PL67342B1 - - Google Patents

Download PDF

Info

Publication number
PL67342B1
PL67342B1 PL136779A PL13677969A PL67342B1 PL 67342 B1 PL67342 B1 PL 67342B1 PL 136779 A PL136779 A PL 136779A PL 13677969 A PL13677969 A PL 13677969A PL 67342 B1 PL67342 B1 PL 67342B1
Authority
PL
Poland
Prior art keywords
scaffolding
boiler
bars
hanging
scaffolds
Prior art date
Application number
PL136779A
Other languages
Polish (pl)
Inventor
Ziebinski Zygmunt
Kmiec Jan
AleksanderBielawski
Majmurek Kazimierz
Original Assignee
Zaklady Energetyczne Okregu Poludniowego Przed¬Siebiorstwo Panstwowe
Filing date
Publication date
Application filed by Zaklady Energetyczne Okregu Poludniowego Przed¬Siebiorstwo Panstwowe filed Critical Zaklady Energetyczne Okregu Poludniowego Przed¬Siebiorstwo Panstwowe
Publication of PL67342B1 publication Critical patent/PL67342B1/pl

Links

Description

Pierwszenstwo: Opublikowano: 20.11.1973 KI. 24g,4/01 MKP F23j 1/00 Wspóltwórcy wynalazku: Zygmunt Ziebinski, Jan Kmiec, Aleksander Bielawski, Kazimierz Majmurek Wlasciciel patentu: Zaklady Energetyczne Okregu Poludniowego Przed¬ siebiorstwo Panstwowe (Zaklad Remontowy Energe¬ tyki), Katowice (Polska) Rusztowanie wiszace skladane do komory paleniskowej kotla Przedmiotem wynalazku jest rusztowanie wiszace skladane do komory paleniskowej kotla.Dotychczas stosowane rusztowania w komorze paleniskowej kotlów, to rusztowania stojace kon- dygnacyjne budowane z drewna lub z rur oraz czesciowo, gdzie wysokosc komory paleniskowej przekracza 25 m stosuje sie rusztowania wiszace o ograniczonych gabarytach ze wzgledu na ich mozliwosc transportu do kotla przez odzuzlacz.Podnoszenie lub opuszczenie rusztowan wiszacych odbywa sie recznie lub mechanicznie z pomostu rusztowania, lub ze stropu kotla przy pomocy lin stalowych.Poza tym w przypadku rusztowan wiszacych za¬ gadnienie sprowadza sie do problemu transportu takich rusztowan do komory paleniskowej kotla.Droga transportu rusztowan wiszacych, z koniecz¬ nosci krótkich i wasitóich, przez odzuzlacz kotla jest utrudniona, gdyz oprócz odsuwania koryta odzuz- lacza spod kotla, trzeba rusztowanie transportowac przez chlodny lej na glówny pomost roboczy, który znajduje sie od 8 do 12 m ponad odzuzlaczem.Celem wynalazku jest usuniecie tych niedogod¬ nosci zwiazanych ze zmniejszonymi z koniecznosci gabarytami rusztowan wiszacych.Cel ten osiagnieto w ten sposób, ze w rusztowa¬ niu wiszacym skladanym do komory paleniskowej kotla, skladajacym sie z dwóch kratownic plaskich statycznie wyznaczalnych z pasami górnymi i pa¬ sami dolnymi, z przyspawanymi blachami wezlo¬ wymi, polaczonymi na sworznie pretami krzyzaka¬ mi, pretami poziomymi i pretami pionowymi, pew¬ na liczba blach wezlowych dla pretów krzyzako¬ wych uksztaltowano jako przeguby niesymetryczne.Umozliwia to skladanie rusztowania do minimal¬ nych wymiarów poprzecznych.Opracowana konstrukcja rusztowania zwieksza wytrzymalosc, sztywnosc i operacyjnosc rusztowa¬ nia, oraz pozwala na organizowanie wiekszej ilosci stanowisk roboczych przy czyszczeniu, przeswietla¬ niu lub wymianie rur ekranowych w kotle.Tak zlozone rusztowania mozna dogodnie trans¬ portowac do kotla droga najkrótsza przez istniejace wlazy lub wzierniki.Przedmiot wynalazku jest przedstawiony w przy¬ kladzie wykonania na rysunku, na którym fig. 1 przedstawia widok z przodu na kratownice ruszto¬ wania, fig. 2 — widok z boku na kratownice rusz¬ towania, fig. 3 — widok w stanie zlozonym w plaszczyznie pionowej, fig. 4 — widok w stanie zlozenia w przekroju A—A na fig. 3, fig. 5 — widok z góry, na fig. 3, fig. 6 — widok z góry w stanie zlozenia ostatecznego w plaszczyznie po¬ ziomej, fig. 7 — widok w stanie zlozenia ostatecz¬ nego w przekroju B—B na fig. 6.Glównymi elementami kratownic rusztowania wiszacego sa pasy górne 1 w danym przypadku z przyspawanymi blachami wezlowymi 4 z prze¬ gubami symetrycznymi i pasy dolne 8 z przyspa¬ wanymi blachami wezlowymi 5, z przegubami 67 3423 67 342 4 niesymetrycznymi. Pas górny 1 i pas dolny 8 w plaszczyznie pionowej polaczony jest przegubowo sworzniami 6 i 7 z pretami krzyzakowymi 2 i 3 i pretami pionowymi 12. Prety pionowe 12 sluza w tym przypadku do mocowania, nieistotnym dla wynalazku, wciagarek lub Mn.Dalsizyimii elementami rusztowania sa prety po¬ ziome 9 i 10 polaczone sworzniami 7 i przegubami 11 z pasami kratownicy 1 i 8 w plaszczyznie po¬ ziomej, których zadaniem jest zabezpieczyc kra¬ townice przed wyboczeniem. Prety poziome 10 w tym przypadku spelniaja role elementów nosnych pomostu rusztowania.W celu zlozenia rusztowania do minimalnych wymiarów poprzecznych nalezy odlaczyc prety pionowe 12 z przegubów, a nastepnie po rozlacze¬ niu po jednym sworzniu 6 z kazdej blachy wezlo¬ wej 4 wykonac zlozenie najpierw pretów krzyza¬ kowych 2, a nastepnie polozyc pasy górne 1 na pasy dolne 8 i zlozyc w plaszczyznie poziomej nie rozlaczajac pretów poziomych 9 i 10 — pas górny do górnego i pas dolny do pasa dolnego. 15 20 Rusztowania tego typu moga miec równiez za¬ stosowanie we wszystkich innych przypadkach, a szczególnie tam gdzie sa male gabaryty dróg trans¬ portowych do miejsca zastosowania.Rusztowania tego typu wykonane z elementów okraglych mozna zlozyc do wymiarów poprzecz¬ nych 4d na 3d. PLPreference: Published: 20/11/1973 IC. 24g, 4/01 MKP F23j 1/00 Inventors: Zygmunt Ziebinski, Jan Kmiec, Aleksander Bielawski, Kazimierz Majmurek The owner of the patent: Zakłady Energetyczne Okregu Poludniowego State Enterprise (Zaklad Remontowy Energeycki), Katowice (Poland) Hanging folding scaffolding The subject of the invention is a hanging scaffold that can be folded into the boiler furnace chamber. The scaffoldings used so far in the boiler furnace chamber are floor-standing scaffoldings made of wood or pipes, and partly, where the height of the furnace chamber exceeds 25 m, hanging scaffoldings of limited dimensions due to the possibility of transporting them to the boiler by means of a separator. Lifting or lowering the hanging scaffolds is done manually or mechanically from the scaffolding platform, or from the boiler ceiling using steel ropes. Moreover, in the case of hanging scaffolds, the issue is reduced to the problem of transport such scaffolding for the combustion chamber The way of transporting the hanging scaffolds, due to the necessity of short and thin scaffolds, through the boiler loosener is difficult, because apart from moving the separator trough from under the boiler, the scaffolding has to be transported through a cold hopper to the main working platform, which is located from 8 to 12 The object of the invention is to eliminate the drawbacks associated with the necessarily reduced dimensions of the hanging scaffolds. This aim was achieved in such a way that in a hanging scaffold folded into the boiler furnace chamber, consisting of two flat trusses statically determinate with stripes upper and lower chords, with welded joint plates, bolted cross bars, horizontal bars and vertical bars, a certain number of cross bars for cross bars are shaped as asymmetric joints. This allows the scaffolding to be assembled to a minimum Different transverse dimensions. The developed scaffolding structure increases the strength, pcs The food and operability of the scaffolding, and allows for the organization of more workstations when cleaning, screening or replacing the screen tubes in the boiler. Such complex scaffolds can be conveniently transported to the boiler by the shortest route through the existing manholes or inspection windows. 1 shows a front view of the scaffolding trusses, FIG. 2 is a side view of the scaffolding trusses, FIG. 3 is an assembled vertical view, FIG. 4 is an assembled view in section A-A in fig. 3, fig. 5 - top view, in fig. 3, fig. 6 - top view in final assembly in a horizontal plane, fig. 7 - view in the final assembled state in section B-B in Fig. 6. The main elements of the trusses of the hanging scaffolding are the upper chords 1 with welded joint plates 4 with symmetrical joints and the lower chords 8 with welded knot plates. mi 5, with joints 67 3423 67 342 4 asymmetrical. The upper chord 1 and the lower chord 8 in the vertical plane are articulated by bolts 6 and 7 with cross bars 2 and 3 and vertical bars 12. In this case, the vertical bars 12 are used for fixing, not essential for the invention, winches or Mn. Further scaffolding elements are horizontal bars 9 and 10 connected by bolts 7 and articulated joints 11 to the truss bars 1 and 8 in the horizontal plane, the task of which is to protect the crosspieces against buckling. In this case, the horizontal bars 10 fulfill the role of the load-bearing elements of the scaffolding platform. In order to assemble the scaffolding to the minimum transverse dimensions, disconnect the vertical bars 12 from the joints, and then, after disconnecting one bolt 6 from each node plate 4, first assemble the bars cross-shaped 2, then put the upper chords 1 on the lower chords 8 and fold them in the horizontal plane without separating the horizontal bars 9 and 10 - the upper chord to the upper one and the bottom chord to the lower chord. Scaffolds of this type can also be used in all other cases, especially where there are small dimensions of the transport routes to the place of use. Scaffolds of this type made of round elements can be folded up to the transverse dimensions of 4d by 3d. PL

Claims (1)

1. Zastrzezenie patentowe Rusztowanie wiszace skladane do komory pale¬ niskowej kotla, skladajace sie z dwóch kratownic plaskich, statycznie wyznaczalnych z pasami gór¬ nymi i pasami dolnymi, z przydawanymi blacha¬ mi wezlowymi, polaczonymi na sworznie pretami krzyzakowymi, pretami poziomymi i pretami pio¬ nowymi, znamienne tym, ze pewna liczbe blach wezlowych (5) dla pretów krzyzakowych (2) i (3) w jednym z pasów kratownicy stanowia przeguby niesymetryczne, w których otwory (7) sa wykonane w róznej odleglosci od pasa (8). 1 | J W A KT W=^ Cena zl 10,— RZG — 2424/72 100 szt. A4 PL1. Patent claim Hanging scaffolding assembled into the combustion chamber of the boiler, consisting of two flat, statically determinate trusses with upper strips and lower strips, with attached gusset plates, bolted cross rods, horizontal rods and horizontal rods ¬ new, characterized by the fact that a certain number of gusset plates (5) for cross bars (2) and (3) in one of the truss chords are asymmetrical joints, in which the holes (7) are made at different distances from the chord (8). 1 | J W A KT W = ^ Price PLN 10, - RZG - 2424/72 100 pcs A4 PL
PL136779A 1969-11-08 PL67342B1 (en)

Publications (1)

Publication Number Publication Date
PL67342B1 true PL67342B1 (en) 1972-10-31

Family

ID=

Similar Documents

Publication Publication Date Title
GB553374A (en) Improvements in and relating to the construction of bridges and other metal frame structures
US2237226A (en) Roof construction
US3628628A (en) Scaffold platform
US1363407A (en) Building structure
US2316560A (en) Structural element
US2966228A (en) Adjustable side shell staging
PL67342B1 (en)
US1365996A (en) Scaffold
CN105464007A (en) Longitudinal foldable plane truss and application method thereof
CN215858986U (en) Crane beam operation cage
US2092022A (en) Derrick
EP0117643B1 (en) Dismountable framework
US3438076A (en) Structural elements for dismountable bridges or the like
US1419868A (en) Framework of buildings
CA2523179A1 (en) Walk-through scaffold and hoist frame
SE9403513A0 (en) Pallet
CN204898502U (en) Light bridge of large -span heavy load
GB547023A (en) Improvements in building construction
CN217399418U (en) Bridge floor is construction with safe foldable basket of hanging
GB550143A (en) Improvements in or relating to scaffolding for buildings or other structures
CN221798170U (en) Inter-box beam installation operation platform
US2663597A (en) Scaffolding device
US1728782A (en) Interlocking joint for steel construction
US2933276A (en) Base member for cribbing devices
CN209429504U (en) An assembled steel structure column and beam installation hanging basket