PL134100B1 - Shield-type roof support - Google Patents

Shield-type roof support Download PDF

Info

Publication number
PL134100B1
PL134100B1 PL23204181A PL23204181A PL134100B1 PL 134100 B1 PL134100 B1 PL 134100B1 PL 23204181 A PL23204181 A PL 23204181A PL 23204181 A PL23204181 A PL 23204181A PL 134100 B1 PL134100 B1 PL 134100B1
Authority
PL
Poland
Prior art keywords
casing
shield
support
cover
roof support
Prior art date
Application number
PL23204181A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL23204181A priority Critical patent/PL134100B1/en
Publication of PL134100B1 publication Critical patent/PL134100B1/en

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

Opis patentowy opublikowano: 1986 10 31 134100 CZritLNlAJ Urzedu Poi*ntnwrgn 1 InL Cl.3 E21D 23/06 E21F 15/04 Twórcy wynalazku: Stanislaw Romanowicz, Edward Janik Uprawniony, z patentu: Centrum Mechanizacji Górnictwa "Komag", Gliwice/Polska/ OBUDOWA P0DP0R0V70-03L0N0tfA Przedniotera wynalazku jest górnicza obudowa podporowo-oslonowa przystosowani do wspólpracy z podsadzka hydrauliczna. Znana z patentu nr 87849 pt. „ Kopalniana tama podsadzkowa" tama podsadzkowa zbudowana jest z pasa plótno przymocowanego od góry do ramowych konstrukcji wsporczych zlaczonych ze stropnicami zmechanizowanej obudowy a od dolu do konstrukcji ramowych przytwierdzonych do spodników stojaków tej obudowy.Szerokosc pasa plótna przymocowanego do konstrukcji tamy jest tak dobrana aby przy maksymalnym rozsuwie stojaków obudowy, plótno siegalo od spagu do stropu. Dla umozliwienia kroczenia obudowy razem z tama na niej zamocowana, w miejscach przerw miedzy czlonami obudowy czyli w miejscach miedzy stropnicami wystepuja nadmiary plótna tworzace pionowe faldy. Faldy te przylegaja do elastycznych oslon, które przymocowane jednym bokiem do konstrukcji wsporczych jednego czlonu obudowy, a drugim opieraja sie na konstrukcji wsporczej sasiedniego czlonu obudowy uniemozliwiaja wypychanie przez material podsadzkowy nadmiaru plótna pomiedzy czlonami obudowy. Tamy takie nie tworza zespolu nosnego obudowy.Celom wynalazku jest obudowa górnicza której zespoly nosne tworza tame podsadzkowa.Cel ten uzyskano za posrednictwem obudowy podporowo-oslonowej rozpieranej miedzy stropnica a spagnica stojakami hydraulicznymi. Oslona odzawalowai tylny lacznik obudowy górniczej maja otwory dla odprowadzenia wody z przestrzeni podsadzkowej. Z kolei oslona odzawalowa ma otwór dla wylotu rurociagu podsadzkowego doprowadzajacego plynna podsadzke do przestrzeni podsadzkowej. Stropnice, oslone odzawalowa i tylny lacznik opasuje tkanina o duzej wytrzymalosci i przepuszczajaca wode. Jeden koniec tkaniny spoczywa na spagu natomiast jego drugi koniec zamocowany jest do przedniego stojaka obudowy. Woda splywajaca do przestrzeni roboczej poprzez otwory w oslonie odzawalowej i tylnym laczniku odprowadzana jest wzdluz sciany do odplywu w chodniku otworami, które to otwory znajduja sie w spagnicy obudowy górniczej tworzac kanal rozciagajacy sie wzdluz wyrobiska.2 134 100 Przedmiot wynalazku jest przedstawiony w przykladzie wykonania na rysunku, który przedstawia ogólny widok podpórowo-oslonowej obudowy górniczej przystosowanej do pracy z podsadzka hydrauliczna. Obudowa górnicza rozpierana miedzy stropnica 1 a 3pagnica 2 hydraulicznymi stojakami 3 i 4 ma oslone odzawalowa 5 polaczona z jednej strony przegubowo ze stropnica 1 natomiast z drugiej strony oslona odzawalowa 5 polaczona jest przegubowo z tylnym ciegnem 6.'Drugi koniec tylnego ciegna 6 polaczony jest ze spagnica 2,. Przednie ciegno 7 laczy sie z jednej strony ze spagnica 1 a z drugiej strony z oslona odzawalowa 5. "Ho stropnicy 1 zawieszony jest na elastycznych ciegnach rurociag podsadzkowy 14, którego to wylot 15 rurociagu podsadzkowego 14 wychodzi przez otwór 16 w oslonie odzawalowej 5 w kierunku przestrzeni podsadzkowej. Obudowe podporowo- oslonowa opasuje tkanina podsadzkowa 11 o duzej wytrzjnnalosci i przepuszczajaca wode.Jeden z koiiców tkaniny podsadzkowej 11 spoczywa na spagu natomiast drugi jej koniec zaczepiony jest do przedniego hydraulicznego stojaka 3 obudowy górniczej za posrednictwem uchwytu 13, który to uchwyt 13 zamocowany jest do stojaka 3 poprzez obejme 19. Oslony boczne 8, 9 i 10 bedace na oslonie odzawalowej 5, tylnym ciegnie 6 i stropnicy 1 przylegaja do oslon bocznych sasiednich sekcji i oddzielaja szczelnie przestrzeli podsadzana od przestrzeni roboczej sciany. Oslona odzawalowa 5 i tylne ciegno 6 maja poprzeczne otwory 17. Srednica poprzecznych otworów 17 jest mniejsza od srednicy otworu 16 dla wylotu 15 rurociagu podsadzkowego 14. Woda z mieszaniny podsadzkowej z przestrzeni podsadzkowej przepuszczana jest przez poprzeczne otwory 17.Po przeplynieciu wody przez poprzeczne otwory 17 znajdujace sie w oslonie odzawalowej 5 i tylnym ciegnie 6 woda plynie wzdluz dciany do odplywu w chodniku poprzez otwór 18 bedacy w spagnicy 2. Otwór 18 o trapezowym ksztalcie tworzy kanal rozciagajacy sie wzdluz wyrobiska a sluzacy do odprowadzania wód podsadzkowych. PLThe patent description was published: 1986 10 31 134100 CZritLNlAJ Urzedu Poi * ntnwrgn 1 InL Cl.3 E21D 23/06 E21F 15/04 Inventors: Stanislaw Romanowicz, Edward Janik Authorized, from the patent: Centrum Mechanizacji Górnictwa "Komag", Gliwice / Poland / HOUSING P0DP0R0V70-03L0N0tfA of the invention is a mining support-shield housing adapted to work with a hydraulic proppant. Known from the patent No. 87849 pt. The "mine filling dam" is made of a canvas belt attached at the top to frame supporting structures connected with canopies of a mechanized support, and at the bottom to frame structures attached to the bottoms of stands of this support. The width of the canvas belt attached to the dam structure is adjusted to the maximum the supports of the casing were moved apart, the canvas stretched from the spag to the ceiling. To enable the casing to be walked together with the dam attached to it, in the places between the casing members, i.e. in the places between the canopies, there are excess cloths forming vertical folds. These folds adhere to elastic covers, which are fixed with one side to the supporting structures of one casing member and the other resting on the supporting structure of the adjacent casing member, they prevent the proppant from pushing out excess cloth between the casing members. Such dams do not form the load-bearing assembly of the casing. The aim was achieved with the use of a support-shield casing stretched between the canopy and the spar with hydraulic props. The casing and the back joint of the mining housing have openings to drain water from the backfill space. In turn, the casing shield has an opening for the exit of the proppant supplying liquid proppant to the proppant space. A high-strength fabric that is water-permeable is wrapped around the rails, a wrapper and a rear joint. One end of the fabric rests on the spag while its other end is attached to the front stand of the housing. Water flowing into the working space through the openings in the casing and the rear connector is drained along the wall to the pavement drain through openings, the openings of which are located in the mine support excavator, forming a channel extending along the excavation. 2 134 100 The subject of the invention is presented in the example of the implementation on a drawing which shows a general view of a support and shield mining support adapted to work with a hydraulic proppant. The mining support is stretched between the canopy 1 and 3, the crane 2 with hydraulic props 3 and 4, has a cave cover 5 connected on one side with a cave guard 1, while on the other side a cave cover 5 is articulated with the rear strand 6. 'The second end of the rear strand 6 is connected with spagnica 2. The front link 7 connects on the one side with the downdraft 1 and on the other side with the mantle cover 5. "Ho of the canopy 1 is suspended on the flexible tendons of the backfilling pipeline 14, the outlet 15 of the backfilling pipeline 14 exits through the opening 16 in the reed cover 5 towards the space. The support and protection casing is wrapped around a high-strength and water-permeable supporting fabric 11. One of the supports of the supporting fabric 11 rests on the foot, while its other end is attached to the front hydraulic stand 3 of the mining casing by means of a handle 13, which handle 13 is attached to to the stand 3 through the clamp 19. Side shields 8, 9 and 10, which are on the cave shield 5, rear bowstring 6 and canopy 1, adjoin the side shields of adjacent sections and tightly separate the filling space from the working space of the wall. transverse holes 17. The diameter of the transverse holes 17 is smaller than diameter of the opening 16 for the outlet 15 of the backfilling pipeline 14. Water from the proppant mixture from the backfilling space is passed through transverse openings 17. After the water has passed through the transverse openings 17 located in the casing 5 and rear pipe 6, the water flows along the wall to the sidewalk drain through hole 18 in the spagnica 2. The hole 18 with a trapezoidal shape forms a channel extending along the excavation and serving to drain backfill water. PL

Claims (1)

1. Zastrzezenie patentowe Obudowa podporowo-oslonowa do pracy z podsadzka hydrauliczna skladajaca sie ze stropnicy i spagnicy, rozpierana stojakami hydraulicznymi, majaca oslone odzawalowa i laczniki polaczone ze soba przegubowo, przy czym oslona odzawalowa laczy sie przegubowo ze spagnica oraz ma otwór dla-wylotu rurociagu podsadzkowego, znamienna tym, z© oslona odzawalowa /5/ i tylny lacznik /6/ ma poprzeczne otwory /l7/, zas spagnica /?./ ma otwór /18/ tworzacy konal rozciagajacy sie wzdluz wyrobiska, a sluzacy do odprowadzania wód podsadzkowych. Pracownia Poligraficzna UP PRL. Naklad 100 egz. Cena 100 zl PL1. Patent claim A support-shield casing for working with a hydraulic support consisting of a canopy and a spigot, expanded with hydraulic props, having a casing cover and joints articulated with each other, while the casing is articulated with the joist and has a hole for the outlet of the pipeline a filler, characterized by the fact that the backfill cover / 5 / and the rear connector / 6 / has transverse openings / 17 /, and the spagger /?./ has an opening / 18 / forming a concave extending along the excavation and serving to drain backfill water. Printing workshop of the UP PRL. Mintage 100 copies. Price PLN 100 PL
PL23204181A 1981-07-03 1981-07-03 Shield-type roof support PL134100B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL23204181A PL134100B1 (en) 1981-07-03 1981-07-03 Shield-type roof support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL23204181A PL134100B1 (en) 1981-07-03 1981-07-03 Shield-type roof support

Publications (1)

Publication Number Publication Date
PL134100B1 true PL134100B1 (en) 1985-07-31

Family

ID=20009173

Family Applications (1)

Application Number Title Priority Date Filing Date
PL23204181A PL134100B1 (en) 1981-07-03 1981-07-03 Shield-type roof support

Country Status (1)

Country Link
PL (1) PL134100B1 (en)

Similar Documents

Publication Publication Date Title
RU2632912C2 (en) Mobile barrier flood protection system
RU2173387C2 (en) Bag support (versions)
RU2592104C1 (en) Coating slopes
PL149218B1 (en) Method of filling mined-out longwall workings and filling stopping therefor
PL134100B1 (en) Shield-type roof support
RU158735U1 (en) REVETMENT
CN210482190U (en) Temporary water retaining device for water conservancy construction
US1984802A (en) Means for mining streams
PL137846B2 (en) Filling dam for mechanical housing
PL174781B1 (en) Filling dam
SU798327A1 (en) Mobile filling-in fence
SU872779A1 (en) Detachable hydraulic filling-in partition
SU891970A1 (en) Sectional portable form
CN212359805U (en) Water prevention and control device for coal mine geological engineering
PL83542B2 (en)
RU29115U1 (en) POLYMER CONTAINER BALLASTING DEVICE (PCBU)
SU757743A1 (en) Method and apparatus for filling-in worked-out area
PL107049B1 (en) DAM FOR CONTINUOUS DAMMING AND FOUNDING SCANAN WITH CROATIA CASING
SU926329A1 (en) Mine bulkhead
RU1798502C (en) Method for making embarkments
SU1023102A1 (en) Power roof support
PL145274B1 (en) Displaceable articulated filling dam
PL231937B1 (en) Method for making the belts of hardened filling, preferably to protect the longwall gallery in the underground mining works and the mechanized lining
PL150746B1 (en) Method of protecting floor rock against upheval and apparatus therefor
PL148661B1 (en) Self-advancing roof support unit