RU2016133821A - Blast furnace N 21.10.08.16 - Google Patents

Blast furnace N 21.10.08.16 Download PDF

Info

Publication number
RU2016133821A
RU2016133821A RU2016133821A RU2016133821A RU2016133821A RU 2016133821 A RU2016133821 A RU 2016133821A RU 2016133821 A RU2016133821 A RU 2016133821A RU 2016133821 A RU2016133821 A RU 2016133821A RU 2016133821 A RU2016133821 A RU 2016133821A
Authority
RU
Russia
Prior art keywords
furnace
iron
critical
mine
shoulders
Prior art date
Application number
RU2016133821A
Other languages
Russian (ru)
Original Assignee
Кожурин Александр Данилович
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Кожурин Александр Данилович filed Critical Кожурин Александр Данилович
Priority to RU2016133821A priority Critical patent/RU2016133821A/en
Publication of RU2016133821A publication Critical patent/RU2016133821A/en

Links

Landscapes

  • Manufacture Of Iron (AREA)

Claims (1)

Известная доменная печь №21.10.08.16, включающая шахту, заплечики, фурмы горячего дутья, бункеры бункерной эстакады, любой известный подъемник подачи шихты в засыпное устройство, отличающаяся тем, что руда и уголь раздроблены и смешены до подачи их в шахту, где установлены фурмы горячего дутья, по крайней мере, в двух уровнях: верхнем уровне и нижнем уровне, вместо всех горновых фурм и дополнительного уровня фурм для повышения производительности печи, а от зазора между приемной воронкой и шахтой к низам проходов, примыкающим к заплечикам и затворам вне печи, проведены газопроводы, а от верхов проходов отведены газопроводы с вентиляторами, продувающими угольную золу к скрубберу, а после этого крицы выпускают из проходов в промежуточные горловины, а из них их затворами, работающими прерывисто, сквозь сквозные горловины направляют к валкам, из-под которых кричное железо кусками поступает в транспортные средства, отправляющие в сталеплавильные печи для производства кричного железа известных форм, железа известных марок и сталей особо высокого качества на основе кричного железа при увеличении производительности печи в разы.The well-known blast furnace No. 21.10.08.16, including a mine, shoulders, hot-blast tuyeres, hopper hopper bunkers, any known charge elevator for feeding the charge into a charging device, characterized in that the ore and coal are crushed and mixed before being fed into the mine, where hot tuyeres are installed blasting, at least in two levels: the upper level and the lower level, instead of all furnace lances and an additional level of lances to increase the productivity of the furnace, and from the gap between the receiving funnel and the shaft to the lower passages adjacent to the shoulders and shutter frames outside the furnace, gas pipelines were drawn, and gas ducts with fans blowing coal ash to the scrubber were allotted from the tops of the aisles, and after that the cries were released from the passages into the intermediate necks, and from them they were discontinuous with shutters running through the through necks to the rolls, from - under which critical iron is transported in pieces to vehicles that are sent to steelmaking furnaces for the production of critical iron of known forms, iron of known grades and especially high quality steels based on critical iron increasing kiln productivity significantly.
RU2016133821A 2016-08-17 2016-08-17 Blast furnace N 21.10.08.16 RU2016133821A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2016133821A RU2016133821A (en) 2016-08-17 2016-08-17 Blast furnace N 21.10.08.16

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2016133821A RU2016133821A (en) 2016-08-17 2016-08-17 Blast furnace N 21.10.08.16

Publications (1)

Publication Number Publication Date
RU2016133821A true RU2016133821A (en) 2018-02-22

Family

ID=61258680

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2016133821A RU2016133821A (en) 2016-08-17 2016-08-17 Blast furnace N 21.10.08.16

Country Status (1)

Country Link
RU (1) RU2016133821A (en)

Similar Documents

Publication Publication Date Title
CN102230040B (en) Iron-smelting method
MX2009010388A (en) Method and system for the supply of hot direct reduced iron for multiple uses.
UA99767C2 (en) Method for feeding pulverized coal into a blast furnace
KR20170104582A (en) Method for introducing feed into blast furnace
SA519401685B1 (en) Direct Reduction Process and Shaft Furnace Utilizing an Extended Flow Diverter Cone
CN109033715B (en) Binary basicity determination method for blast furnace slag
RU2016133821A (en) Blast furnace N 21.10.08.16
US1815899A (en) Method for the treatment of iron ore
RU2016133269A (en) Blast furnace N 20.06.08.16
CN103805727A (en) Direct reduction iron hot-charging method by use of chain conveyer
NO139928B (en) DEVICE FOR CLASSIFICATION AND SORTING (CLASSIFICATION) OF OLD PAPER
RU2016132114A (en) Blast furnace N 19.29.07.16
RU2016131736A (en) Blast furnace N 18.22.07.16
RU2016129573A (en) Blast furnace N 17.14.07.16
CN104789727B (en) The apparatus and method of production pearl iron
CN110029202A (en) A kind of method and device of converter steel scrap continuously pre-heating
RU2015143968A (en) BLAST FURNACE N5 10.10.2015
RU2016124870A (en) Blast furnace N 13.13.06.16
RU2015141465A (en) BLAST FURNACE N 4 09/23/2015
JP6558518B1 (en) Raw material charging method for blast furnace
RU2016143991A (en) Blast furnace N 22. 02.11.16. with loading equipment
RU2016146978A (en) Blast furnace N 23.22.11.16. with loading equipment
RU2015133541A (en) Blast furnace N3 production of critical iron 03.08.2015
AU2013380646B2 (en) System for the treatment of pellet fines and/or lump ore and/or indurated pellets
CN105567894A (en) Limestone and molten steel combined production environmental protection equipment

Legal Events

Date Code Title Description
FA93 Acknowledgement of application withdrawn (no request for examination)

Effective date: 20190819