IT1294492B1
(it)
*
|
1997-09-16 |
1999-04-12 |
Enel Spa |
Metodo per la rappresentazione tramite griglia di calcolo semistrutturata di fenomeni fisici estendentisi in un dominio spaziale
|
WO1999057418A1
(en)
*
|
1998-05-04 |
1999-11-11 |
Schlumberger Evaluation & Production (Uk) Services |
Near wellbore modeling method and apparatus
|
US6765570B1
(en)
|
1998-07-21 |
2004-07-20 |
Magic Earth, Inc. |
System and method for analyzing and imaging three-dimensional volume data sets using a three-dimensional sampling probe
|
FR2787219B1
(fr)
*
|
1998-12-11 |
2001-01-12 |
Inst Francais Du Petrole |
Methode pour modeliser les flux de fluides dans un milieu poreux multi-couches fissure et les interactions correlatives dans un puits de production
|
IES991044A2
(en)
*
|
1998-12-16 |
2000-09-06 |
Kepler Res & Dev Ltd |
Hydrocarbon reservoir testing
|
US6421052B1
(en)
*
|
1999-04-09 |
2002-07-16 |
The Procter & Gamble Company |
Method of seaming and expanding amorphous patterns
|
US8428923B2
(en)
|
1999-04-29 |
2013-04-23 |
Schlumberger Technology Corporation |
Method system and program storage device for simulating a multilayer reservoir and partially active elements in a hydraulic fracturing simulator
|
US7509245B2
(en)
*
|
1999-04-29 |
2009-03-24 |
Schlumberger Technology Corporation |
Method system and program storage device for simulating a multilayer reservoir and partially active elements in a hydraulic fracturing simulator
|
US6192316B1
(en)
*
|
1999-05-26 |
2001-02-20 |
Atlantic Richfield Company |
Fracture discrimination using borehole frequency response of stoneley waves
|
US6826520B1
(en)
*
|
1999-06-24 |
2004-11-30 |
Exxonmobil Upstream Research Company |
Method of upscaling permeability for unstructured grids
|
US6208939B1
(en)
*
|
1999-07-13 |
2001-03-27 |
Monolith Co., Ltd. |
Topography information data processing method and apparatus based on manifold corresponding thereto
|
FR2797329B1
(fr)
*
|
1999-08-06 |
2002-02-08 |
Elf Exploration Prod |
Methode d'elaboration de cartes de probabilite de position de point d'impact d'un puits
|
US6633837B1
(en)
*
|
1999-10-14 |
2003-10-14 |
Object Reservoir |
Method and system for generating software code using a symbolic language translator
|
CA2340547C
(en)
*
|
2000-03-13 |
2005-12-13 |
Smith International, Inc. |
Method for simulating drilling of roller cone bits and its application to roller cone bit design and performance
|
AU2002230389A1
(en)
*
|
2000-06-14 |
2002-04-29 |
Vermeer Manufacturing Company |
Utility mapping and data distribution system and method
|
AU2001271629A1
(en)
*
|
2000-06-29 |
2002-01-14 |
Object Reservoir, Inc. |
Method and system for high-resolution modeling of a well bore in a hydrocarbon reservoir
|
US7369973B2
(en)
*
|
2000-06-29 |
2008-05-06 |
Object Reservoir, Inc. |
Method and system for representing reservoir systems
|
GB2376322B
(en)
*
|
2001-06-08 |
2004-07-07 |
Schlumberger Holdings |
Method for representing a volume of earth using a modelling environment
|
US7428476B1
(en)
|
2001-08-10 |
2008-09-23 |
Yasumi Capital, Llc |
System and method of simulating with respect to spheroid reference models using local surface coordinates
|
US7248259B2
(en)
*
|
2001-12-12 |
2007-07-24 |
Technoguide As |
Three dimensional geological model construction
|
US7069149B2
(en)
*
|
2001-12-14 |
2006-06-27 |
Chevron U.S.A. Inc. |
Process for interpreting faults from a fault-enhanced 3-dimensional seismic attribute volume
|
US7249009B2
(en)
*
|
2002-03-19 |
2007-07-24 |
Baker Geomark Llc |
Method and apparatus for simulating PVT parameters
|
US20030182093A1
(en)
*
|
2002-03-25 |
2003-09-25 |
Jones Thomas A. |
Controlling azimuthally varying continuity in geologic models
|
FR2839368B1
(fr)
*
|
2002-05-06 |
2004-10-01 |
Total Fina Elf S A |
Methode de decimation de traces sismiques pilotee par le trajet sismique
|
EP1556820A1
(en)
*
|
2002-06-14 |
2005-07-27 |
Services Pétroliers Schlumberger |
Method and program storage device for generating grids representing the architecture of fluvial reservoirs
|
GB2398900A
(en)
*
|
2003-02-27 |
2004-09-01 |
Schlumberger Holdings |
Identification of best production potential oil wells and identification of drilling strategy to maximise production potential
|
US7496488B2
(en)
*
|
2003-03-06 |
2009-02-24 |
Schlumberger Technology Company |
Multi-scale finite-volume method for use in subsurface flow simulation
|
US6823297B2
(en)
|
2003-03-06 |
2004-11-23 |
Chevron U.S.A. Inc. |
Multi-scale finite-volume method for use in subsurface flow simulation
|
US7835893B2
(en)
*
|
2003-04-30 |
2010-11-16 |
Landmark Graphics Corporation |
Method and system for scenario and case decision management
|
WO2005033739A2
(en)
*
|
2003-09-30 |
2005-04-14 |
Exxonmobil Upstream Research Company Corp-Urc-Sw348 |
Characterizing connectivity in reservoir models using paths of least resistance
|
NL1024444C2
(nl)
*
|
2003-10-03 |
2005-04-08 |
J O A Beheer B V |
Werkwijze, inrichting, computerprogramma en gegevensdrager voor het met een digitale verwerkingseenheid modelleren van een meerdimensionale heterogene structuur.
|
US20050165555A1
(en)
*
|
2004-01-13 |
2005-07-28 |
Baker Hughes Incorporated |
3-D visualized data set for all types of reservoir data
|
GB2426845B
(en)
*
|
2004-01-20 |
2008-08-06 |
Saudi Arabian Oil Co |
Real time earth model for collaborative geosteering
|
CA2543801C
(en)
*
|
2004-01-30 |
2014-03-04 |
Exxonmobil Upstream Research Company |
Reservoir model building methods
|
CN1898640A
(zh)
*
|
2004-01-30 |
2007-01-17 |
埃克森美孚上游研究公司 |
储层评价方法
|
US7657414B2
(en)
*
|
2005-02-23 |
2010-02-02 |
M-I L.L.C. |
Three-dimensional wellbore visualization system for hydraulics analyses
|
US7596481B2
(en)
|
2004-03-16 |
2009-09-29 |
M-I L.L.C. |
Three-dimensional wellbore analysis and visualization
|
FR2869116B1
(fr)
*
|
2004-04-14 |
2006-06-09 |
Inst Francais Du Petrole |
Methode pour construire un modele geomecanique d'une zone souterraine destine a etre couple a un modele de reservoir
|
US7672818B2
(en)
*
|
2004-06-07 |
2010-03-02 |
Exxonmobil Upstream Research Company |
Method for solving implicit reservoir simulation matrix equation
|
US7742875B2
(en)
*
|
2004-07-01 |
2010-06-22 |
Exxonmobil Upstream Research Company |
Method for geologic modeling through hydrodynamics-based gridding (Hydro-Grids)
|
US7079953B2
(en)
*
|
2004-08-20 |
2006-07-18 |
Chevron U.S.A. Inc. |
Method for creating facies probability cubes based upon geologic interpretation
|
EP1938281B1
(en)
*
|
2004-09-10 |
2015-01-21 |
ExxonMobil Upstream Research Company |
Geologic models of subsurface sedimentray volumes
|
US7707018B2
(en)
*
|
2004-12-14 |
2010-04-27 |
Schlumberger Technology Corporation |
Finite volume method system and program storage device for linear elasticity involving coupled stress and flow in a reservoir simulator
|
US7640149B2
(en)
*
|
2004-12-15 |
2009-12-29 |
Schlumberger Technology Corporation |
Method system and program storage device for optimization of valve settings in instrumented wells using adjoint gradient technology and reservoir simulation
|
FR2886742B1
(fr)
*
|
2005-06-02 |
2007-07-27 |
Inst Francais Du Petrole |
Methode de changement d'echelle des permeabilites absolues pour construire un modele de simulation d'ecoulement
|
US8145463B2
(en)
*
|
2005-09-15 |
2012-03-27 |
Schlumberger Technology Corporation |
Gas reservoir evaluation and assessment tool method and apparatus and program storage device
|
US20070136042A1
(en)
*
|
2005-12-09 |
2007-06-14 |
Jiun-Der Yu |
Quadrilateral grid extension of central difference scheme for ink-jet simulations
|
CA2643911C
(en)
*
|
2006-03-02 |
2015-03-24 |
Exxonmobil Upstream Research Company |
Method for quantifying reservoir connectivity using fluid travel times
|
US7716029B2
(en)
*
|
2006-05-15 |
2010-05-11 |
Schlumberger Technology Corporation |
Method for optimal gridding in reservoir simulation
|
US9646415B2
(en)
*
|
2006-05-16 |
2017-05-09 |
Underground Imaging Technologies, Inc. |
System and method for visualizing multiple-sensor subsurface imaging data
|
US8089390B2
(en)
*
|
2006-05-16 |
2012-01-03 |
Underground Imaging Technologies, Inc. |
Sensor cart positioning system and method
|
US7716028B2
(en)
*
|
2006-05-24 |
2010-05-11 |
Schlumberger Technology Corporation |
Method for modeling a reservoir using a 3D wettability map generated from a wettability logging tool
|
WO2007149766A2
(en)
*
|
2006-06-18 |
2007-12-27 |
Chevron U.S.A. Inc. |
Reservoir simulation using a multi-scale finite volume including black oil modeling
|
CA2655232C
(en)
|
2006-07-07 |
2015-11-24 |
Exxonmobil Upstream Research Company |
Upscaling of reservoir models by reusing flow solutions from geologic models
|
US7983883B2
(en)
*
|
2006-08-14 |
2011-07-19 |
Exxonmobil Upstream Research Company |
Enriched multi-point flux approximation
|
US7877246B2
(en)
*
|
2006-09-22 |
2011-01-25 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
US7895241B2
(en)
*
|
2006-10-16 |
2011-02-22 |
Schlumberger Technology Corp. |
Method and apparatus for oilfield data repository
|
CA2665116C
(en)
*
|
2006-10-30 |
2011-07-19 |
Schlumberger Canada Limited |
System and method for performing oilfield simulation operations
|
US7933758B2
(en)
*
|
2006-12-05 |
2011-04-26 |
Conocophillips Company |
Method and apparatus for geomodel uplayering
|
EP2102823B8
(en)
*
|
2007-01-05 |
2016-06-29 |
Landmark Graphics Corporation |
Systems and methods for visualizing multiple volumetric data sets in real time
|
US9110193B2
(en)
*
|
2007-02-25 |
2015-08-18 |
Chevron U.S.A. Inc. |
Upscaling multiple geological models for flow simulation
|
CA2686714C
(en)
*
|
2007-06-01 |
2016-11-01 |
Exxonmobil Upstream Research Company |
Generation of constrained voronoi grid in a plane
|
US20080319726A1
(en)
|
2007-06-19 |
2008-12-25 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
US8775141B2
(en)
*
|
2007-07-02 |
2014-07-08 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
US8046314B2
(en)
*
|
2007-07-20 |
2011-10-25 |
Schlumberger Technology Corporation |
Apparatus, method and system for stochastic workflow in oilfield operations
|
US8244509B2
(en)
*
|
2007-08-01 |
2012-08-14 |
Schlumberger Technology Corporation |
Method for managing production from a hydrocarbon producing reservoir in real-time
|
US7900700B2
(en)
*
|
2007-08-02 |
2011-03-08 |
Schlumberger Technology Corporation |
Method and system for cleat characterization in coal bed methane wells for completion optimization
|
US8548782B2
(en)
|
2007-08-24 |
2013-10-01 |
Exxonmobil Upstream Research Company |
Method for modeling deformation in subsurface strata
|
CA2690992C
(en)
*
|
2007-08-24 |
2014-07-29 |
Exxonmobil Upstream Research Company |
Method for predicting well reliability by computer simulation
|
US8768672B2
(en)
*
|
2007-08-24 |
2014-07-01 |
ExxonMobil. Upstream Research Company |
Method for predicting time-lapse seismic timeshifts by computer simulation
|
US8423337B2
(en)
*
|
2007-08-24 |
2013-04-16 |
Exxonmobil Upstream Research Company |
Method for multi-scale geomechanical model analysis by computer simulation
|
US9070172B2
(en)
*
|
2007-08-27 |
2015-06-30 |
Schlumberger Technology Corporation |
Method and system for data context service
|
US8156131B2
(en)
*
|
2007-08-27 |
2012-04-10 |
Schlumberger Technology Corporation |
Quality measure for a data context service
|
CN101896690B
(zh)
*
|
2007-12-13 |
2015-02-18 |
埃克森美孚上游研究公司 |
使用非结构化网格的储层模拟上的并行自适应数据分区
|
US8099267B2
(en)
*
|
2008-01-11 |
2012-01-17 |
Schlumberger Technology Corporation |
Input deck migrator for simulators
|
US9074454B2
(en)
|
2008-01-15 |
2015-07-07 |
Schlumberger Technology Corporation |
Dynamic reservoir engineering
|
BRPI0908036A2
(pt)
*
|
2008-02-05 |
2015-08-04 |
Logined Bv |
Método de integrar dados de campo, sistema para integrar dados de campo, e meio legível por computador que armazena instruções para integrar dados de campo
|
US8180578B2
(en)
*
|
2008-02-20 |
2012-05-15 |
Schlumberger Technology Corporation |
Multi-component multi-phase fluid analysis using flash method
|
US8285532B2
(en)
*
|
2008-03-14 |
2012-10-09 |
Schlumberger Technology Corporation |
Providing a simplified subterranean model
|
US8190414B2
(en)
*
|
2008-03-26 |
2012-05-29 |
Exxonmobil Upstream Research Company |
Modeling of hydrocarbon reservoirs containing subsurface features
|
US8428919B2
(en)
*
|
2008-03-28 |
2013-04-23 |
Exxonmobil Upstream Research Company |
Computing a consistent velocity vector field from a set of fluxes
|
US7933750B2
(en)
*
|
2008-04-02 |
2011-04-26 |
Schlumberger Technology Corp |
Method for defining regions in reservoir simulation
|
CA2720117C
(en)
*
|
2008-05-05 |
2017-11-28 |
Exxonmobil Upstream Research Company |
Systems, methods, and computer program products for modeling dynamic systems by visualizing a parameter space and narrowing the parameter space
|
US8688425B2
(en)
*
|
2008-05-06 |
2014-04-01 |
Exxonmobil Upstream Research Company |
Transport property data calculated from derivative seismic rock property data for transport modeling
|
AU2009246244B2
(en)
*
|
2008-05-16 |
2015-05-28 |
Chevron U.S.A. Inc. |
Multi-scale method for multi-phase flow in porous media
|
US8095349B2
(en)
*
|
2008-05-30 |
2012-01-10 |
Kelkar And Associates, Inc. |
Dynamic updating of simulation models
|
BRPI0909958A2
(pt)
*
|
2008-06-06 |
2015-10-20 |
Landmark Graphics Corp |
dispositivos e métodos para ixibir um volume tridimensional dos dados de uma grade geometricamente irregulares representando o volume da grade
|
US8463457B2
(en)
*
|
2008-06-13 |
2013-06-11 |
Schlumberger Technology Corporation |
Feedback control using a simulator of a subterranean structure
|
BRPI0914102A2
(pt)
*
|
2008-07-03 |
2015-10-20 |
Chevron Usa Inc |
método de volume finito de multiescalas e sistemas para uso simular um modelo geológico de escala fina de um reservatório de subsuperfície
|
US8499829B2
(en)
*
|
2008-08-22 |
2013-08-06 |
Schlumberger Technology Corporation |
Oilfield application framework
|
EP2350915A4
(en)
*
|
2008-09-30 |
2013-06-05 |
Exxonmobil Upstream Res Co |
METHOD FOR SOLVING STORAGE SIMULATION MATRIX COMPENSATION USING PARALLEL INCOMPLETE MULTILEVEL FACTORIZATION
|
EP2350810A4
(en)
*
|
2008-09-30 |
2013-06-05 |
Exxonmobil Upstream Res Co |
SELF-ADJUSTING ITERLATIC SOLVENT
|
US8280709B2
(en)
*
|
2008-10-03 |
2012-10-02 |
Schlumberger Technology Corporation |
Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations
|
US8706541B2
(en)
*
|
2008-10-06 |
2014-04-22 |
Schlumberger Technology Corporation |
Reservoir management linking
|
US9228415B2
(en)
*
|
2008-10-06 |
2016-01-05 |
Schlumberger Technology Corporation |
Multidimensional data repository for modeling oilfield operations
|
WO2010042746A2
(en)
*
|
2008-10-09 |
2010-04-15 |
Chevron U.S.A. Inc. |
Iterative multi-scale method for flow in porous media
|
EP2359304B1
(en)
|
2008-11-14 |
2020-04-01 |
Exxonmobil Upstream Research Company |
Forming a model of a subsurface region
|
BRPI0922214A2
(pt)
*
|
2008-12-03 |
2015-12-29 |
Chevron Usa Inc |
método implementado por computador, e, sistema para gerar uma grade usada para construir um modelo de simulação de um reservatório de subsuperfície fraturado
|
US9068448B2
(en)
*
|
2008-12-03 |
2015-06-30 |
Chevron U.S.A. Inc. |
System and method for predicting fluid flow characteristics within fractured subsurface reservoirs
|
WO2010078350A1
(en)
*
|
2008-12-30 |
2010-07-08 |
Kirk Hobbs |
Mobile platform for monitoring a wellsite
|
US8269767B2
(en)
*
|
2009-02-03 |
2012-09-18 |
Autodesk, Inc. |
Multiscale three-dimensional reference grid
|
US8350851B2
(en)
*
|
2009-03-05 |
2013-01-08 |
Schlumberger Technology Corporation |
Right sizing reservoir models
|
US8339396B2
(en)
*
|
2009-03-05 |
2012-12-25 |
Schlumberger Technology Corporation |
Coarsening and splitting techniques
|
US8600708B1
(en)
|
2009-06-01 |
2013-12-03 |
Paradigm Sciences Ltd. |
Systems and processes for building multiple equiprobable coherent geometrical models of the subsurface
|
US8711140B1
(en)
|
2009-06-01 |
2014-04-29 |
Paradigm Sciences Ltd. |
Systems and methods for building axes, co-axes and paleo-geographic coordinates related to a stratified geological volume
|
US9418182B2
(en)
|
2009-06-01 |
2016-08-16 |
Paradigm Sciences Ltd. |
Systems and methods for building axes, co-axes and paleo-geographic coordinates related to a stratified geological volume
|
US9536022B1
(en)
|
2009-06-01 |
2017-01-03 |
Paradigm Sciences Ltd. |
Systems and methods for modeling faults in the subsurface
|
US8510049B2
(en)
*
|
2009-09-01 |
2013-08-13 |
Schlumberger Technology Corporation |
Maximum entropy application methods and systems
|
US8655632B2
(en)
*
|
2009-09-03 |
2014-02-18 |
Schlumberger Technology Corporation |
Gridless geological modeling
|
US8774468B2
(en)
*
|
2009-09-08 |
2014-07-08 |
Schlumberger Technology Corporation |
Dynamic shape approximation
|
US9085957B2
(en)
*
|
2009-10-07 |
2015-07-21 |
Exxonmobil Upstream Research Company |
Discretized physics-based models and simulations of subterranean regions, and methods for creating and using the same
|
US8743115B1
(en)
|
2009-10-23 |
2014-06-03 |
Paradigm Sciences Ltd. |
Systems and methods for coordinated editing of seismic data in dual model
|
AU2010315455B2
(en)
*
|
2009-10-28 |
2015-01-29 |
Chevron U.S.A. Inc. |
Multiscale Finite Volume method for reservoir simulation
|
EP2499567A4
(en)
*
|
2009-11-12 |
2017-09-06 |
Exxonmobil Upstream Research Company |
Method and apparatus for reservoir modeling and simulation
|
CA2776764A1
(en)
|
2009-11-30 |
2011-06-03 |
Exxonmobil Upstream Research Company |
Adaptive newton's method for reservoir simulation
|
US8731872B2
(en)
*
|
2010-03-08 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for providing data corresponding to physical objects
|
US8731887B2
(en)
*
|
2010-04-12 |
2014-05-20 |
Exxonmobile Upstream Research Company |
System and method for obtaining a model of data describing a physical structure
|
US8727017B2
(en)
|
2010-04-22 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for obtaining data on an unstructured grid
|
US8731873B2
(en)
*
|
2010-04-26 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for providing data corresponding to physical objects
|
US9134454B2
(en)
|
2010-04-30 |
2015-09-15 |
Exxonmobil Upstream Research Company |
Method and system for finite volume simulation of flow
|
GB2498255B
(en)
|
2010-06-15 |
2018-11-14 |
Exxonmobil Upstream Res Co |
Method and system for stabilizing formulation methods
|
US20110310101A1
(en)
*
|
2010-06-22 |
2011-12-22 |
Schlumberger Technology Corporation |
Pillar grid conversion
|
CA2803066A1
(en)
|
2010-07-29 |
2012-02-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
WO2012015518A2
(en)
|
2010-07-29 |
2012-02-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
EP2599032A4
(en)
|
2010-07-29 |
2018-01-17 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
US9123161B2
(en)
|
2010-08-04 |
2015-09-01 |
Exxonmobil Upstream Research Company |
System and method for summarizing data on an unstructured grid
|
WO2012021292A1
(en)
*
|
2010-08-09 |
2012-02-16 |
Conocophillips Company |
Reservoir upscaling method with preserved transmissibility
|
US8731875B2
(en)
*
|
2010-08-13 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for providing data corresponding to physical objects
|
US8433551B2
(en)
*
|
2010-11-29 |
2013-04-30 |
Saudi Arabian Oil Company |
Machine, computer program product and method to carry out parallel reservoir simulation
|
US8386227B2
(en)
*
|
2010-09-07 |
2013-02-26 |
Saudi Arabian Oil Company |
Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation
|
EP2614460B1
(en)
*
|
2010-09-07 |
2014-07-09 |
Saudi Arabian Oil Company |
Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation
|
EP2431767A3
(en)
|
2010-09-17 |
2016-11-30 |
Services Pétroliers Schlumberger |
Dynamic subsurface engineering
|
CA2807300C
(en)
|
2010-09-20 |
2017-01-03 |
Exxonmobil Upstream Research Company |
Flexible and adaptive formulations for complex reservoir simulations
|
US9626466B2
(en)
*
|
2010-11-23 |
2017-04-18 |
Exxonmobil Upstream Research Company |
Variable discretization method for flow simulation on complex geological models
|
US20120136636A1
(en)
*
|
2010-11-26 |
2012-05-31 |
Adrian Kleine |
Finite element adjustment for basin faults
|
MX2013006752A
(es)
*
|
2010-12-16 |
2013-12-06 |
Landmark Graphics Corp |
Metodo y sistema para graficar informacion correlacionada.
|
US8660824B2
(en)
|
2010-12-23 |
2014-02-25 |
Schlumberger Technology Corporation |
Discretely gridding complex fracturing for simulation
|
EP2659424A4
(en)
|
2010-12-30 |
2018-05-23 |
Exxonmobil Upstream Research Company |
Systems and methods for subsurface reservoir simulation
|
US9051825B2
(en)
*
|
2011-01-26 |
2015-06-09 |
Schlumberger Technology Corporation |
Visualizing fluid flow in subsurface reservoirs
|
US10175386B2
(en)
|
2011-02-09 |
2019-01-08 |
Saudi Arabian Oil Company |
Sequential fully implicit well model with tridiagonal matrix structure for reservoir simulation
|
US9747393B2
(en)
|
2011-02-09 |
2017-08-29 |
Exxonmobil Upstream Research Company |
Methods and systems for upscaling mechanical properties of geomaterials
|
US9164191B2
(en)
|
2011-02-09 |
2015-10-20 |
Saudi Arabian Oil Company |
Sequential fully implicit well model for reservoir simulation
|
US10113400B2
(en)
|
2011-02-09 |
2018-10-30 |
Saudi Arabian Oil Company |
Sequential fully implicit well model with tridiagonal matrix structure for reservoir simulation
|
US10534871B2
(en)
|
2011-03-09 |
2020-01-14 |
Schlumberger Technology Corporation |
Method and systems for reservoir modeling, evaluation and simulation
|
WO2013039606A1
(en)
|
2011-09-15 |
2013-03-21 |
Exxonmobil Upstream Research Company |
Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations
|
CA2849379C
(en)
*
|
2011-09-20 |
2016-11-29 |
Landmark Graphics Corporation |
System and method for coarsening in reservoir simulation system
|
US10387583B2
(en)
*
|
2011-12-02 |
2019-08-20 |
Schlumberger Technology Corporation |
Rotations from gradient directions
|
US10114134B2
(en)
*
|
2012-03-02 |
2018-10-30 |
Emerson Paradigm Holding Llc |
Systems and methods for generating a geological model honoring horizons and faults
|
EP2825901A1
(en)
|
2012-03-12 |
2015-01-21 |
Vermeer Manufacturing Co., Inc |
Offset frequency homodyne ground penetrating radar
|
WO2013148021A1
(en)
|
2012-03-28 |
2013-10-03 |
Exxonmobil Upstream Research Company |
Method for mutiphase flow upscaling
|
US9753181B2
(en)
*
|
2012-03-30 |
2017-09-05 |
Landmark Graphics Corporation |
System and method for automatic local grid refinement in reservoir simulation systems
|
US9759826B2
(en)
|
2012-04-03 |
2017-09-12 |
Paradigm Sciences Ltd. |
System and method for generating an implicit model of geological horizons
|
EP2901363A4
(en)
|
2012-09-28 |
2016-06-01 |
Exxonmobil Upstream Res Co |
ERROR REMOVAL IN GEOLOGICAL MODELS
|
WO2014062947A2
(en)
*
|
2012-10-19 |
2014-04-24 |
Conocophillips Company |
Method for modeling a reservoir using 3d multiple-point simulations with 2d training images
|
US9390555B2
(en)
*
|
2012-11-09 |
2016-07-12 |
International Business Machines Corporation |
Method to assess the impact of existing fractures and faults for reservoir management
|
US20140236559A1
(en)
|
2013-02-18 |
2014-08-21 |
Saudi Arabian Oil Company |
Systems, methods, and computer-readable media for modeling complex wellbores in field-scale reservoir simulation
|
EP3418778B1
(en)
|
2013-03-15 |
2020-07-15 |
Emerson Paradigm Holding LLC |
Systems and methods to build sedimentary attributes
|
US9739133B2
(en)
|
2013-03-15 |
2017-08-22 |
Vermeer Corporation |
Imaging underground objects using spatial sampling customization
|
GB2512372B
(en)
*
|
2013-03-28 |
2020-07-29 |
Total Sa |
Method of modelling a subsurface volume
|
US10087729B2
(en)
|
2013-06-28 |
2018-10-02 |
Schlumberger Technology Corporatio |
Methods utilizing solutal-convection regimes in a porous medium
|
US20150032420A1
(en)
*
|
2013-07-25 |
2015-01-29 |
Ansys, Inc. |
Systems and Methods for Creating Engineering Models
|
CN103913773B
(zh)
*
|
2013-08-13 |
2016-09-28 |
中国石油化工股份有限公司 |
三维勘探中利用残差法异常加密微测井的方法
|
WO2015023950A1
(en)
*
|
2013-08-16 |
2015-02-19 |
Landmark Graphics Corporation |
Identifying and extracting fluid layers and fluid reservoirs in one or more bodies repressenting a geological structure
|
US9410422B2
(en)
|
2013-09-13 |
2016-08-09 |
Chevron U.S.A. Inc. |
Alternative gauging system for production well testing and related methods
|
US10795053B2
(en)
|
2013-10-29 |
2020-10-06 |
Emerson Paradigm Holding Llc |
Systems and methods of multi-scale meshing for geologic time modeling
|
US9311720B2
(en)
|
2013-11-26 |
2016-04-12 |
Saudi Arabian Oil Company |
Automated saw cut correction for 3D core digital modeling from computerized tomography scanner (CTS) images
|
US10054712B2
(en)
|
2013-12-30 |
2018-08-21 |
Saudi Arabian Oil Company |
Computer-implemented methods for reservoir simulation with automated well completions and reservoir grid data quality assurance
|
US10808501B2
(en)
|
2014-03-17 |
2020-10-20 |
Saudi Arabian Oil Company |
Modeling intersecting faults and complex wellbores in reservoir simulation
|
US10677960B2
(en)
|
2014-03-17 |
2020-06-09 |
Saudi Arabian Oil Company |
Generating unconstrained voronoi grids in a domain containing complex internal boundaries
|
US10422923B2
(en)
|
2014-03-28 |
2019-09-24 |
Emerson Paradigm Holding Llc |
Systems and methods for modeling fracture networks in reservoir volumes from microseismic events
|
EP3175265A1
(en)
|
2014-07-30 |
2017-06-07 |
ExxonMobil Upstream Research Company |
Method for volumetric grid generation in a domain with heterogeneous material properties
|
US10359523B2
(en)
|
2014-08-05 |
2019-07-23 |
Exxonmobil Upstream Research Company |
Exploration and extraction method and system for hydrocarbons
|
US9951601B2
(en)
|
2014-08-22 |
2018-04-24 |
Schlumberger Technology Corporation |
Distributed real-time processing for gas lift optimization
|
US10443358B2
(en)
|
2014-08-22 |
2019-10-15 |
Schlumberger Technology Corporation |
Oilfield-wide production optimization
|
US10458894B2
(en)
|
2014-08-22 |
2019-10-29 |
Schlumberger Technology Corporation |
Methods for monitoring fluid flow and transport in shale gas reservoirs
|
US10101498B2
(en)
|
2014-09-05 |
2018-10-16 |
Schlumberger Technology Corporation |
Well survivability in multidimensional geomechanical space
|
US10288766B2
(en)
|
2014-10-09 |
2019-05-14 |
Chevron U.S.A. Inc. |
Conditioning of object or event based reservior models using local multiple-point statistics simulations
|
AU2015339883B2
(en)
|
2014-10-31 |
2018-03-29 |
Exxonmobil Upstream Research Company |
Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
|
CA2961923A1
(en)
|
2014-10-31 |
2016-05-06 |
Exxonmobil Upstream Research Company |
Managing discontinuities in geologic models
|
EP3213126A1
(en)
|
2014-10-31 |
2017-09-06 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
|
WO2016154160A1
(en)
*
|
2015-03-23 |
2016-09-29 |
Schlumberger Technology Corporation |
Extended isenthalpic and/or isothermal flash calculation for hydrocarbon components that are soluble in oil, gas and water
|
FR3036210B1
(fr)
|
2015-05-12 |
2018-07-06 |
Services Petroliers Schlumberger |
Stratigraphie geologique par fonctions implicites et a saut
|
US9690002B2
(en)
|
2015-06-18 |
2017-06-27 |
Paradigm Sciences Ltd. |
Device, system and method for geological-time refinement
|
US20170184760A1
(en)
*
|
2015-12-23 |
2017-06-29 |
Paradigm Sciences Ltd. |
Device, system and method for a structure and stratigraphy preserving transformation of a geological model
|
US10466388B2
(en)
|
2016-09-07 |
2019-11-05 |
Emerson Paradigm Holding Llc |
System and method for editing geological models by switching between volume-based models and surface-based structural models augmented with stratigraphic fiber bundles
|
CN106383972B
(zh)
*
|
2016-11-04 |
2023-05-12 |
北京航天动力研究所 |
一种火箭发动机推力室用集合器及其径向孔均流设计方法
|
CA3043231C
(en)
|
2016-12-23 |
2022-06-14 |
Exxonmobil Upstream Research Company |
Method and system for stable and efficient reservoir simulation using stability proxies
|
US11041976B2
(en)
*
|
2017-05-30 |
2021-06-22 |
Exxonmobil Upstream Research Company |
Method and system for creating and using a subsurface model in hydrocarbon operations
|
CN107507179B
(zh)
*
|
2017-08-31 |
2020-11-10 |
中国电建集团成都勘测设计研究院有限公司 |
基于gocad的岩土体量化分析方法
|
US10913901B2
(en)
|
2017-09-12 |
2021-02-09 |
Saudi Arabian Oil Company |
Integrated process for mesophase pitch and petrochemical production
|
US11662501B2
(en)
|
2018-04-03 |
2023-05-30 |
ExxonMobil Technology and Engineering Company |
Geologic modeling methods and systems having constrained restoration of depositional space
|
WO2019245643A1
(en)
*
|
2018-06-22 |
2019-12-26 |
Exxonmobil Upstream Research Company |
Method and system for generating simulation grids by mapping a grid from the design space
|
US11409024B2
(en)
|
2018-06-22 |
2022-08-09 |
Exxonmobil Upstream Research Company |
Methods and systems for generating simulation grids via zone by zone mapping from design space
|
US10753736B2
(en)
*
|
2018-07-26 |
2020-08-25 |
Cisco Technology, Inc. |
Three-dimensional computer vision based on projected pattern of laser dots and geometric pattern matching
|
CN109063324B
(zh)
*
|
2018-07-30 |
2021-07-09 |
北京大学 |
基于角点网格的有限元地应力模拟技术方法
|
US10342110B1
(en)
*
|
2018-09-14 |
2019-07-02 |
Serendipity Technologies LLC. |
Plasma power generator (z-box and z-tower)
|
US11156744B2
(en)
|
2019-01-10 |
2021-10-26 |
Emerson Paradigm Holding Llc |
Imaging a subsurface geological model at a past intermediate restoration time
|
US10520644B1
(en)
|
2019-01-10 |
2019-12-31 |
Emerson Paradigm Holding Llc |
Imaging a subsurface geological model at a past intermediate restoration time
|
US10615869B1
(en)
*
|
2019-01-10 |
2020-04-07 |
X Development Llc |
Physical electromagnetics simulator for design optimization of photonic devices
|
CN112085820A
(zh)
*
|
2019-06-12 |
2020-12-15 |
中国石油天然气集团有限公司 |
水平井交互编辑方法及装置
|
US11754745B2
(en)
|
2020-06-30 |
2023-09-12 |
Saudi Arabian Oil Company |
Methods and systems for flow-based coarsening of reservoir grid models
|
CN112650579B
(zh)
*
|
2020-10-30 |
2023-03-10 |
西北大学 |
一种基于网格化的云资源分发调度方法
|
CN113255196B
(zh)
*
|
2021-07-05 |
2021-11-19 |
广州中望龙腾软件股份有限公司 |
一种网格优化方法、网格生成器、存储介质
|
CN114549793B
(zh)
*
|
2022-04-28 |
2022-07-29 |
中国空气动力研究与发展中心计算空气动力研究所 |
一种从二维非结构网格重构结构网格的方法、介质及装置
|