US7251590B2
(en)
|
2000-03-13 |
2007-07-31 |
Smith International, Inc. |
Dynamic vibrational control
|
US9482055B2
(en)
|
2000-10-11 |
2016-11-01 |
Smith International, Inc. |
Methods for modeling, designing, and optimizing the performance of drilling tool assemblies
|
US20060076163A1
(en)
*
|
2004-10-12 |
2006-04-13 |
Smith International, Inc. |
Flow allocation in drill bits
|
US7954559B2
(en)
|
2005-04-06 |
2011-06-07 |
Smith International, Inc. |
Method for optimizing the location of a secondary cutting structure component in a drill string
|
US7784544B2
(en)
*
|
2006-01-24 |
2010-08-31 |
Schlumberger Technology Corporation |
Method of treating a subterranean formation using a rheology model for fluid optimization
|
US8812334B2
(en)
*
|
2006-02-27 |
2014-08-19 |
Schlumberger Technology Corporation |
Well planning system and method
|
US7857046B2
(en)
*
|
2006-05-31 |
2010-12-28 |
Schlumberger Technology Corporation |
Methods for obtaining a wellbore schematic and using same for wellbore servicing
|
US9103195B2
(en)
|
2006-09-27 |
2015-08-11 |
Halliburton Energy Services, Inc. |
Monitor and control of directional drilling operations and simulations
|
US9359882B2
(en)
|
2006-09-27 |
2016-06-07 |
Halliburton Energy Services, Inc. |
Monitor and control of directional drilling operations and simulations
|
US7857047B2
(en)
*
|
2006-11-02 |
2010-12-28 |
Exxonmobil Upstream Research Company |
Method of drilling and producing hydrocarbons from subsurface formations
|
US7606666B2
(en)
*
|
2007-01-29 |
2009-10-20 |
Schlumberger Technology Corporation |
System and method for performing oilfield drilling operations using visualization techniques
|
US7627430B2
(en)
*
|
2007-03-13 |
2009-12-01 |
Schlumberger Technology Corporation |
Method and system for managing information
|
US8014987B2
(en)
*
|
2007-04-13 |
2011-09-06 |
Schlumberger Technology Corp. |
Modeling the transient behavior of BHA/drill string while drilling
|
US8688487B2
(en)
*
|
2007-04-18 |
2014-04-01 |
Schlumberger Technology Corporation |
Method and system for measuring technology maturity
|
US7814989B2
(en)
*
|
2007-05-21 |
2010-10-19 |
Schlumberger Technology Corporation |
System and method for performing a drilling operation in an oilfield
|
US8464808B2
(en)
*
|
2007-06-26 |
2013-06-18 |
Atlas Copco Rock Drills Ab |
Method and device for controlling a rock drill rig
|
US8332194B2
(en)
*
|
2007-07-30 |
2012-12-11 |
Schlumberger Technology Corporation |
Method and system to obtain a compositional model of produced fluids using separator discharge data analysis
|
US8073800B2
(en)
*
|
2007-07-31 |
2011-12-06 |
Schlumberger Technology Corporation |
Valuing future information under uncertainty
|
US8327928B2
(en)
|
2007-08-28 |
2012-12-11 |
Frank's Casing Crew And Rental Tools, Inc. |
External grip tubular running tool
|
US7992634B2
(en)
*
|
2007-08-28 |
2011-08-09 |
Frank's Casing Crew And Rental Tools, Inc. |
Adjustable pipe guide for use with an elevator and/or a spider
|
US8316929B2
(en)
*
|
2007-08-28 |
2012-11-27 |
Frank's Casing Crew And Rental Tools, Inc. |
Tubular guiding and gripping apparatus and method
|
US7997333B2
(en)
*
|
2007-08-28 |
2011-08-16 |
Frank's Casting Crew And Rental Tools, Inc. |
Segmented bottom guide for string elevator assembly
|
US20090076873A1
(en)
*
|
2007-09-19 |
2009-03-19 |
General Electric Company |
Method and system to improve engineered system decisions and transfer risk
|
US7878268B2
(en)
*
|
2007-12-17 |
2011-02-01 |
Schlumberger Technology Corporation |
Oilfield well planning and operation
|
US7845429B2
(en)
*
|
2007-12-21 |
2010-12-07 |
Schlumberger Technology Corporation |
Determining drillstring neutral point based on hydraulic factor
|
US8135862B2
(en)
*
|
2008-01-14 |
2012-03-13 |
Schlumberger Technology Corporation |
Real-time, bi-directional data management
|
US8285532B2
(en)
*
|
2008-03-14 |
2012-10-09 |
Schlumberger Technology Corporation |
Providing a simplified subterranean model
|
US9488044B2
(en)
|
2008-06-23 |
2016-11-08 |
Schlumberger Technology Corporation |
Valuing future well test under uncertainty
|
CA2737415C
(fr)
*
|
2008-11-06 |
2017-03-28 |
Exxonmobil Upstream Research Company |
Systeme et procede de planification d'une operation de forage
|
US10060245B2
(en)
*
|
2009-01-09 |
2018-08-28 |
Halliburton Energy Services, Inc. |
Systems and methods for planning well locations with dynamic production criteria
|
US20100200743A1
(en)
*
|
2009-02-09 |
2010-08-12 |
Larry Dale Forster |
Well collision avoidance using distributed acoustic sensing
|
US8498853B2
(en)
*
|
2009-07-20 |
2013-07-30 |
Exxonmobil Upstream Research Company |
Petrophysical method for predicting plastic mechanical properties in rock formations
|
US8386221B2
(en)
*
|
2009-12-07 |
2013-02-26 |
Nuovo Pignone S.P.A. |
Method for subsea equipment subject to hydrogen induced stress cracking
|
US8567526B2
(en)
*
|
2009-12-08 |
2013-10-29 |
Schlumberger Technology Corporation |
Wellbore steering based on rock stress direction
|
US8931580B2
(en)
|
2010-02-03 |
2015-01-13 |
Exxonmobil Upstream Research Company |
Method for using dynamic target region for well path/drill center optimization
|
US8265874B2
(en)
|
2010-04-21 |
2012-09-11 |
Saudi Arabian Oil Company |
Expert system for selecting fit-for-purpose technologies and wells for reservoir saturation monitoring
|
US20130311147A1
(en)
*
|
2011-02-01 |
2013-11-21 |
Halliburton Energy Services, Inc. |
Drilling optimization
|
US20130191081A1
(en)
*
|
2011-07-14 |
2013-07-25 |
Vivek Jain |
Creating a well path
|
CA2850482C
(fr)
|
2011-10-03 |
2018-10-30 |
Landmark Graphics Corporation |
Procede unidimensionnel ameliore de prediction de la fenetre de densite de boue pour des sections de puits infrasalifere
|
US9953114B2
(en)
|
2012-03-27 |
2018-04-24 |
Exxonmobil Upstream Research Company |
Designing a drillstring
|
WO2013169429A1
(fr)
|
2012-05-08 |
2013-11-14 |
Exxonmobile Upstream Research Company |
Commande de toile pour traitement de données volumétriques 3d
|
EP2880260A4
(fr)
*
|
2012-08-01 |
2015-08-12 |
Services Petroliers Schlumberger |
Évaluation, surveillance et commande des opérations de forage et/ou évaluation des caractéristiques géologiques
|
US9411071B2
(en)
|
2012-08-31 |
2016-08-09 |
Exxonmobil Upstream Research Company |
Method of estimating rock mechanical properties
|
MX2015003998A
(es)
*
|
2012-09-28 |
2015-09-29 |
Landmark Graphics Corp |
Ensamble de geonavegacion autoguiado y metodo para optimizar la colocacion y calidad de pozos.
|
WO2014070503A1
(fr)
*
|
2012-10-31 |
2014-05-08 |
Halliburton Energy Services, Inc. |
Procédés pour produire des laitiers de ciment résistants à l'invasion de fluide
|
US9624419B2
(en)
|
2013-01-30 |
2017-04-18 |
Halliburton Energy Services, Inc. |
Methods for producing fluid migration resistant cement slurries
|
SG11201504699UA
(en)
*
|
2013-02-27 |
2015-07-30 |
Landmark Graphics Corp |
Method and system for predicting drilling events
|
CN105209714A
(zh)
*
|
2013-05-29 |
2015-12-30 |
界标制图有限公司 |
编译来自异类数据源的钻井场景数据
|
US10048403B2
(en)
|
2013-06-20 |
2018-08-14 |
Exxonmobil Upstream Research Company |
Method and system for generation of upscaled mechanical stratigraphy from petrophysical measurements
|
US8996396B2
(en)
*
|
2013-06-26 |
2015-03-31 |
Hunt Advanced Drilling Technologies, LLC |
System and method for defining a drilling path based on cost
|
WO2015023266A1
(fr)
*
|
2013-08-13 |
2015-02-19 |
Landmark Graphics Corporation |
Méthodologie probabiliste pour forage en temps réel
|
RU2016106696A
(ru)
|
2013-08-30 |
2017-08-31 |
Лэндмарк Графикс Корпорейшн |
Оценка и прогнозирование извилистости ствола скважины
|
MX2016004353A
(es)
|
2013-10-25 |
2016-11-14 |
Landmark Graphics Corp |
Constructor de itinerarios para el analisis de la ingenieria de perforacion.
|
EP3084696A1
(fr)
*
|
2013-12-19 |
2016-10-26 |
Energy Dynamics AS |
Outil de modélisation
|
CA2956139C
(fr)
*
|
2014-08-29 |
2021-10-19 |
Landmark Graphics Corporation |
Systeme et procede de production de rapports de qualite de foreuse de forage dirige
|
CA2966043C
(fr)
*
|
2015-03-27 |
2020-02-18 |
Pason Systems Corp. |
Procede et appareil de forage d'un nouveau puits a l'aide de donnees de forages historiques
|
CN106050215A
(zh)
*
|
2015-04-03 |
2016-10-26 |
普拉德研究及开发股份有限公司 |
目标属性的直接控制
|
WO2016161295A1
(fr)
|
2015-04-03 |
2016-10-06 |
Schlumberger Technology Corporation |
Services de système de site de forage
|
WO2016168957A1
(fr)
|
2015-04-19 |
2016-10-27 |
Prad Research And Development Limited |
Trajectoire automatique et anti-collision pour planification de puits
|
EP3362639A4
(fr)
*
|
2015-10-18 |
2019-06-19 |
Services Petroliers Schlumberger |
Système d'information pour des opérations de forage
|
US20180293438A1
(en)
*
|
2015-12-02 |
2018-10-11 |
Halliburton Energy Services, Inc. |
Creation of Digital Representations of Well Schematics
|
WO2017206182A1
(fr)
*
|
2016-06-03 |
2017-12-07 |
Schlumberger Technology Corporation |
Détection d'événements dans des rapports de puits
|
US10872183B2
(en)
*
|
2016-10-21 |
2020-12-22 |
Baker Hughes, A Ge Company, Llc |
Geomechanical risk and hazard assessment and mitigation
|
WO2018231248A1
(fr)
*
|
2017-06-16 |
2018-12-20 |
Landmark Graphics Corporation |
Procédé et appareil de prédiction de l'usure d'un tubage pour des systèmes de puits
|
US10968730B2
(en)
*
|
2017-07-25 |
2021-04-06 |
Exxonmobil Upstream Research Company |
Method of optimizing drilling ramp-up
|
WO2019132929A1
(fr)
*
|
2017-12-28 |
2019-07-04 |
Halliburton Energy Services, Inc. |
Systèmes et procédés pour améliorer le forage directionnel
|
DE112019001243T5
(de)
|
2018-03-09 |
2020-11-26 |
Schlumberger Technology B.V. |
Integrierte Bohrlochkonstruktionssystem-Betriebsvorgänge
|
CA3095021A1
(fr)
*
|
2018-08-17 |
2018-10-18 |
Pason Systems Corp. |
Methodes et systemes de preformage du forage automatise d'un puits de forage
|
CN111206920B
(zh)
*
|
2018-11-01 |
2023-04-07 |
中国石油化工股份有限公司 |
基于多井统计和地层表征的自然造斜规律评价方法
|
CA3129711A1
(fr)
*
|
2019-02-12 |
2020-08-20 |
Helmerich & Payne Technologies, Llc |
Systemes et procedes de planification de puits iterative pour des resultats optimises
|
US10655405B1
(en)
*
|
2019-08-15 |
2020-05-19 |
Sun Energy Services, Llc |
Method and apparatus for optimizing a well drilling operation
|
WO2021081706A1
(fr)
|
2019-10-28 |
2021-05-06 |
Schlumberger Technology Corporation |
Système et procédé de recommandation d'activité de forage
|
US11268380B2
(en)
*
|
2020-04-22 |
2022-03-08 |
Saudi Arabian Oil Company |
Kick detection using logging while drilling
|
CN112377172B
(zh)
*
|
2020-12-07 |
2022-10-04 |
中国石油天然气集团有限公司 |
钻井信号下传系统及方法
|
US11708755B2
(en)
|
2021-10-28 |
2023-07-25 |
Halliburton Energy Services, Inc. |
Force measurements about secondary contacting structures
|