PL89905B1 - - Google Patents

Download PDF

Info

Publication number
PL89905B1
PL89905B1 PL16936574A PL16936574A PL89905B1 PL 89905 B1 PL89905 B1 PL 89905B1 PL 16936574 A PL16936574 A PL 16936574A PL 16936574 A PL16936574 A PL 16936574A PL 89905 B1 PL89905 B1 PL 89905B1
Authority
PL
Poland
Prior art keywords
pipe
borehole
inclination
ramp
salt
Prior art date
Application number
PL16936574A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL16936574A priority Critical patent/PL89905B1/pl
Publication of PL89905B1 publication Critical patent/PL89905B1/pl

Links

Landscapes

  • Earth Drilling (AREA)

Description

Przedmiotem wynalazku jest sposób drazenia pochylni metoda lugownicza, natryskowa w kopalniach soli.Znany jest w górnictwie solnym sposób drazenia pochylni przy pomocy techniki strzelniczej. Ze wzgledu na niebezpieczenstwo wybuchu gazów w kopalniach gazowych oraz duze zapylenie towarzyszace tej metodzie, znalazla ona zastosowanie zwlaszcza w kopalniach niegazowych, dobrze przewietrzanych. W kopalniach eksplo¬ atujacych sól metodami lugowniczymi czyli „na mokro", w których przewietrzanie wyrobisk slepych (komór, wcinek komorowych, chodników) odbywa sie w sposób naturalny na skutek istnienia pradów wstecznych a zwlaszcza w kopalniach gazowych, zastosowanie znanej metody jest bardzo uciazliwe i wymaga zachowania specjalnych srodków ostroznosci. Metoda ta stosowana jest wiec wyjatkowo przy przechodzeniu przez warstwy anhydrytów i przerostów ilowców solnych. W innych przypadkach do polaczenia dwóch poziomów sluza szybiki zaopatrzone w drabiny. Korzystanie z drabin w warunkach kopalnianych, ciemno i duza wilgotnosc, jest niebezpieczne.Celem wynalazku jest opracowanie latwego sposobu drazenia pochylni metoda lugownicza, eliminujacego zapylenie oraz zapewniajacego calkowite bezpieczenstwo przebywajacych w kopalniach osób.Cel ten zostal osiagniety przez zastosowanie znanej metody lugowniczej przez natryskiwanie z tym, ze postep czola przodka nastepuje po upadzie, a kat nachylenia pochylni jest dowolny i z góry zalozony.Sposób drazenia pochylni metoda lugownicza polega na tym, ze wzdluz osi spagu projektowanej pochylni odwierca sie otwór wiertniczy. Otwór ten laczy dwa wyrobiska na róznych poziomach eksploatacyjnych. Po wykonaniu otworu uzbraja sie go na calej dlugosci rura. Korzystnie jest gdy rura jest cementowo-azbestowa o dlugosci dostosowanej do gabarytów wyrobiska lub stalowa skladajaca sie z segmentów o polaczeniu gwintowym. Przestrzen pomiedzy rura a scianka otworu wiertniczego, na dlugosci okolo 1,5 m od dolu wypelnia sie materialem uszczelniajacym. W tak przygotowanym przodku urabia sie calizne solna znana metoda lugownicza przez natryskiwanie. W wyniku lugowania uzyskuje sie postep czola przodka po upadzie i pochylnie o dowolnym nachyleniu, wyznaczona katem nachylenia otworu wiertniczego.Sposób wedlug wynalazku pozwala na drazenie pochylni o zadanym nachyleniu i przekroju. Tak wydrazo¬ ne pochylnie nadaja sie nie tylko jako drogi transportowe, ale przede wszystkim jako drogi komunikacyjne, bezpieczne dla ludzi. <2 89 905 Wynalazek uwidoczniony jest w przykladzie wykonania na rysunku przedstawiajacym w ujeciu schema¬ tycznym sposób drazenia pochylni. Wyrobiska na róznych poziomach eksploatacyjnych laczy sie odwiercajac po upadzie, wzdluz osi spagu projektowanej pochylni otwór wiertniczy 2. Otwór wiertniczy 2 uzbraja sie na calej •dlugosci rura 3 cementowo-azbestowa lub stalowa, skladajaca sie z segmentów o polaczeniu gwintowym. W celu zabezpieczenia przed przesaczeniem sie na nizszy poziom solanki pochodzacej z czynnego przodka, przestrzen pomiedzy rura 3 a scianka otworu wiertniczego 2 na dlugosci okolo 1,5 m od dolu, wypelnia sie materialem uszczelniajacym 5 w postaci betonu lub ilu. W tak przygotowanym przodku ustawia sie a nastepnie uruchamia chodnikowy aparat natryskowy 1 wyposazony w odpowiednia ilosc koncówek rozpylajacych wode. Liczba i rozmieszczenie koncówek rozpylajacych zalezne sa od zadanego przekroju i profilu pochylni. Woda pod odpowiednim cisnieniem uderza w calizne solna i luguje ja. Lugowanie spagu odbywa sie na odcinku dlugosci okolo 1 m miedzy dolna krawedzia wlotu rury 3 a przodkiem, Uzyskana w czasie postepu czola przodka pólsolanka splywa rura 3 na nizszy poziom do kanalu sciekowego 4, gdzie jest ujmowana do rurociagu zbiorczego. W celu uzyskania spagu pochylni o jak najbardziej wyrównanej powierzchni, nalezy systematycznie skracac odsloniety odcinek rury 3. Jesli do uzbrojenia otworu wiertniczego 2 uzywa sie rury 3 cementowo-azbes- towej skracanie nie sprawia zadnych trudnosci, gdyz rura 3 jest niszczona np. przez uderzanie kilofem. Natomiast zastosowanie rury 3 stalowej skrecanej z segmentów o polaczeniu gwintowym, wymaga rozkrecenia poszczegól¬ nych segmentów w zaleznosci od uzyskiwanego postepu przodka. Pozwala to na wielokrotne wykorzystanie rury 3. Proces lugowania prowadzi sie do chwili polaczenia pochylni z wyrobiskiem na poziomie nizszym, przesuwajac w miare postepu czola przodka aparat natryskowy 1. « PLThe subject of the invention is a method of irrigation of the ramp using the spraying method in salt mines. The method of irrigation of the ramp with the use of shooting technique is known in salt mining. Due to the risk of gas explosion in gas mines and high dustiness accompanying this method, it has been used especially in well-ventilated non-gaseous mines. In mines that exploit salt with the use of "wet" methods, in which the ventilation of blind headings (chambers, chamber sections, galleries) takes place naturally due to the existence of reverse currents, and especially in gas mines, the use of the known method is very onerous and requires special precautions.Therefore, this method is used exceptionally when crossing layers of anhydrite and salt product overgrowths. In other cases, shafts equipped with ladders are used to connect the two levels. Using ladders in mining conditions, dark and high humidity, is dangerous. The aim of the invention is to develop an easy method of routing the ramp using the mining method, eliminating the dust and ensuring the complete safety of people in the mines. This goal was achieved by the use of the known method by spraying with the progression of the forehead following the fall and the angle of inclination and the ramp is arbitrary and pre-determined. This hole connects two workings at different exploitation levels. After making the hole, arm it over the entire length of the pipe. It is advantageous if the pipe is asbestos-cement with a length adapted to the dimensions of the excavation or steel, consisting of segments with a threaded joint. The space between the pipe and the wall of the borehole, about 1.5 m from the bottom, is filled with sealing material. In the face prepared in this way, the complete salt leaching method is worked by spraying. As a result of the leaching, the forehead progresses after the fall and inclines of any inclination, determined by the angle of the borehole inclination. The method according to the invention allows for tearing the inclination of a given inclination and section. Such expressive ramps are suitable not only as transport routes, but above all as communication routes, safe for people. <2 89 905 The invention is illustrated by an exemplary embodiment in the drawing which schematically shows the method of treating the ramp. The workings at different exploitation levels are connected by drilling, after the fall, along the axis of the spag, the drilling hole 2. The borehole 2 is reinforced over its entire length, • a cement-asbestos or steel pipe, consisting of segments with a threaded joint. In order to prevent the shifting to the lower level of the brine coming from the active face, the space between the pipe 3 and the wall of the borehole 2 about 1.5 m from the bottom is filled with sealing material 5 in the form of concrete or how much. In the face prepared in this way, the pavement sprayer 1 equipped with the appropriate number of water spraying nozzles is set up and then started. The number and arrangement of spray tips depend on the given cross-section and profile of the ramp. The water under the right pressure hits the salt and leaches it. The spag is leached over a section of approx. 1 m in length between the lower edge of the pipe inlet 3 and the face. The half-salted pipe obtained during the advance of the face of the face flows down the pipe 3 to the lower level to the drainage channel 4, where it is collected into the collecting pipeline. In order to obtain the slope of the ramp with the most even surface, systematically shorten the exposed pipe section 3. If the borehole 2 is reinforced with an asbesite-cement pipe 3, shortening does not cause any difficulties, because the pipe 3 is destroyed, for example, by hitting with a pickaxe . On the other hand, the use of a steel pipe twisted from segments with a threaded connection requires disassembly of individual segments depending on the progress of the face. This allows for multiple use of the pipe 3. The leaching process is carried out until the ramp is connected with the excavation at the lower level, moving the sprayer 1 as the face of the face progresses. «EN

Claims (2)

Zastrzezenia patentowe 1. Sposób drazenia pochylni metoda lugownicza, znamienny tym, ze wzdluz osi spagu projektowa¬ nej pochylni odwierca sie otwór wiertniczy (2), który na calej dlugosci uzbraja sie rura (3) przy czym przestrzen pomiedzy rura (3) a scianka otworu wiertniczego (2) na dlugosci okolo 1,5 m od dolu wypelnia sie materialem uszczelniajacym (5), a nastepnie urabia sie calizne solna znana metoda lugownicza przez natryskiwanie uzyskujac postep czola przodka po upadzie i pochylnie o dowolnym nachyleniu wyznaczona katem nachylenia otworu wiertniczego (2).Claims 1. The method of grooving the ramp using the lug method, characterized in that a borehole (2) is drilled along the axis of the spag of the designed ramp, which is provided with the pipe (3) along its entire length, with the space between the pipe (3) and the wall of the hole borehole (2) at a length of about 1.5 m from the bottom is filled with sealing material (5), and then the salt is fully worked with the known method by spraying, achieving a progression of the forehead after the fall and inclination of any inclination determined by the angle of the inclination of the borehole (2 ). 2. Sposób wedlug zastrz. 1, znamienny tym, ze stosuje sie rure (3) cementowo-azbestowa lub stalowa skladajaca sie z segmentów o polaczeniu gwintowym. « Prac. Poligraf. UP PRL naklad 120+18 Cena 10 zl PL2. The method according to claim The method of claim 1, characterized in that the pipe (3) is asbestos-cement or steel, consisting of segments with threaded connection. «Work. Typographer. UP PRL, circulation 120 + 18 Price PLN 10 PL
PL16936574A 1974-03-08 1974-03-08 PL89905B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL16936574A PL89905B1 (en) 1974-03-08 1974-03-08

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL16936574A PL89905B1 (en) 1974-03-08 1974-03-08

Publications (1)

Publication Number Publication Date
PL89905B1 true PL89905B1 (en) 1976-12-31

Family

ID=19966380

Family Applications (1)

Application Number Title Priority Date Filing Date
PL16936574A PL89905B1 (en) 1974-03-08 1974-03-08

Country Status (1)

Country Link
PL (1) PL89905B1 (en)

Similar Documents

Publication Publication Date Title
CN107905792A (en) A kind of embedded shaft excavation construction technology
PL89905B1 (en)
DE4332422C1 (en) Process for the horizontal drainage of overtipped slopes
RU2034991C1 (en) Method of suppressing dynamic effects at developing coal seams
SU1668667A1 (en) Method for combination mining of gently sloping seams
RU2247245C1 (en) Method for extraction of steep-falling and slanting deposits of low and average power with partial backfill
RU2349754C1 (en) Method of development of blind ore bodies under guarded objects
RU2391507C2 (en) Pilarless development method of coal beds
Nermoen et al. Ground water maintenance and leakage control during construction of unlined rock caverns for pressurized gas storage, Mongstad
RU1800028C (en) Method for mining thick flat seam with use of self-cementing fill
RU2039259C1 (en) Method for drainage of stoping block
SU947440A1 (en) Method of degassing excavated space
SU727759A1 (en) Method of drying water-bearing formations
RU2107165C1 (en) Method of bore-hole hydraulic recovery of minerals
PL223627B1 (en) Method for spills, especially in salt mines
SU1289962A1 (en) Method of producing drainage system
SU1765408A1 (en) Method at mining steep medium-thickness mineral deposit seams
RU2344292C1 (en) Method of development of thick flat-lying coal bed on clots of irregular shape
SU1501926A3 (en) Method of shutting-off hollow underground formations and conduit systems with high-velocity water flow
Hardcastle Wells ancient and modern—an historical review
RU1809116C (en) Method for seam degassing and wetting
SU981615A1 (en) Method of shotcreting a water-saturated surface of working
SU898083A1 (en) Method of constructing mine roof support
SU750072A1 (en) Method of working sloping ore deposits
SU1033752A1 (en) Method of hydraulic fracturing of rock