RU1789632C - Method of superstructing a building - Google Patents

Method of superstructing a building

Info

Publication number
RU1789632C
RU1789632C SU894715326A SU4715326A RU1789632C RU 1789632 C RU1789632 C RU 1789632C SU 894715326 A SU894715326 A SU 894715326A SU 4715326 A SU4715326 A SU 4715326A RU 1789632 C RU1789632 C RU 1789632C
Authority
RU
Russia
Prior art keywords
building
superstructure
support beams
foundations
existing
Prior art date
Application number
SU894715326A
Other languages
Russian (ru)
Inventor
Семен Григорьевич Матвеев
Original Assignee
Уральский государственный институт по проектированию предприятий горнорудной промышленности
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Уральский государственный институт по проектированию предприятий горнорудной промышленности filed Critical Уральский государственный институт по проектированию предприятий горнорудной промышленности
Priority to SU894715326A priority Critical patent/RU1789632C/en
Application granted granted Critical
Publication of RU1789632C publication Critical patent/RU1789632C/en

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

возведени  этажей надстройки передают на опорные балки и стены усили , напрае-; ленные вверх и соответствующие нагрузкам этажей надстройки с последующей фиксацией опорных узлов стержней на внешних фундаментах, а опорных балок - на фундаментных плитам. .На чертеже п Оказана деталь узла на стыке опорной балки, существующей стены и нового фундамента, расположенного за пределами существующего) здани  и несущего силовые механизмы.the erection of the floors of the superstructure is transferred to the support beams and walls, for example; upward and corresponding to the loads of the superstructure floors with subsequent fixation of the support nodes of the rods on the external foundations, and the support beams - on the foundation plates. .In the drawing n, a detail of the assembly at the junction of the support beam, the existing wall and the new foundation located outside the existing) building and carrying power mechanisms is shown.

Надстройка по предлагаемому способу осуществл етс  в следующем пор дке. The add-on according to the proposed method is carried out in the following order.

В цоколе стены 1 и в фундаменты 2 существующего здани  пробуривают горизонтальные 3 и наклонные 4 скважины, расположенные , например, на рассто нии 3 - 10 м по. длине здани . У существующего здани  вне его контура возвод т новые опоры 5, которые:представ-лены фундаментами на естественном основании или свайным растверкбм, которые могут включать инвентарные элементы. Внутри, зданий ниже уровн  пола первого этажа ввод т или изготавливают опорные балки 6, снабженные стальными обоймами. Опорные балки б ус- танавл ивают на невысокие столбы - прокладки 7. выполненные, например, из кладки и, в свою очередь, опирающиес  на Фундаментные плиты 8. установленные по всей длине опорных балок, В подготовленные ранее скважины 3 и 4 ввод т стержни и креп т к закладным част м опорной балки 6. Стержни в скважинах 3 и 4 должны быть выполнены с коррозионноустойчивой защитой , например, в оболочке, заполненной битумом . На внешние фундаментные опоры 15 устанавливают временно силовые механизмы , например, гидроцилиндрыЭ, оси штоков которых направлены в опорные узлы 10 пересечени  горизонтальных и наклонных стержней, где их временно закрепл ют, например , с применением болтов. При необходимости может быть применена временна  пригрузка внешних фундаментов обычными бетонными блоками фундаментных стенок или иным, способом.In the basement of wall 1 and in the foundations 2 of the existing building, horizontal 3 and 4 inclined wells are drilled, located, for example, at a distance of 3-10 m. building length. Outside of its circuit, an existing building is being constructed with new supports 5, which are: represented by foundations on a natural foundation or pile mortar, which may include inventory items. Inside buildings below the floor level of the first floor, support beams 6 are provided or made with steel cages. The support beams are installed on low poles - gaskets 7. made, for example, of masonry and, in turn, supported by foundation plates 8. installed along the entire length of the support beams. The rods are inserted into the previously prepared wells 3 and 4 and fastened to the embedded parts of the support beam 6. The rods in wells 3 and 4 must be made with corrosion-resistant protection, for example, in a shell filled with bitumen. Temporary power mechanisms, for example, hydraulic cylinders E, are installed on external foundation supports 15, the axis of the rods of which are directed to the support nodes 10 of the intersection of horizontal and inclined rods, where they are temporarily fixed, for example, using bolts. If necessary, temporary loading of the external foundations with conventional concrete blocks of the foundation walls or in another way can be applied.

При воздействии гидроцилиндров 9 с усилием, соответствующим нагрузке от всейWhen exposed to hydraulic cylinders 9 with a force corresponding to the load of the whole

надстройки, опорные балки 6, опирающиес  на фундаментные плиты 8. опускаютс  и об- жимают грунт. Затем выполн ют упоры 11 между опорными балками б и существующими стенами и цокол ми путем применени ,add-ons, support beams 6, supported on foundation plates 8. lower and compress the soil. Then the stops 11 are made between the support beams b and the existing walls and socles by applying

например, бетона, обеспечива  плотное взаимное касание сварных балок 6 и существующих конструкций. После этого на существующих стенах возвод т новое перекрытие и начинают монтаж этажей надстройки . Одновременно примен ют обратное действие гидроцилиндров 9, при котором происходит нагружение внешних фундаментов. Эту операцию осуществл ют постепенно при соответствии нагрузок надстройки и усилий в гидроцилиндрах 9, примен   при этом страховочные листовые прокладки 15Из опорных узлах 10. До окончани  операции снимают блоки и другие элементы пригрузки, после чего опорные узлы 10 закрепл ют в заданном положении путем подливки высокопрочного раствора бетона, а в ниши между столбами - прокладками 7 и затем вместо самих столбов от фундаментных плит 8- до опорных балок 6for example, concrete, providing a tight mutual contact of the welded beams 6 and existing structures. After that, a new ceiling is erected on the existing walls and the installation of superstructure floors begins. At the same time, the reverse action of the hydraulic cylinders 9 is used, in which the loading of the external foundations occurs. This operation is carried out gradually, according to the superstructure loads and the forces in the hydraulic cylinders 9, while using safety sheet gaskets 15 from the support nodes 10. Before the end of the operation, the blocks and other loading elements are removed, after which the support nodes 10 are fixed in position by pouring a high-strength solution concrete, and in the niches between the pillars - gaskets 7 and then instead of the pillars themselves from the foundation plates 8- to the supporting beams 6

ввод т бетон на расшир ющемс  цементе, после чего силовые устройства демонтируют . : . ..concrete is introduced on expanding cement, after which the power devices are dismantled. :. ..

Такой способ возведени  надстройки позвол ет использовать опорные балки заводского изготовлени  или изготавливать их на месте. В соответствии со способом реконструкции существующих фундаментов и оснований (не счита  проходки коротких скважин 3 и 4) исключаетс . Усиление участков стен требуетс  лишь при значительных высотах надстройки практически при четырех и более новых этажах. Больша  часть работ производитс  вне существующего здани , что позвол ет расширить габариты надстройки.This method of erecting the superstructure allows the use of prefabricated support beams or their manufacture on site. In accordance with the reconstruction method of existing foundations and foundations (not counting the penetration of short wells 3 and 4) is excluded. Reinforcement of wall sections is only required at significant superstructure heights with virtually four or more new floors. Most of the work is done outside the existing building, which allows the extension of the superstructure.

Ф.о рмул.а и зоб рете н и F.o. rmul.a and goiter n and

Способ надстройки здани , включающий возведение новых этажей, опирающихс  на существующие стены, отличающийс  темгчто, с целью снижени  трудозатрат при обеспечении возможности увеличени  ra6aL ритов надстройки и свободной планировки ее этажей, осуществл емых без реконструкций фундаменто вГдо возведени  новых этажей внутри здани  устанавливаютA method of building a building, including the construction of new floors, supported by existing walls, which is different in order to reduce labor costs while making it possible to increase the ra6aL of the superstructure and the free planning of its floors, carried out without reconstruction of the foundations. Before building new floors inside the building,

фундаментные плиты с прокладными конструкци ми и опорными балками, а снаружи здани  внешние фундаменты с инвентарными силовыми механизмами, которые соедин ют с опорными балками посредством введенных в предварительно выполненные в цоколе или фундаменте существующих стен, скважины горизонтальных и наклонных стержней с опорными узлами, и осуществл ют обжатие грунта основани foundation plates with embedded structures and support beams, and outside the building external foundations with inventory power mechanisms that are connected to the support beams by means of horizontal and inclined rods with support nodes inserted into existing walls, wells in the base or foundation, and realize ground compaction

силовыми механизмами, после чего выполн ют упоры дл  передачи нагрузок от опорных балок на стены и возвод т новое перекрытие и по мере возведени  этажей надстройки передают на опорные балки иby power mechanisms, after which stops are made to transfer loads from the support beams to the walls and a new ceiling is erected and, as the floors of the superstructure are built, they are transferred to the support beams and

стены усили , направленные вверх и соответствующие нагрузкам этажей надстройки с последующей фиксацией опорных узлов стержней на внешних фундаментах, а опорных балок - на фундаментных плитах.force walls directed upward and corresponding to the loads of the superstructure floors with subsequent fixation of the support nodes of the rods on the external foundations, and the support beams on the foundation plates.

SU894715326A 1989-07-04 1989-07-04 Method of superstructing a building RU1789632C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU894715326A RU1789632C (en) 1989-07-04 1989-07-04 Method of superstructing a building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU894715326A RU1789632C (en) 1989-07-04 1989-07-04 Method of superstructing a building

Publications (1)

Publication Number Publication Date
RU1789632C true RU1789632C (en) 1993-01-23

Family

ID=21459100

Family Applications (1)

Application Number Title Priority Date Filing Date
SU894715326A RU1789632C (en) 1989-07-04 1989-07-04 Method of superstructing a building

Country Status (1)

Country Link
RU (1) RU1789632C (en)

Similar Documents

Publication Publication Date Title
US3184893A (en) Contact foundation method
US5528877A (en) Concrete building frame construction method
JP2012107479A (en) Method for constructing underground and aboveground structure
US3254466A (en) Method of erecting a multi-story building structure
RU2220258C1 (en) Process of erection of multilevel underground structure ( variants )
Gromysz et al. Rectification of walls of the historical brick barrack on the site of the former German Nazi Concentration and Extermination Camp KL Auschwitz-Birkenau
US5893254A (en) Brick wall on piers
RU1789632C (en) Method of superstructing a building
US3091938A (en) Method and structure for underpinning
RU2598615C1 (en) Method of reconstruction and vertical extension of buildings
US3552080A (en) Method for erecting multistory buildings
RU2706288C1 (en) Construction method
RU2293830C1 (en) Method for structure erection between ends of existent buildings
CN117231029B (en) Outer frame for reinforcing and reforming precast slab brick concrete structure and construction method thereof
RU2256046C1 (en) Building reconstruction method
RU190322U1 (en) Device for the construction of multi-storey underground structures
Wong The construction of super high-rise composite structures in Hong Kong
JPH1130053A (en) Construction method of base isolation building
JPH08291529A (en) Underground floor construction method
RU34952U1 (en) Reinforced concrete drill string
RU2575914C1 (en) Method of erection of superstructure at reconstruction of building
SU1249164A1 (en) Ferroconcrete lining of underground structure walls
SU1186738A1 (en) Method of erecting building or structure
JPH02132228A (en) Process of building heavy-duty working floor using existing basement structure
RU2045627C1 (en) Wall of underground structure