PL119490B1 - Method of driving of long mine development headingsyrabotok - Google Patents

Method of driving of long mine development headingsyrabotok Download PDF

Info

Publication number
PL119490B1
PL119490B1 PL21126278A PL21126278A PL119490B1 PL 119490 B1 PL119490 B1 PL 119490B1 PL 21126278 A PL21126278 A PL 21126278A PL 21126278 A PL21126278 A PL 21126278A PL 119490 B1 PL119490 B1 PL 119490B1
Authority
PL
Poland
Prior art keywords
comma
galleries
wall
sidewalk
headingsyrabotok
Prior art date
Application number
PL21126278A
Other languages
Polish (pl)
Other versions
PL211262A1 (en
Inventor
Bogdan Gajda
Leonard Liduchowski
Tadeusz Trybus
Original Assignee
Kopalnia Wegla Kamiennego Stas
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kopalnia Wegla Kamiennego Stas filed Critical Kopalnia Wegla Kamiennego Stas
Priority to PL21126278A priority Critical patent/PL119490B1/en
Publication of PL211262A1 publication Critical patent/PL211262A1/xx
Publication of PL119490B1 publication Critical patent/PL119490B1/en

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Description

Przedmiotem wynalazku jest sposób drazenia dlugich górniczych wyrobisk, sluzacych przygotowaniu pola wybierakowego do eksploatacji syste¬ mem scianowym, zwlaszcza w warunkach zagrozenia meta¬ nowego i wysokich temperatur.Stan techniki. Znany jest sposób prowadzenia dlugich wyrobisk chodnikowych polegajacy na tym, ze drazy sie jednoczesnie dwa równolegle wyrobiska usytuowane wzgle¬ dem siebie w niewielkiej odleglosci i laczy sieje przecinkami miedzy soba co kilkadziesiat lub kilkaset metrów.Kazde polaczenie obydwu chodników daje mozliwosc uzyskania obiegowego pradu powietrza, a wiec doprowadze¬ nia jednym z chodników powietrza swiezego i odprowa¬ dzenia drugim powietrza zuzytego po przewietrzeniu drazonych przodków. Od miejsca ostatniej przecinki do obydwu przodków doprowadzona jest wentylacja odrebna, zrealizowana na przyklad przy pomocy wentylatorów i lutniociagów.Wada znanego sposobu jest przede wszystkim zwiek¬ szenie w dwójnasób nakladów na przygotowanie pola do eksploatacji, gdyz tam gdzie dla celów wybierakowych potrzebny jest jeden chodnik, wykonane sa dwa. Inna wada polega na tym, ze pozostawiony miedzy dwoma chodnikami pas wegla jest trudny do wybrania przemyslo¬ wymi i zmechanizowanymi sposobami, totez czesto wo- góle sie go nie wybiera. Jednakze pozostawienie stwarza mozliwosc samozapalenia sie wegla a takze ma negatywne skutki jesli chodzi o zagrozenie tapaniami przy wybieraniu pokladów nizej lub wyzej lezacych. 10 15 20 25 3J Istota wynalazku. Celem wynalazku jest wyelimino¬ wanie wymienionych wad i niedogodnosci. Cel ten osia¬ gnieto w wynalazku dzieki temu, ze równoczesnie wykonuje sie dwa równolegle chodniki stanowiace chodnik nad i podscianowy dla projektowanej sciany. Po osiagnieciu 300 do 600 m postepu chodników, laczy sie je przecinka tak usytuowana, ze tworzy kat ostry w stosunku do kliwazu skal stropowych i jednego z chodników, poczem przystepuje sie do dalszego drazenia obydwu równoleglych chodników.Objasnienie rysunku. Wynalazek zostal pokazany w przykladzie wykonania na rysunku, który przedstawia fragment mapy pola górniczego. Chodnik (1) jest chodni¬ kiem podscianowym a chodnik (2) nadscianowym dla sciany 3. Przecinki 4 i 5 usytuowane sa w stosunku do chodników 1 i 2 skosnie, a jednoczesnie tworzy kat ostry z kierunkiem kliwazu skal stropowych.Przyklad stosowania wynalazku. Postepowanie zgod¬ nie ze sposobem wedlug niniejszego wynalazku jest nastepujace. Chodniki 1 i 2 kazdy z wentylacja odrebna prowadzi sie na odleglosc 300 i 600 m do wysokosci prze¬ cinki 4. Po wykonaniu przecinki 4 uzyskuje sie obiegowa wentylacje. Dalsze drazenie chodników 1 i 2 jest mozliwe, gdyz ich wentylacje odrebna rozpoczyna sie od przecinki 4 w kierunku przecinki 5. Jesli wybieg sciany 3 jest dlugi, po dalszych 300 do 600 m wykonuje sie nastepna przecinke 5. Wtedy tamuje sie przecinke 4 a obieg pradu powietrza uzyskuje sie przez podscianowy chodnik 1, przecinke 5 i nadscianowy chodnik 2.Korzystne skutki, Zaleta sposobu drazenia dlugich górniczych wyrobisk przygotowawczych jest to, ze prowa- 119 490119 490 3 dzone chodniki sluza prawidlowemu przygotowaniu pola eksploatacyjnego do wybierania czystego bez pozostawienia trudnych lub wrecz niemozliwych do zlikwidowania pasów wegla, co w konsekwencji wyklucza mozliwosc powstawania pozarów endogenicznych i zapobiega tapaniom w pokladach sasiednich. Jest oczywiste, ze korzystny uklad chodników nad i podscianowych polaczony z przecinkami pozwala na przygotowanie pola o dowolnej dlugosci.Niezwykle trafnym okazal sie w wynalazku dobór kierunku przecinek, gdyz dzieki temu, ze one sa nieprostopadle do chodników przyscianowych dadza sie latwo likwidowac postepujacym frontem scianowym, zas ich skosne usytuo¬ wanie w stosunku do kliwazu skal stropowych gwarantuje prawidlowe rabowanie sie po przejsciu frontu scianowego. u~ ~'~" -rs] 10 15 Zastrzezenia patentowe Sposób drazenia dlugich górniczych wyrobisk przygoto¬ wawczych w polach metanowych znamienny tym, ze równoczesnie drazy sie dwa równolegle chodniki (1) i (2), stanowiace chodnik nad i podcisnieniowy dla sciany (3), zas po wydrazeniu ich na odleglosc 300 do 600 m laczy sie je przecinka (4) tak usytuowana, ze tworzy kat ostry w sto¬ sunku do kliwazu skal stropowych i jednego z chodników 1) i (2), poczem prowadzi sie dalej chodniki (1) i (2) do miejsca nastepnej przecinki (5) oddalonej od poprzedniej przecinki (4) równiez o odleglosc 300 do 600 metrów a po jej wykonaniu tamuje sie poprzednia przecinke (4) zas chodnik (1) i (2) prowadzi sie do rozcinki scianowej sciany (3), przy czym liczba przecinek (4) i (5) zalezna jest od dlugosci chodników (1) i (2). i LDD Z-d 2, z. 288/1400/83, n. 1(10+20 egft Cena 100 zl PLThe subject of the invention is a method of long mining pits, used to prepare the extraction field for mining with a wall system, especially in conditions of a metal hazard and high temperatures. State of the art. There is a known method of running long paving pits, whereby two parallel pits located at a short distance from each other are simultaneously traversed and are connected by commas between each other every several dozen or several hundred meters. Each connection of both pavements gives the possibility of obtaining a circulating air flow, and Thus, the supply of fresh air with one of the galleries and the discharge of exhaust air with the other after ventilation of the irritated ancestors. From the place of the last decimal point, separate ventilation is provided to both faces, for example by means of fans and ducts. The disadvantage of the known method is, above all, the doubling of the expenditure on preparing the field for exploitation, because where one heading is needed for selection purposes, two are made. Another disadvantage is that the strip of coal left between the two pavements is difficult to select by industrial and mechanized methods, and is often not chosen at all. However, leaving it creates the possibility of coal self-ignition and has negative consequences in terms of the risk of tapping when selecting lower or higher decks. 10 15 20 25 3J Summary of the invention. The object of the invention is to eliminate the above-mentioned drawbacks and inconveniences. This aim is achieved in the invention due to the fact that two parallel sidewalks are made simultaneously, constituting the sidewalk above and under the wall for the designed wall. After reaching 300 to 600 m of sidewalk progress, they are joined by a comma positioned so that it forms an acute angle in relation to the clue of the roof scales and one of the sidewalks, then the two parallel sidewalks are further cut. Clarification of the drawing. The invention is shown in the example of embodiment in the drawing which shows a fragment of a map of a mining field. The sidewalk (1) is an under-wall sidewalk and the sidewalk (2) is an over-wall sidewalk for wall 3. The commas 4 and 5 are diagonally situated in relation to the sidewalks 1 and 2, and at the same time form an acute angle with the direction of the cleft of the roof scales. The procedure of the present invention is as follows. Sidewalks 1 and 2 each with separate ventilation are led up to a distance of 300 and 600 m up to the height of section 4. After comma 4 is made, circular ventilation is obtained. Further tearing of sidewalks 1 and 2 is possible, because their separate ventilation starts with comma 4 in the direction of comma 5. If the wall 3 run is long, another comma 5 is made after a further 300 to 600 m. Then the comma 4 is blocked and the current circuit of air is obtained through the sub-walled walkway 1, the cross-section 5 and the cross-walled walkway 2. Advantageous effects, The advantage of the way of long mining excavation workings is the fact that it leads to the proper preparation of the mining field for clean mining without leaving difficult or even impossible to eliminate carbon strips, which in consequence excludes the possibility of endogenous fires and prevents taping in adjacent decks. It is obvious that the favorable arrangement of the sidewalks above and the sidewalls combined with commas allows for the preparation of a field of any length. and their slanting location in relation to the clone of the roof rocks guarantees the correct robbery after the wall front has passed. u ~ '~ "-rs] 10 15 Patent claims A method for long mining excavation workings in methane fields, characterized by the fact that two parallel galleries (1) and (2) are simultaneously drilled in parallel, constituting a sidewalk over and under pressure for a wall ( 3), and after exposing them to a distance of 300 to 600 m, they are joined by a comma (4) located in such a way that it forms an acute angle in relation to the clinker of the roof rocks and one of the galleries 1) and (2), then proceed further sidewalks (1) and (2) to the place of the next comma (5) distant from the previous comma (4) also by a distance of 300 to 600 meters, and after its execution, the previous decimal point (4) is dammed, while the sidewalk (1) and (2) leads to the wall section (3), where the number of commas (4) and (5) depends on the length of the pavements (1) and (2). and LDD Zd 2, z. 288/1400/83, n. 1 ( 10 + 20 egft Price PLN 100 PL

Claims (1)

Zastrzezenia patentowe Sposób drazenia dlugich górniczych wyrobisk przygoto¬ wawczych w polach metanowych znamienny tym, ze równoczesnie drazy sie dwa równolegle chodniki (1) i (2), stanowiace chodnik nad i podcisnieniowy dla sciany (3), zas po wydrazeniu ich na odleglosc 300 do 600 m laczy sie je przecinka (4) tak usytuowana, ze tworzy kat ostry w sto¬ sunku do kliwazu skal stropowych i jednego z chodników 1. ) i ( 2. ), poczem prowadzi sie dalej chodniki (1) i (2) do miejsca nastepnej przecinki (5) oddalonej od poprzedniej przecinki (4) równiez o odleglosc 300 do 600 metrów a po jej wykonaniu tamuje sie poprzednia przecinke (4) zas chodnik (1) i (2) prowadzi sie do rozcinki scianowej sciany ( 3. ), przy czym liczba przecinek ( 4. ) i ( 5. ) zalezna jest od dlugosci chodników (1) i (2). i LDD Z-d 2, z. 288/1400/83, n. 1(10+20 egft Cena 100 zl PLPatent claims A method of dragging long mining excavations in methane fields, characterized in that two parallel galleries (1) and (2) are simultaneously drilled, constituting the overpressure and underpressure walkway for the wall (3), and after exposing them to a distance of 300 to 600 m, they are joined by a comma (4) located in such a way that it forms an acute angle in relation to the clinkle of the roof rocks and one of the galleries 1.) and (2.), then continue the galleries (1) and (2) to the places of the next comma (5) distant from the previous comma (4) also by a distance of 300 to 600 meters, and after it is made, the previous decimal point (4) is dammed, and the sidewalk (1) and (2) leads to the wall section (3.) , where the number of commas (4.) and (5.) depends on the length of pavements (1) and (2). and LDD Z-d 2, z. 288/1400/83, n. 1 (10 + 20 egft Price PLN 100 PL
PL21126278A 1978-11-27 1978-11-27 Method of driving of long mine development headingsyrabotok PL119490B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL21126278A PL119490B1 (en) 1978-11-27 1978-11-27 Method of driving of long mine development headingsyrabotok

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL21126278A PL119490B1 (en) 1978-11-27 1978-11-27 Method of driving of long mine development headingsyrabotok

Publications (2)

Publication Number Publication Date
PL211262A1 PL211262A1 (en) 1980-08-11
PL119490B1 true PL119490B1 (en) 1982-01-30

Family

ID=19992817

Family Applications (1)

Application Number Title Priority Date Filing Date
PL21126278A PL119490B1 (en) 1978-11-27 1978-11-27 Method of driving of long mine development headingsyrabotok

Country Status (1)

Country Link
PL (1) PL119490B1 (en)

Also Published As

Publication number Publication date
PL211262A1 (en) 1980-08-11

Similar Documents

Publication Publication Date Title
GB1354741A (en) Tunnel or shaft lining segment and a method of lining tunnels,shafts
CN102536229A (en) Tunneling, protecting and anchoring parallel work system and construction technology
ES467010A1 (en) Method of, and apparatus for, driving and lining tunnels
PL119490B1 (en) Method of driving of long mine development headingsyrabotok
WO2021003771A1 (en) Design method for mine without leaving coal pillar and without roadway tunneling
CN108194079A (en) A kind of efficient speedy drivage operational method of moderate stable top plate coal road
RU2560734C1 (en) Development method of ultra-thick deposits using block and chamber system
CN102787845A (en) Segmented construction method of extra-long tunnels by adopting development machines to construct inclined shafts and headings first
CN205577993U (en) Mining system is synthesized by gradual anxious shallow bore hole to extremely thin complicated quartz reef
SU1016532A1 (en) Method of preventing and localizing endogeneous fires
SU949178A1 (en) Method for protecting preparation workings
RU2169264C2 (en) Method of preparation for and mining of steep and sloping coal seams
SU1164420A1 (en) Method of underground mining of ore deposits
SU1668563A1 (en) Method for building deep underground railway station at existing line
SU690181A1 (en) Method of combined mining of mineral fields
GB722649A (en) Improvements in or relating to the construction of roofs
PL146607B1 (en) Method of mining a coal longwall provided with self-advancing roof supports
SU901559A1 (en) Excavating section airing method
SU1337522A1 (en) Method of mounting the support of machinized mining set on ground surface
SU1700248A1 (en) Method of mineral opencast mining
SU1030549A1 (en) Method for working gently sloping coal seams
SU605966A1 (en) Method of mining flat and sloping coal seams
PL100142B1 (en) METHOD OF MAKING WALL PADS IN THE WALLS LEADING TO THE FIELD
SU756009A1 (en) Method of open-pit mining
SU1030555A1 (en) Method for supporting vertical mining working