RU17054U1 - VOLUME-CROSSING FORMWARE KIT - Google Patents

VOLUME-CROSSING FORMWARE KIT Download PDF

Info

Publication number
RU17054U1
RU17054U1 RU2000113420/20U RU2000113420U RU17054U1 RU 17054 U1 RU17054 U1 RU 17054U1 RU 2000113420/20 U RU2000113420/20 U RU 2000113420/20U RU 2000113420 U RU2000113420 U RU 2000113420U RU 17054 U1 RU17054 U1 RU 17054U1
Authority
RU
Russia
Prior art keywords
formwork
locking
panels
elements
volumetric
Prior art date
Application number
RU2000113420/20U
Other languages
Russian (ru)
Inventor
В.Ю. Еранов
Original Assignee
Еранов Владимир Юрьевич
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Еранов Владимир Юрьевич filed Critical Еранов Владимир Юрьевич
Priority to RU2000113420/20U priority Critical patent/RU17054U1/en
Application granted granted Critical
Publication of RU17054U1 publication Critical patent/RU17054U1/en

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

1. Комплект объемно-переставной опалубки, включающий Г-образные секции полутуннелей, в том числе с торцевым щитом, собираемый в пределах захватки с закреплением элементов опалубки между собой на запорно-поворотные скобы, установленные одним концом подвижно на болте-фиксаторе, расположенном на горизонтальном щите одного элемента опалубки и захватывающим другим концом - крючком второй болт-фиксатор на другом элементе опалубки, отличающийся тем, что в него дополнительно вводят опалубку колонн, столы и доборные щиты опалубки перекрытий, универсальные запорные поворотные скобы с единым модулем кратности габаритных размеров элементов опалубки.2. Комплект объемно-переставной опалубки по п.1, отличающийся тем, что универсальные запорно-поворотные скобы выполнены позволяющими соединение между собой горизонтальных щитов отдельных элементов опалубки при смещении болтов-фиксаторов по разные стороны от стыка щитов относительно друг друга в пределах их шага на величину кратную модулю.3. Комплект объемно-переставной опалубки по п.1, отличающийся тем, что опалубка колонн составляется из Г-образных секций опалубки торца колонны и Г-образных секций межколонного пространства, аналогичных секциям полутуннелей.4. Комплект объемно-переставной опалубки по п.1, отличающийся тем, что продольные балки и плоский настил опалубки перекрытий образуют горизонтальные щиты, оснащенные по периметру болтами-фиксаторами, установленными на расстоянии кратном единому модулю.5. Комплект объемно-переставной опалубки по пп. 1-4, отличающийся тем, что позволяет осуществлять одновременное бетонирование внутренних стен и перекрытий между ним1. A set of volumetric climbing formwork, including L-shaped sections of half tunnels, including with an end shield, assembled within the gripper with fixing the formwork elements to each other on locking-rotary brackets, mounted at one end movably on a fixing bolt located on a horizontal the shield of one formwork element and the second bolt-retainer on another formwork element capturing with the other end, hook, characterized in that the formwork of columns, tables and additional panels of the formwork of floors, are additionally inserted into it versal locking rotary brackets with a single module of the multiplicity of the overall dimensions of the formwork elements. 2. A set of volumetric climbing formwork according to claim 1, characterized in that the universal locking and rotary brackets are made allowing the horizontal panels of the individual formwork elements to be connected together when the locking bolts are displaced on different sides of the joint of the panels relative to each other within their step by a multiple of module. 3. A set of volumetric climbing formwork according to claim 1, characterized in that the column formwork is made up of L-shaped sections of the column end formwork and L-shaped sections of the annular space, similar to sections of half tunnels. 4. A set of volumetric climbing formwork according to claim 1, characterized in that the longitudinal beams and the flat flooring of the formwork of the floors form horizontal panels equipped around the perimeter with fixing bolts installed at a distance multiple of a single module. Set of volumetric climbing formwork according to pp. 1-4, characterized in that it allows for simultaneous concreting of internal walls and ceilings between it

Description

.MP113420.MP113420

Комплект объемно-переставной опалубкиVolumetric formwork kit

Полезная модель относится к строительной технологии и может быть использована для возведения зданий и сооружений с монолитным каркасом и внутренними стенами с нрименением объемно-переставной опалубки, в том числе раздвижной, туннельной, колонн и перекрытий одновременно.The utility model relates to construction technology and can be used for the erection of buildings and structures with a monolithic frame and internal walls with the use of volumetric formwork, including sliding, tunnel, columns and ceilings at the same time.

Наиболее близким техническим решением в части опалубки стен является комплект объемно-переставной туннельной опалубки, содержащей т ннельную оналубку для одной захватки, включающую наборные опалубочные Г-образные щиты-полутуннели и Г-образные щиты с торцом, образующие в спаренном положении туннели, закладные элементы, элементы крепления щитов в стык между собой, подкосы регулируемой длины и несущие швеллерные балки для жесткости щитов, составляющие систему стабилизации опалубки и вспомогательное оборудование - подмости.The closest technical solution in terms of wall formwork is a set of volumetric climbing tunnel formwork containing a tunnel formwork for one grab, including a set of formwork L-shaped half-tunnels and L-shaped panels with an end, forming tunnels in the paired position, embedded elements, the elements for fastening the boards in joint with each other, struts of adjustable length and supporting channel beams for the rigidity of the boards, which make up the formwork stabilization system and auxiliary equipment - scaffolding.

Элемепты крепления потолочных щитов туннельной опалубки между собой по стыку выполнены в виде пары болтов-фиксаторов с пятой, укрепле1П1ых по разные стороны стыкуемых щитов, а нята снабжена установочным штифтом, вставленным в соответствующий паз щита и обеспечивающим стабилизацию осевого расстояпия между болтами-фиксаторами с элементом крепления болтов-фиксаторов, выполпеппом в виде запорной поворотной скобы, установленной одним концом нодвижно на одном болте-фиксаторе, и захватывающим в рабочем положении другим концом-крюком второй болтфиксатор (1,2).The elements of fastening the ceiling shields of the tunnel formwork to each other at the junction are made in the form of a pair of fixing bolts with a fifth fixed on the opposite sides of the joined shields, and the nanny is equipped with a mounting pin inserted into the corresponding groove of the shield and providing stabilization of the axial distance between the fixing bolts with the fastening element fixing bolts, made in the form of a locking rotary bracket, mounted at one end motionlessly on one fixing bolt, and a second hook that captures in working position with the other end-hook bolt lock (1,2).

Недостатками технического решения этой опалубки являются отсутствие в ее составе опалубки колонн и универсальных запорных поворотных скоб, обеспечивающих стабилизацию осевого расстояния между болтамификсаторами, установленными со смещением относительно друг друга по разные стороны от стыка щитов.The disadvantages of the technical solution of this formwork are the absence of column formwork and universal locking rotary brackets in its composition, which provide stabilization of the axial distance between the fixing bolts installed offset from each other on opposite sides from the joint of the panels.

МПК-Е04С11/20MPK-E04S11 / 20

1 3 2 о1 3 2 about

Известны конструкции оналубки для бетонирования колонн, включающие отдельные щиты, соединительные и установочные элементы (3,4).Known designs of formwork for concreting columns, including individual panels, connecting and mounting elements (3,4).

Недостатком этих конструкций является отсутствие горизонтальных щитов с болтами-фиксаторами и занорными новоротными скобами, для соединения с горизонтальными щитами секций нолутуннелей и опалубки нерекрытий, исключающее одновременное бетонирование колонн, перекрытий и внутренних стен.The disadvantage of these designs is the lack of horizontal panels with fixing bolts and naughty new brackets for connecting with horizontal panels of sections of nolutunnels and formwork of non-ceilings, excluding the simultaneous concreting of columns, ceilings and internal walls.

Наиболее близким техническим решением оналубки для бетонирования нерекрытия является оналубка, содержащая параллельно расположенные с возможностью регулированиея по высоте и соединенные между собой посредством крестовой рамы с установленными на них поперечно и продольно расположенными балками, на которых закреплен плоский настил перекрытия (5).The closest technical solution to the concrete formwork for non-flooring concreting is a concrete formwork containing parallel with height adjustment and interconnected by means of a cross frame with beams installed transversely and longitudinally on them, on which a flat flooring is fixed (5).

Недостатками опалубки перекрытий являются ограниченные технологические возможности, нозволяющие использовать ее только в замкнутых объемах строительных объектов, то есть только при наличии внутренних стен, а также отсутствие в конструкции болтов-фиксаторов, обеспечивающих соединение с горизонтальными щитами секций полутуннелей опалубки колонн и доборными щитами.The disadvantages of the formwork of the floors are limited technological capabilities that allow it to be used only in confined volumes of construction objects, that is, only with internal walls, as well as the absence of fixing bolts in the design, which provide connection to the horizontal shields of the sections of the half-tunnels of the column formwork and additional shields.

Нзвестные технические решения объемно-переставных опалубок предполагают выполнение монолитного железобетонного каркаса в два этапа: сначала выполнение стен и колонн, затем - перекрытий, или одновременное выполнение только монолитных стен и перекрытий.Unknown technical solutions of volumetric climbing formwork involve the execution of a monolithic reinforced concrete frame in two stages: first, the execution of walls and columns, then - ceilings, or the simultaneous execution of only monolithic walls and ceilings.

Целью предполагаемого решения является одновременное возведение монолитных железобетонных стен, перекрытий и колонн одновременно.The purpose of the proposed solution is the simultaneous construction of monolithic reinforced concrete walls, ceilings and columns at the same time.

Поставленная цель достигается:The goal is achieved:

1. Определением необходимого модуля кратности габаритных размеров элементов опалубки для составления минимально необходимого количественного и номенклатурного набора элементов оналубки, увязки габаритных размеров строительных конструкций в плане и размеров в осях регулярного плана здания.1. The definition of the required modulus of the multiplicity of the overall dimensions of the formwork elements for the preparation of the minimum required quantitative and nomenclature set of the formwork elements, linking the overall dimensions of building structures in plan and dimensions in the axes of the regular building plan.

2.Назначением габаритных размеров и принятием конструктивного решения формообразующих горизонтальных элементов опалубки, составлением элементов опалубки в блоки.2. The appointment of overall dimensions and the adoption of a constructive solution of the forming horizontal elements of the formwork, the preparation of formwork elements in blocks.

3.Разработкой узлов соединения блоков опалубки между собой.3. The development of nodes of the connection between the formwork blocks.

4.Определением конструкции соединительных элементов.4. The definition of the design of the connecting elements.

Комплект объемно-переставной опалубки отличается тем, что в его состав кроме секций полутунпелей и вставок входят с единым модулем кратности габаритных размеров опалубка колонн, опалубка перекрытия, универсальные запорные новоротпые скобы, позволяющие соединение горизонтальных щитов отдельных блоков опалубки при смещении болтовфиксаторов по разные стороны от стыка щитов относительно друг друга в пределах их шага на величину, кратную модулю.A set of volumetric climbing formwork is distinguished by the fact that, in addition to sections of half-tunnels and inserts, it includes a single module of the multiplicity of overall dimensions of the column formwork, floor formwork, universal locking new-bracket staples that allow the connection of horizontal boards of individual formwork blocks when shifting bolt fixators on different sides from the joint shields relative to each other within their step by an amount multiple of the modulus.

Конструктивное рещение опалубки колонн отличается тем, что ее элементы выполнены в виде сблокированных Г-образных секций опалубки торца колонны и Г-образных секций межколонного пространства аналогичных секциям полутуннелей, включающих установочные, выверочные приспособления и колеса для транспортирования элементов опалубки вручную к месту эвакуации, оснащенных универсальной запорной поворотной скобой для соединения горизонтальных щитов опалубки колонн с секциями нолутуннелей, столами и доборными шитами опалубки перекрытий при возможном смещении болтов-фиксаторов по разные стороны от стыка шитов относительно друг друга в пределах их шага на величину, кратную модулю, что позволяет одновременное бетонирование внутренних стен, колонн и перекрытия.The structural solution of the column formwork is characterized in that its elements are made in the form of interlocked L-shaped sections of the column end formwork and L-shaped sections of the annular space similar to sections of half tunnels, including installation, alignment devices and wheels for manually transporting formwork elements to the evacuation site, equipped with a universal locking rotary bracket for connecting horizontal formwork panels of columns with sections of nolutunnels, tables and additional shields of formwork floors the possible displacement of the fixing bolts on different sides from the joint of the shields relative to each other within their step by an amount multiple of the module, which allows simultaneous concreting of internal walls, columns and ceilings.

Конструкция оналубки иерекрытий отличается тем, что представляет собой цельную конструкцию столов, где продольные балки и плоский настил объединены в горизонтальные щиты, оснащенные по периметру болтамификсаторами, установленными на расстоянии друг от друга кратном модулю, что позволяет соединение между собой, а также с горизонтальными щитамиThe construction of the timber deck and floorings is distinguished by the fact that it is an integral table design, where the longitudinal beams and the flat deck are combined into horizontal panels, equipped around the perimeter with bolts, clamps installed at a distance from each other by a multiple module, which allows connection between each other and also with horizontal panels

секций полутуннелей опалубки колонн, доборными щитами при возможном смещении болтов-фиксаторов по разные стороны от стыка щитов относительно друг друга в пределах их шага на величину, кратную модулю, благодаря чему расширяются технологические возможности использования оналубки за рамки замкнутых объемов строительных конструкций, появляется возможность одновременного ее использования с опалубкой колонн, секциями полутуннелей и доборными щитами.sections of the half-tunnels of the formwork of the columns, additional shields with the possible displacement of the fixing bolts on different sides from the joint of the shields relative to each other within their step by an amount multiple of the module, thereby expanding the technological possibilities of using the formwork beyond the closed volumes of building structures, it becomes possible to simultaneously use with formwork of columns, sections of half tunnels and additional boards.

Предлагаемый комплект объемно-переставной опалубки, предназначенный для возведения сооружений и зданий с монолитным каркасом и внутренними стенами с одновременным бетонированием внутренних степ, колонн и перекрытий поясняется чертежами, где на фиг. 1 изображен блок опалубки колонн, общий вид; на фиг.2 - универсальная запорная поворотная скоба; на фиг.З - фрагмент регулярного плана здания с расстоянием между осями «1-2 и «2-3 -4800мм, «3-4 - 3600мм, «4-5 - 4200 мм, «А-Б и «Г-Д - 6000 мм, «Б-Г - 3000 мм; на фиг.4 - монтажный план расстановки элементов оналубки конструкций регулярного плана здания фиг.З; на фиг.З монтажная схема расстановки элементов опалубки перекрытия и колонн с шагом 6000 мм, разрез А-А; на фиг.6 - монтажная схема расстановки элементов опалубки перекрытий и колонн с шагом 3000 мм, разрез на фиг.7 монтажная схема расстановки элементов опалубки стены, колонны и перекрытия, пролетом 4800 мм, разрез на фиг.8 - монтажная схема расстановки элементов опалубки колонн и перекрытия пролетом 4800 мм, разрез The proposed set of volumetric climbing formwork designed for the construction of structures and buildings with a monolithic frame and internal walls with simultaneous concreting of internal steps, columns and ceilings is illustrated by drawings, where in FIG. 1 shows a block formwork columns, General view; figure 2 - universal locking rotary bracket; in Fig. 3 - a fragment of the regular building plan with the distance between the axes "1-2 and" 2-3 -4800mm, "3-4 - 3600mm," 4-5 - 4200 mm, "A-B and" G-D - 6000 mm, “G-D - 3000 mm; figure 4 - installation plan for the placement of elements of the formwork structures of the regular building plan of Fig.Z; on Fig.3 wiring diagram of the arrangement of elements of the formwork of the floor and columns with a pitch of 6000 mm, section AA; in Fig.6 is a wiring diagram of the arrangement of formwork elements of floors and columns with a pitch of 3000 mm, a section in Fig.7 a wiring diagram of a layout of elements of formwork of a wall, column and ceiling, a span of 4800 mm, a section in Fig.8 is a wiring diagram of a layout of elements of a formwork column and overlapping span 4800 mm, section

Опалубка колонн показана на фиг. 1 и представляет собой блок, составленный из двух Г-образных секций опалубки торцов колонн 13 и двух Гобразных секций межколонного пространства 1, выполненных аналогично Гобразным секциям полутуннелей и состоящих из горизонтального щита 3, стенового щита 4, V-образной стойки 7, подкоса 8 и кронштейна 9. Для установки и выверки блока опалубки по высоте V-образная стойка 7 и стеновой щит 4 оснащены домкратами 5 и для перемещения вручную колесами 6. ВColumn formwork is shown in FIG. 1 and is a block composed of two L-shaped sections of the formwork of the ends of the columns 13 and two L-shaped sections of the annular space 1, made similarly to the L-shaped sections of the half-tunnels and consisting of a horizontal shield 3, a wall shield 4, a V-shaped rack 7, a strut 8 and bracket 9. For installation and alignment of the formwork unit in height, the V-shaped rack 7 and the wall shield 4 are equipped with jacks 5 and for manual movement with wheels 6. B

блоке Г-образные секции опалубки соединяются Т-образными стяжками с шайбами 14. Выверка блока по вертикали и придание ему устойчивого положения выполняется подкосами с домкратами 15, которые при необходимости убираются после закрепления опалубки колонн с другими элементами опалубки запорными поворотными скобами 11, установленными на болтыфиксаторы с гайками 2 но разные стороны стыкуемых щитов напротив друг друга. При смещенном относительно друг друга положении болтовфиксаторов в пределах их шага закрепление элементов опалубки производится универсальными занорными поворотными скобами 12. Универсальная запорная поворотная скоба показана на фиг.2 и для удобства может быть как обычного, так и зеркального типа 12 (фиг.1).L-shaped sections of the formwork are connected by T-shaped ties with washers 14. The vertical alignment of the block and its stabilization is carried out by struts with jacks 15, which, if necessary, are removed after fixing the formwork of the columns with other formwork elements using locking rotary brackets 11 mounted on bolt fixers with nuts 2 but different sides of the mating shields opposite each other. When the position of the bolt fixators is shifted relative to each other within their step, the formwork elements are secured by universal nautical pivoting brackets 12. The universal locking pivoting bracket is shown in Fig. 2 and, for convenience, can be either ordinary or mirror type 12 (Fig. 1).

Расстояние между осями отверстий вдоль длинной стороны скобы соответствует величине модуля кратности размеров элементов опалубки, короткой - фиксированному расстоянию между болтами-фиксаторами, установленными по разные стороны от стыка горизонтальных щитов.The distance between the axes of the holes along the long side of the bracket corresponds to the magnitude of the modularity of the sizes of the formwork elements, the short - to the fixed distance between the fixing bolts installed on opposite sides of the junction of horizontal panels.

Представленный на фиг.З фрагмент регулярного плана включает колонны и внутренние стены пролетом 4800, 4200, 3600 мм и шагом колонн 3000 и 6000 мм, конструкции которых могут быть отформованы представленными на монтажном нлане фиг.4 элементами опалубки, где:The regular plan fragment shown in FIG. 3 includes columns and internal walls with a span of 4800, 4200, 3600 mm and a column pitch of 3000 and 6000 mm, the structures of which can be molded by the formwork elements presented on the mounting flange of FIG. 4, where:

1,16- Г-образные секции межколонного пространства;1,16-L-shaped sections of the annular space;

13 - Г-образные секции торцов колонн;13 - L-shaped sections of the ends of the columns;

17,18- доборные щиты опалубки перекрытия межколонного пространства;17,18 - additional panels of the formwork of the overlap of the annular space;

20- столы опалубки перекрытия пролетного пространства;20 - tables of formwork covering the span;

21- щиты торцов перекрытия;21- shields of the ends of the floor;

22,23 - Г-образные секции полутуннелей;22,23 - L-shaped sections of half tunnels;

24- задний (торцевой) щит полутуннелей;24- back (end) shield of half tunnels;

28 - щиты опалубки стен.28 - shields of wall formwork.

Монтажная схема расстановки элементов опалубки, разрез «Б-Б, представленна на фиг. 6, где составленные зеркально друг к другу Г-образные секции межколонного пространства 1, принадлежащие двум разным блокам опалубки колонн образуют П-образную секцию туннеля для минимального щага колонн - 3000 мм. При увеличенном щаге колонн - 6000 мм, представленном на фиг.5 между Г-образными секциями межколонного пространства 1 на телескопических стойках 19 устанавливаются доборные щиты, длиной 1200мм 17 и 1800 мм 18.The wiring diagram for the arrangement of formwork elements, section “BB, shown in FIG. 6, where the L-shaped sections of the annular space 1, which are mirrored to each other, belonging to two different column formwork blocks form a U-shaped tunnel section for a minimum column span of 3000 mm. With an enlarged column span of 6000 mm, shown in FIG. 5, additional shields with a length of 1200 mm 17 and 1800 mm 18 are installed on the telescopic racks 19 between the L-shaped sections of the annular space 1.

При наличии в комплекте опалубки перекрытия доборных щитов различной длины появляется возможность формовать перекрытие между колонн с различным щагом, кратным модулю, в данном случае 3000, 4200, 4800, 6000 мм и т.д.If there is a complete shuttering formwork of additional panels of various lengths, it becomes possible to form an overlap between columns with a different span that is a multiple of the module, in this case 3000, 4200, 4800, 6000 mm, etc.

Одновременное формование внутренних стен, колонн и перекрытия пролетом 4800 мм показано на монтажной схеме расстановки элементов опалубки (фиг.7), где между Г-образными секциями полутуннелей 23 и опалубкой колонн 1 устанавливается опалубка перекрытий в виде столов 20 и доборных щитов 26.The simultaneous molding of internal walls, columns and floors with a span of 4800 mm is shown in the installation diagram of the arrangement of formwork elements (Fig. 7), where between the L-shaped sections of the half-tunnels 23 and the formwork of the columns 1, the formwork of the floors in the form of tables 20 and additional panels 26 is installed.

В представленной на фиг. 8 монтажной схеме расстановки опалубки показано одновременное формование колонн и перекрытия между ними пролетом 4800 мм, где между опалубкой колонн 1 устанавливаются столы 20 и доборные щиты 26.In the embodiment of FIG. Figure 8 shows the formwork layout and the simultaneous formation of columns and overlapping between them by a span of 4800 mm, where tables 20 and additional panels 26 are installed between the formwork of columns 1.

В представленном комплекте обьемно-переставной опалубки, изменяя количество столов и доборных щитов или меняя ориентацию в плане столов (фиг.4) возможно одновременное формование стен, колонн и перекрытий с необходимым набором размеров между осями конструкций в плане при условии их соответствия модулю кратности габаритных размеров элементов опалубки.In the presented set of volumetric climbing formwork, changing the number of tables and additional boards or changing the orientation in the plan of tables (Fig. 4), it is possible to simultaneously form walls, columns and floors with the necessary set of dimensions between the axes of the structures in the plan, provided they correspond to the modulus of the multiplicity of overall dimensions formwork elements.

ность и качество возводимых зданий и сооружений, увеличивает степень их монолитности, упрощает выполнение основных видов работ, уменьшает количество выполняемых операций, трудозатраты на их выполнение, что сокращает сроки возведения здания, а также сокращает энергопотери в процессе набора прочности бетоном.the availability and quality of the buildings and structures being erected, increases the degree of their monolithicity, simplifies the implementation of the main types of work, reduces the number of operations performed, the labor costs for their implementation, which reduces the time of building construction, and also reduces energy losses in the process of concrete strength building.

Источники информации, принятые во внимание:Sources of information taken into account:

1.Патент РФ №2119026, E04G11/20, 19971. RF patent No. 2119026, E04G11 / 20, 1997

2.Патент РФ №2078180, E04G11/20, 19962. RF patent No. 2078180, E04G11 / 20, 1996

3.Патент СССР №1663146, E04G13/02, 19893. USSR patent No. 1663146, E04G13 / 02, 1989

4.Авторское свидетельство СССР №179458, 37е 11о4 , 19614. USSR Certificate of Authorship No. 179458, 37е 11о4, 1961

5.Патент РФ №2081269, E04G11/38, 1997 Еранов Владимир Юрьевич/у5. RF patent No. 2081269, E04G11 / 38, 1997 Eranov Vladimir /

j - .j -.

Claims (5)

1. Комплект объемно-переставной опалубки, включающий Г-образные секции полутуннелей, в том числе с торцевым щитом, собираемый в пределах захватки с закреплением элементов опалубки между собой на запорно-поворотные скобы, установленные одним концом подвижно на болте-фиксаторе, расположенном на горизонтальном щите одного элемента опалубки и захватывающим другим концом - крючком второй болт-фиксатор на другом элементе опалубки, отличающийся тем, что в него дополнительно вводят опалубку колонн, столы и доборные щиты опалубки перекрытий, универсальные запорные поворотные скобы с единым модулем кратности габаритных размеров элементов опалубки.1. A set of volumetric climbing formwork, including L-shaped sections of half tunnels, including with an end shield, assembled within the gripper with fixing the formwork elements to each other on locking-rotary brackets, mounted at one end movably on a fixing bolt located on a horizontal the shield of one formwork element and the second bolt-retainer on another formwork element capturing with the other end, hook, characterized in that the formwork of columns, tables and additional panels of the formwork of floors, are additionally inserted into it versatile locking rotary brackets with a single module of the multiplicity of the overall dimensions of the formwork elements. 2. Комплект объемно-переставной опалубки по п.1, отличающийся тем, что универсальные запорно-поворотные скобы выполнены позволяющими соединение между собой горизонтальных щитов отдельных элементов опалубки при смещении болтов-фиксаторов по разные стороны от стыка щитов относительно друг друга в пределах их шага на величину кратную модулю. 2. The set of volumetric climbing formwork according to claim 1, characterized in that the universal locking and rotary brackets are made allowing the horizontal panels of the individual formwork elements to be connected together when the locking bolts are displaced on opposite sides of the joint of the panels relative to each other within their step by a multiple of the modulus. 3. Комплект объемно-переставной опалубки по п.1, отличающийся тем, что опалубка колонн составляется из Г-образных секций опалубки торца колонны и Г-образных секций межколонного пространства, аналогичных секциям полутуннелей. 3. The set of space-climbing formwork according to claim 1, characterized in that the formwork of the columns is made up of L-shaped sections of the formwork of the end of the column and L-shaped sections of the annular space, similar to sections of half tunnels. 4. Комплект объемно-переставной опалубки по п.1, отличающийся тем, что продольные балки и плоский настил опалубки перекрытий образуют горизонтальные щиты, оснащенные по периметру болтами-фиксаторами, установленными на расстоянии кратном единому модулю. 4. The set of volumetric climbing formwork according to claim 1, characterized in that the longitudinal beams and the flat flooring of the formwork of the floors form horizontal panels equipped around the perimeter with fixing bolts installed at a distance multiple of a single module. 5. Комплект объемно-переставной опалубки по пп. 1-4, отличающийся тем, что позволяет осуществлять одновременное бетонирование внутренних стен и перекрытий между ними с бетонированием колонн и перекрытий в пределах всей захватки.
Figure 00000001
5. Set of volumetric climbing formwork according to paragraphs. 1-4, characterized in that it allows for simultaneous concreting of internal walls and floors between them with concrete columns and ceilings within the entire capture.
Figure 00000001
RU2000113420/20U 2000-05-26 2000-05-26 VOLUME-CROSSING FORMWARE KIT RU17054U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2000113420/20U RU17054U1 (en) 2000-05-26 2000-05-26 VOLUME-CROSSING FORMWARE KIT

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2000113420/20U RU17054U1 (en) 2000-05-26 2000-05-26 VOLUME-CROSSING FORMWARE KIT

Publications (1)

Publication Number Publication Date
RU17054U1 true RU17054U1 (en) 2001-03-10

Family

ID=48277307

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2000113420/20U RU17054U1 (en) 2000-05-26 2000-05-26 VOLUME-CROSSING FORMWARE KIT

Country Status (1)

Country Link
RU (1) RU17054U1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2505651C2 (en) * 2008-12-04 2014-01-27 Васил РОСАТИ Method for stripping of concrete pouring formwork from concrete surface
EA025899B1 (en) * 2014-06-03 2017-02-28 Мурат Абенович Ахметов Modular formwork system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2505651C2 (en) * 2008-12-04 2014-01-27 Васил РОСАТИ Method for stripping of concrete pouring formwork from concrete surface
US8945442B2 (en) 2008-12-04 2015-02-03 Wasyl Rosati Concrete formwork frame assembly and method of stripping concrete formwork from a concrete surface
EA025899B1 (en) * 2014-06-03 2017-02-28 Мурат Абенович Ахметов Modular formwork system

Similar Documents

Publication Publication Date Title
US10837166B2 (en) Building structure and construction method for same
US20060179787A1 (en) Formwork systems
US5813177A (en) Built-up partition wall framework system
CN101649649A (en) One-time forming construction process for concrete building structures and decoration
RU17054U1 (en) VOLUME-CROSSING FORMWARE KIT
RU62622U1 (en) REINFORCED REINFORCED CONCRETE STRUCTURE OF A MULTI-STOREY BUILDING, FRAMEWORK CONSTRUCTION OF A FRAME, INTERIOR ELEMENT
US20190177975A1 (en) Structural element
US4693445A (en) Concrete and construction system and modular plank element for the concrete formwork thereof
RU2194831C2 (en) Set of volumetric-traveling forms and process of erection of buildings with its use
KR100540185B1 (en) Constructing stone exterior wall supporting frame unit
JP3878546B2 (en) Construction method of cross girder integrated concrete slab
JPS6137693Y2 (en)
RU2197584C1 (en) Multipurpose module forms
CN216196149U (en) Prefabricated reinforced concrete slab stair component
RU74406U1 (en) BLOCK FORMWORK OF MONOLITHIC HOUSING CONSTRUCTION, FORMWORK OF MONOLITHIC BUILDING CONSTRUCTION FROM SUCH BLOCKS
RU4767U1 (en) Dismountable and creeping small-panel formwork
US4834923A (en) Method of concrete construction utilizing a concrete formwork of modular plank elements
RU2252304C2 (en) Panel block assembling device
JP2696196B2 (en) Construction method of concrete building
RU2157878C2 (en) Form for building cast-in-situ concrete structures
SU992706A1 (en) Knock-down shiftable small-board form
JP3247657B2 (en) Construction method of reinforced concrete building
RU2198988C2 (en) Process of erection of monolithic walls of buildings and structures in permanent forms
KR101601627B1 (en) Prefabricated construction using half slab
KR200433870Y1 (en) Forming apparatus for half precast concreat slab