RU2101438C1 - Method for reconstruction of building - Google Patents

Method for reconstruction of building Download PDF

Info

Publication number
RU2101438C1
RU2101438C1 RU96113366/03A RU96113366A RU2101438C1 RU 2101438 C1 RU2101438 C1 RU 2101438C1 RU 96113366/03 A RU96113366/03 A RU 96113366/03A RU 96113366 A RU96113366 A RU 96113366A RU 2101438 C1 RU2101438 C1 RU 2101438C1
Authority
RU
Russia
Prior art keywords
building
tent
reconstructed
reconstruction
supports
Prior art date
Application number
RU96113366/03A
Other languages
Russian (ru)
Other versions
RU96113366A (en
Inventor
А.М. Людковский
Original Assignee
Государственный научно-исследовательский, проектно-конструкторский и технологический институт бетона и железобетона
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Государственный научно-исследовательский, проектно-конструкторский и технологический институт бетона и железобетона filed Critical Государственный научно-исследовательский, проектно-конструкторский и технологический институт бетона и железобетона
Priority to RU96113366/03A priority Critical patent/RU2101438C1/en
Application granted granted Critical
Publication of RU2101438C1 publication Critical patent/RU2101438C1/en
Publication of RU96113366A publication Critical patent/RU96113366A/en

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Tents Or Canopies (AREA)

Abstract

FIELD: construction engineering. SUBSTANCE: this relates mainly to reconstruction of long buildings with adding more storeys. Reconstruction is effected successively by diving building into sections and doing one section after another. According to method, made in longitudinal walls of building are holes, inserted into these holes are lateral members with thread on their ends, and temporary supports are installed outside building with fixing them in window openings of top storey and fastening with lateral members by means of nuts. Supports are installed simultaneously on two adjacent sections of building, and guide members are mounted over supports. Then, tent is built on guide members above section to be reconstructed. Under protection of tent, old structures are dismantled and new structures are built. After that, tent is moved to following section and procedure is repeated. Tent and all supports are dismantled on completion of reconstruction operations. EFFECT: high efficiency. 3 dwg

Description

Изобретение относитоя к области строительства и может быть использовано при реконструкции протяженных домов с увеличением этажности без отселения жильцов. The invention relates to the field of construction and can be used in the reconstruction of long houses with an increase in the number of storeys without resettlement of residents.

Известен способ ведения строительных работ, в процессе которых требуется защита от атмосферных воздействий, например ведение арматурных и бетонных работ в тепляках (шатрах) при строительстве железобетонных вытяжных труб [1] Такие тепляки крепят на самоподъемном кране, обеспечивающем перемещение лесов, тепляка и опалубки по мере возведения трубы. There is a method of conducting construction work, in the process of which protection from weathering is required, for example, reinforcing and concrete work in greenhouses (tents) during the construction of reinforced concrete exhaust pipes [1] Such greenhouses are mounted on a self-hoisting crane that allows scaffolding, greenhouse and formwork to be moved as pipe construction.

Наиболее близким к предлагаемому способу является способ реконструкции доменного цеха [2] Этот способ позволяет проводить работы по реконструкции сооружений основного производства под защитой шатра, смонтированного на временных опорах, установленных рядом с существующими колоннами реконструируемого здания. К недостаткам такого способа можно отнести необходимость применения тяжелого кранового оборудования, потребность в дополнительных площадях за пределами реконструируемого цеха, а также то, что при переходе к реконструкции следующего участка цеха шатер надо разобрать, а затем вновь собрать. Closest to the proposed method is a method of reconstruction of a blast furnace workshop [2] This method allows reconstruction of the main production facilities under the protection of a tent mounted on temporary supports installed next to the existing columns of the reconstructed building. The disadvantages of this method include the need to use heavy crane equipment, the need for additional space outside the reconstructed workshop, and the fact that when moving to the reconstruction of the next section of the workshop, the tent must be dismantled and then reassembled.

Техническая задача заключается в упрощении способа и сокращении сроков реконструкции протяженных зданий за счет возможности использования возведенного шатра поэтапно- последовательно на отдельных захватках здания без его демонтажа. The technical task is to simplify the method and reduce the time required for reconstruction of extended buildings due to the possibility of using the erected tent in stages and on separate grips of the building without dismantling it.

Поставленная задача решается таким образом, что в способе реконструкции здания, включающем возведение шатра над реконструируемой захваткой здания с опиранием его на устанавливаемые вдоль продольных стен временные опоры, разбору старых конструкций, возведение новых конструкций здания, демонтаж шатра и временных опор, согласно изобретению, предварительно в продольных стенах здания выше перекрытия последнего этажа устраивают отверстия и протягивают в них связи, устанавливают временные опоры снаружи здания, опирая на стену в оконных проемах последнего этажа и закрепляя их связями, после чего на опорах вдоль стен здания на расстоянии, равном сумме длин реконструируемой захватки здания и последующей захватки, подлежащей реконструкции, монтируют направляющие, возводят шатер над реконструируемой захваткой здания, опирая его на направляющие, затем производят разборку старых конструкций и возведение новых, после этого шатер перемещают по направляющим на последующую захватку, подлежащую реконструкции, и осуществляют перестановку временных опор и направляющих на следующие захватки здания, а демонтаж шатра осуществляют после реконструкции здания по всей длине. The problem is solved in such a way that in the method of building reconstruction, including erecting a tent over the reconstructed building grab with its support on temporary supports installed along the longitudinal walls, disassembling old structures, erecting new building structures, dismantling the tent and temporary supports, according to the invention, previously the longitudinal walls of the building above the ceiling of the last floor make holes and stretch the bonds in them, establish temporary supports outside the building, resting on the wall in the window rails of the last floor and securing them with ties, after which on the supports along the walls of the building at a distance equal to the sum of the lengths of the reconstructed building grab and the subsequent grab to be reconstructed, the rails are mounted, the tent is erected over the reconstructed building grab, resting it on the rails, then the old ones are disassembled structures and the construction of new ones, after that the tent is moved along the guides to the next grab to be reconstructed, and the temporary supports and the guides are rearranged to the following capturing the building, and dismantling the tent is carried out after the reconstruction of the building along the entire length.

Предлагаемый способ отличается от известного тем, что предварительно в продольных стенах здания выше перекрытия последнего этажа устраивают отверстия и протягивают в них связи из арматурной стали, на концах связей имеется резьба. Затем устанавливают временные опоры снаружи здания, опирая на стену в оконных проемах последнего этажа и закрепляя их связями при помощи гаек, что позволяет вести работы по реконструкции крыши, наращиванию стен и другие строительные работы по надстройке здания без отселения жильцов. Кроме того, предлагаемый способ отличается тем, что опоры фиксируют раскосными элементами, после чего на опорах вдоль стен здания на расстоянии, равном сумме длин реконструируемой захватки здания и последующей захватки, подлежащей реконструкции, монтируют направляющие, с опиранием на которые возводят шатер над реконструирумой захваткой здания. Затем под защитой шатра производят разборку старых конструкций и возведение новых, таким образом, строительные работы по реконструкции ведутся в благоприятных условиях под крышей, а существующее здание предохраняется от неблагоприятных атмосферных воздействий. Шатер после этого, не разбирая, перемещают по направляющим на последующую захватку, подлежащую реконструкции. Временные опоры и направляющие с захватки, на которой закончены работы по реконструкции, переставляют на следующие эахватки здания. Такой способ позволяет исключить затраты на разборку и последующее возведение шатра над очередной захваткой. Демонтаж шатра и всех временных опор осуществляют после реконструкции здания по всей длине. The proposed method differs from the known one in that previously holes are made in the longitudinal walls of the building above the ceiling of the last floor and the reinforcement steel ties are drawn into them, there is a thread at the ends of the ties. Then, temporary supports are installed outside the building, resting on a wall in the window openings of the last floor and securing them with ties using nuts, which allows for reconstruction of the roof, wall extension and other construction work on the building superstructure without resettling residents. In addition, the proposed method is characterized in that the supports are fixed with diagonal elements, after which the rails are mounted on supports along the walls of the building at a distance equal to the sum of the lengths of the reconstructed building grab and the subsequent grapple to be reconstructed, based on which the tent is erected over the reconstructed building grab . Then, under the protection of the tent, old structures are dismantled and new ones are erected, thus, reconstruction works are carried out under favorable conditions under the roof, and the existing building is protected from adverse atmospheric influences. The tent after that, without disassembling, is moved along the guides to the subsequent grapple to be reconstructed. Temporary supports and guides from the gripper, on which reconstruction work is completed, are rearranged to the next eahvatki of the building. This method eliminates the cost of disassembling and the subsequent erection of the tent over the next grab. Dismantling of the tent and all temporary supports is carried out after the reconstruction of the building along the entire length.

На фиг. 1 изображено реконструируемое здание в процессе надстройки, на фиг. 2 вид А А фиг. 1, на фиг. 3 узел А фиг. 2 пример конструктивного решения временной опоры. In FIG. 1 shows a reconstructed building during the superstructure; FIG. 2 view A A of FIG. 1, in FIG. 3 node A of FIG. 2 example of a constructive solution of temporary support.

На фиг. 1 показано, как организована по захваткам реконструкция с увеличением этажности протяженного дома: начаты и закончены работы на захватке "а", ведутся работы на реконструируемой захватке "б". In FIG. Figure 1 shows how reconstruction was organized by seizures with an increase in the number of storeys of an extended house: work on capture "a" was started and completed, work is underway on the reconstructed capture "b".

Способ осуществляют в следующей последовательности. Для реконструкции протяженного здания 1 с надстройкой мансарды 2 здание разделяют на технологические захватки "а", "б", "в" и т.д. размер которых определяется удобством ведения работ. Целесообразными являются захватки площадью 200-300 кв. м, что соответствует одному подъезду (одной секции) жилого дома. The method is carried out in the following sequence. For the reconstruction of an extended building 1 with an attic superstructure 2, the building is divided into technological grips “a”, “b”, “c”, etc. the size of which is determined by the convenience of work. Expeditions are 200-300 sq. M. m, which corresponds to one entrance (one section) of a residential building.

В продольных стенах здания выше перекрытия последнего этажа устраивают отверстия 3 и протягивают в них связи 4. Затем устанавливают временные опоры 5, опирая на стену в оконных проемах 6 и закрепляя их при помощи гаек связями 4. Временные опоры 5 устанавливают вдоль наружных стен здания на двух соседних захватках, например на реконструируемую "б" и последующую, подлежащую реконструкции "в". Верхние части опор 5 вдоль стен здания объединяют смонтированные на них направляющие 7. Затем возводят защитный шатер 8 над реконструируемой захваткой "б" здания, опирая его на направляющие 7, и производят разборку старых конструкций 9 и возведение новых конструкций 2. Шатер 8 перемещают на последующую захватку "в", подлежащую реконструкции, и переставляют временные опоры 5 и направляющие 7 на следующую захватку "г". Демонтаж шатра 8 и временных опор 5 со связями 4 осуществляют после окончания реконструкции здания 1 по всей длине. In the longitudinal walls of the building above the ceiling of the last floor, holes 3 are made and ties 4 are drawn in them. Then, temporary supports 5 are installed, resting on the wall in the window openings 6 and securing them with nuts by ties 4. Temporary supports 5 are installed along two external walls of the building on two neighboring captures, for example, on the reconstructed “b” and the next, to be reconstructed “c”. The upper parts of the supports 5 along the walls of the building are combined with the guides mounted on them 7. Then, a protective tent 8 is erected over the reconstructed capture "b" of the building, resting it on the guides 7, and the old structures 9 are dismantled and new structures are erected 2. The tent 8 is moved to the next grasp "c" to be reconstructed, and temporary supports 5 and guides 7 are rearranged on the next grip "g". The dismantling of the tent 8 and temporary supports 5 with connections 4 is carried out after the reconstruction of building 1 along the entire length.

Claims (1)

Способ реконструкции здания, включающий возведение шатра над реконструируемой захваткой здания с опиранием его на устанавливаемые вдоль продольных стен временные опоры, разборку старых конструкций, возведение новых конструкций здания, демонтаж шатра и временных опор, отличающийся тем, что предварительно в продольных стенах здания выше перекрытия последнего этажа устраивают отверстия и протягивают в них связи, устанавливают временные опоры снаружи здания, опирая на стену в оконных проемах последнего этажа и закрепляя их связями, после чего на опорах вдоль стен здания на расстоянии, равном сумме длин реконструируемой захватки здания и последующей захватки, подлежащей реконструкции, монтируют направляющие, возводят шатер над реконструируемой захваткой здания, опирая его на направляющие, затем производят разборку старых конструкций и возведение новых, после этого шатер перемещают по направляющим на последующую захватку, подлежащую реконструкции, и осуществляют перестановку временных опор и направляющих на следующие захватки здания, а демонтаж шатра осуществляют после реконструкции здания по всей длине. The method of building reconstruction, including erecting a tent over the reconstructed building grab with its support on temporary supports installed along the longitudinal walls, disassembling old structures, erecting new building structures, dismantling the tent and temporary supports, characterized in that the longitudinal walls of the building are previously higher than the ceiling of the last floor arrange holes and stretch ties in them, establish temporary supports outside the building, resting on the wall in the window openings of the last floor and fixing them with ties, last which, on supports along the walls of the building at a distance equal to the sum of the lengths of the reconstructed capture of the building and subsequent capture, to be reconstructed, the guides are mounted, the tent is erected over the reconstructed capture of the building, resting it on the guides, then the old structures are disassembled and the new ones are erected, after which the tent is moved along the guides to the next grab to be reconstructed, and rearrange the temporary supports and guides to the next grips of the building, and the tent is dismantled by le reconstruction of the entire length of the building.
RU96113366/03A 1996-06-28 1996-06-28 Method for reconstruction of building RU2101438C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU96113366/03A RU2101438C1 (en) 1996-06-28 1996-06-28 Method for reconstruction of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU96113366/03A RU2101438C1 (en) 1996-06-28 1996-06-28 Method for reconstruction of building

Publications (2)

Publication Number Publication Date
RU2101438C1 true RU2101438C1 (en) 1998-01-10
RU96113366A RU96113366A (en) 1998-01-27

Family

ID=20182699

Family Applications (1)

Application Number Title Priority Date Filing Date
RU96113366/03A RU2101438C1 (en) 1996-06-28 1996-06-28 Method for reconstruction of building

Country Status (1)

Country Link
RU (1) RU2101438C1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Дубровский В.Б. и др. Строительство атомных электростанций. - М.: Энергоиздат, 1985, с.90 - 91. *

Similar Documents

Publication Publication Date Title
CN108625483B (en) Equipment for jacking construction of assembled additional elevator shaft structure
CN109356167B (en) Deep foundation pit support dismantling system and construction method
CN107327068B (en) Steel structure truss string system roof ceiling structure and construction method thereof
CN110685459B (en) Breaking hammer dismantling construction method for dismantling hoist bent from lower part
RU2101438C1 (en) Method for reconstruction of building
RU2101437C1 (en) Method for reconstruction of building
CN108584646B (en) Assembled type additional elevator shaft structure suitable for jacking construction
CN115306137B (en) Operation platform structure for installing suspended ceiling at bottom of high-altitude corridor and construction method thereof
JPS6049675B2 (en) Relocation scaffolding for coke oven construction work
CN212562423U (en) Ring type sliding scaffold for corridor
CN210768009U (en) Movable steel bar processing shed structure
CN210563531U (en) Steel structure support for building protection
RU2338843C1 (en) Method of multistorey building carcassing
US3295266A (en) Suspended floor system for a multi-level building
CN114059658A (en) Construction method of overweight big wood structure vertical frame in historic building reconstruction and restoration
CN213539797U (en) Outer wall supports protection device
RU2097513C1 (en) Process of erection of superstructure of building
CN213572931U (en) Hydraulic climbing operation platform for chimney construction
JP2621748B2 (en) All-weather temporary shed
CN102465598A (en) Construction method of high-altitude cast-in-site arch roof truss
CN1097229A (en) Overhead site-casting method for broad-span presrtressed arch plate
CN216740618U (en) Steel construction protection scaffold puts up system suitable for light rail station
US20230383558A1 (en) Formwork system and a method of forming a wall
CN112681705A (en) Steel wire rope net platform for construction and installation method thereof
SU1544902A1 (en) Method of erecting multistorey building skeleton

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20060629