NO20120145A1 - The cantilever - Google Patents

The cantilever Download PDF

Info

Publication number
NO20120145A1
NO20120145A1 NO20120145A NO20120145A NO20120145A1 NO 20120145 A1 NO20120145 A1 NO 20120145A1 NO 20120145 A NO20120145 A NO 20120145A NO 20120145 A NO20120145 A NO 20120145A NO 20120145 A1 NO20120145 A1 NO 20120145A1
Authority
NO
Norway
Prior art keywords
balcony
cantilever system
floor
platform
hook
Prior art date
Application number
NO20120145A
Other languages
Norwegian (no)
Other versions
NO333644B1 (en
Inventor
Bjorn Myklebust
Original Assignee
Balcon As
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Balcon As filed Critical Balcon As
Priority to NO20120145A priority Critical patent/NO333644B1/en
Priority to PCT/NO2013/050027 priority patent/WO2013122478A1/en
Publication of NO20120145A1 publication Critical patent/NO20120145A1/en
Publication of NO333644B1 publication Critical patent/NO333644B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/003Balconies; Decks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

Utkragersystem (1), fortrinnsvis for balkongplattform, anordnet til en bærende konstruksjon (3), fortrinnsvis et etasjeskille.Utkragersystemet (1) omfatter: en festekonsoll (5) for innfesting til den bærende konstruksjon (3) og som forløper i balkongplattformens bredderetning, festekonsollen (5) er utformet med en mottaksanordning (6) for tilkopling av et krokformet koblingselement (10) som forløper i balkongens bredderetning og parallelt med festekonsollen (5), og minst ett utkraget gulvprofil (15) med sin innfestingstverrende (16) anordnet til det krokformede koplingselement (10) i hele balkongplattformens bredderetning, hvorved et selvbærende utkragersystem er fremskaffet.Cantilever system (1), preferably for balcony platform, arranged to a load-bearing structure (3), preferably a floor divider. The cantilever system (1) comprises: a fastening bracket (5) for fastening to the load-bearing structure (3) and extending in the width direction of the balcony platform, the fastening bracket (5) is formed with a receiving device (6) for connecting a hook-shaped coupling element (10) extending in the width direction of the balcony and parallel to the fastening bracket (5), and at least one cantilevered floor profile (15) with its fastening cross (16) arranged to the hook-shaped coupling element (10) in the entire width direction of the balcony platform, whereby a self-supporting cantilever system is provided.

Description

Foreliggende oppfinnelse angår et utkragersystem, fortrinnsvis for balkongplattform, anordnet til en bærende konstruksjon, fortrinnsvis et etasjeskille. The present invention relates to a cantilever system, preferably for a balcony platform, arranged for a load-bearing structure, preferably a floor partition.

Ved nybygg og rehabilitering av en bygningsmasse er det fra tid til annen behov for å montere et visst antall balkonger i løpet av kort tid og til en lavest mulig pris. Det benyttes derfor ofte balkongløsninger med prefabrikkerte balkongplattformer som kan produseres rasjonelt i ønsket antall, og som deretter henges opp på bygget. In the case of new construction and rehabilitation of a building mass, there is from time to time a need to install a certain number of balconies within a short time and at the lowest possible price. Balcony solutions with prefabricated balcony platforms are therefore often used, which can be produced rationally in the desired number, and which are then hung on the building.

I den følgende beskrivelsen brukes begrepene opp og ned, oppover og nedover og lignende i den retningen balkongelementene vil ha når de er ferdig montert på et bygg. I tråd med vanlig praksis betegner balkongens bakkant den siden som vender inn mot veggen av bygget. Retning mot balkongens forkant skal forstås som retningen vinkelrett ut fra veggen når balkongen er montert, selv om for-kanten i prinsipp kan være buet. In the following description, the terms up and down, up and down and the like are used in the direction the balcony elements will have when they are fully assembled on a building. In line with common practice, the rear edge of the balcony denotes the side facing the wall of the building. Direction towards the balcony's front edge is to be understood as the direction perpendicular to the wall when the balcony is installed, even if the front edge can in principle be curved.

Viktige kvalitets- og kostnadsfaktorer for slike balkongløsninger er krav til brannsikkerhet, styrke, innfesting og opplagring, termisk isolasjon mellom balkongplattform og etasjeskille (kuldebro), sikkerhet og tidsbruk på byggeplass ved montering av balkongplattform, samt ettermontering av rekkverk, avrenningssystem, solskjerming og eventuelt innglassing. Forventet vedlikehold i balkongens levetid er også en vesentlig kvalitetsfaktor. Important quality and cost factors for such balcony solutions are requirements for fire safety, strength, fixing and storage, thermal insulation between the balcony platform and floor separation (cold bridge), safety and time spent on the construction site when installing the balcony platform, as well as retrofitting of railings, drainage system, sun shading and possibly glazing . Expected maintenance during the balcony's lifetime is also an important quality factor.

Eksisterende balkongløsninger kan deles i tre hovedkategorier: 1) betong, Existing balcony solutions can be divided into three main categories: 1) concrete,

2) sveisede metallkonstruksjoner og 3) trykkimpregnert trevirke. Problemstillinger ved eksisterende løsninger er blant annet: 2) welded metal structures and 3) pressure impregnated wood. Problems with existing solutions include:

Betong: Concrete:

- Bygg/veggkonstruksjon må forsterkes pga vekt av plattformelement - Building/wall construction must be reinforced due to the weight of the platform element

- Utsparing i veggkledning for entring av plattformelement gir kuldebro (stor varmegjennomgang) mellom balkong og etasjeskille - Omfattende etterarbeid ved evt. justering ved skjevheter i bygg (etasjeskille/kledning) - Recess in wall cladding for entry of platform element provides a cold bridge (large heat transfer) between balcony and floor partition - Extensive follow-up work for any adjustment in case of deviations in the building (floor partition/cladding)

- Omfattende prosedyre for montasje av balkongplattform - Comprehensive procedure for assembly of balcony platform

o Personsikkerhet o Personal safety

o Lang monteringstid på byggeplass som følge av støping, herding og o Long assembly time on construction site as a result of casting, curing and

oppstendring resurrection

o Bruk av tungt og kostbart løfteutstyr o Use of heavy and expensive lifting equipment

o Behov for stillas o Need for scaffolding

o Ettermontering av rekkverk og avrenningssystem etter at stendere og stillas er revet o Retrofitting of railings and drainage system after the pillars and scaffolding have been demolished

- Omfattende vedlikeholdsbehov - Extensive maintenance needs

Sveisede konstruksjoner: Welded structures:

- Sveis er konstruksjonens svake punkt - Welding is the construction's weak point

- Sveisede løsninger er arbeidskrevende og dyre - Welded solutions are labor-intensive and expensive

- Sveisede aluminiumsløsninger tilfredsstiller ikke brannkrav - Welded aluminum solutions do not meet fire requirements

- Sveisede stålkonstruksjoner er tunge og gir omfattende krav til innfesting/montasje - Welded steel structures are heavy and require extensive fixing/assembly

- Omfattende vedlikeholdsbehov - Extensive maintenance needs

Trykkimpregnert trevirke: Pressure-treated wood:

- Ikke brannklassifisert - Not fire classified

- Bygges på byggeplass - Built on construction site

- Passer best til privatboliger og selvbygging - Best suited for private homes and self-build

- Omfattende vedlikeholdsbehov - Extensive maintenance needs

Figur 1 a og b (kjent teknikk) illustrerer nærmere noen av problemene ved montering av prefabrikkerte balkongplattformer av betong. En monterings-anvisning for betongplattformen 100' kan inneholde følgende trinn: Trinn 1: Kontroll av toleranser og utbedring av toleranseawik. Dette er nødvendig fordi etasjeskille og/eller kledning kan være skjev. Figure 1 a and b (prior art) illustrates in more detail some of the problems when assembling prefabricated concrete balcony platforms. An assembly instruction for the concrete platform 100' may contain the following steps: Step 1: Checking tolerances and correcting tolerance deviations. This is necessary because the floor separation and/or cladding may be crooked.

Trinn 2: Etablering av sikre understøttelser for støtteben 500. Dette kan innebære å Step 2: Establishment of secure supports for support legs 500. This may involve

lage en grusavrettet grop og legge på en lastfordelingsplate 501 for hvert make a pit lined with gravel and put on a load distribution plate 501 for each

støtteben 500. support leg 500.

Trinn 3; Etablering av svill 502 over støtteben 500. Svillen 502 må rettes av i Step 3; Establishment of sleeper 502 over support leg 500. Sleeper 502 must be straightened in

samme høyde som overkant av vinkelkonsollene 503 (fig. 1b) the same height as the upper edge of the angle brackets 503 (fig. 1b)

Trinn 4: Eventuelt høydejustering av konsoll 503 innvendig mot dekkeforkant. Hvis høydeavviket mellom de to vinkelkonsollene 503 i fig. 6b er større enn f eks 10mm, så justeres det ene konsollet slik at høydeforskjellen blir mindre enn Step 4: Any height adjustment of console 503 inside towards the tire front edge. If the height difference between the two angle brackets 503 in fig. 6b is greater than, for example, 10mm, then one console is adjusted so that the height difference is less than

en forhåndsbestemt toleranse, f eks 5mm. a predetermined tolerance, e.g. 5mm.

Trinn 5: Balkongplattformen heises på plass og legges ned på svill 502 og entres ned på dybler (ikke vist) som stikker opp fra konsollene 503. En betong-plattform kan veie 800 kg eller mer. I dette trinnet kreves derfor både en tung og stor heisekran og forsiktighet for å unngå skader, f eks som følge av at plattformen faller ned, eller klemskader når plattformen skal senkes ned på dyblene. Deretter festes svillen 502 i plattformen med betongspiker. Alternativt kan paraplystøtter benyttes. Ved rehabilitering må det lages en midlertidig åpning i kledning og isolasjon som er stor nok til at balkongplattformen kan føres inn i åpningen og deretter senkes ned på dyblene. Step 5: The balcony platform is lifted into place and laid down on sleepers 502 and stepped down on dowels (not shown) which stick up from the consoles 503. A concrete platform can weigh 800 kg or more. This step therefore requires both a heavy and large crane and care to avoid damage, e.g. as a result of the platform falling down, or crushing damage when the platform is to be lowered onto the dowels. The sleeper 502 is then fixed in the platform with concrete nails. Alternatively, umbrella supports can be used. During rehabilitation, a temporary opening must be made in the cladding and insulation that is large enough for the balcony platform to be inserted into the opening and then lowered onto the dowels.

Trinn 6: Montering av skråstag 300'. Skråstagene 300' er typisk strekkfisker der en mutter forbinder to kontragjengede stag som er festet i henholdsvis plattformen og byggets vegg. Mutteren strammes til et gitt moment for å sikre at plattformen ikke beveges når støttebena skal fjernes. Galvaniserte strekkfisker er rimelige, men galvaniseringen på gjengene forsvinner gjerne når mutteren roteres på dem. Det kan derfor stilles krav til dyrere strekkfisker Step 6: Installation of inclined struts 300'. The inclined struts 300' are typically tie-rods where a nut connects two counter-threaded struts which are fixed in the platform and the building's wall respectively. The nut is tightened to a given torque to ensure that the platform does not move when the support legs are to be removed. Galvanized turnbuckles are reasonably priced, but the galvanization on the threads tends to disappear when the nut is rotated on them. Demands can therefore be made for more expensive stretch fish

laget av f eks rustfritt eller syrefast stål. made of e.g. stainless or acid-resistant steel.

Trinn 7: Gjenstøping av hylse for dybel ved vinkelkonsoll. Step 7: Recasting the sleeve for the dowel at the angle bracket.

Trinn 8: Nye paraplystøtter 500' settes på plass over balkongen for neste balkong. Trinn 9: Trinn 1-8 utføres for balkonger over. Step 8: New umbrella supports 500' are put in place above the balcony for the next balcony. Step 9: Steps 1-8 are carried out for balconies above.

Trinn 10: Riving av støtteben 500, 500'. Dette trinnet utføres ovenfra og ned og omfatter å slakke ned støttebena noen millimeter, kontrollere at plattformen ikke siger eller vipper, etterjustere skråstag om nødvendig, slakke ned støttebena enda noen mm og så videre til man er sikker på at plattformen Step 10: Demolition of outriggers 500, 500'. This step is carried out from top to bottom and includes slackening the support legs a few millimeters, checking that the platform does not sag or tilt, readjusting the inclined struts if necessary, slackening the support legs another few mm and so on until it is certain that the platform

er forsvarlig festet i riktig høyde og vinkel og med riktig lastfordeling. is securely fixed at the correct height and angle and with the correct load distribution.

Prosessen gjentas for alle balkongene ovenfra og ned. The process is repeated for all the balconies from top to bottom.

Trinn 11: Montering av rekkverk, avrenningssystem og/eller glass (innglassing). I Step 11: Installation of railings, drainage system and/or glass (glazing). IN

noen tilfeller bygges en vegg med isolasjon og kledning mellom trinnene 10 og 11. in some cases, a wall with insulation and cladding is built between steps 10 and 11.

DE 8302805 U viser en balkongplattform som er dannet av bærende, utkragede hul-profiler av lettmetall som er tett plassert. Profilene går kontinuerlig langs hele balkongen, parallelt med en vegg. Profilen som ligger mot veggen er utstyrt med en kroklignende del og fungerer som hurtigkobling mot en dekkekonsoll. DE 8302805 U shows a balcony platform which is formed by load-bearing cantilevered hollow profiles of light metal which are closely spaced. The profiles run continuously along the entire balcony, parallel to a wall. The profile that lies against the wall is equipped with a hook-like part and functions as a quick connection to a cover bracket.

EP 1477400 A1 beskriver en prefabrikkert monterbar balkong som er dannet av bærende, utkragede profiler som strekker seg vinkelrett ut i forhold til veggen, samt et øvre dekke. Publikasjonen viser tilkoplingselement som fungerer som hurtigkobling. EP 1477400 A1 describes a prefabricated prefabricated balcony which is formed by load-bearing, cantilevered profiles which extend perpendicularly to the wall, as well as an upper deck. The publication shows a connection element that functions as a quick connection.

DE 19846816 A1 beskriver en balkongkonstruksjon med bærende, understøttede profiler som strekker seg vinkelrett ut i forhold til veggen, samt et øvre dekke. Profilene er festet til bærende konstruksjon via langstrakt tilkoblingselement som henger over krok på konsollen. En dekkekonsoll strekker seg ut av etasjeskiller. DE 19846816 A1 describes a balcony structure with load-bearing, supported profiles that extend perpendicularly in relation to the wall, as well as an upper cover. The profiles are attached to the load-bearing structure via an elongated connection element that hangs over a hook on the console. A deck console extends out from floor dividers.

JP 8199692 A beskriver en prefabrikkert balkong utstyrt med kroklignende tilkoblingselementer som gjør hurtig montering mulig. JP 8199692 A describes a prefabricated balcony equipped with hook-like connection elements that enable rapid assembly.

Mye av tiden som medgår til montering av prefabrikkerte betongplattformer skyldes følgelig plattformens vekt, f eks at det er nødvendig å etablere støtteben, og at man må ivareta sikkerhet for å unngå fall- og klemskader. Mange av de samme problemene ses også ved montering av prefabrikkerte balkongplattformer av stål eller tre. Much of the time involved in the installation of prefabricated concrete platforms is consequently due to the weight of the platform, for example the fact that it is necessary to establish support legs, and that safety must be ensured to avoid falling and crushing injuries. Many of the same problems are also seen when installing prefabricated balcony platforms made of steel or wood.

Balkonger av trykkimpregnert trevirke tilfredsstiller vanligvis ikke krav til brannsikkerhet, estetikk osv som kan stilles til balkongløsninger for hus med flere etasjer. Plassbygde trebalkonger er vanligvis for tidkrevende å sette opp til at de er konkurransedyktige mot prefabrikkerte elementer av stål eller betong. Balconies made of pressure-impregnated wood do not usually meet the requirements for fire safety, aesthetics, etc. that can be set for balcony solutions for houses with several floors. Site-built wooden balconies are usually too time-consuming to set up for them to be competitive against prefabricated elements made of steel or concrete.

Et annet problem med eksisterende balkongløsninger er at balkongplattformen ofte er dårlig termisk isolert mot etasjeskillet. Figur 1 a viser en typisk løsning fra kjent teknikk der plattformen legges på et vinkelkonsoll 503, som i sin tur er innfestet i etasjeskillet 410. Dårlig eller mangelfull termisk isolasjon fører til at mye varme kan ledes fra etasjeskillet 410 til en kaldere balkongplattform 100'. Om vinteren i kalde strøk vil derfor innfestingen i plattformens bakkant danne en "kuldebro" inn i huset. Another problem with existing balcony solutions is that the balcony platform is often poorly thermally insulated against the floor separation. Figure 1 a shows a typical solution from prior art where the platform is placed on an angle console 503, which in turn is attached to the floor partition 410. Poor or insufficient thermal insulation means that a lot of heat can be conducted from the floor partition 410 to a colder balcony platform 100'. In winter in cold regions, the fastening at the rear edge of the platform will therefore form a "cold bridge" into the house.

Formålet med den foreliggende oppfinnelsen er å tilveiebringe et balkongsystem og en fremgangsmåte for montering som løser minst ett av problemene som er beskrevet ovenfor. The purpose of the present invention is to provide a balcony system and a method for assembly which solves at least one of the problems described above.

Målene med foreliggende oppfinnelse oppnås ved et utkragersystem, fortrinnsvis for balkongplattform, anordnet til en bærende konstruksjon, fortrinnsvis et etasjeskille, kjennetegnet ved at utkragersystemet omfatter: en festekonsoll for innfesting til den bærende konstruksjon og som forløper i balkongplattformens bredderetning, festekonsollen er utformet med en mottaksanordning for tilkopling av et krokformet koblingselement som forløper i balkongens bredderetning og parallelt med festekonsollen, og minst ett utkraget gulvprofil med sin innfestingstverrende anordnet til det krokformede koplingselement i hele balkongplattformens bredderetning, hvorved et selvbærende utkragersystem er fremskaffet. The aims of the present invention are achieved by a cantilever system, preferably for a balcony platform, arranged to a supporting structure, preferably a floor partition, characterized in that the cantilever system comprises: a fastening bracket for attachment to the supporting structure and which extends in the width direction of the balcony platform, the fastening bracket is designed with a receiving device for the connection of a hook-shaped connecting element that runs in the width direction of the balcony and parallel to the fixing bracket, and at least one cantilevered floor profile with its attachment cross-section arranged to the hook-shaped connecting element in the entire width direction of the balcony platform, whereby a self-supporting cantilever system is provided.

Foretrukne utførelsesformer av utkragersystemet er videre utdypet i kravene 2 til og med 9. Preferred embodiments of the cantilever system are further elaborated in claims 2 to 9 inclusive.

Balkongplattformen lages fortrinnsvis lettest mulig, f eks av hule aluminiumsprofiler som skrus sammen med bolter og braketter. The balcony platform is preferably made as light as possible, for example from hollow aluminum profiles that are screwed together with bolts and brackets.

Balkongsystemet kan også omfatte braketter for feste av utvendig eller innvendig takrenne, balustertapper og/eller adaptere for enkel montering av rekkverk, hånd-løper og/eller glass til innglassing. Profilplater (deksler) og andre synlige elementer kan klipses på balkongen for å tilveiebringe ønsket overflatestruktur og farge. The balcony system can also include brackets for attaching external or internal gutters, baluster studs and/or adapters for easy installation of railings, handrails and/or glass for glazing. Profile plates (covers) and other visible elements can be clipped onto the balcony to provide the desired surface structure and colour.

En balkongplattform av aluminium kan om ønskelig brannisoleres med steinull eller lignede fiber for å oppnå ønsket brannsikkerhet. En slik isolasjon reduserer samtidig trinnlyd, og kan også redusere varmetapet fra normalt oppvarmede rom til en kaldere balkong utendørs. An aluminum balcony platform can, if desired, be fire-insulated with stone wool or similar fibers to achieve the desired fire safety. Such insulation simultaneously reduces footfall noise, and can also reduce heat loss from normally heated rooms to a colder balcony outside.

Andre fordeler ved oppfinnelsen er: Other advantages of the invention are:

- Ikke behov for midlertidig oppstendring, støping og herding (som for betong) - No need for temporary erection, casting and hardening (as for concrete)

- Brannisolasjon gir anvendelse i store høyder med krav til brannklasse - Fire insulation provides application at great heights with requirements for fire class

- Prefabrikkerte braketter innebygget i plattformen gir hurtig og presis påmonter-ing av rekkverk, solskjerming og/eller innglassing umiddelbart etter at balkongplattformen er løftet på plass og festet - Eliminering/reduksjon av varmetransport ved termisk isolert veggfeste og/eller etasjeskillebrakett - Justerbar veggfeste/etasjeskillebrakett ved skjevheter og avvik fra toleranser i bygningens etasjeskille og veggkledning - Premontert avrenningssystem kan leveres som standard (valgfritt utvendig eller innvendig) - Prefabricated brackets built into the platform allow quick and precise fitting of railings, sun shading and/or glazing immediately after the balcony platform has been lifted into place and fixed - Elimination/reduction of heat transport by thermally insulated wall bracket and/or floor divider bracket - Adjustable wall bracket/floor divider bracket in case of deviations and deviations from tolerances in the building's floor separation and wall cladding - Pre-assembled drainage system can be supplied as standard (optionally external or internal)

- Vedlikeholdsfrie behandlede aluminiumsoverflater - Maintenance-free treated aluminum surfaces

- Lavere totalkostnad ved innkjøp, montasje og vedlikehold - Lower total cost of purchase, assembly and maintenance

Oppfinnelsen blir nærmere beskrevet i det følgende med henvisning til de ved-føyde tegningene, hvor: Fig. 1a, 1b illustrerer en fremgangsmåte ved montering av kjent betongbalkong Fig. 2 viser et utkragersystem i følge oppfinnelsen i form av en balkongplattform anordnet til bærende konstruksjon, The invention is described in more detail in the following with reference to the attached drawings, where: Fig. 1a, 1b illustrate a method for assembling a known concrete balcony. Fig. 2 shows a cantilever system according to the invention in the form of a balcony platform arranged as a load-bearing structure,

Fig. 3 viser en detalj av utkragersystemets hovedkomponenter, Fig. 3 shows a detail of the cantilever system's main components,

Fig. 4 viser balkongplattformen fra figur 2 i ikke-fullstendig montert tilstand, Fig. 4 shows the balcony platform from Fig. 2 in an incompletely assembled state,

Fig. 5 viser en detalj av utkragersystemets hovedkomponenter før endelig sammenstilling, Fig. 6 viser en detalj av utkragersystemets hovedkomponenter ferdig montert, og Fig. 5 shows a detail of the cantilever system's main components before final assembly, Fig. 6 shows a detail of the cantilever system's main components fully assembled, and

Fig. 7 viser to sammensatte gulvprofiler til utkragersystemet. Fig. 7 shows two composite floor profiles for the cantilever system.

Figurene er skjematiske illustrasjoner av prinsippene ved oppfinnelsen. Følgelig er ikke figurene nødvendigvis i skala, noen detaljer er fremstilt skjematisk og andre detaljer er utelatt fra figurene. I en virkelig plattform vil det være skruer, bolter, braketter, innfestinger osv som er velkjent for en fagkyndig, men som ikke vises i de skjematiske tegningene. The figures are schematic illustrations of the principles of the invention. Accordingly, the figures are not necessarily to scale, some details are shown schematically and other details are omitted from the figures. In a real platform there will be screws, bolts, brackets, fasteners, etc. which are well known to a person skilled in the art, but which are not shown in the schematic drawings.

Med henvisning til figurene er et utkragersystem 1, som her er i form av en balkongplattform, vist anordnet til en bærende konstruksjon 3. En festekonsoll 5 er innfestet i den bærende konstruksjon 3. Festekonsollen 5 er utformet med en mottaksanordning 6 for tilkopling av et krokformet koplingselement 10. Festekonsollen 5 med mottaksanordning 6 og det krokformede koplingselement 10 forløper i balkongens bredderetning. Et antall utkragete gulvprofiler 15 er anordnet til det krokformede koplingselement 10 i hele balkongplattformens bredderetning. Kombinasjonen av festekonsollen 5 med mottaksanordningen 6, festekonsollen 5 og dyptkragede gulvprofiler 15 tilveiebringer et selvbærende utkragersystem. With reference to the figures, a cantilever system 1, which is here in the form of a balcony platform, is shown arranged to a supporting structure 3. A fastening bracket 5 is attached to the supporting structure 3. The fastening bracket 5 is designed with a receiving device 6 for connecting a hook-shaped connecting element 10. The fastening bracket 5 with receiving device 6 and the hook-shaped connecting element 10 extend in the width direction of the balcony. A number of cantilevered floor profiles 15 are arranged to the hook-shaped connecting element 10 in the entire width direction of the balcony platform. The combination of the fixing bracket 5 with the receiving device 6, the fixing bracket 5 and deep collared floor profiles 15 provides a self-supporting cantilever system.

Hovedkomponentene til utkragersystemet er vist i detalj i figur 3. Mottaksanordningen 6 er i form av en platekonstruksjon som forløper i balkongens bredderetning. Det krokformede koplingselement 10 er utformet med henholdsvis en øvre krokflensanordning 11 som griper over platekonstruksjonens øvre kantområde og med minst en flensanordning 12 som hviler mot festekonsollens nedre plateområde. Festekonsollen 5 er videre anordnet med gjengehull 7 for innføring av bolter 18 i gulvprofilens skruespor 17. The main components of the cantilever system are shown in detail in figure 3. The receiving device 6 is in the form of a plate structure which extends in the width direction of the balcony. The hook-shaped coupling element 10 is designed respectively with an upper hook flange device 11 which grips over the upper edge area of the plate structure and with at least one flange device 12 which rests against the lower plate area of the fastening console. The fastening bracket 5 is also provided with threaded holes 7 for inserting bolts 18 into the screw grooves 17 of the floor profile.

Med henvisning spesielt til figur 2 og 4 er de utkragede gulvprofiler 15 vist anordnet med rammeprofiler 25 som forløper langs balkongplattformens utvendige frie kantområder og er anordnet til gulvprofilenes utvendige frie tverrender og langsgående sider. Med henvisning til tegningene og spesielt figur 7 er gulvprofilene 15 vist som et boks/hulprofil fortrinnsvis av aluminium. Gulvprofilets innfestningstverrende 16 er videre anordnet med skruesporene 17 for innfesting til det krokformede koplingselement 10. Gulvprofilet 15 er videre anordnet med not og fjæranordning 20 for tilkopling til et eller flere parallelt forløpende gulvprofiler 15. With particular reference to Figures 2 and 4, the cantilevered floor profiles 15 are shown arranged with frame profiles 25 which run along the outer free edge areas of the balcony platform and are arranged to the outer free cross ends and longitudinal sides of the floor profiles. With reference to the drawings and especially figure 7, the floor profiles 15 are shown as a box/hollow profile, preferably made of aluminium. The floor profile's attachment end 16 is further provided with screw slots 17 for attachment to the hook-shaped connection element 10. The floor profile 15 is also provided with a tongue and groove device 20 for connection to one or more parallel running floor profiles 15.

Utkragersystemet i følge foreliggende oppfinnelse kan prefabrikkeres før montering på byggeplass. Dette reduserer total byggkostnad og sparer tid på byggeplass. Utkragersystemet kan skreddersys og er nærmest vedlikeholdsfritt. Utkragersystemet legger til rette for hurtig og sikker montasje på byggestedet. The cantilever system according to the present invention can be prefabricated before assembly on the building site. This reduces the total construction cost and saves time on the construction site. The cantilever system can be tailored and is almost maintenance-free. The cantilever system facilitates quick and safe assembly on the construction site.

Den selvutkragende balkongplattform monteres uten understøtting eller skråoppheng. Vekten er lav slik at lett løfteutstyr kan benyttes. Festekonsollene 5 monteres hurtig og presist til bærende konstruksjon 3. Utkragersystemet 1, her i form av en balkongplattform med et premontert rekkverk, monteres hurtig til festekonsollene 5. The self-supporting balcony platform is mounted without support or inclined suspension. The weight is low so that light lifting equipment can be used. The fixing brackets 5 are quickly and precisely fitted to the supporting structure 3. The cantilever system 1, here in the form of a balcony platform with a pre-assembled railing, is quickly fitted to the fixing brackets 5.

Innfesting av festekonsollene 5 til bærende konstruksjon 3 er utført slik at kuldebro elimineres. Opplagringen skjer via en isolert festekonsoll 5 som er boltet i byggets etasjeskille. Konsollen fungerer som kuldebrobrytning. Balkongplattformen trenger derfor ikke ha en opplagring fra for eksempel stender/understøtte eller skråstaksoppheng mot vegg. Fixing of the fastening brackets 5 to the supporting structure 3 is carried out so that thermal bridges are eliminated. The storage takes place via an insulated mounting bracket 5 which is bolted to the building's floor partition. The console acts as a thermal break. The balcony platform therefore does not need to be supported by, for example, uprights/supports or inclined pile suspension against the wall.

De utkragede gulvprofiler 15 er anordnet med not og fjær for sammenføyning/vannlås mellom profilene. De utkragede gulvprofilene som omkranser plattformen danner videre et fundament for rekkverksstolper, samt fungerer som integrert takrenne/avløp for overvann. The cantilevered floor profiles 15 are arranged with tongue and groove for joining/water seal between the profiles. The cantilevered floor profiles that encircle the platform also form a foundation for railing posts, as well as functioning as an integrated gutter/drainage for storm water.

Festekonsollet 5 monteres på bygget i byggets "betongfase". Deretter kles bygget med vegger, hvor festekonsollets stålplate stikker ut av kledningen. Ved montasje av balkongplattformen hektes balkongplattformens krokformede koplingselement 10 på festekonsollens mottaksanordning 6. Balkongplattformen festes deretter i underkant med bolt mellom det krokformede koplingselement 10 og festekonsollen 5. The mounting bracket 5 is mounted on the building in the "concrete phase" of the building. The building is then clad with walls, where the fixing bracket's steel plate protrudes from the cladding. When assembling the balcony platform, the balcony platform's hook-shaped connection element 10 is hooked onto the attachment bracket's receiving device 6. The balcony platform is then fixed at the bottom with a bolt between the hook-shaped connection element 10 and the attachment bracket 5.

Det krokformede koplingselementet 10 danner feste for balkongplattformen mot den isolerte festekonsollen 5 som er boltet i byggets etasjeskille/dekkekant. Det krokformede koplingslementet 10 er konstruert med helning nedover-innover mot vegg for å oppnå ønsket helning for vannavrenning på oversiden av gulvprofilene 15.1 denne utførelsen kan gulvprofilene skjæres i rett vinkel for minimal bearbeiding. Det krokformede koplingselement 10 binder sammen alle gulvprofilene 15 med tre selvgjengede bolter i hvert gulvprofil 15.1 denne utførelse er det tre bolter oppe og en nede. The hook-shaped connecting element 10 forms the attachment for the balcony platform against the insulated attachment bracket 5 which is bolted to the building's floor partition/covering edge. The hook-shaped connecting element 10 is designed with a downward-inward slope towards the wall to achieve the desired slope for water drainage on the upper side of the floor profiles 15.1 this design, the floor profiles can be cut at right angles for minimal processing. The hook-shaped connecting element 10 binds all the floor profiles 15 together with three self-threading bolts in each floor profile 15.1 In this version, there are three bolts at the top and one at the bottom.

Gulvprofilets innfestingstverrende 16 kan i en annen utførelse være anordnet med en vinkel i forhold til vertikalen hvorved gulvprofil 15 inntar helning mot sin frie ende. In another embodiment, the floor profile's fastening cross-end 16 can be arranged at an angle in relation to the vertical, whereby the floor profile 15 assumes an inclination towards its free end.

Gulvprofilet 15 er et boksprofil med to steg og fire skruespor (tre oppe og et nede). Stegene og skruesporene er plassert slik at boltene blir symmetrisk fordelt med lik avstand over hele balkongplattformen. Formålet med dette er optimal spenningsfordeling i det krokformede koplingselement 10. The floor profile 15 is a box profile with two steps and four screw slots (three at the top and one at the bottom). The ladders and screw slots are positioned so that the bolts are symmetrically distributed at equal distances across the entire balcony platform. The purpose of this is optimal voltage distribution in the hook-shaped connecting element 10.

Gulvprofilene 15 har som tidligere nevnt not og fjær både og nede for å hindre vanngjennomtregning mellom profilene. As previously mentioned, the floor profiles 15 have grooves and tongues both at the bottom to prevent water penetration between the profiles.

Gulvprofilenes underside danner balkongplattformens himling, og kan også påfestes brannhemmede plate. The underside of the floor profiles forms the ceiling of the balcony platform, and fire-resistant panels can also be attached.

Gulvprofilets overflate er sklisikret med riller. Rammeprofilene 25 er boltet til gulvprofilene 15. Rekkverk kan festes på toppen av rammeprofilene 25 eller på utsiden. Rammeprofilene 25 har spor for feste av deksel på balkongrammens underside for endring av farge (fargede plater) eller materiale (tre, lettbetong). The surface of the floor profile is non-slip with grooves. The frame profiles 25 are bolted to the floor profiles 15. Railings can be fixed on top of the frame profiles 25 or on the outside. The frame profiles 25 have grooves for fixing the cover on the underside of the balcony frame for changing the color (coloured boards) or material (wood, lightweight concrete).

Som omtalt ovenfor tilveiebringer oppfinnelsen et utkragersystem som kan prefabrikkeres, fraktes til byggeplassen og monteres på en hurtig, sikker og kostnadseffektiv måte. As discussed above, the invention provides a cantilever system that can be prefabricated, transported to the construction site and assembled in a fast, safe and cost-effective manner.

Claims (9)

1. Utkragersystem (1), fortrinnsvis for balkongplattform, anordnet til en bærende konstruksjon (3), fortrinnsvis et etasjeskille, karakterisert vedat utkragersystemet (1) omfatter: en festekonsoll (5) for innfesting til den bærende konstruksjon (3) og som forløper i balkongplattformens bredderetning, festekonsollen (5) er utformet med en mottaksanordning (6) for tilkopling av et krokformet koblingselement (10) som forløper i balkongens bredderetning og parallelt med festekonsollen (5), og minst ett utkraget gulvprofil (15) med sin innfestingstverrende (16) anordnet til det krokformede koplingselement (10) i hele balkongplattformens bredderetning, hvorved et selvbærende utkragersystem er fremskaffet.1. Cantilever system (1), preferably for balcony platform, arranged to a supporting structure (3), preferably a floor partition, characterized in that the cantilever system (1) comprises: an attachment bracket (5) for attachment to the supporting structure (3) and which extends in the width direction of the balcony platform, the attachment bracket (5) is designed with a receiving device (6) for connecting a hook-shaped connecting element (10) which runs in the width direction of the balcony and parallel to the fixing console (5), and at least one cantilevered floor profile (15) with its attachment cross-section (16) arranged to the hook-shaped connecting element (10) in the entire width direction of the balcony platform, whereby a self-supporting cantilever system is provided. 2. Utkragersystem (1) ifølge krav 1, karakterisert vedat mottaksanordningen (6) er i form av en platekonstruksjon som forløper i balkongens bredderetning.2. Cantilever system (1) according to claim 1, characterized in that the receiving device (6) is in the form of a plate structure which extends in the width direction of the balcony. 3. Utkragersystem (1) ifølge krav 1 eller 2, karakterisert vedat det krokformede koplingselement (10) er utformet med henholdsvis en øvre krokflensanordning (11) som griper over platekonstruksjonens øvre kantområde og med minst en flensanordning (12) som hviler mot festekonsollens nedre plateområde.3. Cantilever system (1) according to claim 1 or 2, characterized in that the hook-shaped coupling element (10) is respectively designed with an upper hook flange device (11) which grips over the plate structure's upper edge area and with at least one flange device (12) which rests against the lower plate area of the fastening bracket. 4. Utkragersystem (1) ifølge et hvert av de foregående krav,karakterisert vedat festekonsollen (5) er anordnet med gjengehull (7) for innføring av bolter (18) i gulvprofilenes skruespor (17).4. Cantilever system (1) according to each of the preceding claims, characterized in that the fastening bracket (5) is provided with threaded holes (7) for inserting bolts (18) into the screw grooves (17) of the floor profiles. 5. Utkragersystem (1) ifølge et hvert av de foregående krav,karakterisert vedat det videre omfatter rammeprofiler (25) som forløper langs balkongplattformens utvendige frie kantområde og er anordnet til gulvprofilets(enes) utvendige frie tverrende(r) og langsgående side(er).5. Cantilever system (1) according to each of the preceding claims, characterized in that it further comprises frame profiles (25) which extend along the outer free edge area of the balcony platform and are arranged to the outer free transverse end(s) and longitudinal side(s) of the floor profile(s). . 6. Utkragersystem (1) ifølge et hvert av de foregående krav,karakterisert vedat det minst ene gulvprofil (15) er et boks/hulprofil fortrinnsvis av aluminium.6. Cantilever system (1) according to each of the preceding claims, characterized in that the at least one floor profile (15) is a box/hollow profile, preferably of aluminium. 7. Utkragersystem (1) ifølge et hvert av de foregående krav,karakterisert vedat gulvprofilets innfestingstverrende (16) er anordnet med skruespor (17) for innfesting til det krokformede koplingselement (10).7. Cantilever system (1) according to each of the preceding claims, characterized in that the fastening end (16) of the floor profile is arranged with a screw groove (17) for fastening to the hook-shaped connecting element (10). 8. Utkragersystem (1) ifølge et hvert av de foregående krav,karakterisert vedat gulvprofilet (15) er anordnet med not og fjæranordning (20) for tilkopling til et eller flere parallelt forløpende gulvprofiler (15).8. Cantilever system (1) according to each of the preceding claims, characterized in that the floor profile (15) is arranged with a tongue and groove device (20) for connection to one or more parallel running floor profiles (15). 9. Utkragersystem (1) ifølge et hvert av de foregående krav,karakterisert vedat gulvprofilets innfestingstverrende (16) er anordnet med en vinkel i forhold til vertikalen hvorved gulvprofilet (15) inntar en helning mot sin frie ende.9. Cantilever system (1) according to each of the preceding claims, characterized in that the floor profile's attachment cross-end (16) is arranged at an angle in relation to the vertical whereby the floor profile (15) assumes an inclination towards its free end.
NO20120145A 2012-02-13 2012-02-13 The cantilever NO333644B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
NO20120145A NO333644B1 (en) 2012-02-13 2012-02-13 The cantilever
PCT/NO2013/050027 WO2013122478A1 (en) 2012-02-13 2013-02-12 Cantilever system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NO20120145A NO333644B1 (en) 2012-02-13 2012-02-13 The cantilever

Publications (2)

Publication Number Publication Date
NO20120145A1 true NO20120145A1 (en) 2013-02-22
NO333644B1 NO333644B1 (en) 2013-07-29

Family

ID=47996911

Family Applications (1)

Application Number Title Priority Date Filing Date
NO20120145A NO333644B1 (en) 2012-02-13 2012-02-13 The cantilever

Country Status (2)

Country Link
NO (1) NO333644B1 (en)
WO (1) WO2013122478A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2614922A (en) * 2022-01-25 2023-07-26 Sapphire Balconies Ltd A method and apparatus for installing a series of balconies on a building

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2507365B (en) * 2013-04-22 2014-10-22 Sapphire Balustrades Ltd Balcony
GB2536915B (en) * 2015-03-31 2018-06-06 Mgi Thermo Pte Ltd Hull Insulation of a liquefied gas carrying ship having a plurality of individual tessellating insulation panels
SE539876C2 (en) * 2016-07-05 2017-12-27 Nordiska Balco Ab Balcony floor
CN107461033A (en) * 2017-09-08 2017-12-12 深圳前海特辰科技有限公司 Construction protection canopy and its construction method
US11319702B2 (en) 2018-10-30 2022-05-03 Westbank Projects Corp. Apartment balcony
IT201900024072A1 (en) * 2019-12-16 2021-06-16 Fincantieri Spa PREFABRICATED STRUCTURE OF BALCONY FOR CRUISE SHIP
GB2600752B (en) * 2020-11-09 2023-03-08 Sapphire Balconies Ltd Balcony developments

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE8200561L (en) * 1982-02-02 1983-08-03 Erik Ohman BALCONY CONSTRUCTION
DE19846816A1 (en) * 1998-10-10 2000-04-13 Alupor Fassaden & Balkongelaen Extension balcony can be attached to an existing building by tie bolts passing through the wall
FI20035067A (en) * 2003-05-15 2004-11-16 Jukova Oy Balcony or equivalent

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2614922A (en) * 2022-01-25 2023-07-26 Sapphire Balconies Ltd A method and apparatus for installing a series of balconies on a building

Also Published As

Publication number Publication date
WO2013122478A1 (en) 2013-08-22
NO333644B1 (en) 2013-07-29

Similar Documents

Publication Publication Date Title
NO20120145A1 (en) The cantilever
GB2475138A (en) Modular flooring panel
US20230014744A1 (en) Method of Construction
US3364647A (en) Method for erecting tall buildings with balconies
JP2024119919A (en) Method for constructing multi-storey structures and facades
JP5417018B2 (en) How to install an elevator in an existing building
PL178641B1 (en) Covering panel structure based on alatticework and method of mounting same
RU2155256C2 (en) Structural system for construction of buildings, particularly, single-family houses
WO2006056062A1 (en) Curtain wall construction and fastening system
FI68695B (en) PREFABRICERAD BALKONG
AU2017268495A1 (en) Scaffolding System
AU2017101328A4 (en) Rooftop access and safety system
CN108412033B (en) External vertical forest overhanging balcony structure of building and construction method thereof
AU2017232243B2 (en) Working platform system
RU164817U1 (en) WALL FENCING CONSTRUCTION FOR BUILDING A BUILDING
RU2233367C1 (en) Set for house building
RU214283U1 (en) WALL STRUCTURE FOR FACADE CLADDING
CN218562657U (en) Steel construction assembled outer surrounding ALC wallboard installation node
RU2762964C1 (en) Method for mounting enlarged facade elements
RU2723246C1 (en) Ventilated facade mounting method
RU33136U1 (en) Domokomplekt prefabricated frame-panel building
NO20170332A1 (en) Fastening device and method for mounting an extension part to a building
KR20040017560A (en) Deck panel for reinforced concrete slab
GB2599987A (en) Thermal renovation panel, assembly and method for execution thereof
AU2015101055B4 (en) Working platform system

Legal Events

Date Code Title Description
MM1K Lapsed by not paying the annual fees