US5905657A
(en)
*
|
1996-12-19 |
1999-05-18 |
Schlumberger Technology Corporation |
Performing geoscience interpretation with simulated data
|
US6128577A
(en)
*
|
1996-12-19 |
2000-10-03 |
Schlumberger Technology Corporation |
Modeling geological structures and properties
|
US6052650A
(en)
*
|
1997-02-27 |
2000-04-18 |
Schlumberger Technology Corporation |
Enforcing consistency in geoscience models
|
FR2765692B1
(fr)
*
|
1997-07-04 |
1999-09-10 |
Inst Francais Du Petrole |
Methode pour modeliser en 3d l'impedance d'un milieu heterogene
|
US6191787B1
(en)
|
1998-02-10 |
2001-02-20 |
Schlumberger Technology Corporation |
Interactively constructing, editing, rendering and manipulating geoscience models
|
US6052520A
(en)
*
|
1998-02-10 |
2000-04-18 |
Exxon Production Research Company |
Process for predicting behavior of a subterranean formation
|
WO1999057418A1
(en)
*
|
1998-05-04 |
1999-11-11 |
Schlumberger Evaluation & Production (Uk) Services |
Near wellbore modeling method and apparatus
|
MXPA00011040A
(es)
*
|
1998-05-12 |
2003-08-01 |
Lockheed Corp |
Sistema y proceso para recuperacion de hidrocarburo secundario.
|
US6313837B1
(en)
|
1998-09-29 |
2001-11-06 |
Schlumberger Technology Corporation |
Modeling at more than one level of resolution
|
FR2795841B1
(fr)
*
|
1999-07-02 |
2001-08-10 |
Inst Francais Du Petrole |
Methode pour deformer graduellement des simulations sequentielles d'un milieu heterogene tel qu'une zone souterraine
|
US6853921B2
(en)
|
1999-07-20 |
2005-02-08 |
Halliburton Energy Services, Inc. |
System and method for real time reservoir management
|
FR2800473B1
(fr)
|
1999-10-29 |
2001-11-30 |
Inst Francais Du Petrole |
Methode pour modeliser en 2d ou 3d un milieu heterogene tel que le sous-sol decrit par plusieurs parametres physiques
|
US6876991B1
(en)
|
1999-11-08 |
2005-04-05 |
Collaborative Decision Platforms, Llc. |
System, method and computer program product for a collaborative decision platform
|
FR2801710B1
(fr)
*
|
1999-11-29 |
2002-05-03 |
Inst Francais Du Petrole |
Methode pour generer un maillage hybride permettant de modeliser une formation heterogene traversee par un ou plusieurs puits
|
AU2006235887B2
(en)
*
|
2000-02-22 |
2009-01-08 |
Schlumberger Technology B.V. |
Integrated reservoir optimization
|
US6980940B1
(en)
*
|
2000-02-22 |
2005-12-27 |
Schlumberger Technology Corp. |
Intergrated reservoir optimization
|
US6516080B1
(en)
|
2000-04-05 |
2003-02-04 |
The Board Of Trustees Of The Leland Stanford Junior University |
Numerical method of estimating physical properties of three-dimensional porous media
|
FR2823877B1
(fr)
*
|
2001-04-19 |
2004-12-24 |
Inst Francais Du Petrole |
Methode pour contraindre par des donnees dynamiques de production un modele fin representatif de la repartition dans le gisement d'une grandeur physique caracteristique de la structure du sous-sol
|
US6957202B2
(en)
*
|
2001-05-26 |
2005-10-18 |
Hewlett-Packard Development Company L.P. |
Model selection for decision support systems
|
US7059180B2
(en)
|
2002-06-10 |
2006-06-13 |
Saudi Arabian Oil Company |
Water cut rate of change analytic method
|
US7584165B2
(en)
*
|
2003-01-30 |
2009-09-01 |
Landmark Graphics Corporation |
Support apparatus, method and system for real time operations and maintenance
|
US6739165B1
(en)
|
2003-02-05 |
2004-05-25 |
Kjt Enterprises, Inc. |
Combined surface and wellbore electromagnetic measurement system and method for determining formation fluid properties
|
US7072768B1
(en)
|
2003-05-02 |
2006-07-04 |
Young Alan G |
Method for laterally extrapolating soil property data using soil samples and seismic amplitude data within a seismic coverage area
|
RU2321064C2
(ru)
*
|
2004-06-03 |
2008-03-27 |
Мурманский государственный технический университет |
Способ построения обратимой трехмерной гидродинамической модели земли, калибруемой в реальном времени в процессе бурения
|
US7672818B2
(en)
*
|
2004-06-07 |
2010-03-02 |
Exxonmobil Upstream Research Company |
Method for solving implicit reservoir simulation matrix equation
|
EP1810183A2
(en)
*
|
2004-07-07 |
2007-07-25 |
Exxonmobil Upstream Research Company Copr-Urc |
Bayesian network applications to geology and geographics
|
WO2006016942A1
(en)
*
|
2004-07-07 |
2006-02-16 |
Exxonmobil Upstream Research Company |
Predicting sand-grain composition and sand texture
|
US20060015310A1
(en)
*
|
2004-07-19 |
2006-01-19 |
Schlumberger Technology Corporation |
Method for simulation modeling of well fracturing
|
FR2875305B1
(fr)
*
|
2004-09-16 |
2006-10-27 |
Inst Francais Du Petrole |
Methode pour generer un modele de reservoir sur maillage flexible
|
FR2886740B1
(fr)
*
|
2005-06-03 |
2007-09-28 |
Inst Francais Du Petrole |
Methode pour mettre a jour un modele geologique par des donnees sismiques et de production
|
US7369979B1
(en)
|
2005-09-12 |
2008-05-06 |
John Paul Spivey |
Method for characterizing and forecasting performance of wells in multilayer reservoirs having commingled production
|
AU2007207497B8
(en)
*
|
2006-01-20 |
2013-05-16 |
Landmark Graphics Corporation |
Dynamic production system management
|
FR2897692B1
(fr)
*
|
2006-02-22 |
2008-04-04 |
Oxand Sa |
Procede et systeme d'identification et d'evaluation de risque de defaillance d'un systeme de confinement geologique
|
US8538699B2
(en)
*
|
2006-09-13 |
2013-09-17 |
Exxonmobil Upstream Research Company |
Rapid inversion of electromagnetic reconnaissance survey data
|
AU2007339997A1
(en)
*
|
2006-12-28 |
2008-07-10 |
Chevron U.S.A. Inc. |
History matching and forecasting of hydrocarbon-bearing reservoirs utilizing proxies for likelihood functions
|
US20090105833A1
(en)
*
|
2007-10-22 |
2009-04-23 |
Spinalmotion, Inc. |
Method and Spacer Device for Spanning a Space Formed upon Removal of an Intervertebral Disc
|
DE112008003302B4
(de)
|
2007-12-07 |
2023-05-25 |
ExxonMobil Technology and Engineering Company |
Verfahren und Systeme zur Abschätzung von Bohrlochereignissen
|
US8547783B2
(en)
*
|
2007-12-12 |
2013-10-01 |
Exxonmobil Upstream Research Company |
Method and apparatus for evaluating submarine formations
|
US8437996B2
(en)
*
|
2007-12-13 |
2013-05-07 |
Exxonmobil Upstream Research Company |
Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid
|
US8738341B2
(en)
*
|
2007-12-21 |
2014-05-27 |
Schlumberger Technology Corporation |
Method for reservoir characterization and monitoring including deep reading quad combo measurements
|
US8744817B2
(en)
*
|
2007-12-21 |
2014-06-03 |
Schlumberger Technology Corporation |
Method for upscaling a reservoir model using deep reading measurements
|
US7894991B2
(en)
*
|
2008-02-01 |
2011-02-22 |
Schlumberger Technology Corp. |
Statistical determination of historical oilfield data
|
US8504335B2
(en)
*
|
2008-04-17 |
2013-08-06 |
Exxonmobil Upstream Research Company |
Robust optimization-based decision support tool for reservoir development planning
|
EP2291761A4
(en)
*
|
2008-04-18 |
2013-01-16 |
Exxonmobil Upstream Res Co |
MARKOV DECISION-MAKING DECISION-MAKING ASSISTANCE TOOL FOR TANK DEVELOPMENT PLANNING
|
BRPI0910333A2
(pt)
*
|
2008-04-21 |
2015-10-06 |
Exxonmobil Upstream Res Co |
métodos para planejamento de desenvolvimento de um reservatório, para suporte à decisão que considera o desenvolvimento de recursos de petróleo, para otimização do planejamento de desenvolvimento com base em computador para um reservatório de hidrocarboneto, e para produzir hidrocarbonetos, e, produto de programa de computador
|
US8688425B2
(en)
*
|
2008-05-06 |
2014-04-01 |
Exxonmobil Upstream Research Company |
Transport property data calculated from derivative seismic rock property data for transport modeling
|
GB2463242B
(en)
*
|
2008-09-03 |
2012-11-07 |
Statoilhydro Asa |
Method of modelling a subterranean region of the earth
|
CA2730446A1
(en)
*
|
2008-09-30 |
2010-04-08 |
Exxonmobil Upstream Research Company |
Self-adapting iterative solver
|
US20100082724A1
(en)
*
|
2008-09-30 |
2010-04-01 |
Oleg Diyankov |
Method For Solving Reservoir Simulation Matrix Equation Using Parallel Multi-Level Incomplete Factorizations
|
GB2470760B
(en)
*
|
2009-06-04 |
2013-07-24 |
Total Sa |
An improved process for characterising the evolution of an oil or gas reservoir over time
|
US8781747B2
(en)
*
|
2009-06-09 |
2014-07-15 |
Schlumberger Technology Corporation |
Method of determining parameters of a layered reservoir
|
BR112012009154A2
(pt)
|
2009-10-23 |
2016-08-16 |
Exxonmobil Upstream Res Co |
método para melhorar um modelo geológico de uma região de subsuperfície, produto de programa de computador, e, método para controlar hidrocarbonetos em uma região de subsuperfície
|
CA2777346C
(en)
*
|
2009-11-18 |
2017-01-10 |
Conocophillips Company |
Attribute importance measure for parametric multivariate modeling
|
WO2012015542A1
(en)
|
2010-07-27 |
2012-02-02 |
Exxonmobil Upstream Research Company |
Inverting geophysical data for geological parameters or lithology
|
AU2011283190A1
(en)
|
2010-07-29 |
2013-02-07 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
WO2012024025A1
(en)
|
2010-08-16 |
2012-02-23 |
Exxonmobil Upstream Research Company |
Reducing the dimensionality of the joint inversion problem
|
US9488047B2
(en)
|
2011-04-04 |
2016-11-08 |
Conocophillips Company |
Reservoir calibration parameterization method
|
US9453929B2
(en)
|
2011-06-02 |
2016-09-27 |
Exxonmobil Upstream Research Company |
Joint inversion with unknown lithology
|
US9702995B2
(en)
|
2011-06-17 |
2017-07-11 |
Exxonmobil Upstream Research Company |
Domain freezing in joint inversion
|
EP2734866B1
(en)
|
2011-07-21 |
2020-04-08 |
Exxonmobil Upstream Research Company |
Adaptive weighting of geophysical data types in joint inversion
|
US10591638B2
(en)
|
2013-03-06 |
2020-03-17 |
Exxonmobil Upstream Research Company |
Inversion of geophysical data on computer system having parallel processors
|
US9846255B2
(en)
|
2013-04-22 |
2017-12-19 |
Exxonmobil Upstream Research Company |
Reverse semi-airborne electromagnetic prospecting
|
EP3201655A2
(en)
*
|
2014-09-30 |
2017-08-09 |
King Abdullah University Of Science And Technology |
Reservoir resistivity characterization incorporating flow dynamics
|
KR101625660B1
(ko)
*
|
2015-11-20 |
2016-05-31 |
한국지질자원연구원 |
지구통계기법에서의 관측자료를 이용한 2차자료 생성 방법
|
US10087723B2
(en)
*
|
2015-12-22 |
2018-10-02 |
Chevron U.S.A. Inc. |
Methodology for building realistic numerical forward stratigraphic models in data sparse environment
|
AU2018317320B2
(en)
*
|
2017-08-15 |
2021-10-21 |
Exxonmobil Upstream Research Company |
Reservoir materiality bounds from seismic inversion
|
US20210382198A1
(en)
*
|
2020-06-03 |
2021-12-09 |
Chevron U.S.A. Inc. |
Uncertainty-aware modeling and decision making for geomechanics workflow using machine learning approaches
|
CN112102484B
(zh)
*
|
2020-08-12 |
2022-11-25 |
特雷西能源科技(杭州)有限公司 |
地质模型参数场调整方法和装置
|
CN114185090B
(zh)
*
|
2020-09-15 |
2024-04-05 |
中国石油化工股份有限公司 |
岩相和弹性参数同步反演方法、装置、电子设备及介质
|
CN112163378A
(zh)
*
|
2020-10-28 |
2021-01-01 |
浙江海洋大学 |
根据非线性贝叶斯理论的浅海多层海底地声参数反演方法
|
RU2758278C1
(ru)
*
|
2020-12-07 |
2021-10-28 |
Общество С Ограниченной Ответственностью "Газпром Добыча Надым" |
Способ добычи природного газа на поздней стадии разработки месторождения
|
CN113159321B
(zh)
*
|
2021-04-07 |
2022-05-20 |
中南大学 |
重力约束下断裂面形态的贝叶斯推断方法
|