RU162795U1 - SOIL-FILLED PIPELINE LOADER - Google Patents

SOIL-FILLED PIPELINE LOADER Download PDF

Info

Publication number
RU162795U1
RU162795U1 RU2015123234/05U RU2015123234U RU162795U1 RU 162795 U1 RU162795 U1 RU 162795U1 RU 2015123234/05 U RU2015123234/05 U RU 2015123234/05U RU 2015123234 U RU2015123234 U RU 2015123234U RU 162795 U1 RU162795 U1 RU 162795U1
Authority
RU
Russia
Prior art keywords
box
pipeline
duct
soil
facing
Prior art date
Application number
RU2015123234/05U
Other languages
Russian (ru)
Inventor
Александр Алексеевич Тарасенко
Максим Николаевич Редутинский
Original Assignee
Федеральное государственное бюджетное образовательное учреждение высшего образования "Тюменский индустриальный университет" (ТИУ)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Федеральное государственное бюджетное образовательное учреждение высшего образования "Тюменский индустриальный университет" (ТИУ) filed Critical Федеральное государственное бюджетное образовательное учреждение высшего образования "Тюменский индустриальный университет" (ТИУ)
Priority to RU2015123234/05U priority Critical patent/RU162795U1/en
Application granted granted Critical
Publication of RU162795U1 publication Critical patent/RU162795U1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Sewage (AREA)

Abstract

Утяжелитель трубопровода в виде грунтозаполняемого полого седловидного П-образного короба со стенками, наклонными к вертикальной оси, с расширением полости короба вверх, выполненный из стеклоткани, пропитанной твердеющим составом, с усиливающим поясом в верхней части, снабженным по углам монтажными петлями, при этом короб имеет внешние откидывающиеся от боковых стенок боковые элементы устойчивости, выполненные из георешетки, внутренние грани короба, обращенные в смонтированном положении к магистральному трубопроводу, выполнены закругленными, внутренняя поверхность короба, обращенная в смонтированном положении к магистральному трубопроводу, имеет накладки, и в нижней части короба выполнены отверстия для дренажа воды.The pipeline weighting agent in the form of a soil-filled hollow saddle U-shaped duct with walls inclined to the vertical axis, with the duct cavity expanding upward, made of fiberglass impregnated with a hardening compound, with a reinforcing belt in the upper part, equipped with mounting loops at the corners, while the duct has external lateral stability elements, leaning back from the side walls, made of geogrid, the inner sides of the box, facing the main pipeline in the mounted position, are closed Glenn, the inner surface of the box, facing in assembled position relative to the main pipe, has a lining, and the bottom of the box are provided with holes for water drainage.

Description

Полезная модель относится к области сооружения и ремонта магистральных трубопроводов (МТ) на участках обводненных и заболоченных грунтов со слабой несущей способностью, периодически затопляемых прибрежных участках подводных переходов магистральных трубопроводов (ППМТ) и береговых участках малых водотоков, для обеспечения проектного положения МТ в процессе сооружения и эксплуатации.The utility model relates to the field of construction and repair of trunk pipelines (MT) in areas of waterlogged and marshy soils with weak bearing capacity, periodically flooded coastal sections of underwater crossings of trunk pipelines (MPPT) and coastal sections of small watercourses, to ensure the design position of MT during construction and operation.

Известен утяжелитель изолированного трубопровода, выполненный в виде П-образного бетонного блока с симметричными стойками, каждая из которых имеет касательную к трубопроводу (SU 1244420 A1, 30.07.1980). Недостатком известного утяжелителя является значительная материалоемкость, склонность к опрокидыванию при перемещениях МТ, а также повреждение изоляционного покрытия МТ.Known weighting of an insulated pipeline, made in the form of a U-shaped concrete block with symmetrical racks, each of which has a tangent to the pipeline (SU 1244420 A1, 07/30/1980). A disadvantage of the known weighting agent is significant material consumption, a tendency to tip over when moving MT, as well as damage to the insulation coating MT.

Известен утяжелитель трубопровода выполненный в виде П-образного бетонного блока (SU 901693, 10.06.80). Проблема слабой устойчивости на опрокидывание частично решена размещением в нижней части стоек П-образного блока запирающих элементов. Недостатком известного решения является значительная материалоемкость и повреждение изоляционного покрытия МТ седловидной частью утяжелителя и запирающими устройствами.Known weighting of the pipeline made in the form of a U-shaped concrete block (SU 901693, 10.06.80). The problem of poor rollover stability is partially solved by placing locking elements in the bottom of the racks of the U-shaped block. A disadvantage of the known solution is the significant material consumption and damage to the MT insulation coating by the saddle-shaped part of the weighting agent and locking devices.

Известен утяжелитель для балластировки трубопровода, характеризуемый низкой материалоемкостью (RU 2147352 C1, 19.05.1999). Утяжелитель выполнен в виде грунтозаполняемого короба из термопластичного или композитного материала, снабжен ребрами жесткости и имеет седловину для установки на трубопровод. Недостатками данного решения является слабая устойчивость на опрокидывание при перемещениях МТ.Known weighting agent for ballasting the pipeline, characterized by low material consumption (RU 2147352 C1, 05/19/1999). The weighting agent is made in the form of a soil-filling box made of thermoplastic or composite material, equipped with stiffeners and has a saddle for installation on the pipeline. The disadvantages of this solution is the poor rollover stability during MT movements.

Известен утяжелитель трубопровода и способ его балластировки (RU 2185561 C1, 03.11.2000) выбранный в качестве прототипа, согласно которому на МТ устанавливается седловидный П-образный короб из стеклоткани, пропитанной твердеющим составом. Короб выполнен со стенками, наклонными к вертикальной оси и имеет расширение полости вверх. Усиливающий пояс, выполненный у верхнего торца утяжелителя из полосового материала, снабжен по углам монтажными петлями из стеклоткани. Короб снабжен внешними откидывающимися от боковых стенок клапанами из полосового материала, связанными с нижней и верхней частями боковых стенок. В качестве полосового материала применяется стеклоткань. При монтаже пригруза клапаны откидываются и покрывают всю поверхность дна траншеи.A known weighting of the pipeline and the method of ballasting (RU 2185561 C1, 03.11.2000) selected as a prototype, according to which a saddle U-shaped box made of fiberglass impregnated with a hardening composition is installed on the MT. The box is made with walls inclined to the vertical axis and has an expansion cavity up. The reinforcing belt, made at the upper end of the weighting material from strip material, is equipped with mounting loops of fiberglass at the corners. The box is equipped with external flaps from the side walls of the strip material valves associated with the lower and upper parts of the side walls. As a strip material, fiberglass is used. During the installation of the load, the valves recline and cover the entire surface of the bottom of the trench.

Недостатки утяжелителя по патенту RU 2185561 C1:The disadvantages of the weighting agent according to patent RU 2185561 C1:

- грани пригруза, контактирующие в установленном положении с МТ не имеют скруглений, что негативно сказывается на устойчивости пригруза и сохранность изоляционного покрытия при продольных перемещениях МТ.- the edges of the cargo contacting in the installed position with the MT do not have fillets, which negatively affects the stability of the cargo and the safety of the insulation coating during longitudinal movements of the MT.

- седловидная часть пригруза выполнена гладкой, что увеличивает сопротивление продольному перемещению МТ и концентрирует контактное давление.- the saddle-shaped part of the load is smooth, which increases the resistance to longitudinal movement of the MT and concentrates contact pressure.

- откидывающиеся клапаны выполнены из гладкого материала, оказывающего незначительное сопротивление на выдергивание из грунта при возникновении опрокидывающего момента.- the folding valves are made of smooth material that has little resistance to being pulled out of the ground when a tipping moment occurs.

- в нижней части грунтозаполняемых карманов не предусмотрена система дренажа воды.- there is no water drainage system in the bottom of the soil-filled pockets.

Задачей полезной модели является обеспечение свободного перемещения забалластированного трубопровода в продольном направлении, повышение устойчивости и надежности утяжелителя.The objective of the utility model is to ensure free movement of the ballasted pipeline in the longitudinal direction, increasing the stability and reliability of the weighting agent.

Поставленная задача решается тем, что внутренние грани короба, обращенные в смонтированном положении к магистральному трубопроводу (МТ), имеют закругления (1), а седловидная часть пригруза, обращенная в смонтированном положении к магистральному трубопроводу (МТ), снабжена накладками (2), выполненными совместно с конструкцией пригруза, из материала с низким коэффициентом трения относительно изоляционного покрытия трубопровода. Для увеличения устойчивости утяжелителя от опрокидывания, боковые элементы дополнительной устойчивости пригруза (3) выполнены из георешетки. Для дренажа влаги из корпуса пригруза в нижней части стоек П-образного короба выполнены отверстия (4). До заполнения короба грунтом, на дно стоек укладывается нетканый синтетический материал (5), для предотвращения вымывания грунта через дренажные отверстия.The problem is solved in that the inner faces of the box, facing in a mounted position to the main pipeline (MT), have roundings (1), and the saddle-shaped part of the load, facing the mounted pipeline (MT), is equipped with overlays (2) made together with the construction of the load, from a material with a low coefficient of friction relative to the insulating coating of the pipeline. To increase the stability of the weighting material from tipping over, the side elements of the additional stability of the load (3) are made of geogrid. To drain moisture from the body of the cargo in the lower part of the racks of the U-shaped box, holes (4) are made. Before filling the box with soil, a non-woven synthetic material (5) is placed on the bottom of the racks to prevent the soil from being washed out through the drainage holes.

Существенными отличительными признаками заявленной полезной модели являются:The salient features of the claimed utility model are:

- Закругление (1) внутренних граней короба, обращенных в смонтированном положении к магистральному трубопроводу (МТ).- Rounding (1) of the inner faces of the duct, facing in the mounted position to the main pipeline (MT).

- Устройство на поверхности утяжелителя, обращенной в смонтированном положении к магистральному трубопроводу накладок (2), выполненных совместно с конструкцией короба, из материала с низким коэффициентом трения относительно изоляционного покрытия трубопровода.- The device on the surface of the weighting material, mounted in a mounted position to the main pipeline lining (2), made in conjunction with the design of the box, from a material with a low coefficient of friction relative to the insulation coating of the pipeline.

- Устройство в нижней часть грунтозаполняемых карманов отверстий (4), для дренажа воды с укладкой нетканого синтетического материала (5) до заполнения короба грунтом.- The device in the lower part of the soil-filled pockets of holes (4), for water drainage with the laying of non-woven synthetic material (5) until the box is filled with soil.

- Устройство боковых элементов устойчивости (3) из георешетки.- Arrangement of lateral stability elements (3) from the geogrid.

- Обеспечено свободное перемещение забалластированного трубопровода в продольном направлении Изобретение поясняется чертежами, где на фиг. 1 изображен общий вид предлагаемого утяжелителя, на фиг. 2 - поперечное сечение утяжелителя, на фиг. 3 - вид спереди. На чертежах указано: 1 - скругление грани пригруза; 2 -антифрикционные накладки, призванные обеспечить свободное перемещение трубопровода в продольном направлении под пригрузом; 3 - элементы дополнительной устойчивости пригруза от опрокидывания, выполненные из георешетки; 4 - дренажные отверстия; 5 - нетканый синтетический материал.- Provided free movement of ballasted pipeline in the longitudinal direction The invention is illustrated by drawings, where in FIG. 1 shows a General view of the proposed weighting agent, in FIG. 2 is a cross section of a weighting agent, in FIG. 3 is a front view. The drawings indicate: 1 - rounding of the edge of the load; 2 - anti-friction linings designed to provide free movement of the pipeline in the longitudinal direction under load; 3 - elements of additional stability of the load against capsizing, made of geogrid; 4 - drainage holes; 5 - non-woven synthetic material.

Грунтозаполняемый утяжелитель работает следующим образом. Пустой стеклопаластиковый короб устанавливается седловидной частью на трубопровод, уложенный на проектные отметки, боковые элементы дополнительной устойчивости расправляются по стенкам и низу траншеи. После этого производится заполнение короба и элементов дополнительной устойчивости грунтом, предотвращая смещение заполняемого утяжелителя относительно трубопровода. После заполнения короба производится обратная засыпка трубопровода согласно технологических карт на выполнение данного вида работ. Утяжелитель за счет собственного веса, а также веса грунта обваловки (вовлекаемого в работу боковыми элементами дополнительной устойчивости) фиксирует трубопровод в проектном положении, прижимая его седловидной частью к низу траншеи. Элементы дополнительной устойчивости, прижатые к стенкам и низу траншеи грунтом обваловки, предотвращают опрокидывание утяжелителя при перемещениях трубопровода. За счет установки антифрикционных накладок (2) на седловидной части утяжелителя, выполненных из материала с низким коэффициентом трения по изоляционному покрытию трубопровода, существенно снижается сопротивление продольному перемещению трубопровода относительно утяжелителя. Данное решение (совместно с элементами дополнительной устойчивости) минимизирует вероятность опрокидывания утяжелителя, а также исключает повреждение изоляционного покрытия от повреждения при перемещениях трубопровода.Ground filling weight works as follows. An empty fiberglass duct is installed by the saddle-shaped part on the pipeline laid on the design marks, the side elements of additional stability are straightened along the walls and the bottom of the trench. After that, the box and the elements of additional stability are filled with soil, preventing the displacement of the filled weighting material relative to the pipeline. After filling the box, the pipeline is backfilled according to the technological maps for this type of work. The weighting agent due to its own weight, as well as the weight of the embankment soil (involved in the work by the side elements of additional stability) fixes the pipeline in the design position, pressing it with its saddle-shaped part to the bottom of the trench. Elements of additional stability, pressed to the walls and the bottom of the trench by the embankment soil, prevent the weighting from overturning when the pipeline moves. Due to the installation of anti-friction linings (2) on the saddle-shaped part of the weighting material, made of material with a low coefficient of friction on the insulation coating of the pipeline, the resistance to longitudinal movement of the pipeline relative to the weighting material is significantly reduced. This solution (together with additional stability elements) minimizes the likelihood of the weighting toppling over, and also eliminates damage to the insulation coating from damage during pipeline movements.

Claims (1)

Утяжелитель трубопровода в виде грунтозаполняемого полого седловидного П-образного короба со стенками, наклонными к вертикальной оси, с расширением полости короба вверх, выполненный из стеклоткани, пропитанной твердеющим составом, с усиливающим поясом в верхней части, снабженным по углам монтажными петлями, при этом короб имеет внешние откидывающиеся от боковых стенок боковые элементы устойчивости, выполненные из георешетки, внутренние грани короба, обращенные в смонтированном положении к магистральному трубопроводу, выполнены закругленными, внутренняя поверхность короба, обращенная в смонтированном положении к магистральному трубопроводу, имеет накладки, и в нижней части короба выполнены отверстия для дренажа воды.
Figure 00000001
The pipeline weighting agent in the form of a soil-filled hollow saddle U-shaped duct with walls inclined to the vertical axis, with the duct cavity expanding upward, made of fiberglass impregnated with a hardening compound, with a reinforcing belt in the upper part, equipped with mounting loops at the corners, while the duct has external lateral stability elements, leaning back from the side walls, made of geogrid, the inner sides of the box, facing the main pipeline in the mounted position, are closed Glenn, the inner surface of the box, facing in assembled position relative to the main pipe, has a lining, and the bottom of the box are provided with holes for water drainage.
Figure 00000001
RU2015123234/05U 2015-06-16 2015-06-16 SOIL-FILLED PIPELINE LOADER RU162795U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2015123234/05U RU162795U1 (en) 2015-06-16 2015-06-16 SOIL-FILLED PIPELINE LOADER

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2015123234/05U RU162795U1 (en) 2015-06-16 2015-06-16 SOIL-FILLED PIPELINE LOADER

Publications (1)

Publication Number Publication Date
RU162795U1 true RU162795U1 (en) 2016-06-27

Family

ID=56195608

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2015123234/05U RU162795U1 (en) 2015-06-16 2015-06-16 SOIL-FILLED PIPELINE LOADER

Country Status (1)

Country Link
RU (1) RU162795U1 (en)

Similar Documents

Publication Publication Date Title
CN104196034B (en) A kind of utilize steel sheet pile as the foundation ditch construction method in supporting cofferdam
CN103590836B (en) Method for processing tunnel collapse caused by shallow-buried excavation
CN101949153B (en) Foundation drainage control method
CN106759223A (en) Controllable rigid pile+displacement hull+reinforcement cushion combined composite foundation
CN104164853A (en) Gabion box ecological bag and ecological channel revetment retaining wall of waste tire and method thereof
CN110409242A (en) A kind of antifreeze water barrier and roadbed
CN104929142A (en) Combined cofferdam structure and building construction method thereof
CN104895121A (en) Transverse partition method for reducing ground surface settlement and building structure deformation of underground structure construction
RU162795U1 (en) SOIL-FILLED PIPELINE LOADER
CN204551500U (en) Novel cofferdam in a kind of super thick soft foundation
CN105804045A (en) Equipment for strengthening deep soft soil foundation by vacuum preloading of filter well and method
RU2015131903A (en) Permanent frozen drainage system
CN205444109U (en) Can automatic adapt to composite geomembrane seepage prevention structure that weir body warp
CN106758892A (en) A kind of Seasonal freezing areas Freeway draining means of defence
CN101591907B (en) One-piece vacuum preloading method for quickly treating hydraulic fill hedoro foundation
CN105970882A (en) Structure solving reverse osmosis water problem of dam body in construction process of concrete-faced rockfill dam and construction method thereof
RU2467240C1 (en) Underground pipeline routing method
CN104480897B (en) Flood prevention wall with small land occupation and wide application range
CN210049221U (en) Foundation treatment structure for deep silt
CN204098006U (en) Be applicable to the overall composite working cushion layer of super soft weak soil basement process
CN209430248U (en) A kind of buried Central drain discharge structure of novel tunnel
CN108149698A (en) Guiding solid drainage and construction method and system inside a kind of airport high fill foundation
RU124349U1 (en) STRUCTURE OF THE Trench for laying the pipe in the areas of tectonic faults
CN207297090U (en) A kind of sewer structure for expansive stratum Tunnel Base draining
CN204875823U (en) Combination cofferdam structure

Legal Events

Date Code Title Description
MM1K Utility model has become invalid (non-payment of fees)

Effective date: 20160627

NF9K Utility model reinstated

Effective date: 20190110