NO20083660L - Fremgangsmater, system og datamaskinlesbare medier for sann tids olje- og gassfeltproduksjonsoptimalisring ved a bruke proksysimulator - Google Patents
Fremgangsmater, system og datamaskinlesbare medier for sann tids olje- og gassfeltproduksjonsoptimalisring ved a bruke proksysimulatorInfo
- Publication number
- NO20083660L NO20083660L NO20083660A NO20083660A NO20083660L NO 20083660 L NO20083660 L NO 20083660L NO 20083660 A NO20083660 A NO 20083660A NO 20083660 A NO20083660 A NO 20083660A NO 20083660 L NO20083660 L NO 20083660L
- Authority
- NO
- Norway
- Prior art keywords
- control parameters
- proxy
- simulators
- real
- systems
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 2
- 238000005457 optimization Methods 0.000 title abstract 2
- 230000035945 sensitivity Effects 0.000 abstract 2
- 238000004519 manufacturing process Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B2200/00—Special features related to earth drilling for obtaining oil, gas or water
- E21B2200/22—Fuzzy logic, artificial intelligence, neural networks or the like
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Feedback Control In General (AREA)
- Separation By Low-Temperature Treatments (AREA)
- Air Conditioning Control Device (AREA)
Abstract
Fremgangsmåter, systemer og datamaskinlesbart medium er gitt for sanntids olje- og gassfeltproduksjonsoptimalisering ved å bruke en proksysimulator. En grunrunodell (3 0) til et reservoar (100), brønn (100), rørnettverk (100) eller prosesseringssystem (100) er etablert i en eller flere fysiske simulatorer (26). Et beslutningsstyresystem (24) blir brukt til å definere kontrollparametere, slik som ventilinnstillinger (410), for tilpasning med observerte data (114). En proksymodell blir brukt til å tilpasse kontrollparametrene til utgangene fra den fysiske simulatoren (26), å bestemme sensitiviteter til kontrollparametrene og å beregne korrelasjon mellom kontrollparametrene og utgangsdataene fra simulatoren (26). Kontrollparametere for hvilke sensitivitetene er under en terskel blir eliminert. Beslutningsstyresystemet (24) validerer kontrollparametrene som er utgang fra proksymodellen i simulatoren (26). Proksymodellen kan bli brukt til å forutsi fremtidige kontrollinnstillinger for kontrollparametrene.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US76397106P | 2006-01-31 | 2006-01-31 | |
PCT/US2007/002624 WO2007089832A1 (en) | 2006-01-31 | 2007-01-31 | Methods, systems, and computer-readable media for real-time oil and gas field production optimization using a proxy simulator |
Publications (2)
Publication Number | Publication Date |
---|---|
NO20083660L true NO20083660L (no) | 2008-10-14 |
NO340159B1 NO340159B1 (no) | 2017-03-20 |
Family
ID=38137628
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NO20083660A NO340159B1 (no) | 2006-01-31 | 2008-08-25 | Fremgangsmåter, system og datamaskinlesbare medier for sann tids olje- og gassfeltproduksjonsoptimalisring ved å bruke proksysimulator |
Country Status (10)
Country | Link |
---|---|
US (2) | US20070179766A1 (no) |
EP (1) | EP1982046B1 (no) |
CN (1) | CN101379271B (no) |
AT (1) | ATE503913T1 (no) |
AU (1) | AU2007211294B2 (no) |
BR (1) | BRPI0706804A2 (no) |
CA (1) | CA2640727C (no) |
DE (1) | DE602007013530D1 (no) |
NO (1) | NO340159B1 (no) |
WO (1) | WO2007089832A1 (no) |
Families Citing this family (67)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6853921B2 (en) | 1999-07-20 | 2005-02-08 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
FR2842321B1 (fr) * | 2002-07-11 | 2008-12-05 | Inst Francais Du Petrole | Methode pour contraindre un champ de permeabilite heterogene representant un reservoir souterrain par des donnees dynamiques |
US7584165B2 (en) * | 2003-01-30 | 2009-09-01 | Landmark Graphics Corporation | Support apparatus, method and system for real time operations and maintenance |
EP1999492A4 (en) * | 2006-01-20 | 2011-05-18 | Landmark Graphics Corp | DYNAMIC PRODUCTION MANAGEMENT SYSTEM |
US8504341B2 (en) * | 2006-01-31 | 2013-08-06 | Landmark Graphics Corporation | Methods, systems, and computer readable media for fast updating of oil and gas field production models with physical and proxy simulators |
ATE503913T1 (de) | 2006-01-31 | 2011-04-15 | Landmark Graphics Corp | Verfahren, systeme und computerlesbare medien zur öl- und gasfeldproduktionsoptimierung in echtzeit mit einem proxy-simulator |
US9175547B2 (en) * | 2007-06-05 | 2015-11-03 | Schlumberger Technology Corporation | System and method for performing oilfield production operations |
FR2919932B1 (fr) * | 2007-08-06 | 2009-12-04 | Inst Francais Du Petrole | Methode pour evaluer un schema de production d'un gissement souterrain en tenant compte des incertitudes |
TW200916992A (en) * | 2007-08-14 | 2009-04-16 | Shell Int Research | System and methods for continuous, online monitoring of a chemical plant or refinery |
US9070172B2 (en) * | 2007-08-27 | 2015-06-30 | Schlumberger Technology Corporation | Method and system for data context service |
US8892221B2 (en) * | 2007-09-18 | 2014-11-18 | Groundswell Technologies, Inc. | Integrated resource monitoring system with interactive logic control for well water extraction |
US20090076632A1 (en) * | 2007-09-18 | 2009-03-19 | Groundswell Technologies, Inc. | Integrated resource monitoring system with interactive logic control |
US7660673B2 (en) * | 2007-10-12 | 2010-02-09 | Schlumberger Technology Corporation | Coarse wellsite analysis for field development planning |
AU2008323932B2 (en) * | 2007-11-10 | 2013-06-20 | Landmark Graphics Corporation, A Halliburton Company | Systems and methods for workflow automation, adaptation and integration |
AU2008338406B2 (en) | 2007-12-17 | 2013-09-12 | Landmark Graphics Corporation, A Halliburton Company | Systems and methods for optimization of real time production operations |
CN102007459B (zh) | 2008-04-17 | 2015-01-07 | 埃克森美孚上游研究公司 | 用于储层开发计划的鲁棒性基于优化的决策支持工具 |
BRPI0909446A2 (pt) * | 2008-04-18 | 2015-12-22 | Exxonmobil Upstream Res Co | métodos para planejamento do desenvolvimento de reservatório, para suporte à decisão considerando o desenvolvimento de recurso petrolíferos, para otimização do planejamento de desenvolvimento, e para produção de hidrocarbonetos. |
US8775361B2 (en) | 2008-04-21 | 2014-07-08 | Exxonmobil Upstream Research Company | Stochastic programming-based decision support tool for reservoir development planning |
US20110011595A1 (en) * | 2008-05-13 | 2011-01-20 | Hao Huang | Modeling of Hydrocarbon Reservoirs Using Design of Experiments Methods |
US8527203B2 (en) | 2008-05-27 | 2013-09-03 | Schlumberger Technology Corporation | Method for selecting well measurements |
WO2010002975A1 (en) * | 2008-07-01 | 2010-01-07 | Services Petroliers Schlumberger | Effective hydrocarbon reservoir exploration decision making |
US8706541B2 (en) * | 2008-10-06 | 2014-04-22 | Schlumberger Technology Corporation | Reservoir management linking |
AU2009320119B2 (en) | 2008-11-03 | 2015-11-26 | Schlumberger Technology B.V. | Methods and apparatus for planning and dynamically updating sampling operations while drilling in a subterranean formation |
CN102246060B (zh) * | 2008-12-16 | 2014-07-30 | 埃克森美孚上游研究公司 | 用于优化油气层开发和管理的系统和方法 |
DE102010005955B4 (de) * | 2010-01-27 | 2020-03-05 | Abb Schweiz Ag | Anordnung und Verfahren zur Optimierung der Arbeitsweise eines Versorgungsnetzes |
CA2693640C (en) | 2010-02-17 | 2013-10-01 | Exxonmobil Upstream Research Company | Solvent separation in a solvent-dominated recovery process |
CA2696638C (en) | 2010-03-16 | 2012-08-07 | Exxonmobil Upstream Research Company | Use of a solvent-external emulsion for in situ oil recovery |
CA2705643C (en) | 2010-05-26 | 2016-11-01 | Imperial Oil Resources Limited | Optimization of solvent-dominated recovery |
US9665916B2 (en) | 2010-08-10 | 2017-05-30 | X Systems, Llc | System and method for analyzing data |
US9665836B2 (en) | 2010-08-10 | 2017-05-30 | X Systems, Llc | System and method for analyzing data |
US8849638B2 (en) | 2010-08-10 | 2014-09-30 | X Systems, Llc | System and method for analyzing data |
US9176979B2 (en) | 2010-08-10 | 2015-11-03 | X Systems, Llc | System and method for analyzing data |
US9652726B2 (en) | 2010-08-10 | 2017-05-16 | X Systems, Llc | System and method for analyzing data |
CA2813826A1 (en) * | 2010-09-03 | 2012-03-08 | Chevron U.S.A. Inc. | Iterative method and system to construct robust proxy models for reservoir simulation |
CN103097657B (zh) * | 2010-09-07 | 2015-05-27 | 沙特阿拉伯石油公司 | 用于模拟由储集层的网格界定的多个油气井的生产特性的机器及计算机实施方法 |
US8788068B2 (en) * | 2010-10-05 | 2014-07-22 | Exxonmobil Research And Engineering Company | Modeling tool for planning the operation of refineries |
AU2010364957B2 (en) * | 2010-11-30 | 2015-04-23 | Landmark Graphics Corporation | Systems and methods for reducing reservoir simulator model run time |
WO2012105934A1 (en) * | 2011-01-31 | 2012-08-09 | Landmark Graphics Corporation | System and method for using an artificial neural network to simulate pipe hydraulics in a reservoir simulator |
WO2012109191A1 (en) * | 2011-02-09 | 2012-08-16 | Conocophillips Company | A quantitative method of determining safe steam injection pressure for enhanced oil recovery operations |
US9026415B2 (en) | 2011-10-20 | 2015-05-05 | Energy Solutions International, Inc. | Pipeline flow modeling method |
CA2792557C (en) * | 2011-10-20 | 2016-09-20 | Energy Solutions International, Inc. | Pipeline flow modeling method |
JP6227558B2 (ja) * | 2012-01-13 | 2017-11-15 | プロセス システムズ エンタープライズ リミテッド | 流体処理ネットワークをモニタリングする方法、システム、キャリアメディア及び製品 |
EP2859484A4 (en) * | 2012-06-11 | 2016-07-13 | Landmark Graphics Corp | METHODS AND ASSOCIATED SYSTEMS FOR MODELING AND PREDICTING OPERATIONAL RESULTS OF DRILLING OPERATION |
US9460403B2 (en) | 2012-07-31 | 2016-10-04 | Landmark Graphics Corporation | Methods and systems related to hydrocarbon recovery strategy development |
US9260948B2 (en) | 2012-07-31 | 2016-02-16 | Landmark Graphics Corporation | Multi-level reservoir history matching |
CN102777167B (zh) * | 2012-08-10 | 2016-02-10 | 中国石油天然气股份有限公司 | 二维可定量挤压油气运聚可视物理模拟装置 |
US9816353B2 (en) * | 2013-03-14 | 2017-11-14 | Schlumberger Technology Corporation | Method of optimization of flow control valves and inflow control devices in a single well or a group of wells |
EP2811107A1 (en) * | 2013-06-06 | 2014-12-10 | Repsol, S.A. | Method for selecting and optimizing oil field controls for production plateau |
NO346996B1 (en) | 2013-10-08 | 2023-04-03 | Halliburton Energy Services Inc | Integrated well survey management and planning tool |
US10311173B2 (en) * | 2014-10-03 | 2019-06-04 | Schlumberger Technology Corporation | Multiphase flow simulator sub-modeling |
GB2546645B (en) * | 2014-10-08 | 2021-04-07 | Landmark Graphics Corp | Predicting temperature-cycling-induced downhole tool failure |
US10489523B2 (en) * | 2014-10-22 | 2019-11-26 | Board Of Supervisors Of Louisiana State University And Agricultural And Mechanical College | Apparatuses, systems and methods for performing remote real-time experiments |
US10580095B2 (en) | 2015-03-20 | 2020-03-03 | Accenture Global Solutions Limited | Method and system for water production and distribution control |
US20170051581A1 (en) * | 2015-08-19 | 2017-02-23 | General Electric Company | Modeling framework for virtual flow metering for oil and gas applications |
WO2017192154A1 (en) * | 2016-05-06 | 2017-11-09 | Halliburton Energy Services , Inc. | Multi-parameter optimization of oilfield operations |
WO2017217975A1 (en) * | 2016-06-15 | 2017-12-21 | Schlumberger Technology Corporation | Oilfield optimization system |
US10415354B2 (en) | 2016-09-06 | 2019-09-17 | Onesubsea Ip Uk Limited | Systems and methods for assessing production and/or injection system startup |
FR3059705A1 (fr) * | 2016-12-07 | 2018-06-08 | Landmark Graphics Corporation | Amelioration mutuelle automatisee de modeles de champ petrolifere |
AU2017371671A1 (en) * | 2016-12-07 | 2019-04-18 | Landmark Graphics Corporation | Intelligent, real-time response to changes in oilfield equilibrium |
JP6933899B2 (ja) * | 2017-01-12 | 2021-09-08 | 横河電機株式会社 | プラント運転支援装置、プラント運転支援方法、及びプラント運転支援プログラム |
JP7105556B2 (ja) * | 2017-11-14 | 2022-07-25 | 千代田化工建設株式会社 | プラント管理システム及び管理装置 |
CA3088921A1 (en) * | 2018-01-03 | 2019-07-11 | Cham Ocondi | Video, audio, and historical trend data interpolation |
CN112513418A (zh) * | 2018-07-31 | 2021-03-16 | 阿布扎比国家石油公司 | 综合产能建模系统 |
WO2020055379A1 (en) * | 2018-09-11 | 2020-03-19 | Schlumberger Technology Corporation | Method and system for reactively defining valve settings |
US11079739B2 (en) * | 2019-02-25 | 2021-08-03 | General Electric Company | Transfer learning/dictionary generation and usage for tailored part parameter generation from coupon builds |
CN111639097B (zh) * | 2019-03-01 | 2023-07-04 | 北京国双科技有限公司 | 一种信息处理方法及相关设备 |
CN112539054B (zh) * | 2020-11-25 | 2024-05-14 | 中国石油大学(华东) | 地面管网与地下油藏复杂系统生产优化方法 |
Family Cites Families (52)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5182730A (en) * | 1977-12-05 | 1993-01-26 | Scherbatskoy Serge Alexander | Method and apparatus for transmitting information in a borehole employing signal discrimination |
US4665398A (en) * | 1985-05-06 | 1987-05-12 | Halliburton Company | Method of sampling and recording information pertaining to a physical condition detected in a well bore |
JP2703974B2 (ja) * | 1989-02-09 | 1998-01-26 | 株式会社東芝 | 管網解析システム |
US5148365A (en) * | 1989-08-15 | 1992-09-15 | Dembo Ron S | Scenario optimization |
US5315530A (en) * | 1990-09-10 | 1994-05-24 | Rockwell International Corporation | Real-time control of complex fluid systems using generic fluid transfer model |
US5455780A (en) * | 1991-10-03 | 1995-10-03 | Halliburton Company | Method of tracking material in a well |
US7058617B1 (en) * | 1996-05-06 | 2006-06-06 | Pavilion Technologies, Inc. | Method and apparatus for training a system model with gain constraints |
US5841678A (en) * | 1997-01-17 | 1998-11-24 | Phillips Petroleum Company | Modeling and simulation of a reaction for hydrotreating hydrocarbon oil |
US5835883A (en) * | 1997-01-31 | 1998-11-10 | Phillips Petroleum Company | Method for determining distribution of reservoir permeability, porosity and pseudo relative permeability |
US5924048A (en) * | 1997-03-14 | 1999-07-13 | Mccormack; Michael D. | Automated material balance system for hydrocarbon reservoirs using a genetic procedure |
US5992519A (en) * | 1997-09-29 | 1999-11-30 | Schlumberger Technology Corporation | Real time monitoring and control of downhole reservoirs |
NO982973D0 (no) * | 1998-06-26 | 1998-06-26 | Abb Research Ltd | Anordning ved oljebr°nn |
JP4582511B2 (ja) * | 1998-07-17 | 2010-11-17 | 株式会社フジキン | 流体制御装置の設計装置および設計方法 |
US6088656A (en) * | 1998-11-10 | 2000-07-11 | Schlumberger Technology Corporation | Method for interpreting carbonate reservoirs |
US20080262737A1 (en) * | 2007-04-19 | 2008-10-23 | Baker Hughes Incorporated | System and Method for Monitoring and Controlling Production from Wells |
US6442445B1 (en) * | 1999-03-19 | 2002-08-27 | International Business Machines Corporation, | User configurable multivariate time series reduction tool control method |
US6853921B2 (en) * | 1999-07-20 | 2005-02-08 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
WO2001073476A1 (en) * | 2000-03-27 | 2001-10-04 | Ortoleva Peter J | Method for simulation of enhanced fracture detection in sedimentary basins |
US20020049575A1 (en) * | 2000-09-28 | 2002-04-25 | Younes Jalali | Well planning and design |
US20020177955A1 (en) * | 2000-09-28 | 2002-11-28 | Younes Jalali | Completions architecture |
FR2818742B1 (fr) * | 2000-12-22 | 2003-02-14 | Inst Francais Du Petrole | Methode pour former un module a reseaux neuronaux optimise, destine a simuler le mode d'ecoulement d'une veine de fluides polyphasiques |
US6511526B2 (en) * | 2001-01-12 | 2003-01-28 | Vbox, Incorporated | Pressure swing adsorption gas separation method and apparatus |
AU2002235526B2 (en) * | 2001-02-05 | 2007-02-15 | Schlumberger Holdings Limited | Optimization of reservoir, well and surface network systems |
US7027968B2 (en) * | 2002-01-18 | 2006-04-11 | Conocophillips Company | Method for simulating subsea mudlift drilling and well control operations |
US7512543B2 (en) * | 2002-05-29 | 2009-03-31 | Schlumberger Technology Corporation | Tools for decision-making in reservoir risk management |
US20040064425A1 (en) * | 2002-09-30 | 2004-04-01 | Depold Hans R. | Physics based neural network |
US6920942B2 (en) * | 2003-01-29 | 2005-07-26 | Varco I/P, Inc. | Method and apparatus for directly controlling pressure and position associated with an adjustable choke apparatus |
GB2398900A (en) | 2003-02-27 | 2004-09-01 | Schlumberger Holdings | Identification of best production potential oil wells and identification of drilling strategy to maximise production potential |
WO2004095259A1 (en) * | 2003-03-26 | 2004-11-04 | Exxonmobil Upstream Research Company | Performance prediction method for hydrocarbon recovery processes |
US7835893B2 (en) * | 2003-04-30 | 2010-11-16 | Landmark Graphics Corporation | Method and system for scenario and case decision management |
FR2855633B1 (fr) * | 2003-06-02 | 2008-02-08 | Inst Francais Du Petrole | Methode d'aide a la prise de decision pour la gestion d'un gisement petrolier en presence de parametres techniques et economiques incertains |
FR2855631A1 (fr) * | 2003-06-02 | 2004-12-03 | Inst Francais Du Petrole | Methode pour optimiser la production d'un gisement petrolier en presence d'incertitudes |
CN1302386C (zh) * | 2003-10-17 | 2007-02-28 | 大庆油田有限责任公司 | 低浓度表面活性剂与相态结合的三元复合驱计算机仿真方法 |
US7386430B2 (en) * | 2004-03-19 | 2008-06-10 | Schlumberger Technology Corporation | Method of correcting triaxial induction arrays for borehole effect |
US7292250B2 (en) * | 2004-03-31 | 2007-11-06 | Dreamworks Animation, Llc | Character deformation pipeline for computer-generated animation |
WO2005101060A2 (en) * | 2004-04-19 | 2005-10-27 | Intelligent Agent Corporation | Method of managing multiple wells in a reservoir |
JP2007536634A (ja) * | 2004-05-04 | 2007-12-13 | フィッシャー−ローズマウント・システムズ・インコーポレーテッド | プロセス制御システムのためのサービス指向型アーキテクチャ |
US7415328B2 (en) * | 2004-10-04 | 2008-08-19 | United Technologies Corporation | Hybrid model based fault detection and isolation system |
US7526463B2 (en) * | 2005-05-13 | 2009-04-28 | Rockwell Automation Technologies, Inc. | Neural network using spatially dependent data for controlling a web-based process |
US7636613B2 (en) * | 2005-07-01 | 2009-12-22 | Curtiss-Wright Flow Control Corporation | Actuator controller for monitoring health and status of the actuator and/or other equipment |
US8509926B2 (en) * | 2005-12-05 | 2013-08-13 | Fisher-Rosemount Systems, Inc. | Self-diagnostic process control loop for a process plant |
US8630787B2 (en) * | 2005-12-20 | 2014-01-14 | Borgwarner Inc. | Controlling exhaust gas recirculation in a turbocharged engine system |
US7610251B2 (en) * | 2006-01-17 | 2009-10-27 | Halliburton Energy Services, Inc. | Well control systems and associated methods |
US8504341B2 (en) * | 2006-01-31 | 2013-08-06 | Landmark Graphics Corporation | Methods, systems, and computer readable media for fast updating of oil and gas field production models with physical and proxy simulators |
BRPI0706805A2 (pt) * | 2006-01-31 | 2011-04-05 | Landmark Graphics Corp | métodos, sistemas e meio legìvel por computador para atualização rápida de modelos de produção para campo de gás e óleo com simuladores proxy e fìsico |
ATE503913T1 (de) * | 2006-01-31 | 2011-04-15 | Landmark Graphics Corp | Verfahren, systeme und computerlesbare medien zur öl- und gasfeldproduktionsoptimierung in echtzeit mit einem proxy-simulator |
US8352227B2 (en) * | 2006-10-30 | 2013-01-08 | Schlumberger Technology Corporation | System and method for performing oilfield simulation operations |
US8025072B2 (en) * | 2006-12-21 | 2011-09-27 | Schlumberger Technology Corporation | Developing a flow control system for a well |
US7668707B2 (en) * | 2007-11-28 | 2010-02-23 | Landmark Graphics Corporation | Systems and methods for the determination of active constraints in a network using slack variables and plurality of slack variable multipliers |
US8010225B2 (en) * | 2008-01-30 | 2011-08-30 | International Business Machines Corporation | Method and system of monitoring manufacturing equipment |
US8114221B2 (en) * | 2008-09-30 | 2012-02-14 | Princeton Trade & Technology, Inc. | Method and composition for cleaning tubular systems employing moving three-phase contact lines |
-
2007
- 2007-01-31 AT AT07762832T patent/ATE503913T1/de not_active IP Right Cessation
- 2007-01-31 US US11/669,903 patent/US20070179766A1/en not_active Abandoned
- 2007-01-31 WO PCT/US2007/002624 patent/WO2007089832A1/en active Application Filing
- 2007-01-31 CN CN200780004125XA patent/CN101379271B/zh not_active Expired - Fee Related
- 2007-01-31 CA CA2640727A patent/CA2640727C/en active Active
- 2007-01-31 BR BRPI0706804-2A patent/BRPI0706804A2/pt not_active IP Right Cessation
- 2007-01-31 US US11/669,921 patent/US8352226B2/en active Active
- 2007-01-31 AU AU2007211294A patent/AU2007211294B2/en not_active Ceased
- 2007-01-31 EP EP07762832A patent/EP1982046B1/en active Active
- 2007-01-31 DE DE602007013530T patent/DE602007013530D1/de active Active
-
2008
- 2008-08-25 NO NO20083660A patent/NO340159B1/no unknown
Also Published As
Publication number | Publication date |
---|---|
US20070192072A1 (en) | 2007-08-16 |
BRPI0706804A2 (pt) | 2011-04-05 |
CN101379271B (zh) | 2012-11-07 |
US20070179766A1 (en) | 2007-08-02 |
AU2007211294A1 (en) | 2007-08-09 |
CA2640727A1 (en) | 2007-08-09 |
EP1982046B1 (en) | 2011-03-30 |
US8352226B2 (en) | 2013-01-08 |
EP1982046A1 (en) | 2008-10-22 |
DE602007013530D1 (de) | 2011-05-12 |
ATE503913T1 (de) | 2011-04-15 |
WO2007089832A1 (en) | 2007-08-09 |
NO340159B1 (no) | 2017-03-20 |
AU2007211294B2 (en) | 2012-05-10 |
CA2640727C (en) | 2014-01-28 |
CN101379271A (zh) | 2009-03-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NO20083660L (no) | Fremgangsmater, system og datamaskinlesbare medier for sann tids olje- og gassfeltproduksjonsoptimalisring ved a bruke proksysimulator | |
WO2007089829A3 (en) | Methods, systems, and computer-readable media for fast updating of oil and gas field production models with physical and proxy simulators | |
GB2445305A (en) | Method and system for integrated asset management utilizing multi-level modeling of oil field assets | |
GB2460793A (en) | Neural net for use in drilling simulation | |
EA201391111A1 (ru) | Система и способ для использования искусственной нейронной сети для моделирования гидравлики трубопроводов в имитаторе пластов | |
NO20073424L (no) | A method for facilitating a wellbore operation | |
EA201170472A1 (ru) | Реализованные посредством компьютера системы и способы для использования при моделировании геомеханической системы коллектора | |
MY147614A (en) | Collaboration spaces | |
WO2005040971A3 (en) | System and model for performance value based collaborative relationships | |
GB2451977A (en) | Method for optimal gridding in reservoir simulation | |
NO20092505L (no) | Fremgangsmate og anordning for automatisert, mekanisk-spesifikk-energi(MSE)-basert boring | |
GB2471605A (en) | Analyzing an oilfield network for oilfield production | |
WO2007106786A3 (en) | Methods and systems for multi-credit reporting agency data modeling | |
WO2008157706A3 (en) | System and method for performing oilfield simulation operations | |
WO2004083983A3 (de) | Vergleich von modellen eines komplexen systems | |
WO2006091425A3 (en) | Security risk analysis system and method | |
NO20073485L (no) | Fremgangsmate, system og programlagringsutstyr for optimalisering av verdi-innstillinger i instrumenterte bronner ved hjelp av adjungert gradient-teknikk og reservoarsimulering | |
MY161357A (en) | Method of improving the production of a mature gas or oil field | |
MX2009001264A (es) | Emulador de campo petrolifero. | |
GB2527009A (en) | Simulation of production systems | |
DE602007013693D1 (de) | Betrieb eines Kommunikationsnetzes | |
EA200801405A1 (ru) | Способ оптимизации добычи в масштабе месторождения | |
NO20073680L (no) | Fremgangsmate for a analysere data som har felles og saerskilte egenskaper | |
NO20075972L (no) | Fremgangsmate, program og datamaskinsystem for paleokanalmodellering | |
MX340384B (es) | Metodos y aparatos para moldear las caracteristicas del esquisto en lodos basados en lodos basados en agua utilizando una red neural artificial. |