RU2393320C1 - Slim hole well construction method - Google Patents
Slim hole well construction method Download PDFInfo
- Publication number
- RU2393320C1 RU2393320C1 RU2009133253/03A RU2009133253A RU2393320C1 RU 2393320 C1 RU2393320 C1 RU 2393320C1 RU 2009133253/03 A RU2009133253/03 A RU 2009133253/03A RU 2009133253 A RU2009133253 A RU 2009133253A RU 2393320 C1 RU2393320 C1 RU 2393320C1
- Authority
- RU
- Russia
- Prior art keywords
- drilling
- drilled
- diameter
- density
- water
- Prior art date
Links
Landscapes
- Earth Drilling (AREA)
Abstract
Description
Изобретение относится к нефтяной промышленности и может найти применение при строительстве скважины малого диаметра.The invention relates to the oil industry and may find application in the construction of small diameter wells.
Известен способ эксплуатации скважины, включающий бурение скважины по заданному профилю и спуск обсадных колонн различных типов, включая потайную перфорированную вне скважины. Осуществляют крепление их съемными якорями. Изолируют их в скважине предварительной закачкой термостойкой, седиментационно устойчивой, высокоструктурированной, антикоррозийной, вязкопластичной жидкостью-гидрозатвором в совокупности с герметичным разделителем среды. Эксплуатационную колонку не перфорируют, крепят на устье за предыдущую колонну с дополнительным усилием от выдавливания из скважины весом столба жидкости-гидрозатвора, действующего на герметичный разделитель среды от устья скважины. Герметичный разделитель среды размещают в потайной перфорированной колонне над кровлей продуктивного пласта. В ее торце размещают центратор на роликах с гидромониторным соплом для размыва осадков и компенсации гидрогазоударов со стороны продуктивного пласта. Контроль и управление затрубными, межтрубными и трубными пространствами осуществляют циркуляцией жидкости-гидрозатвора через гидравлические клапаны, датчики контроля среды, установленные над герметичными разделителями среди всех колонн. Приводят в транспортное положение съемные якоря с герметичными разделителями. После предварительной циркуляции жидкости-гидрозатвора поочередно полностью извлекают и полностью заменяют трубные конструкции колонн с их оснасткой (Патент РФ №2139413, опубл. 1999.10.10).A known method of operating a well, comprising drilling a well along a predetermined profile and lowering casing of various types, including countersunk perforated outside the well. They are fastened with removable anchors. They are isolated in the well by preliminary injection of heat-resistant, sedimentation-resistant, highly structured, anticorrosive, viscoplastic fluid-sealant in conjunction with a sealed medium separator. The production column is not perforated; it is attached to the mouth of the previous column with additional force from squeezing out of the well by the weight of a column of hydraulic seal acting on a sealed medium separator from the wellhead. A sealed medium separator is placed in a secret perforated column above the roof of the reservoir. At its end, a centralizer is placed on rollers with a hydromonitor nozzle for erosion of sediments and compensation of hydro-gas impacts from the reservoir side. The control and management of the annular, annular and tube spaces is carried out by the circulation of the hydraulic lock fluid through hydraulic valves, environmental control sensors installed above the sealed separators among all the columns. Removable anchors with sealed dividers are brought into transport position. After preliminary circulation of the hydraulic fluid seal, the pipe structures of the columns with their rigging are completely removed and completely replaced (RF Patent No. 2139413, publ. 1999.10.10).
Известный способ сложен, требует больших затрат на бурение, конструкция скважины металлоемкая.The known method is complicated, requires large expenses for drilling, the design of the well is metal-intensive.
Наиболее близким к изобретению по технической сущности является способ строительства, эксплуатации, консервации и ликвидации скважины, включающий бурение ствола скважины с заданным направлением, спуск и крепление нескольких обсадных колонн, включая последнюю - "хвостовик", малогабаритную эксплуатационную колонну и закачку активного изоляционного материала - гидрозатвора. Первую обсадную колонну спускают, крепят крепящим узлом и изолируют близким к вязкопластичной массе гидрозатвором, скважину углубляют, закачивают гидрозатвор, получаемый из бурового раствора при добавлении вяжущих и нейтрализующих реагентов при помощи малогабаритного устройства - узла приготовления и закачки цементного раствора до требуемых параметров в зависимости от устойчивости и проницаемости пройденных горных пород, спускают следующую очередную, по меньшей мере, одну обсадную колонну, крепят ее снизу крепящим узлом, а последнюю обсадную колонну, нижний конец которой вне скважины перфорирован и оборудован фильтром грубой очистки, спускают выше водонефтяного контура и крепят крепящим узлом выше кровли продуктивного пласта, в последнюю очередь спускают, предварительно закачав гидрозатвор, малогабаритную эксплуатационную колонну, оборудованную пакером с якорем и фильтром средней очистки, устанавливают пакер над продуктивным пластом и вызывают приток свабированием, скважину эксплуатируют, а затем при необходимости консервируют и/или ликвидируют (Патент РФ №2320849, опубл. 27.03.2008 - прототип).Closest to the invention in technical essence is a method of construction, operation, preservation and liquidation of a well, including drilling a wellbore in a given direction, lowering and securing several casing strings, including the latter - a “liner”, a small production casing and pumping an active insulating material - a water seal . The first casing string is lowered, fastened with a fastening unit and isolated with a hydraulic seal close to the viscoplastic mass, the well is deepened, the hydraulic seal obtained from the drilling fluid is added by adding binders and neutralizing agents using a small-sized device - the unit for preparing and pumping cement to the required parameters depending on the stability and permeability of the rocks passed, lower the next next at least one casing, fasten it from below with a fastening unit, and the last the casing, the lower end of which is perforated outside the well and equipped with a coarse filter, is lowered above the oil-water circuit and fastened with a fastening unit above the roof of the reservoir, last but not least, pre-pumped by a water seal, a small production string equipped with a packer with an anchor and a secondary filter, set the packer over the reservoir and cause swab inflow, operate the well, and then, if necessary, preserve and / or liquidate (RF Patent No. 2320 849, publ. 03/27/2008 - prototype).
Известный способ требует больших затрат на бурение, конструкция скважины металлоемкая.The known method requires large costs for drilling, the design of the well is metal-intensive.
В предложенном изобретении решается задача снижения затрат на строительство скважины.The proposed invention solves the problem of reducing the cost of well construction.
Задача решается тем, что в способе строительства скважины малого диаметра, включающем бурение ствола скважины, спуск и крепление обсадных и эксплуатационных колонн, согласно изобретению первую часть ствола скважины - направление бурят диаметром не более 300 мм с применением глинистого бурового раствора плотностью 1,12-1,20 кг/м3, вторую часть - кондуктор бурят диаметром не более 220 мм, третью основную часть бурят диаметром не более 160 мм, в качестве бурового раствора при бурении кондуктора и третьей части используют техническую воду плотностью 1,00-1,09 кг/м3, расход технической воды задают превышающими поглощение технической воды зонами поглощений, бурение продуктивного интервала ведут с использованием технической воды с добавкой смеси поверхностно-активных веществ марки МЛ-81Б в количестве 1-3%, после бурения ствол скважины от забоя до устья или, при наличии зоны поглощения, до зоны поглощения заполняют глинистым раствором плотностью 1,12-1,20 кг/м3, проводят каротажные исследования, спускают компоновку для бурения, прокачивают техническую воду и вращающимся долотом проходят 2-4 раза интервал продуктивного пласта со скоростью 20-30 м/час, при этом в качестве обсадных и эксплуатационных колонн используют колонны с наружным диаметром, обеспечивающим в заколонном пространстве толщину стенки цементного кольца не менее 16 мм.The problem is solved in that in the method of constructing a small-diameter well, including drilling a wellbore, running and securing casing and production strings, according to the invention, the first part of the wellbore is the direction of drilling with a diameter of not more than 300 mm using clay mud with a density of 1.12-1 , 20 kg / m 3 , the second part - the conductor is drilled with a diameter of not more than 220 mm, the third main part is drilled with a diameter of not more than 160 mm, technical drilling water with a density of conductor and the third part is used 1.00-1.09 kg / m 3 , the consumption of process water is set by absorption zones exceeding the absorption of process water, the production interval is drilled using process water with the addition of a mixture of surface-active substances of the ML-81B grade in an amount of 1-3%, after drilling a wellbore from the bottom to the mouth or, in the presence of an absorption zone, to the absorption zone is filled with clay mud with a density of 1.12-1.20 kg / m 3 , wireline surveys are carried out, the layout for drilling is lowered, technical water is pumped and pass with a rotating bit 2 -4 times productive formation interval at a speed of 20-30 m / h, wherein as casing and production tubing string is used with an outer diameter allowing annulus in cement annulus wall thickness not less than 16 mm.
В интервале продуктивного пласта ствол скважины бурят диаметром от 160 до 93 мм.In the interval of the reservoir, the wellbore is drilled with a diameter of 160 to 93 mm.
Сущность изобретенияSUMMARY OF THE INVENTION
До 60% затрат на строительство скважины зависят от ее диаметра. Обычно для бурения направления скважины используют долото диаметром 393,4 мм, при бурении кондуктора - долото диаметром 295,3 мм, при бурении основного ствола - долото диаметром 215,9 мм. При переходе от диаметра долота 215,9 мм к диаметру долота 143,9 мм снижается расход цемента для крепления обсадных колонн более чем наполовину, сокращаются объемы выбуренной породы и земляных работ, расход бурового раствора и металла. При этом дебит скважин не зависит от их диаметра. Стоимость 1 м проходки при традиционном бурении составляет 9220 рублей, при бурении малого диаметра - 5517 рублей, т.е. на 40 процентов меньше. В предложенном изобретении решается задача бурения скважин малого диаметра и, вследствие этого, снижения затрат на строительство скважины. Задача решается следующим образом.Up to 60% of well construction costs depend on its diameter. Typically, for drilling the direction of the well, a bit with a diameter of 393.4 mm is used, when drilling a conductor, a bit with a diameter of 295.3 mm, and when drilling the main shaft, a bit with a diameter of 215.9 mm. When switching from a bit diameter of 215.9 mm to a bit diameter of 143.9 mm, the cement consumption for attaching casing strings is reduced by more than half, the volume of drill cuttings and earthwork, and the flow rate of drilling mud and metal are reduced. In this case, the flow rate of wells does not depend on their diameter. The cost of 1 m of drilling during traditional drilling is 9220 rubles, while drilling a small diameter - 5517 rubles, i.e. 40 percent less. The proposed invention solves the problem of drilling small diameter wells and, consequently, reduce the cost of well construction. The problem is solved as follows.
При строительстве скважины малого диаметра бурят скважину с заданным направлением, бурение кондуктора и основного ствола скважины, спуск и крепление обсадных и эксплуатационных колонн. Направление бурят диаметром не более 300 мм, например, долотом диаметром 295,3 мм. Кондуктор бурят диаметром не более 220 мм, например, долотом диаметром 215,9 мм. Основной ствол бурят диаметром не более 160 мм, например, долотом диаметром 146 или 155,6 мм. В интервале продуктивного ствола возможно бурение диаметром от 160 до 93 мм, например, долотом диаметром 93,114 или 155,6 мм. В качестве бурового раствора при бурении направления используют буровой глинистый раствор плотностью 1,12-1,20 кг/м3, в остальном используют техническую воду плотностью 1,00-1,09 кг/м3. Поскольку в большинстве случаев при бурении встречаются зоны поглощений бурового раствора, то расход технической воды задают превышающими поглощение технической воды зонами поглощений. Этот параметр определяется из практики бурения соседних скважин на данном месторождении. Бурение интервала продуктивного пласта ведут с использованием технической воды с добавкой смеси поверхностно-активных веществ марки МЛ-81Б в количестве 1-3%, что способствует более полному удалению частиц породы с забоя скважины, промывке и отсутствию кольматации призабойной зоны кольматирующими веществами. После бурения ствол скважины от забоя до устья (при отсутствии зоны поглощения) или до зоны поглощения заполняют глинистым раствором плотностью 1,12-1,20 кг/м3, проводят каротажные исследования, спускают компоновку для бурения, прокачивают через компоновку техническую воду и вращающимся долотом проходят 2-4 раза интервал продуктивного пласта со скоростью 20-30 м/час. Этим выравнивают стенки скважины в интервале продуктивного пласта. Спускают эксплуатационную колонну и цементируют заколонное пространство скважины. Для обеспечения толщины стенки цементного кольца в заколонном пространстве не менее 16 мм применяют обсадные и эксплуатационные колонны с соответствующими наружными диаметрами. При этом в качестве обсадной колонны в направлении используют колонну с наружным диаметром, например, 245 мм, в кондукторе, например, 178 мм, в основном стволе, например, 114 мм.During the construction of small-diameter wells, they drill a well with a given direction, drill the conductor and the main wellbore, launch and fix casing and production strings. The direction is drilled with a diameter of not more than 300 mm, for example, a bit with a diameter of 295.3 mm. A conductor is drilled with a diameter of not more than 220 mm, for example, with a chisel with a diameter of 215.9 mm. The main trunk is drilled with a diameter of not more than 160 mm, for example, with a bit with a diameter of 146 or 155.6 mm. In the interval of the productive trunk, drilling with a diameter of 160 to 93 mm is possible, for example, with a chisel with a diameter of 93.114 or 155.6 mm. As the drilling fluid, when drilling in the direction, a clay mud with a density of 1.12-1.20 kg / m 3 is used , the rest use industrial water with a density of 1.00-1.09 kg / m 3 . Since in most cases during drilling there are mud absorption zones, the consumption of process water is set in excess of the absorption zones of industrial water. This parameter is determined from the practice of drilling neighboring wells in a given field. The drilling of the reservoir interval is carried out using industrial water with the addition of a mixture of surface-active substances of the ML-81B grade in an amount of 1-3%, which contributes to a more complete removal of rock particles from the bottom of the well, washing and the absence of mudding of the bottom-hole zone with clogging substances. After drilling, the wellbore from the bottom to the mouth (in the absence of an absorption zone) or to the absorption zone is filled with clay mud with a density of 1.12-1.20 kg / m 3 , logging is carried out, the drilling assembly is lowered, technical water is pumped through the assembly and rotated the chisel passes 2-4 times the interval of the reservoir at a speed of 20-30 m / h. This aligns the walls of the well in the interval of the reservoir. The production casing is lowered and the annulus of the well is cemented. To ensure the wall thickness of the cement ring in the annular space of at least 16 mm, casing and production casing with appropriate outer diameters are used. In this case, a casing string with an outer diameter of, for example, 245 mm, in a conductor, for example, 178 mm, in the main shaft, for example, 114 mm, is used as a casing string in the direction.
В интервале продуктивного пласта возможно использование эксплуатационной колонны или хвостовиков малого диаметра порядка 50-102 мм для создания в заколонной пространстве цементного кольца повышенной толщины.In the interval of the reservoir, it is possible to use a production string or shanks of small diameter of the order of 50-102 mm to create an increased thickness of the cement ring in the annular space.
При наличии зоны поглощений цементирование проводят в направлении от забоя до зоны поглощения и от устья до зоны поглощения.In the presence of an absorption zone, cementation is carried out in the direction from the bottom to the absorption zone and from the mouth to the absorption zone.
МЛ-81Б выпускается согласно ТУ 2481-007-48482528-99, является моющим препаратом, представляет собой подвижную вязкую жидкость от желтого до коричневого цвета с массовой долей ПАВ 30%. Представляет собой смесь неионоактивного и анионактивного ПАВ. Предназначен для использования в составах, применяемых для обработки призабойных зон добывающих и нагнетательных скважин, с целью интенсификации добычи или приемистости, для удаления асфальтосмолопарафиновых отложений и снижения гидравлических потерь в скважинах и трубопроводах, особенно при добыче и транспортировке высоковязких нефтей и водонефтяных эмульсий, а также очистке нефтеналивных емкостей, танкеров и деталей машин.ML-81B is produced according to TU 2481-007-48482528-99, it is a detergent, it is a moving viscous liquid from yellow to brown in color with a mass fraction of surfactant of 30%. It is a mixture of nonionic and anionic surfactants. Designed for use in formulations used to treat bottom-hole zones of production and injection wells, with the aim of intensifying production or injectivity, to remove asphalt-resin-paraffin deposits and reduce hydraulic losses in wells and pipelines, especially during the extraction and transportation of high-viscosity oils and water-oil emulsions, as well as for cleaning oil tanks, tankers and machine parts.
Пример конкретного выполненияConcrete example
Бурят поисковую скважину в карбонатных отложениях Кизеловского горизонта глубиной 1354 м. Под направление скважины от дневной поверхности до глубины 54 м бурение проводят с применением глинистого бурового раствора плотностью 1,80 кг/м3 долотом диаметром 295,9 мм. Колонну направления диаметром 245 мм спускают на глубину 54 м и цементируют заколонное пространство. После затвердения цемента проводят опрессовку давлением 3 МПа на герметичность - герметично. Разбуривают цементный камень на глубине 46-54 м и проводят опрессовку направления - герметично. Дальнейшее бурение под кондуктор ведут с применением технической воды плотностью 1,04 кг/м3 долотом диаметром 215,9 мм до глубины 360 мм. Колонну кондуктора диаметром 168 мм спускают на глубину 360 м. Цементируют заколонное пространство. После затвердения цемента проводят опрессовку давлением 7 МПа на герметичность - герметично. Разбуривают цементный камень в интервале 350-360 м и проводят опрессовку кондуктора при давлении 3,5 МПа при разбуренном башмаке - герметично. Дальнейшее бурение проводят с применением технической воды плотностью 1,04 кг/м3 долотом диаметром 146 мм до глубины 1344 м. В скважину до забоя на глубине 1344 м спускают эксплуатационную колонну диаметром 114 мм. Цементируют заколонное пространство. Опрессовывают заколонное пространство давлением 10 МПа - герметично. Бурят интервал продуктивного пласта на глубине 1344-1354 м с использованием технической воды с добавкой смеси поверхностно-активных веществ марки МЛ-81Б в количестве 2% долотом диаметром 114 мм. Интервал продуктивного пласта обсаживают колонной диаметром 50,8 мм. Цементируют заколонное пространство и опрессовывают давлением 10 МПа - герметично.A prospecting well is drilled in the carbonate sediments of the Kizelovsky horizon 1354 m deep. Under the direction of the well from the surface to a depth of 54 m, drilling is carried out using a clay drilling mud with a density of 1.80 kg / m 3 with a bit with a diameter of 295.9 mm. A column of direction with a diameter of 245 mm is lowered to a depth of 54 m and the annular space is cemented. After hardening of the cement, pressure testing is carried out with a pressure of 3 MPa for tightness - tightly. Cement stone is drilled at a depth of 46-54 m and the direction is pressurized - hermetically. Further drilling under the conductor is carried out using industrial water with a density of 1.04 kg / m 3 with a bit with a diameter of 215.9 mm to a depth of 360 mm. A conductor column with a diameter of 168 mm is lowered to a depth of 360 m. Cement annular space is cemented. After hardening of the cement, pressure testing is carried out with a pressure of 7 MPa for tightness - tightly. Cement stone is drilled in the range of 350-360 m and the conductor is pressure tested at a pressure of 3.5 MPa when the shoe is drilled - hermetically. Further drilling is carried out using industrial water with a density of 1.04 kg / m 3 with a bit with a diameter of 146 mm to a depth of 1344 m. A production casing with a diameter of 114 mm is lowered into the well before the bottom at a depth of 1344 m. Cement annular space. The annular space is pressure tested with a pressure of 10 MPa - tightly. Drilling the interval of the productive formation at a depth of 1344-1354 m using industrial water with the addition of a mixture of surface-active substances of the ML-81B grade in an amount of 2% with a 114 mm diameter bit. The reservoir interval is cased with a column of 50.8 mm diameter. Cement annular space and pressure tested with a pressure of 10 MPa - hermetically.
Расход технической воды задают равными 15 л/с, т.е. превышающими поглощение технической воды зонами поглощений (как правило, поглощение составляет 5-10 л/с). После бурения ствол скважины от забоя до устья заполняют глинистым раствором плотностью 1,14 кг/м3, проводят каротажные исследования, спускают компоновку для бурения, прокачивают техническую воду и вращающимся долотом проходят 3 раза интервал продуктивного пласта со скоростью 25 м/час.The consumption of process water is set equal to 15 l / s, i.e. absorption zones exceeding the absorption of industrial water (as a rule, the absorption is 5-10 l / s). After drilling, the wellbore from the bottom to the mouth is filled with a clay solution with a density of 1.14 kg / m 3 , logging is carried out, the layout for drilling is lowered, industrial water is pumped and the production layer passes 3 times the interval of the reservoir at a speed of 25 m / h.
В результате удается построить скважину малого диаметра, не уступающую по своим характеристикам обычной скважине.As a result, it is possible to build a well of small diameter, not inferior in its characteristics to a conventional well.
Применение технической воды плотностью в пределах от 1,0 до 1,09 кг/м3, добавка МЛ-81Б в пределах от 1 до 3%, применение глинистого раствора плотностью в пределах от 1,12 до 1,20 кг/м3, проходка продуктивного интервала от 2 до 4 раз со скоростью в пределах от 20 до 30 м/час приводит к результату, аналогичному результату в примере конкретного выполнения.The use of industrial water with a density in the range from 1.0 to 1.09 kg / m 3 , the addition of ML-81B in the range from 1 to 3%, the use of a clay solution with a density in the range from 1.12 to 1.20 kg / m 3 , driving a productive interval from 2 to 4 times with a speed ranging from 20 to 30 m / h leads to a result similar to that in the example of a specific implementation.
Применение предложенного способа позволит добиться снижения затрат на строительство скважины.Application of the proposed method will allow to reduce the cost of well construction.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2009133253/03A RU2393320C1 (en) | 2009-09-07 | 2009-09-07 | Slim hole well construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2009133253/03A RU2393320C1 (en) | 2009-09-07 | 2009-09-07 | Slim hole well construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2393320C1 true RU2393320C1 (en) | 2010-06-27 |
Family
ID=42683665
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2009133253/03A RU2393320C1 (en) | 2009-09-07 | 2009-09-07 | Slim hole well construction method |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2393320C1 (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2451149C1 (en) * | 2011-04-01 | 2012-05-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Well construction method |
RU2474668C1 (en) * | 2012-04-16 | 2013-02-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Well construction method |
RU2490415C1 (en) * | 2012-10-04 | 2013-08-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method to construct well of small diameter in complex rocks |
RU2490429C1 (en) * | 2012-10-04 | 2013-08-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Construction method for slim-hole well |
RU2490426C1 (en) * | 2012-10-04 | 2013-08-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method for completion of horizontal well of small diameter |
RU2541980C1 (en) * | 2014-05-21 | 2015-02-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Completion method for well with horizontal shaft |
RU2541981C1 (en) * | 2014-05-21 | 2015-02-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Completion method for well with horizontal shaft |
RU2806905C1 (en) * | 2023-03-24 | 2023-11-08 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Well construction method |
-
2009
- 2009-09-07 RU RU2009133253/03A patent/RU2393320C1/en active
Non-Patent Citations (1)
Title |
---|
СОЛОВЬЕВ Е.М. Заканчивание скважин. - М.: Недра, 1979, с.41-44, 82, 91-102. СУЛЕЙМАНОВ А.Б. Технология и техника эксплуатации скважин малого диаметра. Баку, 1960, с.3-18. САМИХОВ М.М. Резервы снижения затрат в строительстве нефтяных скважин. - М.: Недра, 1966, с.33-38, 72, 73, 108-110. * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2451149C1 (en) * | 2011-04-01 | 2012-05-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Well construction method |
RU2474668C1 (en) * | 2012-04-16 | 2013-02-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Well construction method |
RU2490415C1 (en) * | 2012-10-04 | 2013-08-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method to construct well of small diameter in complex rocks |
RU2490429C1 (en) * | 2012-10-04 | 2013-08-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Construction method for slim-hole well |
RU2490426C1 (en) * | 2012-10-04 | 2013-08-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Method for completion of horizontal well of small diameter |
RU2541980C1 (en) * | 2014-05-21 | 2015-02-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Completion method for well with horizontal shaft |
RU2541981C1 (en) * | 2014-05-21 | 2015-02-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Completion method for well with horizontal shaft |
RU2806905C1 (en) * | 2023-03-24 | 2023-11-08 | Публичное акционерное общество "Татнефть" имени В.Д. Шашина | Well construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2393320C1 (en) | Slim hole well construction method | |
US20110005762A1 (en) | Forming Multiple Deviated Wellbores | |
RU2407879C1 (en) | Construction method of well of small diametre | |
EA012199B1 (en) | Apparatus and method for driving casing or conductor pipe | |
EA005478B1 (en) | Assembly for drilling low pressure formation | |
RU2410514C1 (en) | Method for well construction | |
RU2320849C2 (en) | Well construction and operation method | |
RU2427703C1 (en) | Procedure for construction of wells of multi-pay oil field | |
RU2394981C1 (en) | Procedure for development of oil deposit | |
RU2355873C1 (en) | Well operating procedure | |
RU2542070C1 (en) | Double-hole well operation method | |
RU2444611C1 (en) | Isolation method of productive formation from bottom water inflow | |
RU2524089C1 (en) | Construction of oil production well | |
RU2225938C1 (en) | Methods for exploiting oil extracting wells | |
RU2386776C1 (en) | Method of opening of waterbearing stratum in unstable rocks by upward borehole and device for its implementation | |
RU2787163C1 (en) | Method for drilling a well with an exposed reservoir | |
RU2520033C1 (en) | Method of horizontal oil well construction | |
RU2021477C1 (en) | Method for well construction | |
RU2186203C2 (en) | Method of well operation | |
RU2541985C1 (en) | Cementing method for horizontal shaft of well | |
RU2505667C1 (en) | Method of multilay field development | |
von Flatern | The science of oil and gas well construction | |
RU2811127C1 (en) | Method for killing well with fiberglass casing | |
RU2369724C1 (en) | Method of oil deposit development | |
RU2775849C1 (en) | Method for increasing tightness of annular space of oil and gas wells (options) |