NO20064178L - Fremgangsmate, anordning og programlagringsutstyr tilpasset for visualisering av kvalitativ pg kvantitativ risikobedommelse pa grunnlag av teknisk borehullutforelse og jordegenskaper - Google Patents

Fremgangsmate, anordning og programlagringsutstyr tilpasset for visualisering av kvalitativ pg kvantitativ risikobedommelse pa grunnlag av teknisk borehullutforelse og jordegenskaper

Info

Publication number
NO20064178L
NO20064178L NO20064178A NO20064178A NO20064178L NO 20064178 L NO20064178 L NO 20064178L NO 20064178 A NO20064178 A NO 20064178A NO 20064178 A NO20064178 A NO 20064178A NO 20064178 L NO20064178 L NO 20064178L
Authority
NO
Norway
Prior art keywords
risk
ranked
input data
visualization
qualitative
Prior art date
Application number
NO20064178A
Other languages
English (en)
Inventor
Daan Veeningen
Kris Givens
Original Assignee
Schlumberger Holdings
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Holdings filed Critical Schlumberger Holdings
Publication of NO20064178L publication Critical patent/NO20064178L/no

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/03Credit; Loans; Processing thereof
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/08Insurance

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Finance (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Accounting & Taxation (AREA)
  • Educational Administration (AREA)
  • Technology Law (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Stored Programmes (AREA)

Abstract

Det er beskrevet en fremgangsmåte ved bestemmelse og fremvisning av risikoinformasjon som reaksjon på en mengde inngangsdata, idet inngangsdataene omfatter en mengde beregningsresultater som inngangsdata. Fremgangsmåten omfatter trinn hvor hvert beregningsresultat i mengden av beregningsresultater i inngangsdataene sammenlignes med hvert logisk uttrykk i en mengde logiske uttrykk, beregningsresultatene rangeres etter logiske uttrykk og en mengde rangerte enkeltrisikoer genereres som reaksjon på rangeringstrinnet. Hver i mengden av rangerte enkeltrisikoer representerer et beregningsresultat fra inngangsdataene som er blitt rangert ved hjelp av det logiske uttrykk til å ha enten en høy risikograd, middels risikograd eller lav risikograd. Som reaksjon på mengden av rangerte enkeltrisikoer genereres risikoinformasjon og risikoinformasjonen vises frem, idet fremvisningstrinnet omfatter fremvisning av risikoinformasjon på en risikoinformasjonsfremviser.
NO20064178A 2004-03-17 2006-09-15 Fremgangsmate, anordning og programlagringsutstyr tilpasset for visualisering av kvalitativ pg kvantitativ risikobedommelse pa grunnlag av teknisk borehullutforelse og jordegenskaper NO20064178L (no)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US10/802,613 US7630914B2 (en) 2004-03-17 2004-03-17 Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties
PCT/US2005/009118 WO2005091197A1 (en) 2004-03-17 2005-03-17 Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties

Publications (1)

Publication Number Publication Date
NO20064178L true NO20064178L (no) 2006-12-18

Family

ID=34963229

Family Applications (1)

Application Number Title Priority Date Filing Date
NO20064178A NO20064178L (no) 2004-03-17 2006-09-15 Fremgangsmate, anordning og programlagringsutstyr tilpasset for visualisering av kvalitativ pg kvantitativ risikobedommelse pa grunnlag av teknisk borehullutforelse og jordegenskaper

Country Status (9)

Country Link
US (1) US7630914B2 (no)
EP (1) EP1728206A1 (no)
AR (1) AR048507A1 (no)
CA (1) CA2560065A1 (no)
EA (2) EA200601712A1 (no)
MX (2) MXPA06010579A (no)
NO (1) NO20064178L (no)
TW (1) TWI278760B (no)
WO (1) WO2005091197A1 (no)

Families Citing this family (122)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050273304A1 (en) * 2000-03-13 2005-12-08 Smith International, Inc. Methods for evaluating and improving drilling operations
US9482055B2 (en) 2000-10-11 2016-11-01 Smith International, Inc. Methods for modeling, designing, and optimizing the performance of drilling tool assemblies
US20030125997A1 (en) * 2001-12-20 2003-07-03 Allison Stoltz System and method for risk assessment
US7596481B2 (en) * 2004-03-16 2009-09-29 M-I L.L.C. Three-dimensional wellbore analysis and visualization
US7657414B2 (en) * 2005-02-23 2010-02-02 M-I L.L.C. Three-dimensional wellbore visualization system for hydraulics analyses
US20050228622A1 (en) * 2004-04-05 2005-10-13 Jacobi Norman R Graphical user interface for risk assessment
US7636671B2 (en) * 2004-08-30 2009-12-22 Halliburton Energy Services, Inc. Determining, pricing, and/or providing well servicing treatments and data processing systems therefor
US8457997B2 (en) * 2005-04-29 2013-06-04 Landmark Graphics Corporation Optimization of decisions regarding multiple assets in the presence of various underlying uncertainties
US7784544B2 (en) * 2006-01-24 2010-08-31 Schlumberger Technology Corporation Method of treating a subterranean formation using a rheology model for fluid optimization
US20100175877A1 (en) * 2006-01-24 2010-07-15 Parris Michael D Method of designing and executing a well treatment
US8812334B2 (en) * 2006-02-27 2014-08-19 Schlumberger Technology Corporation Well planning system and method
US8744893B2 (en) * 2006-04-11 2014-06-03 Siemens Aktiengesellschaft Method for analyzing risks in a technical project
US7769684B2 (en) * 2006-05-19 2010-08-03 Accenture Global Services Gmbh Semi-quantitative risk analysis
US7857046B2 (en) * 2006-05-31 2010-12-28 Schlumberger Technology Corporation Methods for obtaining a wellbore schematic and using same for wellbore servicing
US7657407B2 (en) * 2006-08-15 2010-02-02 Landmark Graphics Corporation Method and system of planning hydrocarbon extraction from a hydrocarbon formation
US7860593B2 (en) * 2007-05-10 2010-12-28 Canrig Drilling Technology Ltd. Well prog execution facilitation system and method
US9175547B2 (en) * 2007-06-05 2015-11-03 Schlumberger Technology Corporation System and method for performing oilfield production operations
US11023901B2 (en) * 2007-08-23 2021-06-01 Management Analytics, Inc. Method and/or system for providing and/or analyzing and/or presenting decision strategies
SG151122A1 (en) * 2007-09-12 2009-04-30 Natarajan Krishnamurthy System and method for risk assessment and management
CA2708142C (en) * 2007-12-07 2016-10-18 Landmark Graphics Corporation, A Halliburton Company Systems and methods for utilizing cell based flow simulation results to calculate streamline trajectories
US9026417B2 (en) 2007-12-13 2015-05-05 Exxonmobil Upstream Research Company Iterative reservoir surveillance
CA2705277C (en) * 2007-12-18 2017-01-17 Exxonmobil Upstream Research Company Determining connectivity architecture in 2-d and 3-d heterogeneous data
EP2232406A4 (en) 2007-12-21 2017-10-18 Exxonmobil Upstream Research Company Method and apparatus for analyzing three-dimensional data
US8437997B2 (en) * 2008-01-22 2013-05-07 Exxonmobil Upstream Research Company Dynamic connectivity analysis
WO2009114211A1 (en) 2008-03-10 2009-09-17 Exxonmobil Upstream Research Company Method for determing distinct alternative paths between two object sets in 2-d and 3-d heterogeneous data
WO2009131762A2 (en) 2008-04-22 2009-10-29 Exxonmobil Upstream Research Company Functional-based knowledge analysis in a 2d and 3d visual environment
US9733388B2 (en) 2008-05-05 2017-08-15 Exxonmobil Upstream Research Company Systems and methods for connectivity analysis using functional objects
US8978104B1 (en) 2008-07-23 2015-03-10 United Services Automobile Association (Usaa) Access control center workflow and approval
US8707397B1 (en) 2008-09-10 2014-04-22 United Services Automobile Association Access control center auto launch
US8850525B1 (en) 2008-09-17 2014-09-30 United Services Automobile Association (Usaa) Access control center auto configuration
US8892407B2 (en) 2008-10-01 2014-11-18 Exxonmobil Upstream Research Company Robust well trajectory planning
EP2356611B1 (en) * 2008-11-06 2018-08-29 Exxonmobil Upstream Research Company System and method for planning a drilling operation
US8352228B2 (en) * 2008-12-23 2013-01-08 Exxonmobil Upstream Research Company Method for predicting petroleum expulsion
US9552462B2 (en) * 2008-12-23 2017-01-24 Exxonmobil Upstream Research Company Method for predicting composition of petroleum
US20100169019A1 (en) * 2008-12-27 2010-07-01 Schlumberger Technology Corporation Formation evaluation using local dynamic under-balance in perforating
EP2226752A1 (de) * 2009-03-03 2010-09-08 Siemens Aktiengesellschaft Verfahren zur rechnergestützten Visualisierung des Risikostatus in einem technischen Projekt
WO2010104535A1 (en) 2009-03-13 2010-09-16 Exxonmobil Upstream Research Company Method for predicting fluid flow
BR112012002907A2 (pt) * 2009-08-12 2016-04-05 Exxonmobil Upstream Res Co método e sistema para otimizar a política operacional de campo para uma região de subsuperfície, método para otimizar um problema de otimização durante o tempo,e para suporte de decisão considerando desenvolvimento de recursos de petroléo,e, meio de armazenagem legível por computador.
US8229671B2 (en) * 2009-08-13 2012-07-24 Pritchard David M Method and system for riserless casing seat optimization
US8539438B2 (en) 2009-09-11 2013-09-17 International Business Machines Corporation System and method for efficient creation and reconciliation of macro and micro level test plans
US10235269B2 (en) * 2009-09-11 2019-03-19 International Business Machines Corporation System and method to produce business case metrics based on defect analysis starter (DAS) results
US8667458B2 (en) * 2009-09-11 2014-03-04 International Business Machines Corporation System and method to produce business case metrics based on code inspection service results
US8352237B2 (en) 2009-09-11 2013-01-08 International Business Machines Corporation System and method for system integration test (SIT) planning
US8495583B2 (en) 2009-09-11 2013-07-23 International Business Machines Corporation System and method to determine defect risks in software solutions
US8566805B2 (en) * 2009-09-11 2013-10-22 International Business Machines Corporation System and method to provide continuous calibration estimation and improvement options across a software integration life cycle
US8893086B2 (en) * 2009-09-11 2014-11-18 International Business Machines Corporation System and method for resource modeling and simulation in test planning
US8527955B2 (en) 2009-09-11 2013-09-03 International Business Machines Corporation System and method to classify automated code inspection services defect output for defect analysis
US8689188B2 (en) * 2009-09-11 2014-04-01 International Business Machines Corporation System and method for analyzing alternatives in test plans
US8578341B2 (en) * 2009-09-11 2013-11-05 International Business Machines Corporation System and method to map defect reduction data to organizational maturity profiles for defect projection modeling
US11308434B1 (en) * 2009-09-18 2022-04-19 Charles Schwab & Co., Inc. System and method for limiting project management risk
US8494827B2 (en) * 2009-09-25 2013-07-23 Exxonmobil Upstream Research Company Method of predicting natural fractures and damage in a subsurface region
US9169726B2 (en) 2009-10-20 2015-10-27 Exxonmobil Upstream Research Company Method for quantitatively assessing connectivity for well pairs at varying frequencies
US8386221B2 (en) * 2009-12-07 2013-02-26 Nuovo Pignone S.P.A. Method for subsea equipment subject to hydrogen induced stress cracking
US20110153383A1 (en) * 2009-12-17 2011-06-23 International Business Machines Corporation System and method for distributed elicitation and aggregation of risk information
WO2011096964A1 (en) 2010-02-03 2011-08-11 Exxonmobil Upstream Research Company Method for using dynamic target region for well path/drill center optimization
EP2545461A4 (en) 2010-03-12 2017-09-27 Exxonmobil Upstream Research Company Dynamic grouping of domain objects via smart groups
US8265874B2 (en) 2010-04-21 2012-09-11 Saudi Arabian Oil Company Expert system for selecting fit-for-purpose technologies and wells for reservoir saturation monitoring
US20110283206A1 (en) * 2010-05-13 2011-11-17 Schlumberger Technology Corporation Interactive split feature visualization
US8478629B2 (en) 2010-07-14 2013-07-02 International Business Machines Corporation System and method for collaborative management of enterprise risk
US9593558B2 (en) 2010-08-24 2017-03-14 Exxonmobil Upstream Research Company System and method for planning a well path
CA2815641C (en) * 2010-12-16 2016-04-12 Landmark Graphics Corporation Method and system of plotting correlated data
AU2011356658B2 (en) 2011-01-26 2017-04-06 Exxonmobil Upstream Research Company Method of reservoir compartment analysis using topological structure in 3D earth model
US9874648B2 (en) 2011-02-21 2018-01-23 Exxonmobil Upstream Research Company Reservoir connectivity analysis in a 3D earth model
WO2013006226A1 (en) 2011-07-01 2013-01-10 Exxonmobil Upstream Research Company Plug-in installer framework
US20130096979A1 (en) * 2011-10-12 2013-04-18 Acm Automation Inc. System for monitoring safety protocols
US20140373031A1 (en) * 2011-12-06 2014-12-18 International Business Machines Corporation Method, Device and Computer Program For Visualizing Risk Assessment Values in Event Sequences
US9191266B2 (en) 2012-03-23 2015-11-17 Petrolink International System and method for storing and retrieving channel data
CA2862788A1 (en) 2012-03-28 2013-10-13 Landmark Graphics Corporation Managing versions of cases
US9595129B2 (en) 2012-05-08 2017-03-14 Exxonmobil Upstream Research Company Canvas control for 3D data volume processing
BR112014031209A2 (pt) 2012-06-14 2017-06-27 Halliburton Energy Services Inc sistema, método e produto de programa de computador para determinar a localização de pontos de estimulação de fratura usando mineralogia
US9512707B1 (en) 2012-06-15 2016-12-06 Petrolink International Cross-plot engineering system and method
US9518459B1 (en) 2012-06-15 2016-12-13 Petrolink International Logging and correlation prediction plot in real-time
US9946445B2 (en) 2012-08-10 2018-04-17 Landmark Graphics Corporation Navigating to failures in drilling system displays
CA2894656C (en) * 2012-12-14 2022-05-03 Richard J. Meehan Drilling data visualization method
US20140214476A1 (en) * 2013-01-31 2014-07-31 Halliburton Energy Services, Inc. Data initialization for a subterranean operation
US9823626B2 (en) 2014-10-06 2017-11-21 Fisher-Rosemount Systems, Inc. Regional big data in process control systems
US9665088B2 (en) 2014-01-31 2017-05-30 Fisher-Rosemount Systems, Inc. Managing big data in process control systems
US10866952B2 (en) 2013-03-04 2020-12-15 Fisher-Rosemount Systems, Inc. Source-independent queries in distributed industrial system
US10909137B2 (en) 2014-10-06 2021-02-02 Fisher-Rosemount Systems, Inc. Streaming data for analytics in process control systems
US9558220B2 (en) 2013-03-04 2017-01-31 Fisher-Rosemount Systems, Inc. Big data in process control systems
US10649424B2 (en) 2013-03-04 2020-05-12 Fisher-Rosemount Systems, Inc. Distributed industrial performance monitoring and analytics
US10649449B2 (en) 2013-03-04 2020-05-12 Fisher-Rosemount Systems, Inc. Distributed industrial performance monitoring and analytics
US9804588B2 (en) 2014-03-14 2017-10-31 Fisher-Rosemount Systems, Inc. Determining associations and alignments of process elements and measurements in a process
US10223327B2 (en) 2013-03-14 2019-03-05 Fisher-Rosemount Systems, Inc. Collecting and delivering data to a big data machine in a process control system
US10678225B2 (en) 2013-03-04 2020-06-09 Fisher-Rosemount Systems, Inc. Data analytic services for distributed industrial performance monitoring
US10282676B2 (en) 2014-10-06 2019-05-07 Fisher-Rosemount Systems, Inc. Automatic signal processing-based learning in a process plant
US9397836B2 (en) 2014-08-11 2016-07-19 Fisher-Rosemount Systems, Inc. Securing devices to process control systems
US10386827B2 (en) 2013-03-04 2019-08-20 Fisher-Rosemount Systems, Inc. Distributed industrial performance monitoring and analytics platform
US10352153B2 (en) 2013-03-14 2019-07-16 Geodynamics, Inc. Advanced perforation modeling
CN107885494B (zh) 2013-03-15 2021-09-10 费希尔-罗斯蒙特系统公司 用于分析过程控制数据的方法和计算机系统
US10671028B2 (en) 2013-03-15 2020-06-02 Fisher-Rosemount Systems, Inc. Method and apparatus for managing a work flow in a process plant
EP3008281A2 (en) 2013-06-10 2016-04-20 Exxonmobil Upstream Research Company Interactively planning a well site
US10378329B2 (en) 2013-08-20 2019-08-13 Nabors Drilling Technologies Usa, Inc. Rig control system and methods
US10428647B1 (en) 2013-09-04 2019-10-01 Petrolink International Ltd. Systems and methods for real-time well surveillance
US10590761B1 (en) 2013-09-04 2020-03-17 Petrolink International Ltd. Systems and methods for real-time well surveillance
US9864098B2 (en) 2013-09-30 2018-01-09 Exxonmobil Upstream Research Company Method and system of interactive drill center and well planning evaluation and optimization
BR112016004897B1 (pt) 2013-10-08 2021-06-22 Halliburton Energy Services, Inc Método de sondagem de poço implementado por computador, e, sistema de gerenciamento e planejamento de sondagem de poço
CA2923540C (en) 2013-10-08 2021-05-25 Halliburton Energy Services, Inc. Integrated well survey management and planning tool
US10577918B2 (en) 2014-02-21 2020-03-03 Gyrodata, Incorporated Determining directional data for device within wellbore using contact points
US10329896B2 (en) 2014-02-21 2019-06-25 Gyrodata, Incorporated System and method for analyzing wellbore survey data to determine tortuosity of the wellbore using tortuosity parameter values
US10316639B2 (en) 2014-02-21 2019-06-11 Gyrodata, Incorporated System and method for analyzing wellbore survey data to determine tortuosity of the wellbore using displacements of the wellbore path from reference lines
CN105372702B (zh) * 2014-08-11 2017-09-12 中国石油化工股份有限公司 扭张地质结构的定量化描述方法
US11125017B2 (en) * 2014-08-29 2021-09-21 Landmark Graphics Corporation Directional driller quality reporting system and method
US10101498B2 (en) * 2014-09-05 2018-10-16 Schlumberger Technology Corporation Well survivability in multidimensional geomechanical space
US10168691B2 (en) 2014-10-06 2019-01-01 Fisher-Rosemount Systems, Inc. Data pipeline for process control system analytics
EP3265647B1 (en) * 2015-03-06 2021-02-24 Hartford Steam Boiler Inspection and Insurance Company Risk assessment for drilling and well completion operations
US11151762B2 (en) * 2015-11-03 2021-10-19 Ubiterra Corporation Systems and methods for shared visualization and display of drilling information
US10503483B2 (en) 2016-02-12 2019-12-10 Fisher-Rosemount Systems, Inc. Rule builder in a process control network
WO2017206182A1 (en) * 2016-06-03 2017-12-07 Schlumberger Technology Corporation Detecting events in well reports
US10872183B2 (en) * 2016-10-21 2020-12-22 Baker Hughes, A Ge Company, Llc Geomechanical risk and hazard assessment and mitigation
EP3659101A4 (en) 2017-07-27 2020-12-09 Hartford Steam Boiler Inspection and Insurance Company EQUIPMENT-BASED RISK MANAGEMENT USING AN ASSET-SPECIFIC ENERGY DATA THROUGH DYNAMICALLY ADJUSTABLE SENSOR-CONTROLLED FEEDBACK LOOPS
USD939520S1 (en) * 2017-12-29 2021-12-28 Apollo Intelligent Connectivity (Beijing) Technology Co., Ltd. Display screen or portion thereof with a graphical user interface for an on-board device
CN109063285B (zh) * 2018-07-18 2022-12-02 南昌大学 一种土坡钻孔布置方案设计方法
US11368470B2 (en) * 2019-06-13 2022-06-21 International Business Machines Corporation Real-time alert reasoning and priority-based campaign discovery
CN110633906A (zh) * 2019-09-11 2019-12-31 绍兴建元电力集团有限公司 一种计及人因可靠性的变电站自动化方法失效风险评估方法
CN112130212A (zh) * 2020-08-21 2020-12-25 中国石油天然气集团有限公司 一种海洋电磁节点采集站的承重体结构
CN112734270B (zh) * 2021-01-19 2024-01-23 中国科学院地理科学与资源研究所 一种能源风险传导的测度方法、系统及数据平台
US11818205B2 (en) 2021-03-12 2023-11-14 Bank Of America Corporation System for identity-based exposure detection in peer-to-peer platforms
CN113222399B (zh) * 2021-05-08 2024-04-23 中国人民解放军陆军工程大学 一种工程装备作业保障综合效能评估方法
CN113625364B (zh) * 2021-08-18 2022-08-02 西南石油大学 一种基于双重校正的泥页岩地层孔隙压力的计算方法
CN117784239A (zh) * 2023-12-14 2024-03-29 青岛海洋地质研究所 过去甲烷水合物稳定带底界面位置的判断方法
CN117610395B (zh) * 2024-01-24 2024-04-16 西安交通大学 结晶岩压缩硬化记忆效应表征方法、装置、设备及介质

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IE910209A1 (en) 1990-02-28 1991-09-11 Union Oil Co Drag analysis method
US5611052A (en) * 1993-11-01 1997-03-11 The Golden 1 Credit Union Lender direct credit evaluation and loan processing system
US5696907A (en) * 1995-02-27 1997-12-09 General Electric Company System and method for performing risk and credit analysis of financial service applications
US6408953B1 (en) * 1996-03-25 2002-06-25 Halliburton Energy Services, Inc. Method and system for predicting performance of a drilling system for a given formation
US6109368A (en) * 1996-03-25 2000-08-29 Dresser Industries, Inc. Method and system for predicting performance of a drilling system for a given formation
US6612382B2 (en) * 1996-03-25 2003-09-02 Halliburton Energy Services, Inc. Iterative drilling simulation process for enhanced economic decision making
US7032689B2 (en) * 1996-03-25 2006-04-25 Halliburton Energy Services, Inc. Method and system for predicting performance of a drilling system of a given formation
US6223143B1 (en) * 1998-08-31 2001-04-24 The United States Government As Represented By The Administrator Of The National Aeronautics And Space Administration Quantitative risk assessment system (QRAS)
US7127407B1 (en) * 1999-04-29 2006-10-24 3M Innovative Properties Company Method of grouping and analyzing clinical risks, and system therefor
US7006992B1 (en) * 2000-04-06 2006-02-28 Union State Bank Risk assessment and management system
US20020099586A1 (en) * 2000-11-22 2002-07-25 National Britannia Group Ltd. Method, system, and computer program product for risk assessment and risk management
US7003439B2 (en) * 2001-01-30 2006-02-21 Schlumberger Technology Corporation Interactive method for real-time displaying, querying and forecasting drilling event and hazard information
US20030125997A1 (en) * 2001-12-20 2003-07-03 Allison Stoltz System and method for risk assessment
US7441197B2 (en) * 2002-02-26 2008-10-21 Global Asset Protection Services, Llc Risk management information interface system and associated methods
US7124054B2 (en) * 2002-06-28 2006-10-17 Microsoft Corporation System and method for mining model accuracy display
CN1998013A (zh) * 2003-06-09 2007-07-11 格林莱恩系统公司 用于风险检测、汇报和基础设施的系统和方法
US7698148B2 (en) * 2003-09-12 2010-04-13 Raytheon Company Web-based risk management tool and method
US7243735B2 (en) * 2005-01-26 2007-07-17 Varco I/P, Inc. Wellbore operations monitoring and control systems and methods

Also Published As

Publication number Publication date
TW200614009A (en) 2006-05-01
EA201300977A1 (ru) 2014-05-30
CA2560065A1 (en) 2005-09-29
US20050209866A1 (en) 2005-09-22
WO2005091197A1 (en) 2005-09-29
TWI278760B (en) 2007-04-11
US7630914B2 (en) 2009-12-08
MXPA06010578A (es) 2007-03-15
EA200601712A1 (ru) 2007-02-27
MXPA06010579A (es) 2007-02-16
EP1728206A1 (en) 2006-12-06
AR048507A1 (es) 2006-05-03

Similar Documents

Publication Publication Date Title
NO20064178L (no) Fremgangsmate, anordning og programlagringsutstyr tilpasset for visualisering av kvalitativ pg kvantitativ risikobedommelse pa grunnlag av teknisk borehullutforelse og jordegenskaper
NO20064179L (no) Fremgangsmate, anordning og programlagringsutstyr tilpasset for visualisering av kvalitativ og kvantitativ risikobedommelse pa grunnlag av teknisk borehullutforelse og jordegenskaper
Coles et al. Assessing obsessive compulsive symptoms and cognitions on the internet: evidence for the comparability of paper and Internet administration
Xiao et al. Multiple failure modes analysis and weighted risk priority number evaluation in FMEA
US20080082529A1 (en) Comparing Taxonomies
Enke et al. Introducing a maturity model for learning factories
RU2011117170A (ru) Система и способ для изменения размера окна
Huang et al. Mediation analysis for survival data using semiparametric probit models
Aloisio et al. Fragility functions and behavior factors estimation of multi-story cross-laminated timber structures characterized by an energy-dependent hysteretic model
JP2007208529A5 (no)
Mehta et al. Operator situation awareness and physiological states during offshore well control scenarios
Brunelli et al. Multicentric analysis of performance after major lung resections by using the European Society Objective Score (ESOS)
Mazen et al. Bias correction for replacement samples in longitudinal research
Poulton et al. Measuring self-perceived public health nursing competencies using a quantitative approach
JP2006234621A5 (no)
van Staveren Extending to geotechnical risk management
Ong et al. Impact of simulation training on performance and outcomes of endobronchial ultrasound-guided transbronchial needle aspiration performed by trainees in a tertiary academic hospital
Mukandila et al. Modelling of cohesion and adhesion damage of seal based on dynamic shear rheometer testing
Mort et al. Impact of an introductory pharmacy practice experience on students' performance in an advanced practice experience
JP2011141631A (ja) 現金自動取引装置及び現金自動取引装置の更新プログラムのテスト方法
Hardy et al. Tracking and visualisation of student use of online learning materials in a large undergraduate course
Sheng Trials and tribulations in implementation of the emergency medicine milestones from the frontlines
WO2018011840A1 (ja) 原子力プラントの運転訓練シミュレータ
Tsang et al. Monitoring risk-adjusted outcomes in congenital heart surgery: does the appropriateness of a risk model change with time?
MY144717A (en) Method and apparatus and program storage device adapted for visualization of qualitative and quantitative risk assessment based on technical wellbore design and earth properties.

Legal Events

Date Code Title Description
FC2A Withdrawal, rejection or dismissal of laid open patent application