RU2002100323A - A method of cutting a two-beam fuel assembly of a nuclear reactor for its subsequent storage and a cutting chamber for implementing the method - Google Patents

A method of cutting a two-beam fuel assembly of a nuclear reactor for its subsequent storage and a cutting chamber for implementing the method

Info

Publication number
RU2002100323A
RU2002100323A RU2002100323/06A RU2002100323A RU2002100323A RU 2002100323 A RU2002100323 A RU 2002100323A RU 2002100323/06 A RU2002100323/06 A RU 2002100323/06A RU 2002100323 A RU2002100323 A RU 2002100323A RU 2002100323 A RU2002100323 A RU 2002100323A
Authority
RU
Russia
Prior art keywords
cutting
fuel
tilter
fuel rods
cover
Prior art date
Application number
RU2002100323/06A
Other languages
Russian (ru)
Other versions
RU2219605C2 (en
Inventor
Александр Геннадьевич Божко
Александр Иванович Винников
Анатолий Петрович Дмитриев
Сергей Валентинович Максютенко
Павел Сергеевич Матвеев
Виктор Александрович Шишкин
Леонид Иванович Щуров
Original Assignee
Государственное федеральное унитарное предприятие Центральное конструкторское бюро машиностроения
Filing date
Publication date
Application filed by Государственное федеральное унитарное предприятие Центральное конструкторское бюро машиностроения filed Critical Государственное федеральное унитарное предприятие Центральное конструкторское бюро машиностроения
Priority to RU2002100323A priority Critical patent/RU2219605C2/en
Priority claimed from RU2002100323A external-priority patent/RU2219605C2/en
Publication of RU2002100323A publication Critical patent/RU2002100323A/en
Application granted granted Critical
Publication of RU2219605C2 publication Critical patent/RU2219605C2/en

Links

Claims (8)

1. Способ разделки двухпучковой топливной сборки ядерного реактора для последующего ее хранения, включающий установку сборки в кантователь шахты разделки, отрезку подвески и ее установку в транспортный контейнер для подвесок, разрезку перемычки, соединяющей два пучка твэлов, извлечение верхнего пучка твэлов из кантователя, поворот кантователя в вертикальной плоскости на 180° и извлечение из кантователя нижнего пучка, отличающийся тем, что перед установкой топливной сборки в кантователь шахты разделки, в нем размещают ампулу под нижний пучок твэлов, в которой устанавливают топливную сборку, после разрезки перемычки, верхний пучок твэлов размещают в малой шахте с предварительно установленной в ней ампулой под верхний пучок твэлов, а перед кантованием нижнего пучка твэлов на ампулы малой шахты и кантователя плотно одевают крышки, после поворота кантователя в вертикальной плоскости на 180°, ампулы малой шахты и кантователя, с размещенными в них пучками твэлов, перемещают одновременно к чехлу транспортного контейнера для пучков твэлов и устанавливают в гнезда чехла, а по заполнению всех гнезд чехла осуществляют его установку в транспортный контейнер для пучков твэлов.1. A method of cutting a two-beam fuel assembly of a nuclear reactor for its subsequent storage, including installing the assembly in the tilter of the cutting mine, cutting the suspension and installing it in the transport container for suspensions, cutting the jumper connecting the two bundles of fuel rods, removing the upper bundle of fuel rods from the tilter, turning the tilter 180 ° in the vertical plane and extracting the lower beam from the tilter, characterized in that before installing the fuel assembly in the tilter of the cutting mine, an ampoule under the lower the fuel rod in which the fuel assembly is installed, after cutting the jumper, the upper bundle of fuel rods is placed in a small mine with an ampoule pre-installed in it under the upper bundle of fuel rods, and before tilting the lower bundle of fuel rods to the ampoules of the small shaft and the tilter tightly put on covers after turning the tilter in a vertical plane through 180 °, the ampoules of the small mine and the tilter, with the fuel rods placed in them, are moved simultaneously to the cover of the transport container for the fuel rods and installed in the jacks of the cover, and All the nests of the cover are installed in a transport container for fuel rod bundles. 2. Способ разделки по п.1, отличающийся тем, что отрезанную подвеску топливной сборки размещают в чехле транспортного контейнера для подвесок, а после его заполнения, чехол устанавливают в контейнер для подвесок.2. The cutting method according to claim 1, characterized in that the cut-off suspension of the fuel assembly is placed in the cover of the transport container for suspensions, and after filling it, the cover is installed in the container for suspensions. 3. Способ разделки по п.1, отличающийся тем, что установку верхнего пучка твэлов из кантователя шахты разделки в ампулу малой шахты и установку отрезанной подвески в чехол транспортного контейнера для подвесок, осуществляют консольным краном с двумя независимыми грузовыми подвесками, одна из которых оснащена захватным средством под подвеску топливной сборки а вторая - захватным средством под силовую решетку верхнего пучка твэлов.3. The cutting method according to claim 1, characterized in that the installation of the upper bundle of fuel rods from the tilter of the cutting mine into the ampule of the small mine and the installation of the cut suspension in the cover of the transport container for suspensions is carried out using a jib crane with two independent cargo suspensions, one of which is equipped with a gripper means for suspension of the fuel assembly and the second - gripping means for the power grid of the upper bundle of fuel rods. 4. Способ разделки по п.1, отличающийся тем, что установку ампул в кантователь шахты разделки и в мелкую шахту и все манипуляции с крышками ампул и ампулами, с размещенными в них пучками твэлов, осуществляют вторым консольным краном с двумя независимыми грузовыми подвесками, оснащенными захватными средствами под крышки ампул.4. The cutting method according to claim 1, characterized in that the installation of the ampoules in the tilter of the cutting mine and in the small shaft and all manipulations with the caps of the ampoules and ampoules with the bundles of fuel rods placed in them are carried out by a second jib crane with two independent cargo suspensions equipped with gripping means under the capsules of the ampoules. 5. Способ разделки по п.1, отличающийся тем, что разделку отработавших топливных сборок осуществляют на двух параллельно расположенных технологических линиях, снабженных общими чехлами транспортных контейнеров для пучков твэлов и подвесок.5. The method of cutting according to claim 1, characterized in that the cutting of spent fuel assemblies is carried out on two parallel technological lines equipped with common covers of transport containers for bundles of fuel rods and suspensions. 6. Камера разделки для осуществления способа разделки двухпучковой топливной сборки ядерного реактора, содержащая перемещающийся вдоль продольной оси камеры кран, приемное гнездо и комплект оборудования в виде шахты разделки с кантователем, малой шахты, зажимного устройства, расположенного на шахте разделки, отрезного станка, смонтированного с возможностью его установки соосно шахте разделки, манипулятора с рабочим органом и транспортных контейнеров под пучки твэлов и подвески топливных сборок, отличающаяся тем, что камера разделки снабжена чехлом транспортного контейнера под пучки твэлов с установленными в чехле ампулами с крышками под пучки твэлов и чехлом транспортного контейнера под подвески топливных сборок, малая шахта комплекта оборудования снабжена зажимным устройством, а комплект оборудования дополнительно снабжен двумя настенными консольными кранами с тележками с двумя независимыми грузовыми подвесками каждая, причем один консольный кран установлен с возможностью перемещения между чехлом транспортного контейнера для подвесок топливных сборок и приемным гнездом, а второй - установлен с возможностью перемещения между чехлом транспортного контейнера под пучки твэлов и шахтой разделки.6. Cutting chamber for implementing the method of cutting a two-beam fuel assembly of a nuclear reactor, comprising a crane moving along the longitudinal axis of the chamber, a receiving socket and a set of equipment in the form of a cutting shaft with a tilter, a small shaft, a clamping device located on the cutting shaft, a cutting machine mounted with the possibility of its installation coaxial to the mine of cutting, a manipulator with a working body and transport containers under the bundles of fuel rods and suspension of fuel assemblies, characterized in that the cutting chamber with it is loaded with a transport container cover for bundles of fuel rods with ampoules with covers for fuel bundles and a transport container cover for suspension of fuel assemblies, the small shaft of the equipment set is equipped with a clamping device, and the equipment set is additionally equipped with two wall-mounted console cranes with trolleys with two independent cargo suspensions each, and one cantilever crane is installed with the ability to move between the cover of the transport container for hanging fuel assemblies and receiving mnogo nest, and the second - is installed with the ability to move between the cover of the transport container under the bundles of fuel rods and shaft cutting. 7. Камера разделки по п.6, отличающаяся тем, что грузовые подвески одной тележки оснащены захватными средствами под силовую решетку верхнего пучка твэлов и подвеску топливной сборки, а грузовые подвески второй тележки оснащены захватными средствами под крышки ампул.7. The cutting chamber according to claim 6, characterized in that the cargo suspensions of one truck are equipped with gripping means for the power grid of the upper bundle of fuel rods and the suspension of the fuel assembly, and the cargo suspensions of the second truck are equipped with gripping means for the caps of the ampoules. 8. Камера разделки по п.6, отличающаяся тем, что камера дополнительно снабжена вторым комплектом оборудования и вторым приемным гнездом, при этом комплекты оборудования и приемные гнезда расположены по обе стороны продольной оси камеры, а чехлы транспортных контейнеров расположены на продольной оси камеры.8. The cutting chamber according to claim 6, characterized in that the camera is additionally equipped with a second set of equipment and a second receiving socket, while the sets of equipment and receiving sockets are located on both sides of the longitudinal axis of the camera, and the covers of the transport containers are located on the longitudinal axis of the camera.
RU2002100323A 2002-01-03 2002-01-03 Method and preparation chamber for preparing two-bundle fuel assembly of nuclear reactor for storage RU2219605C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2002100323A RU2219605C2 (en) 2002-01-03 2002-01-03 Method and preparation chamber for preparing two-bundle fuel assembly of nuclear reactor for storage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2002100323A RU2219605C2 (en) 2002-01-03 2002-01-03 Method and preparation chamber for preparing two-bundle fuel assembly of nuclear reactor for storage

Publications (2)

Publication Number Publication Date
RU2002100323A true RU2002100323A (en) 2003-08-20
RU2219605C2 RU2219605C2 (en) 2003-12-20

Family

ID=32065826

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2002100323A RU2219605C2 (en) 2002-01-03 2002-01-03 Method and preparation chamber for preparing two-bundle fuel assembly of nuclear reactor for storage

Country Status (1)

Country Link
RU (1) RU2219605C2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2444799C1 (en) * 2010-07-08 2012-03-10 Открытое акционерное общество "Центральное конструкторское бюро машиностроения" Ampule filling device

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2650187C2 (en) * 2016-07-25 2018-04-11 Акционерное Общество "Центральное Конструкторское Бюро Машиностроения" Method for cutting a two-beam fuel assembly of a nuclear reactor and a device for its implementation
RU2687048C1 (en) * 2018-06-14 2019-05-07 Акционерное общество "Концерн по производству электрической и тепловой энергии на атомных станциях" (АО "Концерн Росэнергоатом") Method of cutting into fragments of long elements of nuclear reactor and device for its implementation
RU2768977C1 (en) * 2021-11-01 2022-03-28 Федеральное государственное бюджетное учреждение науки Институт гидродинамики им. М.А. Лаврентьева Сибирского отделения Российской академии наук (ИГиЛ СО РАН) Tilter for spent fuels assembly (sfa)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2444799C1 (en) * 2010-07-08 2012-03-10 Открытое акционерное общество "Центральное конструкторское бюро машиностроения" Ampule filling device

Similar Documents

Publication Publication Date Title
JP5782320B2 (en) Method for carrying out nuclear fuel material in a nuclear power plant
ITMI20101739A1 (en) CARGO VESSEL TO REFORM TUBES WITH A VESSEL FOR LAYING UNDERWATER PIPES, METHOD AND TRANSFER TUBE KITS FROM A CARGO VESSEL TO A VESSEL TO INSTALL UNDERWATER PIPES
CN205158917U (en) Radioactive solid waste of nuclear power plant transports cask
WO2022034965A1 (en) Filter replacement device
EP3790024A1 (en) Remote dismantling system for nuclear power plant and nuclear power plant having same
JP6708619B2 (en) Modular portable cask transfer facility
RU2002100323A (en) A method of cutting a two-beam fuel assembly of a nuclear reactor for its subsequent storage and a cutting chamber for implementing the method
JP6337410B1 (en) Reactor pressure vessel dismantling method
CN108665989A (en) Nuclear Power Station's Exhausted Fuels associated component shears capacity reduction method
RU2328046C2 (en) Process of spent fuel assembly loading into capsule for further storage, and capsule for implementing process
RU2444798C1 (en) Device for collection of spilt spent nuclear fuel pellets
CN1427995A (en) Method and device for loading core of nuclear reactor with fuel assembles
JP5905947B2 (en) Method for carrying out nuclear fuel material in a nuclear power plant
CN111489845A (en) Underwater vertical type shrinkage processing method and device for fuel related assembly
RU2219605C2 (en) Method and preparation chamber for preparing two-bundle fuel assembly of nuclear reactor for storage
RU2002114532A (en) A method of cutting a spent two-beam fuel assembly of a nuclear reactor for its subsequent storage and a cutting chamber for its implementation
CN209912518U (en) Underwater vertical type shrinkage processing device for fuel related assembly
RU2226011C2 (en) Method and chamber for dismantling nuclear reactor spent fuel for its next storage
JP6473775B2 (en) Carrying out the reactor internals in a nuclear power plant
RU2171508C2 (en) Method and chamber for separating spent two- bundle fuel assembly of nuclear reactor for its further disposal
JP6670660B2 (en) Volume reduction processing device and volume reduction processing method
RU2208849C2 (en) Method and facility for stripping spent fuel assembly of nuclear reactor
CN105500395A (en) Grabbing mechanical arm
CN205419531U (en) Portable prefabricated plate handling instrument
CN213059880U (en) Special lifting appliance for frame type container