PL78606B2 - - Google Patents

Download PDF

Info

Publication number
PL78606B2
PL78606B2 PL15879372A PL15879372A PL78606B2 PL 78606 B2 PL78606 B2 PL 78606B2 PL 15879372 A PL15879372 A PL 15879372A PL 15879372 A PL15879372 A PL 15879372A PL 78606 B2 PL78606 B2 PL 78606B2
Authority
PL
Poland
Prior art keywords
wall
floor
walls
spag
ceiling
Prior art date
Application number
PL15879372A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL15879372A priority Critical patent/PL78606B2/pl
Publication of PL78606B2 publication Critical patent/PL78606B2/pl

Links

Landscapes

  • Road Paving Structures (AREA)
  • Earth Drilling (AREA)

Description

Pierwszenstwo: Zgloszenie ogloszono: 30.09.1973 Opis patentowy opublikowano: 30.08.1975 78606 KI. 5d,15/04 MKP E21f 15/04 Twórcy wynalazku: Zbigniew Klonowski, Jan Nosal, Franciszek Rakowski, Henryk Sliwa, Alojzy Wylenzek Uprawniony z patentu tymczasowego: Kopalnia Wegla Kamiennego „Miechowice", Bytom (Polska) Sposób ukladania podlogi na spagu w górniczych przodkach eksploatacyjnych, szczególnie przy scianowym systemie wybierania Przedmiotem wynalazku jest msposób ukladania podlogi na spagu w górniczych przodkach eksplo¬ atacyjnych, szczególnie przy scianowym systemie wybierania grubych pokladów,, w kolejnosci od stropu do spagu.Obecnie przy wybieraniu grubych pokladów war¬ stwami z góry na dól na zawal dla zabezpieczenia mozliwosci eksploatacji drugiej i kolejnych warstw od góry w kazdej warstwie pozaspagowej uklada sie podloge na spagu na której nastepnie wykonu¬ je sie zawal. Tak wczesniej ulozona podloga two¬ rzy sztuczny strop zabezpieczajac wyrobisko przed nim prowadzone przed zawaleniem.Obecnie podloge wykonuje sie z dlugich belek zwanych filarówkami, które uklada sie równole¬ gle do calizny przodka. Taki sposób ukladania fila- rówek powoduje powazne trudnosci w prowadze¬ niu sciany, poniewaz dla zabezpieczenia sie przed jednoczesnym odkryciem stropu w miare eksplo¬ atacji nastepnej sciana wzdluz ciagu filarówek, które spowodowaloby ich wypadania. Sciany pro¬ wadzone pod takimi stropami musza byc prowa¬ dzone w stosunku do siebie pod znacznym katem tak azeby filarówki byly odslaniane ukosnie do swego polozenia. Wzajemne ukosne polozenie scian przy eksploatacji podluznej powoduje powstawanie ociosu wiszacego, który stanowi powazne zagroze¬ nie dla pracujacych w tej czesci sciany ludzi. Po¬ lo 15 25 za tym duze róznice w odleglosciach pomiedzy wy¬ lotami scian w chodnikach podscianowych i nad- scianowych dochodzace do 100 metrów stanowia powazne utrudnienie ruchowe. Celem wynalazku jest - opracowanie takiego sposobu ukladania pod¬ logi, który umozliwilby równolegle prowadzenie scian przy zachowaniu pelnej mozliwosci kontroli stropu.Cel ten osiagnieto przez opracowanie sposobu, którego istota jest to, ze filarówki stanowiace przy¬ szly sztuczny strop uklada sie na spagu w war¬ stwie eksploatowanej poza warstwa przyspagowa ukosnie w stosunku do eksploatowanej calizny przy jednoczesnym równoleglym prowadzeniu scian w stosunku do siebie w poszczególnych warstwach. PLPriority: Application announced: September 30, 1973 Patent description was published: August 30, 1975 78606 KI. 5d, 15/04 MKP E21f 15/04 Creators of the invention: Zbigniew Klonowski, Jan Nosal, Franciszek Rakowski, Henryk Sliwa, Alojzy Wylenzek Authorized by a temporary patent: "Miechowice" Coal Mine, Bytom (Poland) The method of laying the floor on the mining spag The subject of the invention is the method of laying the floor on the spag in mining operational faces, especially in the wall system of extracting thick decks, in the order from the ceiling to the spag. Currently, when choosing thick decks in layers from above on down to the collapse to ensure the possibility of exploitation of the second and subsequent layers, from the top, in each off-seam layer, a floor is laid on the spag, which then collapses. The previously laid floor forms an artificial ceiling, protecting the excavation against it from collapsing. It is made of long beams called pillars that are laid parallel it goes to the whole forefather. This way of arranging the pillars causes serious difficulties in guiding the wall, because in order to prevent simultaneous uncovering of the ceiling as the next wall is operated along the series of pillars, which would cause them to fall out. Walls led under such ceilings must be led at a significant angle relative to each other so that the pillars are exposed diagonally to their position. Mutual oblique position of the walls in longitudinal exploitation causes the formation of a hanging side, which is a serious threat to people working in this part of the wall. Moreover, the large differences in the distances between the wall outlets in the longitudinal and over-wall pavements, up to 100 meters, constitute a serious mobility impediment. The aim of the invention is to develop such a method of laying the floor, which would allow the walls to be laid in parallel, while maintaining the full possibility of controlling the ceiling. The fracture of the exploited outside the welded layer obliquely to the exploited body, while the walls are led parallel to each other in individual layers. PL

Claims (1)

1. Zastrzezenie patentowe Sposób ukladania podlogi na spagu w górniczych przodkach eksploatacyjnych szczególnie przy scia¬ nowym systemie wybierania, znamienny tym, ze filarówki stanowiace przyszly sztuczny strop ukla¬ da sie na spagu w warstwie eksploatowanej poza warstwa przyspagowa ukosnie w stosunku do eks¬ ploatowanej calizny przy jednoczesnym równole¬ glym prowadzeniu scian w stosunku do siebie w poszczególnych warstwach. 78 606 PL1. Patent claim. with simultaneous guidance of the walls in relation to each other in the individual layers. 78 606 PL
PL15879372A 1972-11-10 1972-11-10 PL78606B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL15879372A PL78606B2 (en) 1972-11-10 1972-11-10

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL15879372A PL78606B2 (en) 1972-11-10 1972-11-10

Publications (1)

Publication Number Publication Date
PL78606B2 true PL78606B2 (en) 1975-06-30

Family

ID=19960549

Family Applications (1)

Application Number Title Priority Date Filing Date
PL15879372A PL78606B2 (en) 1972-11-10 1972-11-10

Country Status (1)

Country Link
PL (1) PL78606B2 (en)

Similar Documents

Publication Publication Date Title
UA125374C2 (en) Equipment system for no-roadway no-coal-pillar retained roadway mining method
CN103629980A (en) Adjacent existing railway steep mountain loosen control blast construction method
PL78606B2 (en)
CN115012936A (en) A method for unloading pressure and danger during coal mine TBM excavation and driving through coal
US3989302A (en) Continuous roof support system for tunnel boring
RU2122634C1 (en) Method of mining thick steeply dipping coal seam by horizontal layers
SU863862A1 (en) Method of mining thick ore bodies
CN109578051B (en) Fire prevention and extinguishing method for steeply inclined coal seam group
RU2236598C1 (en) Method for protection from air-blast by temporary rock wall
Karasiewicz-Szczypiorski et al. Balaklava (Sevastopol, Ukraine)–season 2012. Some remarks on the chronology and spatial layout of the roman for
GB1603817A (en) Lining of tunnels and excavations and constructing walls
SU992740A1 (en) Method of working deposits of minerals in unsteady master rock
RU2086765C1 (en) Method of preparing to mining flat-lying coal seam
SU1335701A1 (en) Method of underground mining of ore deposits
Pillsbury TECHNICAL ENGINEERING DETAILS OF THE HINDENBURG LINE IN THE SECTOR OF ATTACK OF THE II ARMY CORPS
SU881322A1 (en) Method of working pillars at chamber-and-pillar excavating routine
SU1543077A1 (en) Method of mining pillars
Brown Into darkness: The red hill underground fuel storage facility
PL149011B1 (en) Method of protecting dog headings disposed in existing or procpective safety pilars against effects of crumps
Currid A Note on the Function of Building 5900 at Shechem—Again
SU487236A1 (en) The way to develop gently dipping minerals
PL77315B2 (en)
SU901529A1 (en) Method for working thick ore deposits
RU99127225A (en) METHOD FOR ESTABLISHING AN INNER CITY SPEED RING MEGAPOLIS ROAD
PL132654B1 (en) Method of isolating cavings of a longwall heading