RU2008116906A - METHOD FOR FORMING A CLOSED AQUATORY BOTTOM AREA WITH THE POSSIBILITY OF ITS DRYING AND ITS SYSTEM IMPLEMENTING - Google Patents

METHOD FOR FORMING A CLOSED AQUATORY BOTTOM AREA WITH THE POSSIBILITY OF ITS DRYING AND ITS SYSTEM IMPLEMENTING Download PDF

Info

Publication number
RU2008116906A
RU2008116906A RU2008116906/03A RU2008116906A RU2008116906A RU 2008116906 A RU2008116906 A RU 2008116906A RU 2008116906/03 A RU2008116906/03 A RU 2008116906/03A RU 2008116906 A RU2008116906 A RU 2008116906A RU 2008116906 A RU2008116906 A RU 2008116906A
Authority
RU
Russia
Prior art keywords
spb
closed
section
equipment
plan
Prior art date
Application number
RU2008116906/03A
Other languages
Russian (ru)
Other versions
RU2382142C2 (en
Inventor
Николай Иванович Петров (RU)
Николай Иванович Петров
Владимир Яковлевич Коростышевский (RU)
Владимир Яковлевич Коростышевский
Original Assignee
Закрытое акционерное общество "Фирма УНИКОМ" (RU)
Закрытое акционерное общество "Фирма УНИКОМ"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Закрытое акционерное общество "Фирма УНИКОМ" (RU), Закрытое акционерное общество "Фирма УНИКОМ" filed Critical Закрытое акционерное общество "Фирма УНИКОМ" (RU)
Priority to RU2008116906/03A priority Critical patent/RU2382142C2/en
Publication of RU2008116906A publication Critical patent/RU2008116906A/en
Application granted granted Critical
Publication of RU2382142C2 publication Critical patent/RU2382142C2/en

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Revetment (AREA)

Abstract

1. Способ формирования замкнутого в плане участка дна акватории с возможностью его осушения, включающий первоначальное изготавление единого с управляемой плавучестью средства без донной части и с размещенными на ней крановым и другим оборудованием, площадками для временного складирования строительных материалов, которое затем транспортируют и выводят на место формирования замкнутого в плане огражденного участка дна акватории, позиционируют и фиксируют положение упомянутого плавучего средства над ним с помощью фиксаторов, после чего выравнивают по горизонту и затем на дне акватории возводят замкнутый в плане участок путем огражденния его пространства, после чего, при необходимости, удаляют воду из огражденного пространства и производят на нем работы, отличающийся тем, что единое с управляемой плавучестью средство без донной части изготавливают в виде самоподъемной с майной по середине плавучей баржи (СПБ) и на ней в качестве фиксаторов используют четное, не менее четырех, количество опускаемых опор, обеспечивающих при необходимости подъем корпуса СПБ на высоту, исключающую воздействие волновых нагрузок на корпус СПБ, с внутренней стенки майны устанавливают с возможностью заглубления в грунт направляющие (тавры), а по верх палубы СПБ в составе другого оборудования располагают набор кессонов, которые выполняют с возможностью взаимодействия с направляющими путем перемещения по ним при их погружении с помощью кранового оборудования, а после выравнивания СПБ по горизонту с помощью кранового оборудования по направляющим монтируют кессоны, соединяя их для герметичности между собой традиционными замка1. The method of forming a closed in plan section of the bottom of the water area with the possibility of drainage, including the initial production of a single, with controlled buoyancy means without a bottom and with crane and other equipment placed on it, sites for temporary storage of building materials, which are then transported and put into place the formation of a closed in plan fenced section of the bottom of the water area, position and fix the position of the aforementioned floating means above it with the help of clamps, after which they are leveled horizontally and then at the bottom of the water area they erect a section that is closed in plan by fencing its space, after which, if necessary, remove water from the fenced space and work on it, characterized in that a unit with controlled buoyancy without the bottom is made in the form self-elevating with a lane in the middle of a floating barge (SPB) and on it, as an anchor, use an even, not less than four, number of lowered supports, providing, if necessary, lifting the SPB hull to a height, suit the damaging effect of wave loads on the SPB hull, from the inner wall of the lane, guides (brands) are installed with the possibility of deepening into the ground, and a set of caissons are placed on top of the SPB deck as part of other equipment, which can interact with the guides by moving along them when immersed with the help of crane equipment, and after aligning the SPB horizontally with the help of crane equipment along the rails, the caissons are mounted, connecting them for tightness with a traditional lock

Claims (2)

1. Способ формирования замкнутого в плане участка дна акватории с возможностью его осушения, включающий первоначальное изготавление единого с управляемой плавучестью средства без донной части и с размещенными на ней крановым и другим оборудованием, площадками для временного складирования строительных материалов, которое затем транспортируют и выводят на место формирования замкнутого в плане огражденного участка дна акватории, позиционируют и фиксируют положение упомянутого плавучего средства над ним с помощью фиксаторов, после чего выравнивают по горизонту и затем на дне акватории возводят замкнутый в плане участок путем огражденния его пространства, после чего, при необходимости, удаляют воду из огражденного пространства и производят на нем работы, отличающийся тем, что единое с управляемой плавучестью средство без донной части изготавливают в виде самоподъемной с майной по середине плавучей баржи (СПБ) и на ней в качестве фиксаторов используют четное, не менее четырех, количество опускаемых опор, обеспечивающих при необходимости подъем корпуса СПБ на высоту, исключающую воздействие волновых нагрузок на корпус СПБ, с внутренней стенки майны устанавливают с возможностью заглубления в грунт направляющие (тавры), а по верх палубы СПБ в составе другого оборудования располагают набор кессонов, которые выполняют с возможностью взаимодействия с направляющими путем перемещения по ним при их погружении с помощью кранового оборудования, а после выравнивания СПБ по горизонту с помощью кранового оборудования по направляющим монтируют кессоны, соединяя их для герметичности между собой традиционными замками или болтовыми соединениями и опускают их на дно, формируя с их помощью на дне акватории замкнутый в плане участок путем огражденния его пространства, а после выполнения в этом пространстве работ с помощью кранового оборудования осуществляют подъем кессонов по упомянутым направляющим и разъединяют их поштучно.1. The method of forming a closed in plan section of the bottom of the water area with the possibility of drainage, including the initial production of a single, with controlled buoyancy means without a bottom and with crane and other equipment placed on it, sites for temporary storage of building materials, which are then transported and put into place the formation of a closed in plan fenced section of the bottom of the water area, position and fix the position of the aforementioned floating means above it with the help of clamps, after which they are leveled horizontally and then at the bottom of the water area they erect a section that is closed in plan by fencing its space, after which, if necessary, remove water from the fenced space and work on it, characterized in that a unit with controlled buoyancy without the bottom is made in the form self-elevating with a lane in the middle of a floating barge (SPB) and on it, as an anchor, use an even, not less than four, number of lowered supports, providing, if necessary, lifting the SPB hull to a height, suit the damaging effect of wave loads on the SPB hull, from the inner wall of the lane, guides (brands) are installed with the possibility of deepening into the ground, and a set of caissons are placed on top of the SPB deck as part of other equipment, which can interact with the guides by moving along them when immersed with the help of crane equipment, and after aligning the SPB horizontally with the help of crane equipment along the rails, the caissons are mounted, connecting them for tightness with a traditional lock or bolted joints and lower them to the bottom, forming with their help at the bottom of the water area a plan-closed area by fencing its space, and after performing work in this space using crane equipment, the caissons are lifted along the said guides and disconnected by the pieces. 2. Система формирования замкнутого в плане участка дна акватории с возможностью его осушения, содержащая единое с управляемой плавучестью средство без донной части, фиксаторы его положения над местом формирования замкнутого в плане участка дна акватории и размещенное на палубе крановое оборудование и другое оборудование, площадки для временного складирования строительных материалов, отличающаяся тем, что в качестве единого с управляемой плавучестью средства без донной части применена самоподъемная с майной по середине плавучая баржа (СПБ) и на ней расположены фиксаторы в виде четного, не менее четырех, количества опускаемых опор, обеспечивающих при необходимости подъем корпуса СПБ на высоту, исключающую воздействие волновых нагрузок на корпус СПБ, с внутренней стенки майны установлены направляющие (тавры) с возможностью их заглубления в донный грунт, а по верх палубы СПБ расположен набор кессонов, которые выполнены с возможностью взаимодействия с направляющими путем перемещения по ним при их погружении с помощью кранового оборудования на дно и при подъеме с дна, а так же с возможностью взаимодействия между собой с созданием герметичного в горизонтальной плоскости разъема и с формированием замкнутого в плане огражденного участка дна акватории. 2. The system of forming a planed section of the bottom of the water area with the possibility of draining it, containing a single tool with controlled buoyancy without a bottom, fixators of its position above the formation of a closed plan of the section of the bottom of the water area and crane equipment and other equipment located on the deck, areas for temporary storage of building materials, characterized in that as a single vehicle with controlled buoyancy without a bottom, a self-elevating floating barge with a lane in the middle is used (SPB) and on it there are latches in the form of an even, at least four, number of lowered supports, providing, if necessary, lifting the SPB case to a height that excludes the influence of wave loads on the SPB case, guides (brands) are installed from the inner wall of the lane with the possibility of deepening them in the bottom soil, and on the top of the SPB deck there is a set of caissons that are designed to interact with the guides by moving along them when they are immersed using crane equipment to the bottom and when lifting from the bottom, and It is capable of interacting with each other creating a hermetic horizontal parting plane and forming a closed section in terms of enclosure bottom area.
RU2008116906/03A 2008-04-28 2008-04-28 Method for formation of closed section of water area bottom with possibility of its drying and system, which realises it RU2382142C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2008116906/03A RU2382142C2 (en) 2008-04-28 2008-04-28 Method for formation of closed section of water area bottom with possibility of its drying and system, which realises it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2008116906/03A RU2382142C2 (en) 2008-04-28 2008-04-28 Method for formation of closed section of water area bottom with possibility of its drying and system, which realises it

Publications (2)

Publication Number Publication Date
RU2008116906A true RU2008116906A (en) 2009-11-10
RU2382142C2 RU2382142C2 (en) 2010-02-20

Family

ID=41354236

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2008116906/03A RU2382142C2 (en) 2008-04-28 2008-04-28 Method for formation of closed section of water area bottom with possibility of its drying and system, which realises it

Country Status (1)

Country Link
RU (1) RU2382142C2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2465408C1 (en) * 2011-03-30 2012-10-27 Государственное Унитарное Предприятие "Водоканал Санкт-Петербурга" Method to construct and repair water conduits and headers of shallow waste water on bottom of rivers and water reservoirs
RU2493326C2 (en) * 2011-11-10 2013-09-20 Федеральное государственное образовательное учреждение высшего профессионального образования "Астраханский государственный технический университет" Method to withdraw pile from water area soil

Also Published As

Publication number Publication date
RU2382142C2 (en) 2010-02-20

Similar Documents

Publication Publication Date Title
RU2710433C1 (en) Method for construction of caisson blocks and structure from caisson blocks
US20120321387A1 (en) Universal refloating and launching system and method of operation
US2657540A (en) Method of erecting and positioning marine structures
KR101256265B1 (en) Construction method of the pier without the temporary dike
JP4409357B2 (en) Construction method for underwater foundation
RU2386755C1 (en) Method for arrangement of shallow subway at water area bottom
KR102353849B1 (en) Method of manufacturing concrete block and method of constructing concrete block structure
RU2008116906A (en) METHOD FOR FORMING A CLOSED AQUATORY BOTTOM AREA WITH THE POSSIBILITY OF ITS DRYING AND ITS SYSTEM IMPLEMENTING
JP3065927B2 (en) Dry work method and work box used for it
RU2310721C1 (en) Protection device to protect self-elevating floating drilling installation for exploratory well drilling in ice conditions and method for protection device construction
KR101031571B1 (en) Method for constructing seperating type caisson
CN1020203C (en) Making method of harbour engineering structure parts and its equipment
RU2252300C1 (en) Method and system for shallow tunnel construction on bottom of water area
FI119778B (en) Pile group repair equipment for water structures
KR100556302B1 (en) Caisson Installed Support Means and Construction Method of Underwater Structure Using It
KR200252103Y1 (en) Structure of the pontoon type barge for grauting work in the bottom of the sea
KR101510453B1 (en) Method for constructing steel house bridge footing using steel plate
RU188612U1 (en) DEVICE FOR FLUSH BURNING FLARE GAS AT SEA OIL AND GAS PRODUCTION ON SHIPPING
DK2860314T3 (en) Gravity fundering
KR200357965Y1 (en) Caisson Installed Support Means
RU2011136338A (en) METHOD OF BUILDING A BRIDGE IN AQUATORIA
RU54380U1 (en) SYSTEM FOR TEMPORARY DRAINAGE OF THE SECTION OF THE BOTTOM
KR101381276B1 (en) Construction method of split type pc house and split type pc house
JPH0469253B2 (en)
ES2650735T3 (en) Foundation Base

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20150429