RU2012138690A - STEAM-GAS ADJUSTMENT OF A STEAM TURBINE POWER UNIT WITH DOCRITICAL STEAM PARAMETERS - Google Patents

STEAM-GAS ADJUSTMENT OF A STEAM TURBINE POWER UNIT WITH DOCRITICAL STEAM PARAMETERS Download PDF

Info

Publication number
RU2012138690A
RU2012138690A RU2012138690/06A RU2012138690A RU2012138690A RU 2012138690 A RU2012138690 A RU 2012138690A RU 2012138690/06 A RU2012138690/06 A RU 2012138690/06A RU 2012138690 A RU2012138690 A RU 2012138690A RU 2012138690 A RU2012138690 A RU 2012138690A
Authority
RU
Russia
Prior art keywords
steam
gas
steam turbine
power unit
pressure
Prior art date
Application number
RU2012138690/06A
Other languages
Russian (ru)
Other versions
RU2525569C2 (en
Inventor
Леонид Павлович Шелудько
Original Assignee
Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования Самарский государственный университет
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования Самарский государственный университет filed Critical Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования Самарский государственный университет
Priority to RU2012138690/06A priority Critical patent/RU2525569C2/en
Publication of RU2012138690A publication Critical patent/RU2012138690A/en
Application granted granted Critical
Publication of RU2525569C2 publication Critical patent/RU2525569C2/en

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/16Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

Парогазовая надстройка паротурбинного энергоблока с докритическими параметрами пара, содержащего паротурбинный энергоблок, снабженный: паровым котлом с первичным и промежуточным пароперегревателями, паропроводом острого пара, холодным и горячим паропроводами промперегрева, конденсационной паровой турбиной, деаэратором высокого давления, питательным насосом высокого давления, регенеративными подогревателями высокого давления, электрогенератором; предвключенную паровую турбину суперсверхкритических параметров пара с электрогенератором; питательный насос суперсверхкритического давления/выход предвключенной паровой турбины суперсверхкритических параметров пара соединен паропроводом острого пара с входом конденсационной паровой турбины паротурбинного энергоблока с докритическими параметрами пара, отличающаяся тем, что она дополнительно снабжена: газотурбинной установкой, содержащей компрессоры низкого и высокого давления, газовые турбины высокого и низкого давления, промежуточный воздухоохладитель, камеры сгорания высокого и низкого давления, электрогенератор; котел-утилизатор, содержащий парогенератор суперсверхвысокого давления, пароперегреватель суперсверхкритической температуры, газоводяной подогреватель деаэрированной воды, газоводяной подогреватель питательной воды паротурбинного энергоблока; вакуумным деаэратором, бустерным питательным насосом, питательным насосом суперсверхкритического давления с конденсационным турбоприводом, паропроводом суперсверхкритических параметров; промежуточный воздухоохладитель установлен в газоходе между компрессорами низкого и высоSteam-gas superstructure of a steam turbine power unit with subcritical parameters of steam containing a steam turbine power unit, equipped with: a steam boiler with primary and intermediate superheaters, a steam line for hot steam, cold and hot superheat steam lines, a condensing steam turbine, a high pressure deaerator, a high pressure feed pump, a high pressure feed pump, a high pressure heat pump electric generator; an upstream steam turbine of supercritical steam parameters with an electric generator; super supercritical pressure feed pump / outlet of an upstream super turbine supercritical steam turbine connected by a steam line to the inlet of a condensing steam turbine of a steam turbine power unit with subcritical steam parameters, characterized in that it is additionally equipped with a gas turbine installation containing low and high pressure compressors, high and high pressure gas turbines low pressure, intercooler, high and low pressure combustion chambers, electric generator; a recovery boiler containing a superhigh pressure steam generator, a supercritical temperature superheater, a gas-water heater for deaerated water, a gas-water heater for feed water of a steam turbine power unit; vacuum deaerator, booster feed pump, super supercritical feed pump with condensing turbo drive, super supercritical steam line; an intermediate air cooler is installed in the duct between the low and high compressors

Claims (1)

Парогазовая надстройка паротурбинного энергоблока с докритическими параметрами пара, содержащего паротурбинный энергоблок, снабженный: паровым котлом с первичным и промежуточным пароперегревателями, паропроводом острого пара, холодным и горячим паропроводами промперегрева, конденсационной паровой турбиной, деаэратором высокого давления, питательным насосом высокого давления, регенеративными подогревателями высокого давления, электрогенератором; предвключенную паровую турбину суперсверхкритических параметров пара с электрогенератором; питательный насос суперсверхкритического давления/выход предвключенной паровой турбины суперсверхкритических параметров пара соединен паропроводом острого пара с входом конденсационной паровой турбины паротурбинного энергоблока с докритическими параметрами пара, отличающаяся тем, что она дополнительно снабжена: газотурбинной установкой, содержащей компрессоры низкого и высокого давления, газовые турбины высокого и низкого давления, промежуточный воздухоохладитель, камеры сгорания высокого и низкого давления, электрогенератор; котел-утилизатор, содержащий парогенератор суперсверхвысокого давления, пароперегреватель суперсверхкритической температуры, газоводяной подогреватель деаэрированной воды, газоводяной подогреватель питательной воды паротурбинного энергоблока; вакуумным деаэратором, бустерным питательным насосом, питательным насосом суперсверхкритического давления с конденсационным турбоприводом, паропроводом суперсверхкритических параметров; промежуточный воздухоохладитель установлен в газоходе между компрессорами низкого и высокого давления, пароперегреватель суперсверхкритической температуры размещен в газоходе между газовой турбиной высокого давления и камерой сгорания низкого давления; парогенератор суперсверхвысокого давления соединен паропроводом суперсверхвысоких параметров через пароперегреватель суперсверхвысокой температуры с входом предвключенной паровой турбины суперсверхкритических параметров, выход которой связан паропроводом острого пара с конденсационной паровой турбиной паротурбинного энергоблока; выход газовой турбины низкого давления соединен газоходом с входом котла-утилизатора, в котором по ходу газов размещены - парогенератор суперсверхкритического давления, газоводяной подогреватель питательной воды паротурбинного энергоблока и газоводяной подогреватель деаэрированной воды; выхлопной газоход котла-утилизатора связан с атмосферой; вход конденсационной паровой турбины турбопривода питательного насоса сверхкритического давления соединен паропроводом перегретого пара с горячим паропроводом промперегрева паротурбинного энергоблока, а конденсатор паровой турбины паротурбинного энергоблока связан трубопроводом конденсата через промежуточный воздухоохладитель с первым входом вакуумного деаэратора, второй вход которого соединен трубопроводом греющей воды с деаэратором высокого давления; выход вакуумного деаэратора соединен трубопроводом деаэрированной воды через бустерный насос с входом питательного насоса суперсверхкритического давления, выход которого связан трубопроводом питательной воды суперсверхкритического давления с входом парогенератора суперсверхвысокого давления; питательный насос высокого давления паротурбинного энергоблока связан питательным трубопроводом через газоводяной подогреватель питательной воды с паровым котлом. Steam-gas superstructure of a steam turbine power unit with subcritical parameters of steam containing a steam turbine power unit, equipped with: a steam boiler with primary and intermediate superheaters, a steam line for hot steam, cold and hot superheat steam lines, a condensing steam turbine, a high pressure deaerator, a high pressure feed pump, a high pressure feed pump, a high pressure heat pump electric generator; an upstream steam turbine of supercritical steam parameters with an electric generator; super supercritical pressure feed pump / outlet of an upstream super turbine supercritical steam turbine connected by a steam line to the inlet of a condensing steam turbine of a steam turbine power unit with subcritical steam parameters, characterized in that it is additionally equipped with a gas turbine installation containing low and high pressure compressors, high and high pressure gas turbines low pressure, intercooler, high and low pressure combustion chambers, electric generator; a recovery boiler containing a superhigh pressure steam generator, a supercritical temperature superheater, a gas-water heater for deaerated water, a gas-water heater for feed water of a steam turbine power unit; vacuum deaerator, booster feed pump, super supercritical feed pump with condensing turbo drive, super supercritical steam line; an intermediate air cooler is installed in the gas duct between the low and high pressure compressors, a super supercritical temperature superheater is placed in the gas duct between the high pressure gas turbine and the low pressure combustion chamber; a superhigh pressure steam generator is connected by a superhigh-temperature steam pipe through a superhigh-temperature steam superheater to the input of an upstream super-critical steam turbine, the output of which is connected by a sharp steam pipe to a condensing steam turbine of a steam turbine power unit; the outlet of the low-pressure gas turbine is connected by a gas duct to the inlet of the recovery boiler, in which the super-critical pressure steam generator, the gas-water heater for the feed water of the steam turbine power unit and the gas-water heater for deaerated water are located along the gases; the exhaust duct of the recovery boiler is associated with the atmosphere; the input of the condensing steam turbine of the supercritical pressure feed pump turbine is connected by the superheated steam steam line to the hot steam superheater steam line of the steam turbine power unit, and the steam turbine condenser of the steam turbine power unit is connected by a condensate pipe through an intermediate air cooler to the first inlet of the vacuum deaerator, the second inlet of which is connected to the heating water pipeline; the vacuum deaerator outlet is connected by a deaerated water pipeline through the booster pump to the inlet of the super supercritical pressure feed pump, the outlet of which is connected by the super supercritical pressure feed water pipe to the inlet of the superhigh pressure steam generator; the high-pressure feed pump of the steam turbine power unit is connected by a feed pipe through a gas-water feed water heater to a steam boiler.
RU2012138690/06A 2012-09-10 2012-09-10 Combined-cycle topping plant for steam power plant with subcritical steam parameters RU2525569C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2012138690/06A RU2525569C2 (en) 2012-09-10 2012-09-10 Combined-cycle topping plant for steam power plant with subcritical steam parameters

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2012138690/06A RU2525569C2 (en) 2012-09-10 2012-09-10 Combined-cycle topping plant for steam power plant with subcritical steam parameters

Publications (2)

Publication Number Publication Date
RU2012138690A true RU2012138690A (en) 2014-03-20
RU2525569C2 RU2525569C2 (en) 2014-08-20

Family

ID=50279878

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2012138690/06A RU2525569C2 (en) 2012-09-10 2012-09-10 Combined-cycle topping plant for steam power plant with subcritical steam parameters

Country Status (1)

Country Link
RU (1) RU2525569C2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2605879C2 (en) * 2015-02-11 2016-12-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Самарский государственный технический университет" Power plant combined-cycle plant
RU2616148C2 (en) * 2015-07-23 2017-04-12 федеральное государственное автономное образовательное учреждение высшего образования "Самарский государственный аэрокосмический университет имени академика С.П. Королева (национальный исследовательский университет)" (СГАУ) Electric power generation device with high temperature vapour-gas condensing turbine
RU2620610C1 (en) * 2016-02-15 2017-05-29 федеральное государственное бюджетное образовательное учреждение высшего образования "Самарский государственный технический университет" Work method of combined cycle gas turbine power plant
RU2689483C2 (en) * 2017-10-30 2019-05-28 федеральное государственное автономное образовательное учреждение высшего образования "Самарский национальный исследовательский университет имени академика С.П. Королёва" Energy plant with high-temperature steam-gas condensate turbine
RU2747786C1 (en) * 2020-10-09 2021-05-14 Федеральное государственное бюджетное образования учреждение высшего образования "Кубанский государственный технологический университет" (ФГБОУ ВО "КубГТУ") Thermal power station

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI68458C (en) * 1980-12-23 1985-09-10 Sulzer Ag TVAONGSSTYRDAONGGENERATORANLAEGGNING
SU1101617A1 (en) * 1983-04-07 1984-07-07 Всесоюзный Дважды Ордена Трудового Красного Знамени Теплотехнический Научно-Исследовательский Институт Им.Ф.Э.Дзержинского Straight-through boiler
RU2027865C1 (en) * 1991-01-24 1995-01-27 Государственная районная электростанция N 19 Ленинградского производственного объединения "Ленэнерго" Thermal power station
RU2376524C1 (en) * 2008-11-17 2009-12-20 Открытое акционерное общество "Всероссийский теплотехнический научно-исследовательский институт" Steam boiler with sectionalised live steam superheater and automatic gas control system of uniform steam heating in sections of such superheater
RU101090U1 (en) * 2010-09-15 2011-01-10 Открытое акционерное общество "Всероссийский дважды ордена Трудового Красного Знамени теплотехнический научно-исследовательский институт" ENERGY BUILDING STEAM-GAS INSTALLATION (OPTIONS)

Also Published As

Publication number Publication date
RU2525569C2 (en) 2014-08-20

Similar Documents

Publication Publication Date Title
RU2691881C1 (en) Thermal power plant
JP2010031867A (en) Exhaust heat recovery boiler for combined cycle power plant
RU2012138690A (en) STEAM-GAS ADJUSTMENT OF A STEAM TURBINE POWER UNIT WITH DOCRITICAL STEAM PARAMETERS
RU2496992C1 (en) Method of operation of thermal power plant
RU2011116163A (en) STEAM POWER PLANT FOR ELECTRIC POWER GENERATION
RU156586U1 (en) BINAR STEAM GAS INSTALLATION
RU2006129783A (en) METHOD FOR INCREASING EFFICIENCY AND POWER OF A TWO-CIRCUIT NUCLEAR STATION AND A DEVICE FOR ITS IMPLEMENTATION (OPTIONS)
RU2524588C2 (en) Power plant running on organic fuel with carbon dioxide separator and method of its operation
RU2009109733A (en) STEAM-GAS UNIT WITH STEAM TURBINE COMPRESSOR ACTUATOR AND REGENERATIVE GAS TURBINE
RU2015130684A (en) Power generating device with high temperature steam condensing turbine
RU168003U1 (en) Binary Combined Cycle Plant
RU2012152236A (en) POWER PLANT WITH STEAM-GAS PLANT
RU2752123C1 (en) Thermal power station
RU2561780C2 (en) Combined-cycle plant
RU2561776C2 (en) Combined-cycle plant
CN104832227A (en) Coal-fired unit efficient subcritical system
RU2349764C1 (en) Combined heat and power plant overbuilt with gas turbine plant
RU2015149555A (en) METHOD FOR WORKING MANEUVERED REGENERATIVE STEAM-GAS HEAT ELECTROCENTRAL AND DEVICE FOR ITS IMPLEMENTATION
RU126373U1 (en) STEAM GAS INSTALLATION
RU2016134576A (en) The method of operation of a maneuverable cogeneration combined-cycle plant and a device for its implementation
RU2328045C2 (en) Method of operating atomic steam-turbine power generating system and equipment for implementing method
RU167924U1 (en) Binary Combined Cycle Plant
RU2009118720A (en) MULTI-MODE HEATING INSTALLATION
RU109797U1 (en) HEAT RECOVERY COMPLEX WITH STEAM TURBINE
RU2533593C1 (en) Combined-cycle plant with steam turbine drive of compressor and high-pressure steam generator

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20140911