en) * 2010-11-11 2011-03-20 Сергей Викторович Яшечкин AUTONOMOUS ENERGY GENERATING SYSTEM

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2597304C1 (en) * 2015-07-21 2016-09-10 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Method of operating high-viscosity oil producing wells
RU2603866C1 (en) * 2016-02-24 2016-12-10 Публичное акционерное общество "Татнефть" им. В.Д. Шашина Method of removing deposits from well equipped with bottom-hole pump
RU2626484C1 (en) * 2016-04-26 2017-07-28 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Operating method of high-viscosity oil recovery downhole
RU181061U1 (en) * 2018-01-11 2018-07-04 Общество с ограниченной ответственностью "Пермская компания нефтяного машиностроения" Well sucker rod pump

Similar Documents

Publication Publication Date Title
RU2494232C1 (en) Operating method of production well of high-viscosity oil
CN103334717A (en) Oil pumping device for oil field oil pumping well
CN102817594B (en) Horizontal well water pumping gas production method and device
CN110284857B (en) Hydraulic oil production device and bidirectional flow divider thereof
CN111021995B (en) Mechanical pumping drainage gas production wellhead supercharging process tubular column
RU144119U1 (en) INSTALLATION FOR SIMULTANEOUSLY SEPARATE OPERATION OF TWO LAYERS (OPTIONS)
RU2395718C1 (en) Sucker rod pumping unit
RU168316U1 (en) DRILLING PUMP UNIT FOR OPERATIONAL COLUMNS OF SMALL DIAMETER
RU156338U1 (en) DEVICE FOR CREATING PERFORATION CHANNELS IN A WELL
RU74163U1 (en) Borehole PUMPING PLANT FOR SIMULTANEOUS-SEPARATE OIL PRODUCTION
CN201425018Y (en) Pipe column drainage pump for oil well
CN211666694U (en) Mechanical pumping drainage gas production wellhead pressurization process pipe column
CN210598927U (en) Special downhole hydraulic motor for oil production
CN202064862U (en) Continuous sand washing device for immovable wellhead
RU2505708C1 (en) Well sucker-rod pump station
RU2684517C1 (en) Oil well pump
CN104929595A (en) Pulsating pressure driving self-balancing piston pump drain device and technological method thereof
RU165961U1 (en) INSTALLATION FOR SEPARATE OIL AND WATER PRODUCTION FROM A HIGHLY WATERED OIL WELL
CN103510921A (en) Phase-flow hollow draining device
CN204692060U (en) A kind of low-resistance sand-proof oil-well pump
RU76992U1 (en) WELL PUMP UNIT WITH HYDRAULIC PLUNG DRIVE
RU2565619C1 (en) Bidirectional oil well pump
RU146622U1 (en) IMPLOSIVE PRESSURE HYDROGENERATOR
RU135018U1 (en) Borehole PUMP PUMP FOR OIL AND GAS PRODUCTION
RU106677U1 (en) BODY PUMPING PLANT FOR OIL PRODUCTION AND WATER INJECTION

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20181020