RU2010118262A - METHOD FOR INSTALLING ADJUSTMENTS OF INTERMEDIATE SUPPORTS AND SPAN STRUCTURES OF RAILWAY BRIDGE - Google Patents

METHOD FOR INSTALLING ADJUSTMENTS OF INTERMEDIATE SUPPORTS AND SPAN STRUCTURES OF RAILWAY BRIDGE Download PDF

Info

Publication number
RU2010118262A
RU2010118262A RU2010118262/03A RU2010118262A RU2010118262A RU 2010118262 A RU2010118262 A RU 2010118262A RU 2010118262/03 A RU2010118262/03 A RU 2010118262/03A RU 2010118262 A RU2010118262 A RU 2010118262A RU 2010118262 A RU2010118262 A RU 2010118262A
Authority
RU
Russia
Prior art keywords
bridge
platforms
crane
installation
spans
Prior art date
Application number
RU2010118262/03A
Other languages
Russian (ru)
Inventor
Владимир Анатольевич Вороной (RU)
Владимир Анатольевич Вороной
Сергей Александрович Вуколов (RU)
Сергей Александрович Вуколов
Александр Васильевич Матвеев (RU)
Александр Васильевич Матвеев
Лев Павлович Светлов (RU)
Лев Павлович Светлов
Александр Владимирович Квитко (RU)
Александр Владимирович Квитко
Сергей Александрович Лагунов (RU)
Сергей Александрович Лагунов
Александр Сергеевич Низов (RU)
Александр Сергеевич Низов
Original Assignee
Министерство обороны Российской Федерации Государственное образовательное учреждение высшего профессионального образования ВОЕННАЯ
Министерство обороны Российской Федерации Государственное образовательное учреждение высшего профессионального образования Военная академия тыла и транспорта имени А.В. Хрулева
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Министерство обороны Российской Федерации Государственное образовательное учреждение высшего профессионального образования ВОЕННАЯ, Министерство обороны Российской Федерации Государственное образовательное учреждение высшего профессионального образования Военная академия тыла и транспорта имени А.В. Хрулева filed Critical Министерство обороны Российской Федерации Государственное образовательное учреждение высшего профессионального образования ВОЕННАЯ
Priority to RU2010118262/03A priority Critical patent/RU2010118262A/en
Publication of RU2010118262A publication Critical patent/RU2010118262A/en

Links

Abstract

Способ установки надстроек промежуточных опор и пролетных строений железнодорожных мостов, при котором на базу укрупнительной сборки элементов моста подают укладочный кран УК-25/9-18 с платформами типа МПД, платформы загружают перевернутыми звеньями мостового полотна, на которые устанавливают собранные блоки надстроек опор и пролетные строения, в последовательности их дальнейшей установки в оси моста, и в количестве, необходимом для строительства (восстановления) всего моста, после чего формируют установочный поезд и подают его в ось моста, затем устанавливают с одной стоянки крана, постепенно подтягивая с платформ по роликовому конвейеру в шлюз крана очередной элемент моста, надстройку опоры, пролетное строение и мостовое полотно, после чего перемещают установочный поезд на уложенное и окончательно собранное мостовое полотно и весь цикл повторяют до полной сборки всего стоящегося (восстанавливаемого) моста. A method of installing add-ons for intermediate supports and spans of railway bridges, in which a UK-25 / 9-18 laying crane with MPD-type platforms is fed to the base assembly structure of the bridge elements, the platforms are loaded with inverted links of the bridge web onto which assembled blocks of support structures and spans are installed structures, in the sequence of their further installation in the axis of the bridge, and in the amount necessary for the construction (restoration) of the entire bridge, after which they form the installation train and feed it into the axis of the mos that, then install from one parking lot of the crane, gradually pulling from the platforms on the roller conveyor to the crane lock the next bridge element, support superstructure, span and bridge, then the installation train is moved to the laid and finally assembled bridge and the whole cycle is repeated until complete assemblies of the entire standing (restored) bridge.

Claims (1)

Способ установки надстроек промежуточных опор и пролетных строений железнодорожных мостов, при котором на базу укрупнительной сборки элементов моста подают укладочный кран УК-25/9-18 с платформами типа МПД, платформы загружают перевернутыми звеньями мостового полотна, на которые устанавливают собранные блоки надстроек опор и пролетные строения, в последовательности их дальнейшей установки в оси моста, и в количестве, необходимом для строительства (восстановления) всего моста, после чего формируют установочный поезд и подают его в ось моста, затем устанавливают с одной стоянки крана, постепенно подтягивая с платформ по роликовому конвейеру в шлюз крана очередной элемент моста, надстройку опоры, пролетное строение и мостовое полотно, после чего перемещают установочный поезд на уложенное и окончательно собранное мостовое полотно и весь цикл повторяют до полной сборки всего стоящегося (восстанавливаемого) моста. A method of installing add-ons for intermediate supports and spans of railway bridges, in which a UK-25 / 9-18 laying crane with MPD-type platforms is fed to the base assembly structure of the bridge elements, the platforms are loaded with inverted links of the bridge web onto which assembled blocks of support structures and spans are installed structures, in the sequence of their further installation in the axis of the bridge, and in the amount necessary for the construction (restoration) of the entire bridge, after which they form the installation train and feed it into the axis of the mos that, then install from one parking lot of the crane, gradually pulling from the platforms on the roller conveyor to the crane lock the next bridge element, support superstructure, span and bridge, then the installation train is moved to the laid and finally assembled bridge and the whole cycle is repeated until complete assemblies of the entire standing (restored) bridge.
RU2010118262/03A 2010-05-05 2010-05-05 METHOD FOR INSTALLING ADJUSTMENTS OF INTERMEDIATE SUPPORTS AND SPAN STRUCTURES OF RAILWAY BRIDGE RU2010118262A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2010118262/03A RU2010118262A (en) 2010-05-05 2010-05-05 METHOD FOR INSTALLING ADJUSTMENTS OF INTERMEDIATE SUPPORTS AND SPAN STRUCTURES OF RAILWAY BRIDGE

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2010118262/03A RU2010118262A (en) 2010-05-05 2010-05-05 METHOD FOR INSTALLING ADJUSTMENTS OF INTERMEDIATE SUPPORTS AND SPAN STRUCTURES OF RAILWAY BRIDGE

Publications (1)

Publication Number Publication Date
RU2010118262A true RU2010118262A (en) 2011-11-10

Family

ID=44996941

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2010118262/03A RU2010118262A (en) 2010-05-05 2010-05-05 METHOD FOR INSTALLING ADJUSTMENTS OF INTERMEDIATE SUPPORTS AND SPAN STRUCTURES OF RAILWAY BRIDGE

Country Status (1)

Country Link
RU (1) RU2010118262A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU172673U1 (en) * 2017-01-26 2017-07-19 Федеральное государственное казенное военное образовательное учреждение высшего образования "ВОЕННАЯ АКАДЕМИЯ МАТЕРИАЛЬНО-ТЕХНИЧЕСКОГО ОБЕСПЕЧЕНИЯ имени генерала армии А.В. Хрулева" COMPONENT STAND OF THE PLANE SUPPORT OF THE REM-500 METAL STRUCTURE
RU2673345C1 (en) * 2017-08-07 2018-11-26 Федеральное государственное казенное военное образовательное учреждение высшего образования "ВОЕННАЯ АКАДЕМИЯ МАТЕРИАЛЬНО-ТЕХНИЧЕСКОГО ОБЕСПЕЧЕНИЯ имени генерала армии А.В. Хрулева" Method of installing bridge span structures of rem-500 metal overhead
RU2737748C1 (en) * 2019-11-18 2020-12-02 Федеральное государственное казенное военное учреждение высшего образования "ВОЕННАЯ АКАДЕМИЯ МАТЕРИАЛЬНО-ТЕХНИЧЕСКОГО ОБЕСПЕЧЕНИЯ имени Генерала армии А.В. Хрулева" Installation of underwater road demountable bridge in design position of superstructure with one intermediate pile-shoe support

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU172673U1 (en) * 2017-01-26 2017-07-19 Федеральное государственное казенное военное образовательное учреждение высшего образования "ВОЕННАЯ АКАДЕМИЯ МАТЕРИАЛЬНО-ТЕХНИЧЕСКОГО ОБЕСПЕЧЕНИЯ имени генерала армии А.В. Хрулева" COMPONENT STAND OF THE PLANE SUPPORT OF THE REM-500 METAL STRUCTURE
RU2673345C1 (en) * 2017-08-07 2018-11-26 Федеральное государственное казенное военное образовательное учреждение высшего образования "ВОЕННАЯ АКАДЕМИЯ МАТЕРИАЛЬНО-ТЕХНИЧЕСКОГО ОБЕСПЕЧЕНИЯ имени генерала армии А.В. Хрулева" Method of installing bridge span structures of rem-500 metal overhead
RU2737748C1 (en) * 2019-11-18 2020-12-02 Федеральное государственное казенное военное учреждение высшего образования "ВОЕННАЯ АКАДЕМИЯ МАТЕРИАЛЬНО-ТЕХНИЧЕСКОГО ОБЕСПЕЧЕНИЯ имени Генерала армии А.В. Хрулева" Installation of underwater road demountable bridge in design position of superstructure with one intermediate pile-shoe support

Similar Documents

Publication Publication Date Title
CN109972517B (en) Construction method of main beam of cable-stayed bridge with steel-concrete composite beam
CN104480862B (en) A kind of erection method of cable stayed bridge end bay steel truss girder
ATE548258T1 (en) METHOD AND SYSTEMS FOR A COMPOSITE STRUCTURAL SUPPORT
WO2011055996A3 (en) Method for constructing a suspension bridge using temporary cables under tensionless stay cable conditions, and temporary cable for same
JP6514882B2 (en) Construction method of bridge girder
MX2009013516A (en) Method for mounting in sections an annular tower for wind power generator, heliostatic power generator or chimney composed from three concrete segments or more.
WO2011005009A3 (en) Upper part structure for a continuous bridge, which efficiently supports negative moment and has improved constructability, and method for constructing same
RU2010118262A (en) METHOD FOR INSTALLING ADJUSTMENTS OF INTERMEDIATE SUPPORTS AND SPAN STRUCTURES OF RAILWAY BRIDGE
JP2015078561A (en) Erection method of steel structure
KR101404481B1 (en) Bridge construction method using road decking panel at limited space for girder manufacturing
GB2521981A (en) Improvements relating to railway structures
EA201400082A1 (en) COMBINATION WAY OF THE INCLINED TRANSPORT SYSTEM OF CARRIER DUMP TRUCKS
CN204113295U (en) A kind of municipal shield tunnel
JP2011208419A (en) Erection method of bridge girder
RU2010113460A (en) APPLICATION OF THE LAYING CRANE UK 25 / 9-18 FOR THE INSTALLATION OF SPAN STRUCTURES OF THE BRIDGE
WO2011160625A3 (en) Method for rehabilitating a track system having a ballast bed
CN204940118U (en) Walking beam rail set
DE602007000342D1 (en) Installation structure and method for installing cladding and equipment
KR102213088B9 (en) Precast concrete girder for used by continuous construction method
DE112019007617A5 (en) Steel installation part for buildings to replace a predetermined area of a reinforced concrete part intended for load bearing
CN203977245U (en) A kind of modularization concrete splicing road
WO2016162881A3 (en) Precast segments for elevated transit rail station
CN103757994B (en) Based on the floating ballast bed construction method of floating plate and macromolecule isolation mounting
RU2016143796A (en) METHOD FOR INSTALLATION OF REM-500
KR20120072446A (en) Precast segment of the stress ribbon bridge and system/method constructing the stress ribbon bridge by it

Legal Events

Date Code Title Description
FA94 Acknowledgement of application withdrawn (non-payment of fees)

Effective date: 20121114