US7516056B2
(en)
*
|
2005-04-26 |
2009-04-07 |
Schlumberger Technology Corporation |
Apparatus, method and system for improved reservoir simulation using a multiplicative overlapping Schwarz preconditioning for adaptive implicit linear systems
|
AU2006259275B2
(en)
*
|
2005-06-14 |
2010-03-18 |
Chevron U.S.A. Inc. |
Apparatus, method and system for improved reservoir simulation using an algebraic cascading class linear solver
|
US20070279429A1
(en)
*
|
2006-06-02 |
2007-12-06 |
Leonhard Ganzer |
System and method for rendering graphics
|
US8711146B1
(en)
*
|
2006-11-29 |
2014-04-29 |
Carnegie Mellon University |
Method and apparatuses for solving weighted planar graphs
|
US7565278B2
(en)
*
|
2006-12-04 |
2009-07-21 |
Chevron U.S.A. Inc. |
Method, system and apparatus for simulating fluid flow in a fractured reservoir utilizing a combination of discrete fracture networks and homogenization of small fractures
|
BRPI0811880A2
(pt)
*
|
2007-06-01 |
2014-11-18 |
Exxonmobil Upstream Res Co |
Métodos para gerar uma triangulação de delaunay e uma grade de voronoi restringidas para um domínio planar com limites e características internas
|
GB2455077A
(en)
*
|
2007-11-27 |
2009-06-03 |
Polyhedron Software Ltd |
Estimating the state of a physical system using generalized nested factorisation
|
CA2702965C
(en)
|
2007-12-13 |
2014-04-01 |
Exxonmobil Upstream Research Company |
Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid
|
EP2235500B1
(en)
*
|
2007-12-18 |
2018-10-31 |
Exxonmobil Upstream Research Company |
Determining connectivity architecture in 2-d and 3-d heterogeneous data
|
AU2008340399B2
(en)
|
2007-12-21 |
2013-09-26 |
Exxonmobil Upstream Research Company |
Method and apparatus for analyzing three-dimensional data
|
US20110087471A1
(en)
*
|
2007-12-31 |
2011-04-14 |
Exxonmobil Upstream Research Company |
Methods and Systems For Determining Near-Wellbore Characteristics and Reservoir Properties
|
WO2009094064A1
(en)
|
2008-01-22 |
2009-07-30 |
Exxonmobil Upstream Research Company |
Dynamic connectivity analysis
|
AU2009223731B2
(en)
|
2008-03-10 |
2013-09-05 |
Exxonmobil Upstream Research Company |
Method for determing distinct alternative paths between two object sets in 2-D and 3-D heterogeneous data
|
US8190414B2
(en)
*
|
2008-03-26 |
2012-05-29 |
Exxonmobil Upstream Research Company |
Modeling of hydrocarbon reservoirs containing subsurface features
|
US8175853B2
(en)
*
|
2008-03-28 |
2012-05-08 |
International Business Machines Corporation |
Systems and methods for a combined matrix-vector and matrix transpose vector multiply for a block-sparse matrix
|
AU2009244721B2
(en)
|
2008-05-05 |
2013-09-26 |
Exxonmobile Upstream Research Company |
Systems and methods for connectivity analysis using functional obejects
|
FR2933220B1
(fr)
*
|
2008-06-27 |
2010-06-18 |
Inst Francais Du Petrole |
Methode pour construire un maillage hybride a partir d'un maillage de type cpg
|
WO2010003004A2
(en)
*
|
2008-07-03 |
2010-01-07 |
Chevron U.S.A. Inc. |
Multi-scale finite volume method for reservoir simulation
|
US8302076B2
(en)
*
|
2008-11-12 |
2012-10-30 |
Landmark Graphics Corporation |
Systems and methods for improved parallel ILU factorization in distributed sparse linear systems
|
US9552462B2
(en)
*
|
2008-12-23 |
2017-01-24 |
Exxonmobil Upstream Research Company |
Method for predicting composition of petroleum
|
US8352228B2
(en)
*
|
2008-12-23 |
2013-01-08 |
Exxonmobil Upstream Research Company |
Method for predicting petroleum expulsion
|
EP2406663A1
(en)
|
2009-03-13 |
2012-01-18 |
Exxonmobil Upstream Research Company |
Method for predicting fluid flow
|
US9169726B2
(en)
|
2009-10-20 |
2015-10-27 |
Exxonmobil Upstream Research Company |
Method for quantitatively assessing connectivity for well pairs at varying frequencies
|
US8429671B2
(en)
*
|
2009-10-21 |
2013-04-23 |
Exxonmobil Upstream Research Company |
Integrated workflow builder for disparate computer programs
|
US8650016B2
(en)
*
|
2009-10-28 |
2014-02-11 |
Chevron U.S.A. Inc. |
Multiscale finite volume method for reservoir simulation
|
CN102612682B
(zh)
|
2009-11-12 |
2016-04-27 |
埃克森美孚上游研究公司 |
用于储层建模和模拟的方法和设备
|
CA2776764A1
(en)
|
2009-11-30 |
2011-06-03 |
Exxonmobil Upstream Research Company |
Adaptive newton's method for reservoir simulation
|
IN2012DN05167A
(no)
*
|
2010-02-12 |
2015-10-23 |
Exxonmobil Upstream Res Co |
|
US9703006B2
(en)
|
2010-02-12 |
2017-07-11 |
Exxonmobil Upstream Research Company |
Method and system for creating history matched simulation models
|
EP2564309A4
(en)
*
|
2010-04-30 |
2017-12-20 |
Exxonmobil Upstream Research Company |
Method and system for finite volume simulation of flow
|
US8463586B2
(en)
|
2010-06-22 |
2013-06-11 |
Saudi Arabian Oil Company |
Machine, program product, and computer-implemented method to simulate reservoirs as 2.5D unstructured grids
|
CA2803144C
(en)
*
|
2010-06-22 |
2014-04-29 |
Saudi Arabian Oil Company |
Machine, program product, and computer-implemented method to simulate reservoirs as 2.5d unstructured grids
|
US9754056B2
(en)
|
2010-06-29 |
2017-09-05 |
Exxonmobil Upstream Research Company |
Method and system for parallel simulation models
|
US8359185B2
(en)
|
2010-06-30 |
2013-01-22 |
Saudi Arabian Oil Company |
Reservoir simulation of giant subsurface reservoirs with accelerated phase equilibrium determination
|
WO2012015500A1
(en)
|
2010-07-26 |
2012-02-02 |
Exxonmobil Upstream Research Company |
Method and system for parallel multilevel simulation
|
WO2012015521A1
(en)
|
2010-07-29 |
2012-02-02 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
US10087721B2
(en)
|
2010-07-29 |
2018-10-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine—learning based simulation of flow
|
CA2803315A1
(en)
|
2010-07-29 |
2012-02-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
AU2011283193B2
(en)
|
2010-07-29 |
2014-07-17 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
US8386227B2
(en)
|
2010-09-07 |
2013-02-26 |
Saudi Arabian Oil Company |
Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation
|
US8433551B2
(en)
|
2010-11-29 |
2013-04-30 |
Saudi Arabian Oil Company |
Machine, computer program product and method to carry out parallel reservoir simulation
|
EP2811112B1
(en)
*
|
2010-09-07 |
2019-07-24 |
Saudi Arabian Oil Company |
Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation
|
US9063882B1
(en)
*
|
2010-09-09 |
2015-06-23 |
Sas Ip, Inc. |
Matrix preconditioners for simulations of physical fields
|
US9058446B2
(en)
|
2010-09-20 |
2015-06-16 |
Exxonmobil Upstream Research Company |
Flexible and adaptive formulations for complex reservoir simulations
|
US9626466B2
(en)
|
2010-11-23 |
2017-04-18 |
Exxonmobil Upstream Research Company |
Variable discretization method for flow simulation on complex geological models
|
GB2499768A
(en)
*
|
2010-12-13 |
2013-08-28 |
Chevron Usa Inc |
Improved constrained pressure residual preconditioner for efficient solution of the adjoint equation
|
US10089424B2
(en)
|
2010-12-16 |
2018-10-02 |
Landmark Graphics Corporation |
Systems and methods for two-dimensional domain decomposition during parallel reservoir simulation
|
CA2820999A1
(en)
|
2010-12-30 |
2012-07-05 |
Exxonmobil Upstream Research Company |
Systems and methods for subsurface reservoir simulation
|
US8583411B2
(en)
|
2011-01-10 |
2013-11-12 |
Saudi Arabian Oil Company |
Scalable simulation of multiphase flow in a fractured subterranean reservoir as multiple interacting continua
|
US8437999B2
(en)
|
2011-02-08 |
2013-05-07 |
Saudi Arabian Oil Company |
Seismic-scale reservoir simulation of giant subsurface reservoirs using GPU-accelerated linear equation systems
|
US10175386B2
(en)
|
2011-02-09 |
2019-01-08 |
Saudi Arabian Oil Company |
Sequential fully implicit well model with tridiagonal matrix structure for reservoir simulation
|
US10113400B2
(en)
|
2011-02-09 |
2018-10-30 |
Saudi Arabian Oil Company |
Sequential fully implicit well model with tridiagonal matrix structure for reservoir simulation
|
US9164191B2
(en)
|
2011-02-09 |
2015-10-20 |
Saudi Arabian Oil Company |
Sequential fully implicit well model for reservoir simulation
|
WO2012116296A2
(en)
*
|
2011-02-24 |
2012-08-30 |
Chevron U.S.A. Inc. |
System and method for performing reservoir simulation using preconditioning
|
CA2828724A1
(en)
|
2011-04-14 |
2012-10-18 |
Exxonmobil Upstream Research Company |
Method for preparing petroleum based samples for analysis of elemental and isotopic species
|
WO2012158218A1
(en)
*
|
2011-05-17 |
2012-11-22 |
Exxonmobil Upstream Research Company |
Method for partitioning parallel reservoir simulations in the presence of wells
|
CA2843929C
(en)
|
2011-09-15 |
2018-03-27 |
Exxonmobil Upstream Research Company |
Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations
|
US9674033B2
(en)
|
2011-10-11 |
2017-06-06 |
Saudi Arabian Oil Company |
High performance and grid computing with liveliness and deadlines fault tolerant data distributor quality of service
|
EP2766746B1
(en)
|
2011-10-11 |
2017-08-30 |
Saudi Arabian Oil Company |
High performance and grid computing with quality of service control
|
US9429677B2
(en)
|
2011-10-11 |
2016-08-30 |
Saudi Arabian Oil Company |
High performance and grid computing with fault tolerant data distributors quality of service
|
US9482769B2
(en)
*
|
2011-10-11 |
2016-11-01 |
Saudi Arabian Oil Company |
High performance and grid computing with partitioning quality of service control
|
BR112014007823B1
(pt)
|
2011-11-11 |
2021-10-26 |
Exxonmobil Upstream Research Company |
Método para determinar a localização, tamanho, e composição de fluido de um acúmulo de hidrocarbonetos de subsuperfície
|
US10309217B2
(en)
|
2011-11-11 |
2019-06-04 |
Exxonmobil Upstream Research Company |
Method and system for reservoir surveillance utilizing a clumped isotope and/or noble gas data
|
WO2013119906A1
(en)
*
|
2012-02-09 |
2013-08-15 |
Saudi Arabian Oil Company |
Multi-level solution of large-scale linear systems in simulation of porous media in giant reservoirs
|
US9208268B2
(en)
|
2012-02-14 |
2015-12-08 |
Saudi Arabian Oil Company |
Giga-cell linear solver method and apparatus for massive parallel reservoir simulation
|
WO2013148021A1
(en)
|
2012-03-28 |
2013-10-03 |
Exxonmobil Upstream Research Company |
Method for mutiphase flow upscaling
|
EP2845143A4
(en)
*
|
2012-05-30 |
2016-09-28 |
Landmark Graphics Corp |
OIL OR GAS PRODUCTION USING COMPUTER SIMULATION OF OIL OR GAS FIELDS AND PRODUCTION PLANTS
|
EP2901363A4
(en)
|
2012-09-28 |
2016-06-01 |
Exxonmobil Upstream Res Co |
ERROR REMOVAL IN GEOLOGICAL MODELS
|
US10591638B2
(en)
|
2013-03-06 |
2020-03-17 |
Exxonmobil Upstream Research Company |
Inversion of geophysical data on computer system having parallel processors
|
GB2512372B
(en)
*
|
2013-03-28 |
2020-07-29 |
Total Sa |
Method of modelling a subsurface volume
|
US9667330B2
(en)
|
2013-11-17 |
2017-05-30 |
RF DSP Inc. |
Massive MIMO multi-user beamforming and single channel full duplex for wireless networks
|
CN106961739B
(zh)
|
2013-12-20 |
2020-07-24 |
射频数字信号处理公司 |
频分双工多输入输出无线网络中信道状态信息的获取方法
|
CN105814858B
(zh)
|
2013-12-20 |
2018-05-25 |
射频数字信号处理公司 |
多输入多输出无线通信系统中的自适应预编码
|
RU2634793C1
(ru)
|
2014-03-07 |
2017-11-03 |
Эксонмобил Апстрим Рисерч Компани |
Способ разведки и система для обнаружения углеводородов по водяному столбу
|
US9810052B2
(en)
|
2014-07-14 |
2017-11-07 |
Saudi Arabian Oil Company |
Multilateral wells placement via transshipment approach
|
CN107005291B
(zh)
*
|
2014-09-27 |
2020-07-17 |
梁平 |
使用迫零波束成形矩阵的近似的多用户mimo无线通信的方法
|
US10803534B2
(en)
|
2014-10-31 |
2020-10-13 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity with the help of grid optimization techniques
|
US11409023B2
(en)
|
2014-10-31 |
2022-08-09 |
Exxonmobil Upstream Research Company |
Methods to handle discontinuity in constructing design space using moving least squares
|
CA2976457A1
(en)
*
|
2015-02-13 |
2016-08-18 |
Exxonmobil Upstream Resarch Company |
Method and system to enhance computations for a physical system
|
US10242136B2
(en)
|
2015-05-20 |
2019-03-26 |
Saudi Arabian Oil Company |
Parallel solution for fully-coupled fully-implicit wellbore modeling in reservoir simulation
|
CN105260175B
(zh)
*
|
2015-09-16 |
2019-01-25 |
浪潮(北京)电子信息产业有限公司 |
基于OpenMP的天文学软件Gridding的处理方法
|
US10571605B2
(en)
|
2016-03-28 |
2020-02-25 |
Exxonmobil Upstream Research Company |
Method and system for modeling and simulating a fractured reservoir
|
US10329905B2
(en)
|
2016-04-07 |
2019-06-25 |
Baker Hughes, A Ge Company, Llc |
Method to estimate the influence of pore-size distribution on phase equilibrium of multi-component hydrocarbon systems in unconventional shale gas and oil reservoirs
|
US10572611B2
(en)
|
2016-04-29 |
2020-02-25 |
Exxonmobil Upstream Research Company |
Method and system for characterizing fractures in a subsurface region
|
US10846447B2
(en)
|
2016-04-29 |
2020-11-24 |
Exxonmobil Upstream Research Company |
Method and system for stacking fracture prediction
|
US10712472B2
(en)
|
2016-04-29 |
2020-07-14 |
Exxonmobil Upstresm Research Company |
Method and system for forming and using a subsurface model in hydrocarbon operations
|
WO2018009396A1
(en)
|
2016-07-05 |
2018-01-11 |
Saudi Arabian Oil Company |
High performance and grid computing with liveliness and deadlines fault tolerant data distributor quality of service
|
US10997271B2
(en)
|
2016-11-29 |
2021-05-04 |
Halliburton Energy Services, Inc. |
Variable elimination to improve solver efficiency
|
WO2018118374A1
(en)
|
2016-12-23 |
2018-06-28 |
Exxonmobil Upstream Research Company |
Method and system for stable and efficient reservoir simulation using stability proxies
|
US10570706B2
(en)
|
2017-06-23 |
2020-02-25 |
Saudi Arabian Oil Company |
Parallel-processing of invasion percolation for large-scale, high-resolution simulation of secondary hydrocarbon migration
|
US10913901B2
(en)
|
2017-09-12 |
2021-02-09 |
Saudi Arabian Oil Company |
Integrated process for mesophase pitch and petrochemical production
|
US11126762B2
(en)
|
2018-02-28 |
2021-09-21 |
Saudi Arabian Oil Company |
Locating new hydrocarbon fields and predicting reservoir performance from hydrocarbon migration
|
CN109902412B
(zh)
*
|
2019-03-07 |
2023-02-17 |
南方科技大学 |
地下水流数值的预测方法、装置、服务器和存储介质
|
US11353622B2
(en)
|
2020-01-06 |
2022-06-07 |
Saudi Arabian Oil Company |
Systems and methods for hydrocarbon reservoir three dimensional unstructured grid generation and development
|
CN110984979B
(zh)
*
|
2020-01-06 |
2023-03-14 |
中国石油化工股份有限公司 |
针对角度不整合油藏建模数模的网格设计方法
|
CN111914448B
(zh)
*
|
2020-07-16 |
2023-06-09 |
青岛海洋地质研究所 |
基于控制体有限元方法的流固耦合数值模拟方法
|
CN114385972B
(zh)
*
|
2021-12-20 |
2023-09-01 |
北京科技大学 |
一种直接求解结构化三角稀疏线性方程组的并行计算方法
|