PL49752B1 - - Google Patents

Download PDF

Info

Publication number
PL49752B1
PL49752B1 PL101406A PL10140663A PL49752B1 PL 49752 B1 PL49752 B1 PL 49752B1 PL 101406 A PL101406 A PL 101406A PL 10140663 A PL10140663 A PL 10140663A PL 49752 B1 PL49752 B1 PL 49752B1
Authority
PL
Poland
Prior art keywords
dam
casing
steel
stands
ropes
Prior art date
Application number
PL101406A
Other languages
Polish (pl)
Inventor
Danda Gustaw
Original Assignee
Kopalnia Wegla Kamiennego „Nowy Wirek"
Filing date
Publication date
Application filed by Kopalnia Wegla Kamiennego „Nowy Wirek" filed Critical Kopalnia Wegla Kamiennego „Nowy Wirek"
Publication of PL49752B1 publication Critical patent/PL49752B1/pl

Links

Description

Pierwszenstwo: Opublikowano: 29: X. 1965 49752 KI. -5d, 14/PT""* MKP E 21 f UKD Twórca wynalazku: Gustaw Danda Wlasciciel patentu: Kopalnia Wegla Kamiennego „Nowy Wirek", Ruda Slaska (Polska) Tama do podsadzki plynnej przystosowanej do obudowy stalowej Przy prowadzeniu wyrobisk scianowych z pod¬ sadzka plynna do obudowy uzywa sie stojaki i stropnice drewniane budowane prostopadle lub równolegle do czola wyrobiska scianowego, przy czym tama czolowa stanowi masywna, zbudowa¬ na z rygli, rozpór i zastrzalów konstrukcje.Do obudowy zuzywa sie duza ilosc drewna, któ¬ rego odzysk po wykorzystaniu jest maly, co powo¬ duje koniecznosc ciaglego transportu znacznej ilo¬ sci swiezego drewna do przodku. Pozostawienie czesci elementów obudowy drewnianej w pustce przeznaczonej do podsadzania nie gwarantuje rów¬ nomiernej linii ugiecia. Obudowa drewniana nie stwarza wysokiego stopnia bezpieczenstwa z uwa¬ gi na swa niska wytrzymalosc.Tym niedogodnosciom zapobiega obudowa z tama wedlug pomyslu, przy zastapieniu elementów obu¬ dowy drewnianej obudowa stalowa, a drewnia¬ nego rozparcia tamy — rozparciem linowo-cieg¬ nowym.Obudowe wyrobiska wraz z tama ilustruje ry¬ sunek, na którym fig. 1 przedstawia obudowe wraz z tama w widoku z przodu i z góry, fig. 2 — obudowe wraz z polem roboczym w przekroju poprzecznym fig. 3 — zamek klinowy wraz ze sciegnem w widoku z przodu i z boku, a fig. 4 — zamek klinowy w przekroju poprzecznym.Obudowa stalowa zlozona jest ze stojaków sta¬ lowych 1 (ciernych) wczesnopodporowych o wy- 10 15 20 25 30 miarach uzaleznionych od wysokosci scian pod¬ sadzkowych oraz stropnic stalowych 2, zabudo¬ wanych prostopadle do czola wyrobiska sciano¬ wego. Stropnice budowane sa na dwóch stojakach na zakladke. Prostopadle usytuowanie stropnic sta¬ lowych w stosunku do linii frontu sciany stwarza korzystne warunki do stosowania mechanizacji urabiania oraz ladowania urobku w przodku scia¬ nowym.Konstrukcja tamy linowo-ciegnowej sklada sie z dwóch lin 3, najkorzystniej trójdzielnych szcze- pianych zlaczami zaczepowymi 4. Jedna z lin jest usytuowana w czesci przystropowej, a druga w czesci przyspagowej tamy podsadzkowej. Konce lin umocowane sa do stojaków 5 obudowy w do- wierzchni przyscianowej od strony posadzkowego wybiegu. Na konce lin wprowadzono sruby rzym¬ skie 6, za pomoca których uzyskuje sie naciag lin wzdluz tamy czolowej. Podluzne liny za pomoca powtarzalnych (to jest odzyskiwanych) ciegien 7 wiazane sa do stojaków drewnianych 8, posta¬ wionych w drugim rzedzie obudowy, liczac od ta¬ my w kierunku wybranej przestrzeni. Ciegna 1 skladaja sie z miekkiej liny stalowej oraz.z zam¬ ka 9, który pozwala na zaklinowanie naciagnietej koncówki ciegna. Zamek stanowi tuleja 10. Z jed¬ nym koncem tulei 10 spojony jest na zewnetrznej stronie jeden koniec 11 ciegna 7, którego drugi ko¬ niec 12 jest przeciagniety przez tuleje. Klin 13, za- 4975249752 mocowany do tulei 10 lancuchem 14, zaklinowuje ciegno 7 w tulei.Obicie 15 tamy sklada sie z plótna zszywanego na powierzchni w jeden pas o szerokosci zalez¬ nej od wysokosci tamy. Usztywnienie tamy uzy¬ skuje sie przez podluznie usytuowane pasy 16, najkorzystniej wykonane z odpadkowej tasmy gu¬ mowej. Wykonanie tamy polega na zapieciu lin i ciegien, usytuowaniu pasów gumowych, zawie¬ szeniu uszczelniajacego plótna 15, przytwierdzo¬ nego do ciagnacych sie wzdluz tamy desek 17, przytwierdzonych do stojaków 8. Liczby 16 i 17) oznaczaja elementy nowoprzygotowanej tamy.Wszystkie elementy rozpierajace tame sa powta¬ rzalne. Odzyskiwane sa po zamuleniu pustki, prze¬ noszone do nastepnego pola oraz montowane przy nastepnej tamie. Odcinki lin podluznych, biegnace wzdluz tam bocznych, wiazane sa podobnie za po¬ moca ciegien, co stanowi wzmocnienie rozparcia tam bocznych. 10 PLPriority: Published: October 29, 1965 49752 IC. -5d, 14 / PT "" * MKP E 21 f UKD Inventor: Gustaw Danda Patent owner: "Nowy Wirek" Hard Coal Mine, Ruda Slaska (Poland) Dam for liquid filling adapted to steel lining. liquid pond for the casing use wooden stands and canopies built perpendicularly or parallel to the face of the wall excavation, while the front dam is a massive structure made of bolts, struts and struts. A large amount of wood is used for the casing, which is recovered after It is small in use, which makes it necessary to constantly transport a large amount of fresh wood to the face. Leaving some parts of the wooden casing in the void intended for supporting does not guarantee an even deflection line. Due to its low durability, these inconveniences are prevented by the dam-casing according to the idea, when the wooden casing elements are the alley, and the wooden expansion of the dam - by a rope and string. The casing of the excavation together with the dam is illustrated by a drawing, in which Fig. 1 shows the casing with the dam in front and top view, Fig. Fig. 3 - a wedge lock with a tie in the front and side view, and Fig. 4 - a wedge lock in a cross-section. The steel casing is composed of steel stands 1 (frictional) with early support 15 20 25 30 measures depending on the height of the flooring walls and steel canopies 2, built perpendicularly to the face of the excavation. The staircases are built on two stands with a tab. The perpendicular positioning of the steel canopies in relation to the front line of the wall creates favorable conditions for the use of mining mechanization and loading the excavated material in the wall face. of the ropes is situated in the landing part, and the other in the butt-landing part of the dam. The ends of the ropes are fastened to the stands 5 of the casing in the wall area from the side of the runway. Turnbuckles 6 are inserted at the ends of the ropes, by means of which the ropes are stretched along the frontal dam. The longitudinal ropes are tied by repeating (ie recovered) strings 7 to wooden stands 8, formed in the second row of the casing, counting from the belt towards the selected space. The tendons 1 consist of a soft steel rope and a buckle 9 which allows the stretched end of the tendon to be wedged. The lock is a sleeve 10. One end 11 of the rod 7 is bonded on the outside to one end of the sleeve 10, the other end 12 of which is threaded through the sleeves. The wedge 13, fastened to the sleeve 10 with a chain 14, wedges the tie 7 in the sleeve. The padding 15 of the dam consists of a cloth sewn on the surface into one strip with a width depending on the height of the dam. The dam is stiffened by longitudinally extending strips 16, most preferably made of scrap rubber tape. The dam is made by fastening the ropes and strings, arranging the rubber belts, suspending the sealing cloth 15, attached to boards 17 extending along the dam, attached to the stands 8. Numbers 16 and 17) denote the elements of the newly prepared dam. are repetitive. They are recovered after silting up the void, transferred to the next field and mounted at the next dam. Sections of longitudinal ropes running along the side there are similarly tied with strings, which strengthens the strut of the side there. 10 PL

Claims (2)

Zastrzezenia patentowe 1. Tama do podsadzki plynnej, przystosowanej do 5 obudowy stalowej, zlozona ze stojaków stalo¬ wych i stropnic stalowych, zmiennna tym, ze jest wyposazona w zespól lin sprzegajacych (3) umocowanych do stojaków (5) obudowy, na¬ ciaganych srubami rzymskimi (6) i wiazanych do stojaków (8) ciegnami (7) zaklinowanymi w zamkach (9), oraz w plócienne obicie uszczel¬ niajace (15), usztywnione podluznymi pasami gumowymi 16), zamocowane do desek (17). 15Claims 1. A dam for a liquid support, adapted to a steel casing, composed of steel props and steel canopies, variable in that it is equipped with a set of connecting ropes (3) fixed to the casing stands (5) tightened with bolts Roman (6) and tied to the stands (8) with the strings (7) wedged in the locks (9), and in a sealing cloth (15), stiffened with longitudinal rubber bands 16), attached to the boards (17). 15 2. Tama wedlug zastrz. 1, znamienna tym, ze slu¬ zacy do klinowania ciegna (7) zamek (9) skla¬ da sie z klina (13) i z tulei (10), z jednym kon¬ cem której spojony jest jeden z konców cieg- 20 na (7).49752 Fig.Z49752 BIB L IO f t K Aj P^f du Pafilowego RSW „Prasa", Wr. Zam. 1004/65. Naklad 250 PL2. The dam according to claim The method of claim 1, characterized in that the lock (9) used for wedging the tie (7) consists of a wedge (13) and a sleeve (10), with one end of which is bonded one of the ends of the string ( 7) .49752 Fig. Z49752 BIB L IO ft K Aj P ^ f du Paphilowy RSW "Press", Wr. Order 1004/65. Mintage 250 PL
PL101406A 1963-04-26 PL49752B1 (en)

Publications (1)

Publication Number Publication Date
PL49752B1 true PL49752B1 (en) 1965-06-15

Family

ID=

Similar Documents

Publication Publication Date Title
PL49752B1 (en)
PL150746B1 (en) Method of protecting floor rock against upheval and apparatus therefor
ES391873A1 (en) Procedure and constructive unit for the entibation of tunnels and galleries. (Machine-translation by Google Translate, not legally binding)
US3602363A (en) Grain elevator telescoping head
RU1795101C (en) Method of rilling thick steeply dipping coal seems
PL44820B1 (en)
SU693024A1 (en) Combination cover for excavating thick sloping beds
PL150316B1 (en) Method of confining a pace to be filled with pneumatically feed filling material
US1645910A (en) Standing boom
SU812666A1 (en) Belt conveyer framework section
PL162749B3 (en) Shiftable filling material stopping for longwall mine workings with self-advancing roof supports
PL149535B1 (en) Segmented,repeating filling dam,particularly for high headings
PL90614B1 (en)
PL102417B1 (en) TEMPORARY INSULATION MINING BRATTICE
PL43310B1 (en)
RU2059818C1 (en) Method for rill stoping of thick seams
PL156015B1 (en) The method of securing canopies against falling off
DE3031063A1 (en) Mine or tunnel splayed anchor - has grooves in spreader nut and tongues on spreader wedges for guidance
PL9331B1 (en) Construction method4 of the dam, used "" in silting workings.
PL167624B1 (en) Mining powered support for hydraulic backfilling
PL174781B1 (en) Filling dam
PL137585B1 (en) Method of supporting a roof in a longwall working
CS267837B1 (en) Partition wall of protective mantle for burying vertical mine works of John
PL114977B2 (en) Method of protecting internal surfaces of large diameter bores
PL105896B1 (en) UNDERGROUND INSTALLATION CHAMBER FOR MINING DEVICES