RU2004121381A - METHOD FOR CONTROLLING ARRIVAL OF THE TRAIN COMPLETELY - Google Patents

METHOD FOR CONTROLLING ARRIVAL OF THE TRAIN COMPLETELY Download PDF

Info

Publication number
RU2004121381A
RU2004121381A RU2004121381/11A RU2004121381A RU2004121381A RU 2004121381 A RU2004121381 A RU 2004121381A RU 2004121381/11 A RU2004121381/11 A RU 2004121381/11A RU 2004121381 A RU2004121381 A RU 2004121381A RU 2004121381 A RU2004121381 A RU 2004121381A
Authority
RU
Russia
Prior art keywords
train
rail
time
length
speed
Prior art date
Application number
RU2004121381/11A
Other languages
Russian (ru)
Other versions
RU2271951C1 (en
Inventor
Юрий Иосифович Полевой (RU)
Юрий Иосифович Полевой
Людмила Владимировна Полева (RU)
Людмила Владимировна Полевая
Анатолий Филлипович Хохлов (RU)
Анатолий Филлипович Хохлов
ев Валерий Анатольевич Смышл (RU)
Валерий Анатольевич Смышляев
Валерий Борисович Гуменников (RU)
Валерий Борисович Гуменников
Марина Васильевна Трошина (RU)
Марина Васильевна Трошина
Original Assignee
Самарска государственна академи путей сообщени (СамГАПС) (RU)
Самарская государственная академия путей сообщения (СамГАПС)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Самарска государственна академи путей сообщени (СамГАПС) (RU), Самарская государственная академия путей сообщения (СамГАПС) filed Critical Самарска государственна академи путей сообщени (СамГАПС) (RU)
Priority to RU2004121381/11A priority Critical patent/RU2271951C1/en
Publication of RU2004121381A publication Critical patent/RU2004121381A/en
Application granted granted Critical
Publication of RU2271951C1 publication Critical patent/RU2271951C1/en

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Claims (1)

Способ контроля прибытия поезда в полном составе, заключающийся в том, что поезд, проходящий по двум смежным рельсовым цепям, поочередно обесточивает, а затем возбуждает путевые реле этих рельсовых цепей, отличающийся тем, что отсчитывают время занятия поездом первой по ходу рельсовой цепи до занятия второй и на основании этого времени определяют скорость головы поезда, затем определяют время занятия второй рельсовой цепи с момента освобождения первой и определяют скорость хвоста поезда, по упомянутым скоростям определяют усредненную скорость движения поезда, с учетом времени занятия второй рельсовой цепи определяют сумму длины поезда и второй рельсовой цепи путем умножения упомянутого времени на усредненную скорость, и, наконец, из полученной суммарной длины вычитают известную длину второй рельсовой цепи, что соответствует длине поезда при входе на упомянутые рельсовые цепи, сравнивая полученную длину с той, которая была передана с предыдущей станции (блокпоста), и в случае их совпадения фиксируют прибытие поезда в полном составе.A way to control the arrival of a train in its entirety, consisting in the fact that a train passing through two adjacent rail circuits de-energizes one by one, and then excites the track relays of these rail circuits, characterized in that they count down the time the train takes the first along the rail circuit until the second and based on this time, determine the speed of the head of the train, then determine the time of occupation of the second rail chain from the moment the first one is released and determine the speed of the tail of the train, determine the average the speed of the train, taking into account the occupation time of the second rail chain, determine the sum of the length of the train and the second rail chain by multiplying the mentioned time by the average speed, and finally, the known length of the second rail chain is subtracted from the total length obtained, which corresponds to the length of the train at the entrance to the mentioned rail chains, comparing the received length with the one that was transmitted from the previous station (checkpoint), and if they coincide, they record the arrival of the train in full force.
RU2004121381/11A 2004-07-12 2004-07-12 Method of checking arrival of train with its full complement RU2271951C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2004121381/11A RU2271951C1 (en) 2004-07-12 2004-07-12 Method of checking arrival of train with its full complement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2004121381/11A RU2271951C1 (en) 2004-07-12 2004-07-12 Method of checking arrival of train with its full complement

Publications (2)

Publication Number Publication Date
RU2004121381A true RU2004121381A (en) 2006-01-10
RU2271951C1 RU2271951C1 (en) 2006-03-20

Family

ID=35872251

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2004121381/11A RU2271951C1 (en) 2004-07-12 2004-07-12 Method of checking arrival of train with its full complement

Country Status (1)

Country Link
RU (1) RU2271951C1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4378793A1 (en) * 2022-12-01 2024-06-05 Siemens Mobility GmbH Method for determining a speed value of a track-guided vehicle

Also Published As

Publication number Publication date
RU2271951C1 (en) 2006-03-20

Similar Documents

Publication Publication Date Title
FR2853609B1 (en) METHOD AND DEVICE FOR REDUCING THE BRAKE LOAD ON AT LEAST ONE WHEEL BRAKE
WO2008073545A3 (en) Method and apparatus for optimizing a train trip using signal information
FR2884022B1 (en) METHOD AND DEVICE FOR ASSISTING THE SIDE CONTROL OF A ROLLING PLANE ON A TRACK
NO20072376L (en) Modular scissors bridge, as well as installation device and method for installing modular scissors bridges
JP2018202993A5 (en)
RU2004121381A (en) METHOD FOR CONTROLLING ARRIVAL OF THE TRAIN COMPLETELY
DE60236730D1 (en) RAIL CHAIN SHOE WITH SEVERAL ROLLER TRACKS AND MULTIPLE DRIVE OUTS
CN108642978A (en) A kind of non-covered rack rails changing points mechanism
ATE331080T1 (en) SOLID ROAD
PL1498546T3 (en) Clearing chain for the transport of ballast of a railway track
DE602005017142D1 (en) Soft drive system
FR2818930B1 (en) TRADITIONAL TRACTOR DEVICE ON TRACKS TRANSFORMABLE INTO A RAILROUTED TRACTOR AT HIGH SPEED IN A RAIL CONVEYOR
TW200630620A (en) Method and apparatus for quantifying the timing error induced by an impedance variation of a signal path
ATE518572T1 (en) RIDE BUSINESS AND METHOD FOR OPERATING A RIDE BUSINESS
US1313091A (en) Passenger and freight transfer system
RU2004120622A (en) METHOD FOR MONITORING TRAIN TRAIN IN FULL COMPOSITION
BE1008124A3 (en) METHOD FOR UITSLUIZEN TRANSPORT UNITS IN A HOME TRACK TO A siding IN A FLOOR CHAIN ​​TRANSPORT.
NL1009076C2 (en) Railway transport system for e.g. subway
RU2423266C1 (en) Method of controlling track state
WO2002076219A3 (en) Gas stunning facility for slaughter animals
JPS604462A (en) Railroad crossing fixed-time setter
RU2005115610A (en) METHOD FOR MANAGING TRAIN MOVEMENT AND SYSTEM FOR ITS IMPLEMENTATION
RU2004124308A (en) METHOD FOR MONITORING TRAIN TRAINS IN FULL COMPOSITION
RU2003117315A (en) METHOD FOR DETERMINING THE ADDITIONAL BYPASS ZONE OF THE RELATIVE RAIL CHAIN
SU663618A1 (en) Railway car uncoupling device

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20070713