RU2014122887A - METHOD FOR OPERATING OIL WELL WITH TWO LAYERS - Google Patents

METHOD FOR OPERATING OIL WELL WITH TWO LAYERS Download PDF

Info

Publication number
RU2014122887A
RU2014122887A RU2014122887/03A RU2014122887A RU2014122887A RU 2014122887 A RU2014122887 A RU 2014122887A RU 2014122887/03 A RU2014122887/03 A RU 2014122887/03A RU 2014122887 A RU2014122887 A RU 2014122887A RU 2014122887 A RU2014122887 A RU 2014122887A
Authority
RU
Russia
Prior art keywords
pump
centrifugal pump
fluid
well
column
Prior art date
Application number
RU2014122887/03A
Other languages
Russian (ru)
Other versions
RU2553710C2 (en
Inventor
Олег Сергеевич Николаев
Original Assignee
Олег Сергеевич Николаев
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Олег Сергеевич Николаев filed Critical Олег Сергеевич Николаев
Priority to RU2014122887/03A priority Critical patent/RU2553710C2/en
Publication of RU2014122887A publication Critical patent/RU2014122887A/en
Application granted granted Critical
Publication of RU2553710C2 publication Critical patent/RU2553710C2/en

Links

Abstract

1. Способ эксплуатации нефтяной скважины с двумя пластами, включающий монтаж насосной установки, состоящей из колонны лифтовых труб, электроприводного центробежного насоса для откачивания флюида из нижнего пласта, возвратно-поступательного насоса с приводной штангой, перемещающейся в колонне лифтовых труб, для откачивания флюида из верхнего пласта, жидкоструйного эжектора, силового кабеля, питающего электропривод центробежного насоса от наземной станции управления, пакера с кабельным вводом, разобщающего пласты в заданном интервале скважины, и системы погружной телеметрии, связанной кабелем со станцией управления, а после монтажа насосной установки осуществляют одновременный или раздельный запуск в работу вышеуказанных насосов для откачивания флюида из пластов по колонне лифтовых труб на поверхность скважины с возможностью учета их дебитов на станции управления, отличающийся тем, что в зависимости от объема газа, выделяемого нижним пластом скважины, откачивание флюида центробежным насосом из нижнего пласта ведут либо прямотоком по колонне лифтовых труб, либо через сопло жидкоструйного эжектора, последний смонтирован ниже возвратно-поступательного насоса, с возможностью стравливания газовой шапки из подпакерной затрубной полости скважины, для чего турбулентный поток флюида на выходе из центробежного насоса переводят в ламинарный, а при падении давления на выходе из центробежного насоса и/или превышении потребляемого им тока выполняют подземную промывку центробежного насоса, для чего из насосной установки последовательно демонтируют возвратно-поступательный насос и жидкоструйный эжектор, н1. A method of operating an oil well with two layers, including mounting a pump installation consisting of a column of elevator pipes, an electric drive centrifugal pump for pumping fluid from the lower reservoir, a reciprocating pump with a drive rod moving in the column of elevator pipes, for pumping fluid from the upper formation, liquid-jet ejector, power cable supplying the electric drive of the centrifugal pump from the ground control station, a packer with cable entry, disconnecting the layers in a given interval wells, and submersible telemetry systems connected by a cable to the control station, and after the installation of the pumping unit, the above pumps are simultaneously launched or separately launched to pump fluid from the formations along the string of elevator pipes to the surface of the well with the possibility of recording their flow rates at the control station, characterized in that, depending on the volume of gas emitted by the lower layer of the well, pumping out the fluid by a centrifugal pump from the lower layer is either directly through the column of elevator pipes or without a liquid jet ejector nozzle, the latter is mounted below the reciprocating pump, with the possibility of bleeding the gas cap from the sub-packer annular cavity of the well, for which the turbulent fluid flow at the outlet of the centrifugal pump is transferred to the laminar one, and when the pressure drops at the outlet of the centrifugal pump and / or exceeding the current consumed by them, underground washing of the centrifugal pump is performed, for which a reciprocating pump and a liquid-jet ejector are sequentially dismantled from the pump installation, n

Claims (2)

1. Способ эксплуатации нефтяной скважины с двумя пластами, включающий монтаж насосной установки, состоящей из колонны лифтовых труб, электроприводного центробежного насоса для откачивания флюида из нижнего пласта, возвратно-поступательного насоса с приводной штангой, перемещающейся в колонне лифтовых труб, для откачивания флюида из верхнего пласта, жидкоструйного эжектора, силового кабеля, питающего электропривод центробежного насоса от наземной станции управления, пакера с кабельным вводом, разобщающего пласты в заданном интервале скважины, и системы погружной телеметрии, связанной кабелем со станцией управления, а после монтажа насосной установки осуществляют одновременный или раздельный запуск в работу вышеуказанных насосов для откачивания флюида из пластов по колонне лифтовых труб на поверхность скважины с возможностью учета их дебитов на станции управления, отличающийся тем, что в зависимости от объема газа, выделяемого нижним пластом скважины, откачивание флюида центробежным насосом из нижнего пласта ведут либо прямотоком по колонне лифтовых труб, либо через сопло жидкоструйного эжектора, последний смонтирован ниже возвратно-поступательного насоса, с возможностью стравливания газовой шапки из подпакерной затрубной полости скважины, для чего турбулентный поток флюида на выходе из центробежного насоса переводят в ламинарный, а при падении давления на выходе из центробежного насоса и/или превышении потребляемого им тока выполняют подземную промывку центробежного насоса, для чего из насосной установки последовательно демонтируют возвратно-поступательный насос и жидкоструйный эжектор, на месте последнего монтируют перепускной узел, состоящий из коаксиальных труб с радиальными каналами, затем из устья скважины по колонне лифтовых труб через коаксиальную полость и сообщающиеся с ней радиальные каналы перепускного узла закачивают промывочную жидкость в подпакерную затрубную полость скважины, под давлением которой через входной модуль промывают центробежный насос, из последнего использованную промывочную жидкость под остаточным давлением направляют по аксиальной полости и сообщающиеся с ней радиальные каналы перепускного узла через надпакерную затрубную полость в устье скважины, а после промывки центробежного насоса из насосной установки демонтируют перепускной узел и на его месте последовательно монтируют жидкоструйный эжектор и возвратно-поступательный насос, после чего продолжают откачивание флюида из пластов по колонне лифтовых труб на поверхность скважины.1. A method of operating an oil well with two layers, including mounting a pump installation consisting of a column of elevator pipes, an electric drive centrifugal pump for pumping fluid from the lower reservoir, a reciprocating pump with a drive rod moving in the column of elevator pipes, for pumping fluid from the upper formation, liquid-jet ejector, power cable supplying the electric drive of the centrifugal pump from the ground control station, a packer with cable entry, disconnecting the layers in a given interval wells, and submersible telemetry systems connected by a cable to the control station, and after the installation of the pumping unit, the above pumps are simultaneously launched or separately launched to pump fluid from the formations along the string of elevator pipes to the surface of the well with the possibility of recording their flow rates at the control station, characterized in that, depending on the volume of gas emitted by the lower layer of the well, pumping out the fluid by a centrifugal pump from the lower layer is either directly through the column of elevator pipes or without a liquid jet ejector nozzle, the latter is mounted below the reciprocating pump, with the possibility of bleeding the gas cap from the sub-packer annular cavity of the well, for which the turbulent fluid flow at the outlet of the centrifugal pump is transferred to the laminar one, and when the pressure drops at the outlet of the centrifugal pump and / or exceeding the current consumed by them, underground washing of the centrifugal pump is performed, for which a reciprocating pump and a liquid-jet ejector are sequentially dismantled from the pump installation, n and at the site of the latter, a bypass assembly consisting of coaxial pipes with radial channels is mounted, then, from the wellhead, a column of elevator pipes through the coaxial cavity and the radial channels of the bypass assembly communicating with it, pump the washing liquid into the sub-packer annular cavity of the well, under the pressure of which it is washed through the input module centrifugal pump, from the last used flushing fluid under residual pressure is directed along the axial cavity and the radial channels of the bypass connected with it knogo node via nadpakernuyu annular cavity at the wellhead, and after washing with a centrifugal pump of the pump unit is dismantled bypass assembly and in its place sequentially mounted fluid jet ejector and a reciprocating pump, and then continue pumping fluid from the reservoir through the column tubing at the well surface. 2. Способ по п. 1, отличающийся тем, что в процессе эксплуатации скважины демонтаж и монтаж возвратно-поступательного насоса, жидкоструйного эжектора и перепускного узла в насосной установке осуществляют монтажным инструментом через колонну лифтовых труб из устья скважины. 2. The method according to p. 1, characterized in that during the operation of the well, the dismantling and installation of the reciprocating pump, the liquid-jet ejector and the bypass assembly in the pump installation is carried out by the installation tool through the column of lift pipes from the wellhead.
RU2014122887/03A 2014-06-04 2014-06-04 Dual well completion method RU2553710C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2014122887/03A RU2553710C2 (en) 2014-06-04 2014-06-04 Dual well completion method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2014122887/03A RU2553710C2 (en) 2014-06-04 2014-06-04 Dual well completion method

Publications (2)

Publication Number Publication Date
RU2014122887A true RU2014122887A (en) 2014-10-10
RU2553710C2 RU2553710C2 (en) 2015-06-20

Family

ID=53379950

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2014122887/03A RU2553710C2 (en) 2014-06-04 2014-06-04 Dual well completion method

Country Status (1)

Country Link
RU (1) RU2553710C2 (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6082452A (en) * 1996-09-27 2000-07-04 Baker Hughes, Ltd. Oil separation and pumping systems
RU2132933C1 (en) * 1997-03-11 1999-07-10 Грабовецкий Владимир Леонидович Combined method and equipment for operating producing well
RU2454531C1 (en) * 2010-12-30 2012-06-27 Олег Сергеевич Николаев Packer installation (versions) and device for its pumps washing (versions)
RU2459930C1 (en) * 2011-03-30 2012-08-27 Олег Сергеевич Николаев Downhole packer installation and device for gas extraction for it
RU2485292C2 (en) * 2011-07-29 2013-06-20 Олег Сергеевич Николаев Device for simultaneous and separate operation of well with two formations
RU2488689C1 (en) * 2012-02-29 2013-07-27 Открытое акционерное общество "Нефтяная компания "Роснефть" Dowhnole pump unit for simultaneous and separate operation of two formations

Also Published As

Publication number Publication date
RU2553710C2 (en) 2015-06-20

Similar Documents

Publication Publication Date Title
US20170159384A1 (en) Deviated/Horizontal Well Propulsion For Downhole Devices
RU132836U1 (en) SUBMERSIBLE PUMP INSTALLATION
RU2546685C2 (en) Downhole plant for simultaneous-separate operation of two beds of single well (versions)
RU2394978C1 (en) Procedure for completion and operation of well
EA201700194A2 (en) METHOD FOR INCREASING HYDROCARBON RESPONSE TO PLASTES AND INTENSIFICATION OF THE PRODUCTION OF OIL AND GAS CONDENSATE WELLS THROUGH HYDRO-MONITORING RADIAL DISCIPLINATION
RU2488689C1 (en) Dowhnole pump unit for simultaneous and separate operation of two formations
US10221663B2 (en) Wireline-deployed positive displacement pump for wells
RU2473790C1 (en) System of well operation using submersible electric pump by means of packers with cable entry
RU2485292C2 (en) Device for simultaneous and separate operation of well with two formations
RU109792U1 (en) EQUIPMENT FOR SIMULTANEOUS-SEPARATE OIL PRODUCTION FROM TWO LAYERS
RU91371U1 (en) DEVICE FOR DEVELOPMENT AND OPERATION OF WELLS
RU2515630C1 (en) Method of simultaneous separate operation of multiple-zone well by two submersible pumps and equipment for its implementation
RU2473821C1 (en) Borehole jetting unit for hydrofrac and well tests
RU2550613C2 (en) Method of extraction of fluid from two layers of one well and pump-ejector unit for its implementation
RU2542999C2 (en) Dowhnole pump unit for simultaneous and separate operation of two formations
RU2014122887A (en) METHOD FOR OPERATING OIL WELL WITH TWO LAYERS
RU2522837C1 (en) Device for dual production of wellbore fluid and liquid injection
US10087719B2 (en) Systems and methods for artificial lift subsurface injection and downhole water disposal
RU2569526C1 (en) Unit for dual operation of wells
RU2014119062A (en) METHOD FOR PRODUCING A SINGLE-PLASTED BOREHOLINE AND A PUMP-EJECTOR INSTALLATION FOR ITS IMPLEMENTATION
RU127416U1 (en) DIFFERENTIAL SUBMERSIBLE REMAINED ELECTRIC PUMP INSTALLATION FOR SIMULTANEOUS SEPARATE WATER PUMPING IN SEVERAL PRODUCTIVE LAYERS
RU2525563C1 (en) Processing of wellbore zone of formation
RU144477U1 (en) PUMPING SYSTEM FOR SIMULTANEOUS PRODUCTION FROM TWO LAYERS
RU132507U1 (en) INTEGRATED SUBMERSIBLE BARBED ELECTRIC PUMP INSTALLATION
RU165135U1 (en) SUBMERSIBLE PUMP INSTALLATION

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20170605