OA12271A - Method for plugging a well with a resin. - Google Patents

Method for plugging a well with a resin. Download PDF

Info

Publication number
OA12271A
OA12271A OA1200200354A OA1200200354A OA12271A OA 12271 A OA12271 A OA 12271A OA 1200200354 A OA1200200354 A OA 1200200354A OA 1200200354 A OA1200200354 A OA 1200200354A OA 12271 A OA12271 A OA 12271A
Authority
OA
OAPI
Prior art keywords
well
resin
rubber
plug
cernent
Prior art date
Application number
OA1200200354A
Other languages
English (en)
Inventor
Martin Gerard Rene Bosma
Erik Kerst Cornelissen
Alexander Schwing
Original Assignee
Shell Int Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shell Int Research filed Critical Shell Int Research
Publication of OA12271A publication Critical patent/OA12271A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B36/00Heating, cooling or insulating arrangements for boreholes or wells, e.g. for use in permafrost zones
    • E21B36/001Cooling arrangements
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/42Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells
    • C09K8/426Compositions for cementing, e.g. for cementing casings into boreholes; Compositions for plugging, e.g. for killing wells for plugging
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • E21B33/138Plastering the borehole wall; Injecting into the formation

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Sealing Material Composition (AREA)
  • Drilling Tools (AREA)
  • Sampling And Sample Adjustment (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Compositions Of Macromolecular Compounds (AREA)
OA1200200354A 2000-05-22 2001-05-21 Method for plugging a well with a resin. OA12271A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP00304289 2000-05-22

Publications (1)

Publication Number Publication Date
OA12271A true OA12271A (en) 2006-05-11

Family

ID=8173013

Family Applications (1)

Application Number Title Priority Date Filing Date
OA1200200354A OA12271A (en) 2000-05-22 2001-05-21 Method for plugging a well with a resin.

Country Status (8)

Country Link
US (1) US6802375B2 (no)
EP (1) EP1283939B1 (no)
AU (2) AU7567201A (no)
BR (1) BR0111032B1 (no)
DK (1) DK1283939T3 (no)
NO (1) NO324297B1 (no)
OA (1) OA12271A (no)
WO (1) WO2001090531A1 (no)

Families Citing this family (45)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BRPI0519027A2 (pt) * 2004-12-15 2008-12-23 Shell Int Research mÉtodo para vedar um espaÇo anular formado entre um elemento tubular expansÍvel disposto em um furo de poÇo e uma parede que circunda o elemento tubular expansÍvel
US20060236794A1 (en) * 2005-03-31 2006-10-26 Sherman Jason T Method and apparatus for determining the operating points of bone cement
CN100357735C (zh) * 2005-04-19 2007-12-26 西南石油学院 油井水泥浆凝结时间的测量方法及水泥浆凝结仪
MXNL05000067A (es) * 2005-09-07 2007-03-06 Geo Estratos S A De C V Metodo automatico de identificacion de pozos petroleros con fuga y/o comunicacion entre tuberias y/o empacadores.
CN101372886B (zh) * 2008-07-29 2010-10-27 李瑞峰 油田用环保、高效加热炉系统
EP2192094A1 (en) 2008-11-27 2010-06-02 Services Pétroliers Schlumberger Aqueous resin compositions and methods for cement repair
US9233874B2 (en) 2010-07-21 2016-01-12 Halliburton Energy Services, Inc. Cement compositions with a high-density additive of silicon carbide or sintered bauxite
CA2758514A1 (en) 2010-12-08 2012-06-08 Schlumberger Canada Limited Compositions and methods for well completions
CN102305045A (zh) * 2011-08-05 2012-01-04 中联煤层气国家工程研究中心有限责任公司 一种井筒裂缝模拟装置
US20130220612A1 (en) * 2012-02-24 2013-08-29 Halliburton Energy Services, Inc. Shear Bond Strength of Set Cement
US10093770B2 (en) 2012-09-21 2018-10-09 Schlumberger Technology Corporation Supramolecular initiator for latent cationic epoxy polymerization
WO2014164044A1 (en) * 2013-03-13 2014-10-09 Bayer Materialscience Llc Polymers and process for filling cavities, gaps and voids
BR112017004598A2 (pt) * 2014-10-23 2018-01-30 Halliburton Energy Services Inc ferramenta de fundo de poço.
US20160348464A1 (en) * 2015-05-27 2016-12-01 Wild Well Control, Inc. Method of sealing wells by injection of sealant
US10214988B2 (en) 2015-08-12 2019-02-26 Csi Technologies Llc Riserless abandonment operation using sealant and cement
GB201521886D0 (en) 2015-12-11 2016-01-27 Aubin Ltd A method of treating a well
AU2017217194B2 (en) * 2016-02-08 2019-03-14 Shell Internationale Research Maatschappij B.V. Method for providing zonal isolation in an underground wellbore
US10738567B2 (en) 2016-09-30 2020-08-11 Conocophillips Company Through tubing P and A with two-material plugs
CA3055412A1 (en) 2017-03-11 2018-09-20 Randall S. Shafer Helical coil annular access plug and abandonment
CN106928947B (zh) * 2017-03-28 2022-11-15 北京华油油气技术开发有限公司 一种套管间环空的封堵材料、封堵装置和封堵方法
US10378299B2 (en) 2017-06-08 2019-08-13 Csi Technologies Llc Method of producing resin composite with required thermal and mechanical properties to form a durable well seal in applications
US10428261B2 (en) 2017-06-08 2019-10-01 Csi Technologies Llc Resin composite with overloaded solids for well sealing applications
CN107522422B (zh) * 2017-07-14 2020-06-23 中国石油天然气集团公司 一种油井水泥的自修复剂及其制备方法和测试方法
CN107643242B (zh) * 2017-08-17 2019-11-01 武汉科技大学 一种高炉料柱透液性的评价方法与装置
US11352541B2 (en) 2018-08-30 2022-06-07 Saudi Arabian Oil Company Sealing compositions and methods of sealing an annulus of a wellbore
US10696888B2 (en) 2018-08-30 2020-06-30 Saudi Arabian Oil Company Lost circulation material compositions and methods of isolating a lost circulation zone of a wellbore
US11168243B2 (en) 2018-08-30 2021-11-09 Saudi Arabian Oil Company Cement compositions including epoxy resin systems for preventing fluid migration
CN109653729B (zh) * 2018-12-14 2022-03-01 中海石油(中国)有限公司 一种井筒组件微泄漏循环密封模拟检测装置及方法
CN109707340B (zh) * 2019-02-12 2021-04-06 中国海洋石油集团有限公司 一种致密气中选择性控水方法
CN112177571B (zh) * 2019-06-14 2023-04-07 中国石油化工股份有限公司 一种储层亏空防砂井砾石充填程度模拟实验装置和方法
CA3153304A1 (en) 2019-09-05 2021-03-11 Saudi Arabian Oil Company Propping open hydraulic fractures
CN111088956B (zh) * 2019-12-04 2022-03-11 中国石油天然气集团有限公司 一种基于磁流变液的油气井口暂堵换阀装置及方法
US11332656B2 (en) 2019-12-18 2022-05-17 Saudi Arabian Oil Company LCM composition with controlled viscosity and cure time and methods of treating a lost circulation zone of a wellbore
US11370956B2 (en) 2019-12-18 2022-06-28 Saudi Arabian Oil Company Epoxy-based LCM compositions with controlled viscosity and methods of treating a lost circulation zone of a wellbore
US11193052B2 (en) 2020-02-25 2021-12-07 Saudi Arabian Oil Company Sealing compositions and methods of plugging and abandoning of a wellbore
US11236263B2 (en) 2020-02-26 2022-02-01 Saudi Arabian Oil Company Method of sand consolidation in petroleum reservoirs
GB2594700B (en) 2020-04-01 2022-06-01 Univ Heriot Watt Method of artificially reducing porosity
US11661489B2 (en) 2020-08-19 2023-05-30 Saudi Arabian Oil Company Foamable resin composition for controlling loss circulation
US11618842B2 (en) 2020-09-08 2023-04-04 Saudi Arabian Oil Company Nanosized dendrimeric epoxy resin to prevent casing-casing annulus pressure issues
US11485898B2 (en) 2020-10-21 2022-11-01 Saudi Arabian Oil Company Environmentally friendly epoxidized vegetable oil based fatty acid esters to prevent loss circulation
US11492537B2 (en) 2021-04-07 2022-11-08 Saudi Arabian Oil Company Nanosized dendrimeric epoxy resin as a loss circulation material
US11708521B2 (en) * 2021-12-14 2023-07-25 Saudi Arabian Oil Company Rigless method for selective zonal isolation in subterranean formations using polymer gels
US11827841B2 (en) 2021-12-23 2023-11-28 Saudi Arabian Oil Company Methods of treating lost circulation zones
CN115093164B (zh) * 2022-04-23 2023-06-02 濮阳市华瑞通能源工程技术有限公司 贴堵剂及其制备方法
CN115434661B (zh) * 2022-10-18 2023-09-15 中国地质调查局油气资源调查中心 暂闭封井方法

Family Cites Families (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3170516A (en) 1962-06-25 1965-02-23 Jersey Prod Res Co Method of plugging a well bore with a thermosetting resin
US3312296A (en) 1964-05-13 1967-04-04 Halliburton Co Method of reducing the permeability of portions of bore holes
US3960801A (en) 1973-06-18 1976-06-01 Halliburton Company Pumpable epoxy resin composition
US3933204A (en) 1974-10-15 1976-01-20 Shell Oil Company Plugging subterranean regions with acrylic-epoxy resin-forming emulsions
US4216829A (en) 1977-10-06 1980-08-12 Halliburton Company Gelled water epoxy sand consolidation system
NO162810C (no) 1982-04-06 1992-08-13 Schlumberger Cie Dowell Sementoppslemming og fremgangsmaate for sementering av oljebroenner og geotermiske broenner.
CA1247352A (en) 1984-11-19 1988-12-28 Robert H. Friedman High temperature chemical cement
US4797159A (en) * 1986-07-25 1989-01-10 Dowell Schlumberger Incorporated Expandable cement composition
US4898242A (en) 1986-07-30 1990-02-06 Mobil Oil Corporation Method for suspending wells
FR2626040B1 (fr) 1988-01-20 1993-10-22 Hutchinson Sa Procede d'isolation entre zones de production d'un puits et dispositif de mise en oeuvre de ce procede
US4921047A (en) 1989-08-10 1990-05-01 Conoco Inc. Composition and method for sealing permeable subterranean formations
SU1728473A1 (ru) 1989-12-12 1992-04-23 Институт Минеральных Ресурсов Главного Координационного Геологического Управления "Укргеология" Тампонажный полимерный состав "Герметик-1
US5159980A (en) 1991-06-27 1992-11-03 Halliburton Company Well completion and remedial methods utilizing rubber latex compositions
US5215147A (en) * 1991-12-19 1993-06-01 Mobil Oil Corporation Method for selectively closing an intermediate zone of a near wellbore area
JP2729871B2 (ja) 1992-01-10 1998-03-18 信越化学工業株式会社 フロロシリコーンゴム組成物
JP2660468B2 (ja) 1992-03-24 1997-10-08 信越化学工業株式会社 含フッ素シリコーンゴム組成物
US5404950A (en) 1992-12-22 1995-04-11 Mobil Oil Corporation Low temperature underwater epoxy system for zone isolation, remedial cementing, and casing repair
US5314023A (en) 1993-01-19 1994-05-24 Dartez Terry R Method for selectively treating wells with a low viscosity epoxy resin-forming composition
US5497829A (en) 1993-11-17 1996-03-12 Foam Concepts, Inc. Expansion foam borehole plug and method
US5484020A (en) 1994-04-25 1996-01-16 Shell Oil Company Remedial wellbore sealing with unsaturated monomer system
US5712314A (en) 1996-08-09 1998-01-27 Texaco Inc. Formulation for creating a pliable resin plug
US5738463A (en) 1996-08-15 1998-04-14 Halliburton Company Elastomeric grouting of subsurface conduits
US5873413A (en) 1997-08-18 1999-02-23 Halliburton Energy Services, Inc. Methods of modifying subterranean strata properties
US6006834A (en) 1997-10-22 1999-12-28 Halliburton Energy Services, Inc. Formation evaluation testing apparatus and associated methods
GC0000046A (en) 1998-02-26 2004-06-30 Shell Int Research Compositions for use in well construction, repair and/or abandonment.
US6012524A (en) 1998-04-14 2000-01-11 Halliburton Energy Services, Inc. Remedial well bore sealing methods and compositions
US6431282B1 (en) 1999-04-09 2002-08-13 Shell Oil Company Method for annular sealing

Also Published As

Publication number Publication date
NO324297B1 (no) 2007-09-17
EP1283939B1 (en) 2007-09-19
US20030121662A1 (en) 2003-07-03
NO20025576L (no) 2003-01-20
AU7567201A (en) 2001-12-03
NO20025576D0 (no) 2002-11-21
EP1283939A1 (en) 2003-02-19
BR0111032B1 (pt) 2009-08-11
AU2001275672B2 (en) 2004-11-11
WO2001090531A1 (en) 2001-11-29
DK1283939T3 (da) 2008-01-02
BR0111032A (pt) 2003-06-17
US6802375B2 (en) 2004-10-12

Similar Documents

Publication Publication Date Title
OA12271A (en) Method for plugging a well with a resin.
AU2001275672A1 (en) Method for plugging a well with a resin
US5779787A (en) Well cement compositions containing rubber particles and methods of cementing subterranean zones
US11472998B2 (en) Cement compositions including epoxy resin systems for preventing fluid migration
US7089816B2 (en) Method and apparatus for testing cement slurries
US6593402B2 (en) Resilient well cement compositions and methods
US6196316B1 (en) Compositions for use in well construction, repair and/or abandonment
US20150361760A1 (en) Materials with nanomaterials for well operations
NO339889B1 (no) Fremgangsmåte for å bruke vedlikeholdsfluider for brønner omfattende elastisk materiale
EA003240B1 (ru) Способ уплотнения кольцевого пространства, скважина и труба
Drecq et al. A single technique solves gas migration problems across a wide range of conditions
JP2021536518A (ja) 逸泥防止材料組成物および坑井の逸泥ゾーンを分離する方法
US11485895B2 (en) Cement with resilient latex polymer
BR112017020361B1 (pt) Método para formar um recipiente de armazenamento de gás subterrâneo
KR20210052509A (ko) 웰보어의 환형부를 밀봉하는 밀봉 조성물 및 방법
Chukwuemeka et al. Plug and abandonment of oil and gas wells–A comprehensive review of regulations, practices, and related impact of materials selection
Backe et al. Shrinkage of oil well cement slurries
Gao et al. Cementing technical solutions for long-term isolation of national underground gas storage (UGS) project
WO2023056002A9 (en) High temperature well fluid for supercritical operations
Bosma et al. Development of a novel silicone rubber/cement plugging agent for cost effective thru'tubing well abandonment
Khandka Leakage behind casing
Li Development of wellbore simulator for better understanding oil well cement behavior and gas migration during early gelation
Guan et al. Well Cementing and Completion
Yang Santos A Comprehensive Wellbore Cement Integrity Analysis and Remedies
Dahi Taleghani et al. Integrity Assessment Through Experiments