JP2018202993A5 - - Google Patents

Download PDF

Info

Publication number
JP2018202993A5
JP2018202993A5 JP2017109655A JP2017109655A JP2018202993A5 JP 2018202993 A5 JP2018202993 A5 JP 2018202993A5 JP 2017109655 A JP2017109655 A JP 2017109655A JP 2017109655 A JP2017109655 A JP 2017109655A JP 2018202993 A5 JP2018202993 A5 JP 2018202993A5
Authority
JP
Japan
Prior art keywords
train
time
schedule
control device
station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017109655A
Other languages
Japanese (ja)
Other versions
JP7080019B2 (en
JP2018202993A (en
Filing date
Publication date
Application filed filed Critical
Priority to JP2017109655A priority Critical patent/JP7080019B2/en
Priority claimed from JP2017109655A external-priority patent/JP7080019B2/en
Priority to PCT/JP2018/012239 priority patent/WO2018220966A1/en
Publication of JP2018202993A publication Critical patent/JP2018202993A/en
Publication of JP2018202993A5 publication Critical patent/JP2018202993A5/ja
Application granted granted Critical
Publication of JP7080019B2 publication Critical patent/JP7080019B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Description

上記課題を解決するために、代表的な本発明の列車運行制御装置の一つは、列車が駅へ到着する時刻である到着時刻と駅から出発する時刻である出発時刻を記録したダイヤを管理する列車運行制御装置において、列車の駅間に対して設定された幾つかの走行時間と、当該走行時間ごとに前記ダイヤの運転時隔を達成するための走行目標と、当該走行時間ごとの走行目標に従わない運転を行った場合の運転時隔とが格納された走行時間時隔走行目標データを保持し、駅への到着が遅延する見込みの列車である到着遅延見込列車が存在する場合に、走行時間時隔走行目標データを参照して、到着遅延見込列車に続行する列車がダイヤに記録された到着時刻に従って駅に到着するための走行目標を到着遅延見込列車に対して与えるダイヤ限定修正を行う場合の第1のダイヤ案の評価値と、到着遅延見込列車のダイヤに加えて到着遅延見込列車以外の列車の前記ダイヤも修正するダイヤ全体修正を行う場合の第2のダイヤ案の評価値とをそれぞれ算出し、算出した第1及び第2のダイヤ案の評価値を表示し、又は、当該第1及び第2のダイヤ案の評価値に基づいて、第1及び第2のダイヤ案のいずれか一方を選択することを特徴とする。 In order to solve the above-mentioned problems, one of the typical train operation control devices of the present invention manages a diagram that records an arrival time, which is a time at which a train arrives at a station, and a departure time, which is a time at which the train departs from the station. In the train operation control device to run, some travel time set for between train stations, a travel target to achieve the time interval of the diagram for each travel time, travel for each travel time in the case where the operation time interval in the case of performing the operation that do not comply with the target to hold the traveling time during the interval running target data that has been stored, there is a train at a late arrival expected train expected to delay the arrival of the station , A train-limited correction that gives a run target to a delayed-arrival expected train so that a train continuing to the delayed-arrival expected train arrives at the station according to the arrival time recorded on the schedule with reference to the travel time interval travel target data To Evaluation value of the first diamond draft when cormorants and, second evaluation value of the diamond proposed in the case of performing the diamonds entire modification diamond also modify the arrival delay expected train timetable plus non arrival delay expected train train Are calculated, and the calculated evaluation values of the first and second timetables are displayed, or based on the evaluation values of the first and second timeline plans, the values of the first and second timeline plans are calculated. It is characterized in that either one is selected .

Claims (5)

列車が駅へ到着する時刻である到着時刻と前記駅から出発する時刻である出発時刻を記録したダイヤを管理する列車運行制御装置において、
前記列車の前記駅間に対して設定された幾つかの走行時間と、当該走行時間ごとに前記ダイヤの運転時隔を達成するための走行目標と、当該走行時間ごとの前記走行目標に従わない運転を行った場合の運転時隔とが格納された走行時間時隔走行目標データを保持し、
前記駅への到着が遅延する見込みの前記列車である到着遅延見込列車が存在する場合に、前記走行時間時隔走行目標データを参照して
前記到着遅延見込列車に続行する列車が前記ダイヤに記録された前記到着時刻に従って前記駅に到着するための走行目標を前記到着遅延見込列車に対して与えるダイヤ限定修正を行う場合の第1のダイヤ案の評価値と
前記到着遅延見込列車の前記ダイヤに加えて前記到着遅延見込列車以外の前記列車の前記ダイヤも修正するダイヤ全体修正を行う場合の第2のダイヤ案の評価値とをそれぞれ算出し、算出した前記第1及び第2のダイヤ案の前記評価値を表示し、又は、当該第1及び第2のダイヤ案の前記評価値に基づいて、前記第1及び第2のダイヤ案のいずれか一方を選択すること
を特徴とする列車運行制御装置。
In a train operation control device that manages a diagram recording an arrival time that is a time at which a train arrives at a station and a departure time that is a time at which the train departs from the station,
Some running times set for the trains between the stations, running targets for achieving the operating time interval of the diamond for each running time, and the running targets for each running time are not followed. The driving time interval and the running time interval when the driving is performed
When there is an expected arrival delay train, which is the train expected to be delayed in arriving at the station, with reference to the travel time interval travel target data ,
A first schedule in a case of performing a schedule-limited correction that gives a run target for a train following the arrival delay expected train to arrive at the station according to the arrival time recorded on the schedule to the arrival delay expected train. The evaluation value of the plan ,
In addition to the schedule of the expected arrival delay train, the evaluation value of the second schedule plan in the case of performing a schedule correction of the entire schedule to correct the schedule of the train other than the expected arrival delay train is calculated and calculated. The evaluation values of the first and second timetables are displayed, or one of the first and second timelines is selected based on the evaluation values of the first and second timelines. A train operation control device.
請求項1に記載の列車運行制御装置であって、
前記評価値は、
全列車の遅れ時間合計、
あるいは全列車の平均速度、
あるいは時間当たり輸送力、
あるいは列車間隔の偏差、
あるいは前記ダイヤが保持する全列車の消費電力合計値、
あるいは変電所の最大消費電力値、
のうちの少なくとも1つであること
を特徴とする列車運行制御装置。
The train operation control device according to claim 1 ,
The evaluation value is:
Total delay time of all trains,
Or the average speed of all trains,
Or transport capacity per hour,
Or train interval deviation,
Or the total power consumption of all trains held by the diamond,
Or the maximum power consumption of the substation,
A train operation control device , which is at least one of the following.
請求項1乃至請求項のいずれか一つに記載の列車運行制御装置であって、
前記ダイヤ全体修正とは
前記列車の各駅における前記到着時刻を、
当該列車に先行する列車の当該駅の前記出発時刻から、
前記到着時刻と前記当該駅の前記出発時刻で定まる走行時間に対応する運転時隔以上経過した時刻に設定することを、
前記ダイヤの全列車について実施すること
を特徴とする列車運行制御装置。
The train operation control device according to any one of claims 1 and 2 ,
The diamond whole fixes and is,
The arrival time at each station of the train,
From the departure time at the station of the train preceding the train,
To set the elapsed time operation time interval or corresponding to the transit time determined by the departure time of the arrival time and the relevant station,
A train operation control device, which is implemented for all trains on the diagram.
請求項1乃至請求項のいずれか一つに記載の列車運行制御装置であって、
前記走行目標は
前記列車が前記駅を出発してから進出完了までの時間と、前記駅間の最高速度とを含むこと
を特徴とする列車運行制御装置。
The train operation control device according to any one of claims 1 to 3 ,
The running target,
A train operation control device , comprising: a time from when the train leaves the station to when the train is completed, and a maximum speed between the stations .
請求項乃至請求項のいずれか一つに記載の列車運行制御装置であって、
前記評価値を、重み付け値を用いた重み付け評価値に変換し、
前記第1及び第2のダイヤ案のうちの重み付け評価値の値が高い一方を選択し、
前記第1のダイヤ案を選択した場合には、前記ダイヤ限定修正を行い、前記第2のダイヤ案を選択した場合には、前記ダイヤ全体修正を行うこと
を特徴とする列車運行制御装置。
A train service control system according to any one of claims 1 to 4,
The evaluation value is converted to a weighted evaluation value using a weighted value,
Selecting one of the first and second schedules with a higher weight evaluation value,
When the first schedule is selected, the schedule limitation correction is performed, and when the second schedule is selected, the entire schedule is corrected. Control device.
JP2017109655A 2017-06-02 2017-06-02 Train operation control device Active JP7080019B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2017109655A JP7080019B2 (en) 2017-06-02 2017-06-02 Train operation control device
PCT/JP2018/012239 WO2018220966A1 (en) 2017-06-02 2018-03-26 Train operation control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017109655A JP7080019B2 (en) 2017-06-02 2017-06-02 Train operation control device

Publications (3)

Publication Number Publication Date
JP2018202993A JP2018202993A (en) 2018-12-27
JP2018202993A5 true JP2018202993A5 (en) 2020-02-27
JP7080019B2 JP7080019B2 (en) 2022-06-03

Family

ID=64456212

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017109655A Active JP7080019B2 (en) 2017-06-02 2017-06-02 Train operation control device

Country Status (2)

Country Link
JP (1) JP7080019B2 (en)
WO (1) WO2018220966A1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101558890B1 (en) 2013-07-22 2015-10-12 주식회사한우공영 Expanding apparatus for exhaust pipe insertion joint part of vehicle muffler
JP7186110B2 (en) * 2019-02-21 2022-12-08 公益財団法人鉄道総合技術研究所 Program and train driving simulator
CN110293999B (en) * 2019-04-30 2021-06-04 北京交大思诺科技股份有限公司 Safe LKJ brake control mode
JP7336917B2 (en) * 2019-08-30 2023-09-01 東日本旅客鉄道株式会社 Electric railway power supply system
CN110803204B (en) * 2019-11-13 2021-09-07 东北大学 On-line control method for keeping running stability of high-speed train
WO2022097207A1 (en) 2020-11-04 2022-05-12 三菱電機株式会社 Railroad system, operation management device, operation management method, and operation management program
CN113401172A (en) * 2021-06-28 2021-09-17 通号城市轨道交通技术有限公司 Method and device for adjusting operation line with train as core

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6026551B2 (en) * 2012-10-24 2016-11-16 株式会社日立製作所 Train operation management device, system, and method
JP6453536B2 (en) * 2013-12-03 2019-01-16 株式会社東芝 Train operation control device, control method, and control program
JP6305248B2 (en) * 2014-07-01 2018-04-04 三菱電機株式会社 Energy saving diagram suggestion device

Similar Documents

Publication Publication Date Title
JP2018202993A5 (en)
WO2016057540A3 (en) Managed access system for traffic flow optimization
WO2013169522A3 (en) Public transportation journey planning
EA201790144A1 (en) MANAGEMENT SYSTEM OF AN IMPROVED RAIL TRANSPORT SYSTEM FOR THE TRANSPORT OF BULK CARGOES
US20180129984A1 (en) Virtual queuing techniques
Hall Vehicle scheduling at a transportation terminal with random delay en route
WO2013173581A3 (en) Techniques in transit advertising
WO2007089441A3 (en) Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics
JP7080019B2 (en) Train operation control device
CN110979407B (en) Urban rail train timetable group adjusting method
Schmöcker et al. Metro service delay recovery: comparison of strategies and constraints across systems
SG11202008372PA (en) Railway train operation control method and system
WO2016084197A1 (en) Train operation interval control system, and train operation interval control device
EA201300710A1 (en) METHOD OF MANAGING THE TRAFFIC TRAFFIC BY TIMETABLE
CN108583621B (en) Control method and alarm system
JP2011126404A (en) Operational support device for vehicle not powered by overhead electric wire
MX2019009849A (en) Train stop timer.
JP6143691B2 (en) Operation control system
WO2011137327A3 (en) Methods and apparatus for geographically-based event scheduling
Teng et al. Development and evaluation of bus operation control system based on cooperative speed guidance
JP6324493B2 (en) Driving support system
JP3775322B2 (en) Train passenger guidance information device
Mukherjee et al. Augmenting an inbound raw material handling system of a steel plant by uncovering hidden logistics capacity
JP6527710B2 (en) Railway information providing system and railway information providing method
EP3950545A4 (en) Conveyor system, cause information notification device, program for cause information notification device, and computer-readable recording medium on which program for cause information notification device has been recorded