RU2009329C1 - Method for formation of filling mass under permafrost conditions - Google Patents
Method for formation of filling mass under permafrost conditions Download PDFInfo
- Publication number
- RU2009329C1 RU2009329C1 SU4871152A RU2009329C1 RU 2009329 C1 RU2009329 C1 RU 2009329C1 SU 4871152 A SU4871152 A SU 4871152A RU 2009329 C1 RU2009329 C1 RU 2009329C1
- Authority
- RU
- Russia
- Prior art keywords
- formation
- filling
- layers
- filling mass
- array
- Prior art date
Links
Landscapes
- Treatment Of Sludge (AREA)
Abstract
Description
Изобретение относится к горной промышленности и может быть использовано при разработке полезных ископаемых подземным способом в условиях многолетней мерзлоты. The invention relates to the mining industry and can be used in the development of minerals underground method in the conditions of permafrost.
Цель изобретения - сокращение времени на возведение массива. The purpose of the invention is the reduction of time for the construction of the array.
Способ осуществляется следующим образом. The method is as follows.
При подземной разработке полезных ископаемых в выработанном пространстве формируют целик. Для этого по размерам целика изготавливается опалубка и через скважину, пробуренную с поверхности, подают материал, из которого формируют закладочный массив. В качестве закладочного материала используют горные породы в талом состоянии. Перед началом закладочных работ этот материал доводят до полного влагонасыщения, т. е. используют смесь талых грунтов с водой. Одновременно из этих же пород подготавливается более сухая смесь с весовой влажностью 5-15% , которая используется для компенсирующего слоя. In underground mining, a pillar is formed in the worked out space. To do this, the formwork is made according to the size of the pillar and through the well drilled from the surface, the material is fed from which the filling array is formed. Rocks in a thawed state are used as filling material. Before starting the laying work, this material is brought to full moisture saturation, i.e., a mixture of thawed soils with water is used. At the same time, a drier mixture with a weight humidity of 5-15% is prepared from the same rocks, which is used for the compensating layer.
Приготовленными смесями послойно закладывают выработанное пространство на всю высоту и оставляют в покое. При этом мощность компенсирующих слоев выбирают в зависимости от высоты закладочного массива и физических параметров укладываемого материала. Под воздействием отрицательной температуры вмещающих пород вода, находящаяся в закладочной смеси, замерзает по периметру закладочного массива в направлении к центру целика, и в результате объемного расширения из слоев с полным влагонасыщением переходит в менее влагонасыщенный компенсирующий слой, образуя по всей высоте целика равномерный по влажности закладочный массив. Using prepared mixtures, lay out the worked-out space in full layers and leave it alone. The power of the compensating layers is selected depending on the height of the filling array and the physical parameters of the material being laid. Under the influence of the negative temperature of the enclosing rocks, the water in the filling mixture freezes along the perimeter of the filling mass in the direction to the center of the pillar, and as a result of volume expansion from layers with full moisture saturation, it passes into a less moisture-saturated compensating layer, forming a filling with a uniform moisture content throughout the height of the pillar an array.
Применение указанного способа исключает образование внутри массива линз из несмерзшейся воды и тем самым сокращает время на возведение массива и не требует дополнительных энергозатрат для смерзания целика. (56) Авторское свидетельство СССР N 70123, кл. E 21 15/00, 1950. The application of this method eliminates the formation of lenses from non-frozen water inside the array and thereby reduces the time required to erect the array and does not require additional energy consumption to freeze the pillar. (56) Copyright certificate of the USSR N 70123, cl. E 21 15/00, 1950.
Авторское свидетельство СССР N 589446, кл. E 21 15/08, 1948. USSR copyright certificate N 589446, cl. E 21 15/08, 1948.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU4871152 RU2009329C1 (en) | 1990-10-01 | 1990-10-01 | Method for formation of filling mass under permafrost conditions |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU4871152 RU2009329C1 (en) | 1990-10-01 | 1990-10-01 | Method for formation of filling mass under permafrost conditions |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2009329C1 true RU2009329C1 (en) | 1994-03-15 |
Family
ID=21538813
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU4871152 RU2009329C1 (en) | 1990-10-01 | 1990-10-01 | Method for formation of filling mass under permafrost conditions |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2009329C1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2452858C2 (en) * | 2010-07-02 | 2012-06-10 | Учреждение Российской академии наук Институт горного дела Севера им. Н.В. Черского Сибирского отделения РАН | Underground development method of technogenic deep-lying gravel deposits of permafrost zone |
-
1990
- 1990-10-01 RU SU4871152 patent/RU2009329C1/en active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2452858C2 (en) * | 2010-07-02 | 2012-06-10 | Учреждение Российской академии наук Институт горного дела Севера им. Н.В. Черского Сибирского отделения РАН | Underground development method of technogenic deep-lying gravel deposits of permafrost zone |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2009329C1 (en) | Method for formation of filling mass under permafrost conditions | |
Türkmen et al. | Grouting a tunnel cave-in from the surface: a case study on Kurtkulağı irrigation tunnel, Turkey | |
GB1530441A (en) | Impermeable ecological barrier and process of making same from reconstituted shale | |
RU2602565C1 (en) | Backfilling mass erection method | |
RU2172837C2 (en) | Method of protection of in-bed mine workings | |
RU2203426C2 (en) | Stowage material and process of its laying in worked-out space (versions) | |
RU2099534C1 (en) | Method for support of underground working in water-logged frozen grounds | |
SU483477A1 (en) | The method of construction of gravel base of the road | |
SU924412A2 (en) | Method for filling worked space | |
JPS5667013A (en) | Stabilization technique for housing area, roads or ground | |
SU1073367A1 (en) | Shallow-depth pressure-head tunnel | |
SU1170042A1 (en) | Method of consolidating sagging loess soil | |
SU756042A1 (en) | Method of ice filling-up of underground working | |
SU1068575A1 (en) | Method of constructing earth structures | |
RU1812309C (en) | Process of mining thick self-igniting coal seams | |
RU2093678C1 (en) | Method for mining thick steep ore bodies | |
SU1717823A1 (en) | Method of ore mining under complicated mining and geological conditions | |
Brekke | Shotcrete in hard-rock tunneling | |
RU1803562C (en) | Method of erection of artificial pillars in underground working of mines | |
SU1689617A1 (en) | Method for erecting artificial supports | |
SU1364734A1 (en) | Method of erecting solid concrete support | |
RU1786276C (en) | Method for construction of artificial pillars, isolation and gob packs, and dams in workings | |
SU1342972A1 (en) | Method of erecting earth structures | |
SU1351997A1 (en) | Method of compacting the body of sagging loess soil | |
SU1071690A1 (en) | Method of constructing a counter-filtration screen |