PL446342A1 - Method of strengthening the soil, especially the one with low bearing capacity - Google Patents
Method of strengthening the soil, especially the one with low bearing capacityInfo
- Publication number
- PL446342A1 PL446342A1 PL446342A PL44634223A PL446342A1 PL 446342 A1 PL446342 A1 PL 446342A1 PL 446342 A PL446342 A PL 446342A PL 44634223 A PL44634223 A PL 44634223A PL 446342 A1 PL446342 A1 PL 446342A1
- Authority
- PL
- Poland
- Prior art keywords
- strengthening
- bearing capacity
- soil
- low bearing
- package
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
Przedmiotem zgłoszenia jest sposób wzmacniania podłoża gruntowego, w szczególności o niskiej nośności do celów geotechnicznych z użyciem środków strzałowych oraz wody. Na podłożu gruntowym umieszcza się co najmniej jeden pakiet środków strzałowych (1), dalej umieszcza się na nim płaszcz (2) z geomembrany, przy czym płaszcz (2) złożony jest z dolnej części (4) i górnej części (5), korzystnie o grubości 0,3 m, gdzie w dolnej części (4) wykonuje się komorę (3) przykrywającą pakiet środków strzałowych (1), zaś górną część (5) płaszcza (2) z geomembrany formuje się w kształt powierzchni obrotowej Gaussa. Dolną część (4) i górną część (5) łączy się i wypełnia się wodą przez wykonany w jego górnej części (5) otwór (6). W ostatnim etapie odpala się pakiet środka strzałowego (1).The subject of the application is a method of strengthening the ground, in particular of low bearing capacity for geotechnical purposes using blasting agents and water. At least one package of blasting agents (1) is placed on the ground, then a geomembrane casing (2) is placed on it, wherein the casing (2) consists of a lower part (4) and an upper part (5), preferably 0.3 m thick, where in the lower part (4) a chamber (3) is made covering the package of blasting agents (1), while the upper part (5) of the geomembrane casing (2) is formed in the shape of a Gaussian surface of revolution. The lower part (4) and the upper part (5) are connected and filled with water through an opening (6) made in its upper part (5). In the last stage, the package of blasting agent (1) is fired.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL446342A PL446342A1 (en) | 2023-10-10 | 2023-10-10 | Method of strengthening the soil, especially the one with low bearing capacity |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL446342A PL446342A1 (en) | 2023-10-10 | 2023-10-10 | Method of strengthening the soil, especially the one with low bearing capacity |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| PL446342A1 true PL446342A1 (en) | 2025-04-14 |
Family
ID=95337890
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PL446342A PL446342A1 (en) | 2023-10-10 | 2023-10-10 | Method of strengthening the soil, especially the one with low bearing capacity |
Country Status (1)
| Country | Link |
|---|---|
| PL (1) | PL446342A1 (en) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| PL151405B1 (en) * | 1987-12-30 | 1990-08-31 | Politechnika Gdanska | Method for densifying non-coherent soil |
| PL210676B1 (en) * | 2004-09-08 | 2012-02-29 | Polbud Wykonawstwo Społka Z Ograniczoną Odpowiedzialnością | Method for reinforcing low load carrying capacity construction site subsoils using the pyrotechnic method |
| PL224818B1 (en) * | 2014-03-10 | 2017-02-28 | Menard Polska Spółka Z Ograniczoną Odpowiedzialnością | Method for elaboration of explosive charge in soil |
| CN110029679A (en) * | 2019-04-28 | 2019-07-19 | 三峡大学 | Promote the method on slip mass classification landslide using active mode |
-
2023
- 2023-10-10 PL PL446342A patent/PL446342A1/en unknown
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| PL151405B1 (en) * | 1987-12-30 | 1990-08-31 | Politechnika Gdanska | Method for densifying non-coherent soil |
| PL210676B1 (en) * | 2004-09-08 | 2012-02-29 | Polbud Wykonawstwo Społka Z Ograniczoną Odpowiedzialnością | Method for reinforcing low load carrying capacity construction site subsoils using the pyrotechnic method |
| PL224818B1 (en) * | 2014-03-10 | 2017-02-28 | Menard Polska Spółka Z Ograniczoną Odpowiedzialnością | Method for elaboration of explosive charge in soil |
| CN110029679A (en) * | 2019-04-28 | 2019-07-19 | 三峡大学 | Promote the method on slip mass classification landslide using active mode |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5728746B2 (en) | A system for storing potential energy and a method for manufacturing the system. | |
| DE60004356D1 (en) | RELEASING FIXED VALVES | |
| CN110029679B (en) | Method for promoting graded landslide of landslide body by adopting active mode | |
| JPS5532849A (en) | Grouting method | |
| CN101575857B (en) | A landslide aeration and drainage treatment method | |
| CN207436043U (en) | A kind of reinforced soft soil ground device | |
| UA89955C2 (en) | Method and device for building tunnel immersed on sub-sea soil | |
| Ng et al. | Hydrological effects of live poles on transient seepage in an unsaturated soil slope: centrifuge and numerical study | |
| CN108343103A (en) | A kind of digging ground for building based devices | |
| CN103758171A (en) | Electric transmission line iron tower excavation type rock foundation mechanical excavating method | |
| CN206736937U (en) | Foundation ditch water leak preventing structure | |
| CN206260379U (en) | A kind of thick bamboo tube for quick planting in desert | |
| RU97113873A (en) | METHOD FOR INSULATING UNDERGROUND STORAGE OF TOXIC WASTE IN SALINE ROCKS | |
| JPS5850215A (en) | Permeability test at site | |
| Rutqvist et al. | Hydraulic field measurements of incompletely closed fractures in granite | |
| George | Hydraulics of the Entrance Pump Tower and Location of the Rotunda First Hoppers at Mammoth Cave, Kentucky | |
| CN110700284A (en) | A shallow buried cave treatment structure | |
| JP2001146309A (en) | High pressure gas storage facility and leak prevention method in high pressure gas storage facility | |
| JPH03222879A (en) | Small caliber storage pump | |
| Noor et al. | Modelling wetting collapse behaviour in unsaturated granite residual soil | |
| RU94026109A (en) | Method for digging rock steps | |
| JP2021031859A (en) | Soil water discharge device | |
| JPS5592425A (en) | Method and device for pile being driven into predigged hole | |
| Zhang et al. | Inverse Prediction on the Deformation of a Typical High Loess-filled Foundation during and after Construction—Taking a Key Profile as an Example | |
| Shugeng et al. | Calculation of hydro-dynamic stability of the soil inside bucket in the process of bucket foundation penetration |