RU2550613C2 - Method of extraction of fluid from two layers of one well and pump-ejector unit for its implementation - Google Patents
Method of extraction of fluid from two layers of one well and pump-ejector unit for its implementation Download PDFInfo
- Publication number
- RU2550613C2 RU2550613C2 RU2014119600/03A RU2014119600A RU2550613C2 RU 2550613 C2 RU2550613 C2 RU 2550613C2 RU 2014119600/03 A RU2014119600/03 A RU 2014119600/03A RU 2014119600 A RU2014119600 A RU 2014119600A RU 2550613 C2 RU2550613 C2 RU 2550613C2
- Authority
- RU
- Russia
- Prior art keywords
- oil
- ejector
- nozzle
- liquid
- well
- Prior art date
Links
- 239000012530 fluid Substances 0.000 title claims description 10
- 238000000605 extraction Methods 0.000 title 1
- 239000007788 liquid Substances 0.000 claims abstract description 35
- 238000005086 pumping Methods 0.000 claims abstract description 10
- 239000000203 mixture Substances 0.000 claims abstract description 7
- 238000009434 installation Methods 0.000 claims description 13
- 230000015572 biosynthetic process Effects 0.000 claims description 8
- 238000005755 formation reaction Methods 0.000 claims description 8
- 238000004519 manufacturing process Methods 0.000 abstract description 16
- 238000005065 mining Methods 0.000 abstract description 2
- 239000003129 oil well Substances 0.000 abstract 2
- 239000000126 substance Substances 0.000 abstract 1
- 210000004544 DC2 Anatomy 0.000 description 1
- 241000731961 Juncaceae Species 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 238000003379 elimination reaction Methods 0.000 description 1
- 238000005187 foaming Methods 0.000 description 1
- 230000002530 ischemic preconditioning Effects 0.000 description 1
- 238000000844 transformation Methods 0.000 description 1
- 230000001131 transforming Effects 0.000 description 1
Images
Abstract
Description
Группа изобретений относится к области горного дела, в частности к нефтедобыче, и может быть использована для добычи нефти из двух пластов одной скважины, преимущественно с малым содержанием газа.The group of inventions relates to the field of mining, in particular to oil production, and can be used for oil production from two layers of one well, mainly with a low gas content.
Известен способ добычи флюида из двух пластов одной скважины, включающий спуск в скважину на колонне насосно-компрессорных труб по меньшей мере одного пакера для разобщения пластов скважины, жидкоструйного эжектора и центробежного насоса, откачку флюида из нижнего пласта центробежным насосом с подачей под давлением в сопло жидкоструйного эжектора, последним одновременно с флюидом из нижнего пласта откачивают флюид из верхнего пласта по колонне насосно-компрессорных труб в устье скважины.A known method of producing fluid from two reservoirs of one well, including descent into the well at the tubing string of at least one packer to separate the wellbore, liquid ejector and centrifugal pump, pumping fluid from the lower reservoir by a centrifugal pump with a pressurized liquid nozzle ejector, the last simultaneously with the fluid from the lower reservoir pump fluid from the upper reservoir along the string of tubing at the wellhead.
Известна струйная скважинная насосная установка, содержащая колонну насосно-компрессорных труб с установленными на ней верхним пакером выше верхнего пласта, нижним пакером между верхним и нижним пластами скважины и струйным насосом, сопло последнего со стороны входа в него сообщено с колонной труб ниже струйного насоса и с наружной стороны - с верхним пластом. К нижнему концу колонны насосно-компрессорных труб присоединен центробежный насос. Нижний пакер расположен не более 10 м ниже подошвы верхнего пласта, а верхний пакер - не более 10 м выше его кровли. (Патент RU №2278996 С1, МПК F04F 5/54, опубл. 20.03.2014. Струйная скважинная насосная установка.) Данное техническое решение принято за прототип.Known jet borehole pump installation containing a tubing string with an upper packer installed on it above the upper layer, a lower packer between the upper and lower layers of the well and the jet pump, the nozzle of the latter from the input side is communicated with the pipe string below the jet pump and the outer side - with the upper layer. A centrifugal pump is attached to the lower end of the tubing string. The lower packer is located no more than 10 m below the sole of the upper layer, and the upper packer is no more than 10 m above its roof. (Patent RU No. 2278996 C1, IPC F04F 5/54, publ. 03/20/2014. In-line well pump unit.) This technical solution is taken as a prototype.
Недостатком известного технического решения является возникновение турбулентности в потоке жидкости на выходе из центробежного насоса, приводящей к вспениванию нагнетаемой жидкости и колебанию давления на входе в сопло струйного насоса и, как следствие, к отключению установки, что снижает эффективность добычи нефти и отрицательно влияет на срок службы электропривода центробежного насоса.A disadvantage of the known technical solution is the occurrence of turbulence in the fluid stream at the outlet of the centrifugal pump, which leads to foaming of the injected fluid and pressure fluctuations at the inlet of the jet pump nozzle and, as a result, to shutdown the installation, which reduces the efficiency of oil production and negatively affects the service life electric centrifugal pump.
Основной задачей, на решение которой направлены заявляемые технические решения, является повышение эффективности эксплуатации скважин путем исключения сбоев в работе жидкоструйного эжектора при содержании в нефти газа менее 100 м3/т.The main task, which is claimed by the claimed technical solutions, is to increase the efficiency of wells by eliminating failures in the operation of a liquid-jet ejector with a gas content of less than 100 m 3 / t in oil.
Техническим результатом является повышение эффективности эксплуатации скважин с содержанием в нефти газа менее 100 м3/т за счет исключения сбоев в работе жидкоструйного эжектора.The technical result is to increase the efficiency of wells with a gas content of less than 100 m 3 / t due to the elimination of failures in the operation of a liquid jet ejector.
Указанный технический результат достигается тем, что в известном способе добычи нефти из двух пластов одной скважины, разобщенных пакером, включающем откачивание нефти из нижнего пласта центробежным насосом с подачей под давлением в сопло жидкоструйного эжектора, последним одновременно с нефтью из нижнего пласта откачивают нефть из верхнего пласта по колонне насосно-компрессорных труб в устье скважины, согласно предложенному техническому решению нефть из нижнего пласта нагнетают в сопло жидкоструйного эжектора ламинарным течением потока нефти с малым содержанием газа, а откачивание нефти в устье скважины производят центробежным насосом с напором, задаваемым из условия распределения давления на подъем масс нефти из нижнего пласта в сопло жидкоструйного эжектора и смеси нефти из обоих пластов по колонне насосно-компрессорных труб и на работу жидкоструйного эжектора, при этом проходные сечения сопла и камеры смешения жидкоструйного эжектора задают прямо пропорциональными дебиту нижнего пласта и дебиту обоих пластов скважины соответственно.The specified technical result is achieved by the fact that in the known method of extracting oil from two layers of one well, separated by a packer, including pumping oil from the lower layer by a centrifugal pump with a pressurized liquid ejector, the latter simultaneously pumping oil from the lower layer to the oil from the upper layer along the string of tubing at the wellhead, according to the proposed technical solution, oil from the lower reservoir is injected into the nozzle of a liquid-jet ejector by a laminar flow outflow of oil with a low gas content, and the pumping of oil at the wellhead is carried out by a centrifugal pump with a pressure set from the condition for the pressure distribution to lift the mass of oil from the lower reservoir to the nozzle of the liquid ejector and the mixture of oil from both reservoirs along the tubing string and to work liquid ejector, while the bore of the nozzle and the mixing chamber of the liquid ejector are set directly proportional to the flow rate of the lower reservoir and the flow rate of both layers of the well, respectively.
Указанный технический результат достигается тем, что в известной насосно-эжекторной установке для добычи нефти из двух пластов одной скважины, содержащей спускаемые в скважину на колонне насосно-компрессорных труб электроприводной центробежный насос с силовым кабелем, жидкоструйный эжектор, соединенный входом в сопло с трубой, в которой установлен обратный клапан, и по крайней мере один пакер с кабельным вводом, разобщающий пласты скважины, согласно предложенному техническому решению,The specified technical result is achieved by the fact that in the known pump-ejector installation for oil production from two layers of one well, containing an electric drive centrifugal pump with a power cable lowered into the well on the tubing string, a liquid jet ejector connected to the pipe inlet to the nozzle which is equipped with a check valve, and at least one packer with cable entry, separating the wellbore, according to the proposed technical solution,
на выходе центробежного насоса установлен ресивер, соединенный трубой с входом в сопло жидкоструйного эжектора, на выходе из ресивера установлен вышеупомянутый обратный клапан, а в канале подвода флюида из верхнего пласта скважины в приемную камеру эжектора установлен второй обратный клапан, при этом жидкоструйный эжектор выполнен с проходными сечениями сопла и камеры смешения прямо пропорциональными дебиту нижнего пласта и дебиту обоих пластов скважины соответственно;a receiver is installed at the outlet of the centrifugal pump, connected by a pipe to the entrance to the nozzle of the liquid jet ejector, the aforementioned check valve is installed at the outlet of the receiver, and a second non-return valve is installed in the channel for supplying fluid from the upper formation to the receiving chamber of the ejector, while the liquid jet ejector is made with sections of the nozzle and mixing chamber are directly proportional to the flow rate of the lower layer and the flow rate of both layers of the well, respectively;
на колонне насосно-компрессорных труб может быть установлен дополнительный пакер с кабельным вводом на уровне выше канала подвода нефти из верхнего пласта скважины в приемную камеру жидкоструйного эжектора.An additional packer can be installed on the tubing string with cable entry at a level above the channel for supplying oil from the upper wellbore to the receiving chamber of the liquid jet ejector.
Проведенный заявителем анализ уровня техники позволил установить, что аналоги, характеризующиеся совокупностями признаков, тождественными всем признакам заявленных способа добычи нефти из двух пластов одной скважины и насосно-эжекторной установки для его осуществления, отсутствуют. Следовательно, заявляемые технические решения соответствует условию патентоспособности «новизна».The analysis of the prior art by the applicant has made it possible to establish that there are no analogues that are characterized by sets of features that are identical to all the features of the claimed method for producing oil from two layers of one well and a pump-ejector installation. Therefore, the claimed technical solution meets the condition of patentability "novelty."
Результаты поиска известных решений в данной области техники с целью выявления признаков, совпадающих с отличительными от прототипов признаками заявляемых технических решений, показали, что они не следуют явным образом из уровня техники. Из определенного заявителем уровня техники не выявлена известность влияния предусматриваемых существенными признаками заявляемых технических решений преобразований на достижение указанного технического результата. Следовательно, каждое из заявляемых технических решений соответствуют условию патентоспособности «изобретательский уровень».The search results for known solutions in the art in order to identify features that match the distinctive features of the prototypes of the claimed technical solutions have shown that they do not follow explicitly from the prior art. From the prior art determined by the applicant, the influence of the transformations provided for by the essential features of the claimed technical solutions on the achievement of the specified technical result is not revealed. Therefore, each of the claimed technical solutions meets the condition of patentability "inventive step".
Заявленные технические решения могут быть использованы на скважинах для добычи нефти из двух пластов одной скважины с содержанием в нефти газа менее 100 м3/т. Следовательно, заявляемые технические решения соответствует условию патентоспособности «промышленная применимость».The claimed technical solutions can be used in wells for oil production from two layers of one well with a gas content of less than 100 m 3 / t in oil. Therefore, the claimed technical solution meets the condition of patentability "industrial applicability".
В настоящей заявке на выдачу патента соблюдено требование единства изобретений, поскольку заявленные способ добычи нефти из двух пластов одной скважины и насосно-эжекторная установка для его осуществления предназначены для повышения эффективности добычи нефти. Заявленные технические решения решают одну и ту же задачу - повышение эффективности добычи нефти.In the present application for the grant of a patent, the requirement of unity of inventions is met, since the claimed method of oil production from two layers of one well and a pump-ejector installation for its implementation are intended to increase the efficiency of oil production. The claimed technical solutions solve the same problem - increasing the efficiency of oil production.
На фиг. 1 схематично показана насосно-эжекторная установка для добычи нефти из двух пластов одной скважины; на фиг. 2 - то же, оснащенная дополнительным пакером с кабельным вводом.In FIG. 1 schematically shows a pump-ejector installation for oil production from two layers of one well; in FIG. 2 - the same, equipped with an additional packer with cable entry.
Сущность предложенного способа добычи нефти из двух пластов одной скважины заключается в следующем.The essence of the proposed method of oil production from two layers of one well is as follows.
Добычу нефти из двух пластов I и II одной скважины, разобщенных пакером, ведут центробежным насосом с откачиванием нефти с малым содержанием газа (менее 100 м3/т) из нижнего пласта I ламинарным течением потока нефти по трубе в сопло жидкоструйного эжектора, последним одновременно откачивают нефть из верхнего пласта II по колонне насосно-компрессорных труб в устье скважины. Откачивание нефти производят центробежным насосом с напором, заданным из условия распределения давления на подъем масс нефти из нижнего пласта I скважины по трубе в сопло жидкоструйного эжектора и смеси нефти из обоих пластов I и II по колонне насосно-компрессорных труб в устье скважины и на работу жидкоструйного эжектора, который определяют из условия:Oil is extracted from two layers I and II of one well, separated by a packer, by a centrifugal pump with pumping out oil with a low gas content (less than 100 m 3 / t) from the lower layer I by a laminar flow of oil through the pipe into the nozzle of a liquid ejector, the latter being simultaneously pumped out oil from the upper formation II along the tubing string at the wellhead. Oil is pumped out by a centrifugal pump with a pressure set from the condition for the pressure distribution to lift the masses of oil from the lower layer of the first well in the pipe into the nozzle of the liquid ejector and the mixture of oil from both layers of the second and second columns of the tubing at the wellhead and for the operation of the liquid ejector, which is determined from the condition:
Рэцн≥тмнс+тнкт+Рстр,P ≥t MHC ESP + m + p p tubing,
гдеWhere
Рэцн - напор нефти, создаваемый центробежным насосом;R etsn - the pressure of oil created by a centrifugal pump;
тмнс - масса нефти между центробежным насосом и жидкоструйным эжектором;t mnc is the mass of oil between a centrifugal pump and a liquid jet ejector;
тнкт - масса смеси нефти из обоих пластов I и II скважины в колонне насосно-компрессорных труб;t tubing - the mass of the mixture of oil from both reservoirs of I and II wells in the tubing string;
рстр - потеря давления на работу жидкоструйного эжектора.p p - pressure loss on the work of a liquid ejector.
Проходное сечение сопла жидкоструйного эжектора выполнено размером, прямо пропорциональным дебиту Q1 нижнего пласта I скважины, и определяется по формуле:The bore of the nozzle of the liquid jet ejector is made in a size directly proportional to the flow rate Q 1 of the lower formation I of the well, and is determined by the formula:
Sc=K1·Q1,S c = K 1 · Q 1 ,
гдеWhere
Sc - площадь проходного сечения сопла жидкоструйного эжектора,S c - the area of the orifice of the nozzle of the liquid jet ejector,
Q1 - дебит нижнего пласта I скважины,Q 1 - flow rate of the lower layer I of the well,
K1 - коэффициент пропорциональности.K 1 - coefficient of proportionality.
Проходное сечение камеры смешения жидкоструйного эжектора выполнено размером, прямо пропорциональным сумме дебитов (Q1+Q2) обоих пластов I и II скважины, и определяется по формуле:The bore of the mixing chamber of the liquid jet ejector is made in a size directly proportional to the sum of flow rates (Q 1 + Q 2 ) of both layers of the first and second wells, and is determined by the formula:
Sk=K2·(Q1+Q2),S k = K 2 · (Q 1 + Q 2 ),
гдеWhere
Sk - площадь проходного сечения камеры смешения жидкоструйного эжектора,S k - the area of the bore of the mixing chamber of the liquid jet ejector,
Q1 - дебит нижнего пласта I скважины,Q 1 - flow rate of the lower layer I of the well,
Q2 - дебит верхнего пласта II скважины,Q 2 - flow rate of the upper reservoir II of the well,
K2 - коэффициент пропорциональности.K 2 - coefficient of proportionality.
Насосно-эжекторная установка для добычи нефти из двух пластов одной скважины содержит спускаемые в скважину на насосно-компрессорных трубах 1 центробежный насос 2 с погружным электроприводом 3, последний герметично соединен с силовым кабелем 4 электропитания привода 3 центробежного насоса 2, жидкоструйный эжектор 5 и по крайней мере один пакер 6 с кабельным вводом, разобщающий нижний пласт I и верхний пласт II в затрубном пространстве 7. На выходе центробежного насоса 2 установлен ресивер 8, соединенный трубой 9 с входом в сопло 10 эжектора 5. На выходе из ресивера 8 установлен обратный клапан 11. В канале 12 подвода нефти из верхнего пласта II скважины в приемную камеру 13 эжектора 5 установлен второй обратный клапан 14 (Фиг. 1). Жидкоструйный эжектор 5 выполнен с проходным сечением сопла 10, прямо пропорциональным дебиту Q1 нижнего пласта I скважины, и с проходным сечением камеры смешения 15, прямо пропорциональным дебиту обоих пластов I и II скважины. На колонне насосно-компрессорных труб 1 может быть установлен дополнительный пакер 16 с кабельным вводом на уровне выше канала 12 подвода нефти из верхнего пласта II скважины в приемную камеру 13 эжектора 5, исключающий возможную депрессию верхнего пласта I скважины (Фиг. 2).A pump-ejector installation for oil production from two layers of one well contains a centrifugal pump 2 with a submersible electric drive 3, lowered into the well by tubing 1, the latter being hermetically connected to the power cable 4 of the power supply of the drive 3 of the centrifugal pump 2, a liquid-jet ejector 5 and at least at least one packer 6 with cable entry, separating the lower layer I and upper layer II in the annulus 7. At the outlet of the centrifugal pump 2, a receiver 8 is installed, connected by a pipe 9 to the entrance to the nozzle 10 of the ejector 5. On the outlet valve 11 is installed with a check valve 11. In the channel 12 for supplying oil from the upper formation II of the well to the receiving chamber 13 of the ejector 5, a second check valve 14 is installed (Fig. 1). The liquid-jet ejector 5 is made with a passage section of the nozzle 10, directly proportional to the flow rate Q 1 of the lower formation I of the well, and with a passage section of the mixing chamber 15, directly proportional to the flow rate of both layers I and II of the well. An additional packer 16 can be installed on the tubing string 1 with a cable entry above the channel 12 for supplying oil from the upper formation II of the well to the receiving chamber 13 of the ejector 5, eliminating the possible depression of the upper formation I of the well (Fig. 2).
Пример осуществления способа добычи нефти из двух пластов одной скважины с помощью насосно-эжекторной установки для его осуществленияAn example of the method of oil production from two layers of the same well using a pump-ejector installation for its implementation
Электроприводной центробежный насос 2 с погружным электроприводом 3 и силовым кабелем 4, жидкоструйный эжектор 5 и по крайней мере один пакер 6 с кабельным вводом, разобщающий пласты скважины, устанавливают в скважине на колонне насосно-компрессорных труб 1. Нефть с содержанием газа менее 100 м3/т откачивают одновременно из верхнего пласта II с дебитом Q2=20 м3/сут и из нижнего пласта I с дебитом Q1=60 м3/сут в устье скважины центробежным насосом 2 с напором Рэцн=9,7 МПа, задаваемым из условия распределения давления Рэцн на подъем массы тмнс нефти из нижнего пласта I по трубе 9 в сопло 10 жидкоструйного эжектора 5 и массы тнкт смеси нефти обоих пластов I и II скважины по колонне насосно-компрессорных труб 1 и потерю давления рстр на работу жидкоструйного эжектора 5, из условия:An electric drive centrifugal pump 2 with a submersible electric drive 3 and a power cable 4, a liquid-jet ejector 5 and at least one packer 6 with a cable entry, separating the well strata, are installed in the well on the tubing string 1. Oil with a gas content of less than 100 m 3 / t is evacuated simultaneously from the top layer II at a flow rate Q 2 = 20 m 3 / day and from the lower reservoir I at a flow rate Q 1 = 60 m 3 / day at the wellhead centrifugal pump with a pressure P 2 = 9.7 MPa ESP, predeterminable from the condition of the distribution of pressure P ect on the increase in mass t mnc oil from the lower layer I through pipe 9 to the nozzle 10 of the liquid ejector 5 and the mass t of oil mixture of both layers of I and II wells along the tubing string 1 and the pressure loss p p for the operation of the liquid ejector 5, from the condition:
Рэцн≥тмнс+тнкт+рстр.P ≥t MHC ESP + m + p p tubing.
Для выполнения этого условия проходное сечение Sc сопла 10 жидкоструйного эжектора 5 выполнено с диаметром 3,8 мм, прямо пропорциональным дебиту Q1 нижнего пласта I согласно формуле:To fulfill this condition, the orifice S c of the nozzle 10 of the liquid-jet ejector 5 is made with a diameter of 3.8 mm, which is directly proportional to the flow rate Q 1 of the lower layer I according to the formula:
Sc=K1·Q1.S c = K 1 · Q 1 .
Проходное сечение Sk камеры смешения 15 жидкоструйного эжектора 5 выполнено с диаметром 5,4 мм, прямо пропорциональным дебиту (Q1+Q2) обоих пластов I и II скважины, согласно формуле:The cross section S k of the mixing chamber 15 of the liquid-jet ejector 5 is made with a diameter of 5.4 mm, which is directly proportional to the flow rate (Q 1 + Q 2 ) of both reservoirs I and II of the well, according to the formula:
Sk=K2·(Q1+Q2).S k = K 2 · (Q 1 + Q 2 ).
Из центробежного насоса 2 нефть нижнего пласта I с содержанием газа менее 100 м3/т и дебитом Q1=60 м3/сут турбулентным течением потока перетекает в ресивер 8, в котором происходит сглаживание колебаний давления нефти, вызываемых пульсирующей подачей и прерывистым потоком нефти из центробежного насоса 2, перетекает ламинарным течением через обратный клапан 11 ресивера 8 с напором Рэцн=9,7 МПа по трубе 9 в сопло 10 с диаметром 3,8 мм жидкоструйного эжектора 5 и далее через приемную камеру 13 в камеру смешения 15 с диаметром 5,4 мм жидкоструйного эжектора 5. Одновременно с нефтью из нижнего пласта I жидкоструйным эжектором 5 откачивают нефть из верхнего пласта II с дебитом Q2=20 м3/сут через затрубное пространство 7 скважины, обратный клапан 14 по каналу 12 и приемную камеру 13 жидкоструйного эжектора 5 в колонну насосно-компрессорных труб 1. Из камеры смешения 15 жидкоструйным эжектором 5 смесь нефти из обоих пластов I и II с дебитом 80 м3/сут поднимается с напором 5,0 МПа по колонне насосно-компрессорных труб 1 в устье скважины. После выключения работы насосно-эжекторной установки нефть из колонны насосно-компрессорных труб 1 под воздействием собственного веса устремляется обратно в скважину и перекрывает обратный клапан 14 в канале 12 после приемной камеры 13 жидкоструйного эжектора 5 и обратный клапан 11 ресивера 8 перед центробежным насосом 2.From the centrifugal pump 2, the oil of the lower reservoir I with a gas content of less than 100 m 3 / t and flow rate Q 1 = 60 m 3 / day flows into the receiver 8 in a turbulent flow, in which the pressure fluctuations of the oil are smoothed out due to the pulsating flow and intermittent oil flow from a centrifugal pump 2, flows through the check valve 11 of the receiver 8 with a laminar flow with a pressure of R ect = 9.7 MPa through the pipe 9 into the nozzle 10 with a diameter of 3.8 mm of a liquid-jet ejector 5 and then through a receiving chamber 13 into a mixing chamber 15 with a diameter 5.4 mm liquid jet ejector 5. Simultaneously with the oil from the lower layer I, a liquid-jet ejector 5 pumps oil from the upper layer II with a flow rate of Q 2 = 20 m 3 / day through the annulus 7 of the well, a check valve 14 through channel 12 and a receiving chamber 13 of the liquid-jet ejector 5 to the pump casing -compressor pipes 1. From the mixing chamber 15 with a liquid-jet ejector 5, a mixture of oil from both reservoirs I and II with a flow rate of 80 m 3 / day rises with a pressure of 5.0 MPa along the string of tubing 1 at the wellhead. After shutting down the operation of the pump-ejector installation, oil from the tubing string 1, under the influence of its own weight, rushes back into the well and closes the check valve 14 in the channel 12 after the receiving chamber 13 of the liquid jet ejector 5 and the check valve 11 of the receiver 8 in front of the centrifugal pump 2.
Использование предлагаемых способа добычи нефти из двух пластов одной скважины и насосно-эжекторной установки для его осуществления позволит повысить эффективность эксплуатации скважин с содержанием газа менее 100 м3/т и исключить сбои в работе жидкоструйного эжектора установки.Using the proposed method of oil production from two layers of one well and a pump-ejector installation for its implementation will improve the efficiency of wells with a gas content of less than 100 m 3 / t and eliminate malfunctions in the operation of a liquid-jet ejector of the installation.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2014119600/03A RU2550613C2 (en) | 2014-05-15 | 2014-05-15 | Method of extraction of fluid from two layers of one well and pump-ejector unit for its implementation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2014119600/03A RU2550613C2 (en) | 2014-05-15 | 2014-05-15 | Method of extraction of fluid from two layers of one well and pump-ejector unit for its implementation |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2014119600A RU2014119600A (en) | 2014-08-10 |
RU2550613C2 true RU2550613C2 (en) | 2015-05-10 |
Family
ID=51355062
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2014119600/03A RU2550613C2 (en) | 2014-05-15 | 2014-05-15 | Method of extraction of fluid from two layers of one well and pump-ejector unit for its implementation |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2550613C2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2693119C1 (en) * | 2018-06-29 | 2019-07-01 | Федеральное государственное бюджетное учреждение науки Институт проблем нефти и газа РАН (ИПНГ РАН) | Submersible pumping unit |
RU2718553C1 (en) * | 2019-09-11 | 2020-04-08 | Олег Сергеевич Николаев | Pumping-ejector plant for downhole fluid transfer from lower to upper formation |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5961282A (en) * | 1996-05-07 | 1999-10-05 | Institut Francais Du Petrole | Axial-flow and centrifugal pumping system |
RU2157926C1 (en) * | 2000-02-17 | 2000-10-20 | Архипов Юрий Александрович | Guide vanes of axial-flow compressor |
RU2274731C2 (en) * | 2004-02-24 | 2006-04-20 | ЗАО "Новомет-Пермь" | Oil production method and facility |
RU2278996C1 (en) * | 2005-02-10 | 2006-06-27 | Зиновий Дмитриевич Хоминец | Jet well pumping unit |
RU2295631C1 (en) * | 2005-06-22 | 2007-03-20 | Александр Николаевич Дроздов | Immersed pump-ejector system for extracting oil |
RU2405918C1 (en) * | 2009-06-08 | 2010-12-10 | Олег Марсович Гарипов | Method of garipov for oil production and device for its realisation |
RU2406917C2 (en) * | 2009-02-19 | 2010-12-20 | Геннадий Николаевич Матвеев | Method of acquisition and transportation of production of oil wells with high gas factor and system for its implementation |
-
2014
- 2014-05-15 RU RU2014119600/03A patent/RU2550613C2/en not_active IP Right Cessation
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5961282A (en) * | 1996-05-07 | 1999-10-05 | Institut Francais Du Petrole | Axial-flow and centrifugal pumping system |
RU2157926C1 (en) * | 2000-02-17 | 2000-10-20 | Архипов Юрий Александрович | Guide vanes of axial-flow compressor |
RU2274731C2 (en) * | 2004-02-24 | 2006-04-20 | ЗАО "Новомет-Пермь" | Oil production method and facility |
RU2278996C1 (en) * | 2005-02-10 | 2006-06-27 | Зиновий Дмитриевич Хоминец | Jet well pumping unit |
RU2295631C1 (en) * | 2005-06-22 | 2007-03-20 | Александр Николаевич Дроздов | Immersed pump-ejector system for extracting oil |
RU2406917C2 (en) * | 2009-02-19 | 2010-12-20 | Геннадий Николаевич Матвеев | Method of acquisition and transportation of production of oil wells with high gas factor and system for its implementation |
RU2405918C1 (en) * | 2009-06-08 | 2010-12-10 | Олег Марсович Гарипов | Method of garipov for oil production and device for its realisation |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2693119C1 (en) * | 2018-06-29 | 2019-07-01 | Федеральное государственное бюджетное учреждение науки Институт проблем нефти и газа РАН (ИПНГ РАН) | Submersible pumping unit |
RU2718553C1 (en) * | 2019-09-11 | 2020-04-08 | Олег Сергеевич Николаев | Pumping-ejector plant for downhole fluid transfer from lower to upper formation |
Also Published As
Publication number | Publication date |
---|---|
RU2014119600A (en) | 2014-08-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB2499473A (en) | Gas lift system with surface jet pump | |
RU2550613C2 (en) | Method of extraction of fluid from two layers of one well and pump-ejector unit for its implementation | |
RU2405918C1 (en) | Method of garipov for oil production and device for its realisation | |
RU2014151076A (en) | OIL PRODUCING COMPLEX | |
RU2488689C1 (en) | Dowhnole pump unit for simultaneous and separate operation of two formations | |
US10337296B2 (en) | Gas lift assembly | |
RU115408U1 (en) | INSTALLATION FOR SIMULTANEOUSLY SEPARATE DEVELOPMENT OF TWO OPERATING OBJECTS ONE WELL | |
RU2698785C1 (en) | Method for reduction of annular pressure of mechanized wells and device for its implementation | |
RU2513566C2 (en) | Dual string production method in well with increased gas ratio and device for its implementation | |
RU2473821C1 (en) | Borehole jetting unit for hydrofrac and well tests | |
RU2553110C2 (en) | Method of production of single-formation borehole fluid and pumping and ejecting unit for its implementation | |
RU2564312C1 (en) | Method of deposit hydraulic fracturing in well | |
RU2549946C1 (en) | Pump packer system for multiple-zone well | |
RU2520315C2 (en) | Dual production method from two beds in same well | |
RU2522837C1 (en) | Device for dual production of wellbore fluid and liquid injection | |
RU2405924C1 (en) | Pumping unit for simultaneous-separate operation of two reservoirs in well | |
RU2569526C1 (en) | Unit for dual operation of wells | |
RU165135U1 (en) | SUBMERSIBLE PUMP INSTALLATION | |
RU127416U1 (en) | DIFFERENTIAL SUBMERSIBLE REMAINED ELECTRIC PUMP INSTALLATION FOR SIMULTANEOUS SEPARATE WATER PUMPING IN SEVERAL PRODUCTIVE LAYERS | |
RU2531228C1 (en) | Well operation installation | |
RU132507U1 (en) | INTEGRATED SUBMERSIBLE BARBED ELECTRIC PUMP INSTALLATION | |
RU2633852C2 (en) | Method of simultaneous-separate production of well fluid and injection of liquid into well and ejector plant for its implementation (versions) | |
RU2499133C2 (en) | Electrically drive pump unit for oil extraction and fluid injection in bed | |
RU2485299C1 (en) | Treatment method of bottom-hole formation zone, and downhole system for its implementation | |
RU144477U1 (en) | PUMPING SYSTEM FOR SIMULTANEOUS PRODUCTION FROM TWO LAYERS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20170516 |