NL2028601A - A construction method for a main propulsor bsea of a deep-water dynamic positioning crude oil cargo transfer vessel - Google Patents
A construction method for a main propulsor bsea of a deep-water dynamic positioning crude oil cargo transfer vessel Download PDFInfo
- Publication number
- NL2028601A NL2028601A NL2028601A NL2028601A NL2028601A NL 2028601 A NL2028601 A NL 2028601A NL 2028601 A NL2028601 A NL 2028601A NL 2028601 A NL2028601 A NL 2028601A NL 2028601 A NL2028601 A NL 2028601A
- Authority
- NL
- Netherlands
- Prior art keywords
- welding
- groove
- panel
- flange
- cylinder
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
- B63B73/40—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms characterised by joining methods
- B63B73/43—Welding, e.g. laser welding
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K31/00—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
- B23K31/003—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to controlling of welding distortion
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K31/00—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
- B23K31/02—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K31/00—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
- B23K31/02—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
- B23K31/025—Connecting cutting edges or the like to tools; Attaching reinforcements to workpieces, e.g. wear-resisting zones to tableware
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K9/00—Arc welding or cutting
- B23K9/0026—Arc welding or cutting specially adapted for particular articles or work
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K9/00—Arc welding or cutting
- B23K9/02—Seam welding; Backing means; Inserts
- B23K9/028—Seam welding; Backing means; Inserts for curved planar seams
- B23K9/0288—Seam welding; Backing means; Inserts for curved planar seams for welding of tubes to tube plates
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K9/00—Arc welding or cutting
- B23K9/16—Arc welding or cutting making use of shielding gas
- B23K9/164—Arc welding or cutting making use of shielding gas making use of a moving fluid
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K9/00—Arc welding or cutting
- B23K9/16—Arc welding or cutting making use of shielding gas
- B23K9/173—Arc welding or cutting making use of shielding gas and of a consumable electrode
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
- B63B73/20—Building or assembling prefabricated vessel modules or parts other than hull blocks, e.g. engine rooms, rudders, propellers, superstructures, berths, holds or tanks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
- B63B73/60—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms characterised by the use of specific tools or equipment; characterised by automation, e.g. use of robots
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K2103/00—Materials to be soldered, welded or cut
- B23K2103/02—Iron or ferrous alloys
- B23K2103/04—Steel or steel alloys
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Plasma & Fusion (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Ocean & Marine Engineering (AREA)
- Robotics (AREA)
- Optics & Photonics (AREA)
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
The invention discloses a construction method for a main propulsor base of a deep- water dynamic positioning crude oil cargo transfer vessel, which belongs to the field of 5 ship engineering. The construction method for a main propulsor base of a deep-water dynamic positioning crude oil cargo transfer vessel comprises the following steps: press the front and rear edges of the flat cylinder steel plate, form a cylinder by rounding, and weld the sixth groove on both sides of the cylinder, splice and weld a plurality of fan-shaped panels through the fifth groove to form a flange, position the 10 cylinder at the upper end of the flange with the flange as the reference plane, and weld the third groove for the flange and the cylinder, weld the first groove of the panel to the outer side of the flange and weld the fourth groove of the web to the outer side of the cylinder to form the propulsor base, turn the propulsor base over and continue to weld among the second groove of the web, the panel and the flange. The method of the 15 invention ensures the machining accuracy of the propulsor base, effectively reduces the welding deformation and ensures that the formed structure rigidity and manufacturing accuracy of the welded main propulsor base meet requirements.
Description
-1-
VESSEL Technical Field
[0001] The invention relates to the field of ship engineering, in particular to a construction method for a main propulsor base of a deep-water dynamic positioning crude oil cargo transfer vessel.
Background Art
[0002] Under the background that the international crude oil price remains low and the global offshore oil companies greatly cut the operating costs, CTV (Cargo Transfer Vessel) for reducing FPSO oil unloading costs emerges. The new concept deep-water dynamic positioning crude oil CTV will challenge the traditional existing crude oil transfer ways in the market.
[0003] Two full-revolving propulsors are required to be installed in the deep-water dynamic positioning crude oil cargo transfer vessel, a single full-revolving propulsor has the propeller diameter of up to 3,500 mm, the weight of 56T and the net height of more than 6,000 mm, the volume and weight are large, and the installation accuracy is high, so the base for the full-revolving propulsors is required to connect the stern structure of the vessel with the main propulsor, so as to realize the installation of the main propulsor.
[0004] By comparing other structures of the ship, the main propulsor base for the deep- water dynamic positioning crude oil cargo transfer vessel adopts the thick plate structure, the thickness of the flange is 120 mm, and the thickness of the other structures reaches 50 mm, so the conventional welding method can hardly meet the requirements for the structure rigidity and the manufacturing accuracy of the main propulsor base for the deep-water dynamic positioning crude oil cargo transfer vessel.
Contents of the Invention
[0005] The invention aims to propose a construction method for a main propulsor base of a deep-water dynamic positioning crude oil cargo transfer vessel.
[0006] For this purpose, the invention adopts the following technical proposal which
-2- includes the following steps: Step S10: arrange a first groove on the outer side of the panel, arrange a second groove on the top of the web, arrange a third groove on the top of the cylinder steel plate, and arrange a fourth groove on one side of the web, arrange a fifth groove on both ends of the sector panel, and arrange a sixth groove on both sides of the cylinder steel plate; Step S20: preheat both sides of the first groove, the second groove, the third groove, the fourth groove, the fifth groove and the sixth groove before welding; Step S30: press the front and rear edges of the flat cylinder steel plate, form a cylinder by rounding, and weld the sixth groove on both sides of the cylinder; Step S40: splice and weld a plurality of fan-shaped panels through the fifth groove to form a flange; Step S50: carry out post-weld heat treatment on both sides of the weld for the flange formed by welding; Step S60: position the cylinder at the upper end of the flange with the flange as the reference plane, and weld the third groove for the flange and the cylinder; Step S70: weld the first groove of the panel to the outer side of the flange and weld the fourth groove of the web to the outer side of the cylinder to form the propulsor base; Step S80: turn the propulsor base over and continue to weld among the second groove of the web, the panel and the flange; Step S90: relieve stress at the welding position of the propulsor base.
[0007] Preferably, the construction method also comprises Step S31: round the cylinder after seam welding, and then relieve stress on the butt welds at the front and rear ends of the cylinder.
[0008] Preferably, the first groove, the second groove, the third groove, the fourth groove and the sixth groove are asymmetric V-shaped grooves, and the fifth groove is a symmetrical V-shaped groove.
[0009] Preferably, Step S60 includes: Step S61: divide the joint part between the cylinder and the flange into a first seam, a second seam, a third seam and a fourth seam which are equal in length and symmetrically distributed, wherein two ends of the first seam are respectively connected with one end of the third seam and one end of the fourth seam, and two ends of the second seam are respectively connected with the other end of the third seam and the other end of the fourth seam;
-3- Step S62: weld the backing layer and the filling layer counterclockwise in sequence on the inner side of the first seam; Step S63: perform back gouging on the outer side of the first seam; Step S64: weld the backing layer and the filling layer counterclockwise in sequence on the outer side of the first seam; Step S65: weld the capping layer counterclockwise on the inner side of the first seam; Step S66: weld the capping layer counterclockwise on the outer side of the first seam; Step S67: repeat steps S62-S67 for the second seam, the third seam and the fourth seam to complete the welding between the flange and the cylinder.
[0010] Preferably, Step S70 includes: Step S71: divide the area to be welded between the panel and the flange counterclockwise in sequence into a first panel welding area, a fourth panel welding area, a sixth panel welding area, a second panel welding area, a fifth panel welding area and a third panel welding area symmetrically arranged, Step S72: set the sequence of welding between the panel and the flange as follows: the first panel welding area - the fourth panel welding area - the sixth panel welding area - the second panel welding area - the fifth web panel area - the third web panel area; Step S73: weld between the panel and the flange in the welding sequence set in Step S72; Step S74: cover the weld formed by welding in Step S73 with thermal insulation cotton for slow cooling; Step S75: divide the area to be welded between the web and the cylinder counterclockwise in sequence into a first web welding area, a fourth web welding area, a sixth web welding area, a second web welding area, a fifth web welding area and a third web welding area symmetrically arranged; Step S76: set the sequence of welding between the web and the cylinder as follows: the first web welding area -- the fourth web welding area -- the sixth web welding area -- the second web welding area -- the fifth web welding area -- the third web welding area; Step S77: weld between the web and cylinder in the welding sequence set in Step S76; Step S78: cover the weld formed by welding in Step S77 with thermal insulation cotton for slow cooling.
[0011] Preferably, Step S80 includes:
-4- Step S81: turn the propulsor base over through a lifting device; Step S82: divide the area to be welded between the panel and the web counterclockwise in sequence into a first T-shaped beam welding area, a fourth T- shaped beam welding area, a sixth T-shaped beam welding area, a second T-shaped beam welding area, a fifth T-shaped beam welding area and a third T-shaped beam welding area symmetrically arranged, Step S83: set the sequence of welding among the web, the panel and the flange as follows: the first T-shaped beam welding area -- the fourth T-shaped beam welding area -- the sixth T-shaped beam welding area -- the second T-shaped beam welding area -- the fifth T-shaped beam welding area -- the third T-shaped beam welding area; Step S84: weld among web, the panel and the flange in the welding sequence set in Step S83; Step S85: cover the weld formed by welding in Step S84 with thermal insulation cotton for slow cooling.
[0012] Preferably, the construction method also includes Step S51 for 100% UT and MT on the flange after post-weld heat treatment.
[0013] Preferably, the sector panel is positioned by the ground sample line splicing method in Step S40.
[0014] Preferably, welding between the third groove of the cylinder and the flange, between the fourth groove of the web and the outer side of the cylinder, between the first groove of the panel and the outer side of the flange and among the second groove of the web, the panel and the flange is FCAW double-sided welding.
[0015] Preferably, the fifth groove between the sector panels and the sixth groove on both sides of the cylinder are welded by SAW.
[0016] The invention has the following beneficial effects: the method of the invention realizes the fabrication of the propulsor base for the deep-water dynamic positioning crude oil cargo transfer vessel, ensures the the installation accuracy of the propulsor base, effectively reduces the internal stress generated during the construction process of the propulsor base to effectively decrease the welding deformation, so that the formed structure rigidity and manufacturing accuracy of the welded main propulsor base meet requirements, thereby ensuring the installation accuracy of the main propulsor during the construction process of the deep-water dynamic positioning crude oil cargo transfer vessel.
-5- Drawing Description
[0017] The drawings provide further explanation for the invention, but the contents in the drawings do not constitute any limitation to the invention.
[0018] Fig. 1 is a schematic diagram for the process flow of the invention; Fig. 2 is a schematic diagram drawn by the ground sample line for the invention; Fig. 3 is a schematic diagram for the section structure of the propulsor base for the invention; Fig. 4(a) 1s a partially enlarged view for position I of Fig. 3; Fig. 4(b) is a section enlarged view for position II of Fig. 3; Fig. 4(c) is a partially enlarged view for position III of Fig. 3; Fig. 4(d) is a section view for position IV of Fig. 3; Fig. 5 is the section view for the fifth groove of the invention; Fig. 6 is the section view for the sixth groove of the invention; Fig. 7(a) is a schematic diagram for the welding sequence between the inner side of the cylinder and the flange; Fig. 7(b) is a schematic diagram for the welding sequence between the outer side of the cylinder and the flange; Fig. 8(a) is a schematic diagram for the area to be welded between the panel and the flange; Fig. 8(b) is a schematic diagram for the area to be welded between the web and the cylinder; Fig. 8(c) 1s a schematic diagram for the area to be welded between the web and the panel; Fig. 9 is a schematic diagram for the division of joint part between the cylinder and the web of the invention.
Embodiments
[0019] The technical proposal of the invention is further explained below according to the drawings and the embodiments.
[0020] According to Fig. 1, the construction method for the main propulsor base of the deep-water dynamic positioning crude oil cargo transfer vessel in the embodiment comprises the following steps: Step S10: arrange a first groove on the outer side of the panel, arrange a second groove
-6- on the top of the web, arrange a third groove on the top of the cylinder steel plate, and arrange a fourth groove on one side of the web, arrange a fifth groove on both ends of the sector panel, and arrange a sixth groove on both sides of the cylinder steel plate; Step S20: preheat both sides of the first groove, the second groove, the third groove, the fourth groove, the fifth groove and the sixth groove before welding; Step S30: press the front and rear edges of the flat cylinder steel plate, form a cylinder by rounding, and weld the sixth groove on both sides of the cylinder; Step S40: splice and weld a plurality of fan-shaped panels through the fifth groove to form a flange; Step S50: carry out post-weld heat treatment on both sides of the weld for the flange formed by welding; Step S60: position the cylinder at the upper end of the flange with the flange as the reference plane, and weld the third groove for the flange and the cylinder; Step S70: weld the first groove of the panel to the outer side of the flange and weld the fourth groove of the web to the outer side of the cylinder to form the propulsor base; Step S80: turn the propulsor base over and continue to weld among the second groove of the web, the panel and the flange; Step S90: relieve stress at the welding position of the propulsor base.
[0021] Wherein, in Step 30, the front and rear edges of the flat cylinder steel plate are pressed before rounding to avoid wrinkling on the two edges of the cylinder steel plate 21 during rounding, and the cylinder steel plate is rounded by a three-star roller rounding machine to ensure the roundness of the cylinder with large plate thickness. In Step S40, a plurality of fan-shaped panels are spliced and welded through the fifth groove to form a flange to greatly facilitate transportation and installation and ensure that the the accuracy of the flange meets the requirements, and the ground sample line positioning method is used in the splicing process, so that the levelness of the flange surface is under control. In Step S60, when the cylinder is installed at the upper end of the flange, the perpendicularity of welded cylinder and flange is ensured by controlling the perpendicularity of the cylinder and the flange. In Step S80, the propulsor base is turned over to facilitate the welding of seam between the web and the panel. After the completion of fabricaton of the propulsor base, the stress is relieved at the welding position of the propulsor base by setting Step S90 to avoid the impact of welding stress on the mechanical properties of the propulsor base.
-7-
[0022] The method of this embodiment is used to construct the propulsor base of the deep-water dynamic positioning crude oil cargo transfer vessel. As shown in Fig. 3, the structure of the propulsor base for the deep-water dynamic positioning crude oil cargo transfer vessel comprises a flange 23, a cylinder 21 and a plurality of T-shaped beams, wherein the cylinder 21 is installed at the upper end of the flange 23, a plurality of T-shaped beams are evenly distributed on the outer side of the cylinder, the T-shaped beam comprises a web 221 and a panel 222, one side of the web 221 is connected with the outer side of the cylinder 21, the bottom of the web 221 1s connected with the upper side of the flange 23 and the panel 222, and one side of the panel 222 is connected with the outer side of the flange 23.
[0023] Preferably, the construction method also comprises Step S31: round the cylinder after seam welding, and then relieve stress on the butt welds at the front and rear ends of the cylinder. Therefore, after welding the seams at the front and rear ends of the cylinder, the cylinder is rounded by the rounding machine to ensure that the roundness of the welded cylinder meets the requirements; the stress on the butt welds at the front and rear ends of the cylinder are relieved to avoid the impact of stress caused by welding on the mechanical properties of the cylinder structure.
[0024] Preferably, according to Fig. 4 to Fig. 6, the first groove, the second groove, the third groove, the fourth groove and the sixth groove are asymmetric V-shaped grooves, and the fifth groove is a symmetrical V-shaped groove.
[0025] The workpieces to be welded are all of thick plate structure, in which the panel 1s 50 mm thick, the web is 35 mm thick, the cylinder is 35 mm thick, and the flange is 120 mm thick, so the first groove, the second groove, the third groove, the fourth groove and the sixth groove are asymmetric V-shaped grooves, and the fifth groove is a symmetric V-shaped groove to ensure the welding effect between the panel and the flange, between the web and the flange, between the cylinder and the flange and between the web and the panel, the welding arc can go deep into the root of the seam, and the weld can connect the gap in the seam to improve the strength of the welding position, so that the formed structure rigidity and manufacturing accuracy of the welded main propulsor base meet requirements.
[0026] Further, the first groove angle of the first groove is set to 40-45 degrees, the second groove angle is set to 40-45 degrees, and the root gap is set to 0-3 mm; the first groove angle of the second groove is set to 40-45 degrees, the second groove angle is
-8- set to 45 degrees, and the root gap is set to 0-3 mm; the first groove angle of the third groove is set to 40-45 degrees, the second groove angle is set to 45 degrees, and the root gap Is set to 0-3 mm; the first groove angle of the fourth groove is set to 40-45 degrees, the second groove angle is set to 45 degrees, and the root gap is set to 0-3 mm; the first groove angle of the fifth groove is set to 50-60 degrees, and the root gap is set to 6-8 mm; the first and second groove angles of the sixth groove are set to 60 degrees, and the root gap is set to 6-8mm.
[0027] Preferably, Step S60 includes: Step S61: according to Fig. 7, divide the joint part between the cylinder and the flange into a first seam 1, a second seam 2, a third seam 3 and a fourth seam 4 which are equal in length and symmetrically distributed, wherein two ends of the first seam 1 are respectively connected with one end of the third seam 3 and one end of the fourth seam 4, and two ends of the second seam 2 are respectively connected with the other end of the third seam 3 and the other end of the fourth seam 4; Step S62: weld the backing layer and the filling layer counterclockwise in sequence on the inner side of the first seam 1; Step S63: perform back gouging on the outer side of the first seam 1; Step S64: weld the backing layer and the filling layer counterclockwise in sequence on the outer side of the first seam 1; Step S65: weld the capping layer counterclockwise on the inner side of the first seam 1; Step S66: weld the capping layer counterclockwise on the outer side of the first seam 1; Step S67: repeat steps S62-S67 for the second seam 2, the third seam 3 and the fourth seam 4 to complete the welding between the flange and the cylinder.
[0028] Welding between the flange and the cylinder is sequence balanced welding. The welding position is divided according to the actual size of the cylinder on the main propulsor base. As the section of the cylinder is circular, in order to disperse the weld heat and facilitate the positioning and fixation of cylinder, two symmetrical seams are welded each time to reduce the deformation caused by the internal stress during welding. Each seam is welded according to Steps S62 to S67. The angular deformation of the structure is effectively controlled by double-sided cross welding of the same seam, thus guaranteeing the accurate installation of the main propulsor.
-9-
[0029] Preferably, Step S70 includes: Step S71: according to Fig. 8, divide the area to be welded between the panel and the flange counterclockwise in sequence into a first panel welding area Al, a fourth panel welding area A4, a sixth panel welding area A6, a second panel welding area A2, a fifth panel welding area A5 and a third panel welding area A3 symmetrically arranged, Step S72: set the sequence of welding between the panel and the flange as follows: the first panel welding area Al - the fourth panel welding area A4 - the sixth panel welding area A6 - the second panel welding area A2 - the fifth web panel area A5 - the third web panel area A3, Step S73: weld between the panel and the flange in the welding sequence set in Step S72; Step S74: cover the weld formed by welding in Step S73 with thermal insulation cotton for slow cooling; Step S75: divide the area to be welded between the web and the cylinder counterclockwise in sequence into a first web welding area B1, a fourth web welding area B4, a sixth web welding area B6, a second web welding area B2, a fifth web welding area B5 and a third web welding area B3 symmetrically arranged, Step S76: set the sequence of welding between the web and the cylinder as follows: the first web welding area B1 -- the fourth web welding area B4 -- the sixth web welding area B6 -- the second web welding area B2 -- the fifth web welding area BS -- the third web welding area B3; Step S77: weld between the web and cylinder in the welding sequence set in Step S76; Step S78: cover the weld formed by welding in Step S77 with thermal insulation cotton for slow cooling.
[0030] Step S80 includes: Step S81: turn the propulsor base over through a lifting device; Step S82: divide the area to be welded between the panel and the web counterclockwise in sequence into a first T-shaped beam welding area C1, a fourth T- shaped beam welding area C4, a sixth T-shaped beam welding area C6, a second T- shaped beam welding area C2, a fifth T-shaped beam welding area C5 and a third T- shaped beam welding area C3 symmetrically arranged, Step S83: set the sequence of welding among the web, the panel and the flange as
-10- follows: the first T-shaped beam welding area C1 -- the fourth T-shaped beam welding area C4 -- the sixth T-shaped beam welding area C6 -- the second T-shaped beam welding area C2 -- the fifth T-shaped beam welding area C5 -- the third T-shaped beam welding area C3; Step S84: weld among web, the panel and the flange in the welding sequence set in Step S83; Step S85: cover the weld formed by welding in Step S84 with thermal insulation cotton for slow cooling.
[0031] A plurality of T-shaped beams are arranged on the outer side of the main propulsor base for the deep-water dynamic positioning crude oil cargo transfer vessel and are welded by the web and the panel, so that the whole main propulsor base is in gear shape. The T-shaped beams are used for connecting with a T-shaped connecting structure in the stern structure of the deep-water dynamic positioning crude oil cargo transfer vessel. Therefore, by setting the welding path, welding each panel with the flange in set sequence, then welding each web with the cylinder and finally welding each panel with each web, the weld heat is dispersed effectively to reduce the deformation caused by the internal stress during welding, thereby ensuring the installation accuracy of the T-shaped beams and the stern structure for the deep-water dynamic positioning crude oil cargo transfer vessel.
[0032] Wherein, the steps for welding between the first groove of the panel and the outer side of the flange are as follows: weld the backing layer and the filling layer on one side between the first groove of the panel and the outer side of the flange; perform back gouging on the other side between the first groove of the panel and the outer side of the flange; weld the backing layer and the filling layer in sequence on the other side between the first groove of the panel and the outer side of the flange; weld the capping layer on one side between the first groove of the panel and the outer side of the flange; weld the capping layer on the other side between the first groove of the panel and the outer side of the flange.
[0033] Thus, for the welding between one side of the panel and the flange, the method of double-sided cross welding is used on the same seam to effectively control the angular deformation between the panel and the flange and ensure the installation accuracy of the panel and the flange, thereby ensuring the installation accuracy of the T-shaped beams and the stern structure for the deep-water dynamic positioning crude
-11- oil cargo transfer vessel.
[0034] The steps for welding between the fourth groove on the web and the outer side of the cylinder are as follows: according to Fig.9, divide the joint part between the cylinder and the web into a fifth seam 5 and a sixth seam 6 which are equal in length, wherein one end of the sixth seam 6 is connected with the panel, and the other end of the sixth seam is connected with one end of the fifth seam 5; weld the backing layer and the filling layer on one side of the fifth seam 5 in sequence; perform back gouging on the other side of the fifth seam 5; weld the backing layer and the filling layer on the other side of the fifth seam 5; weld the capping layer on one side of the fifth seam 5; weld the capping layer on the other side of the fifth seam 5; repeat the above steps for the sixth seam 6 to complete the welding between the cylinder and the web.
[0035] The seam between the cylinder and the web 1s long according to the actual size of the cylinder and the web on the main propulsor base. If the seam is welded by one step, the heat of the weld will be high due to too long welding time to finally cause the thermal expansion and deformation of the weld. Therefore, in the backstep welding method of the embodiment, the joint part between the cylinder and the web is divided into the fifth seam 5 and the sixth seam 6 equal in length, the fifth seam 5 away from the cylinder is first welded, and then the sixth seam 6 close to the cylinder is welded, so that the part being welded keeps away from the part already welded, reducing the temperature difference between the fifth seam 5 and the sixth seam 6, and avoiding the thermal expansion and deformation of the weld.
[0036] Moreover, for welding between the cylinder and the web, the angular deformation between the cylinder and the web is effectively controlled by double-sided cross welding of the same seam to ensure the installation accuracy between the cylinder and the web, thus ensuring the installation accuracy of the T-shaped beams and the stern structure for the deep-water dynamic positioning crude oil cargo transfer vessel.
[0037] The steps for welding between the second groove of the web, the panel and the flange are as follows: weld the backing layer and the filling layer on one side among the second groove of the web, the panel and the flange; perform back gouging on the other side among the second groove of the web, the panel and the flange; weld the backing layer and the filling layer on the other side among the second groove of the web, the panel and the flange in sequence; weld the capping layer on one side among
-12- the second groove of the web, the panel and the flange; weld the capping layer on the other side among the second groove of the web, the panel and the flange.
[0038] For welding among the flange, the web and the panel, the angular deformation among the flange, the web and the panel is also effectively controlled by double-sided cross welding of the same seam to ensure the installation accuracy among the flange, the web and the panel, thus ensuring the installation accuracy of the T-shaped beams and the stern structure for the deep-water dynamic positioning crude oil cargo transfer vessel.
[0039] The weld formed by the above welding 1s covered with thermal insulation cotton for slow cooling at the weld temperature of not less than 250 degrees centigrade after welding, so that the weld heat is dissipated to reduce the internal stress.
[0040] Preferably, 100% UT and MT are performed on the flange after post-weld heat treatment, thereby ensuring the flatness of the welded flange to be +2.5 mm and realize the high installation accuracy of the main propulsor and the stern structure for the deep- water dynamic positioning crude oil cargo transfer vessel.
[0041] Preferably, in Step S40, according to Fig. 2, the ground sample line splicing method is used to position the sector panel.
[0042] The sector panel is positioned by the ground sample line splicing method to ensure that the excircle size and roundness after a plurality of sector panels are spliced and welded. The ground sample line splicing method is that two vertical cross center lines are drawn on the construction platform or the assembly jig, and the outer contour line is drawn with the cross center lines as the reference, so that the outer contour of the sector panel corresponds to the drawn outer contour line during the splicing of sector panels, thus ensuring the excircle size and roundness atter splicing.
[0043] Preferably, welding between the third groove of the cylinder and the flange, between the fourth groove of the web and the outer side of the cylinder, between the first groove of the panel and the outer side of the flange and among the second groove of the web, the panel and the flange is FCAW double-sided welding; the fifth groove between the sector panels and the sixth groove on both sides of the cylinder are welded by SAW.
[0044] For welding between the third groove of the cylinder and the flange, between the first groove of the panel and the outer side of the flange and among the second groove of the web, the panel and the flange, the welding parameters are as follows:
-13- Backing layer: welding current: 180-200A, welding voltage: 26-30V, gas flow: 15- 20L/min; Filling layer: welding current: 200-230A, welding voltage: 28-32V, gas flow: 15- 20L/min; Capping layer: welding current: 200-230A, welding voltage: 28-32V, gas flow: 15- 20L/min.
[0045] For welding between the fourth groove of the web and the outer side of the cylinder body, the welding parameters are as follows: Backing layer: welding current: 160-190A, welding voltage: 25-39V, gas flow: 15- 20L/min; Filling layer: welding current: 180-200A, welding voltage: 26-30V, gas flow: 15- 20L/min; Capping layer: welding current: 180-220A, welding voltage: 26-31 V, gas flow: 15- 20L/min.
[0046] For the welding of the fifth groove between the sector panels and the sixth groove on both sides of the cylinder, the welding parameters are as follows: Backing layer: welding current: 640-660A, welding voltage: 31-33 V, welding speed: 290mm/min; Filling layer: welding current: 720-760A, welding voltage: 32-34V, welding speed: 260mm/min,; Capping layer: welding current: 720-760A, welding voltage: 32-34V, welding speed: 260mm/min; By setting the welding parameters, the defects such as hot cracks or incomplete penetration can be prevented.
[0047] The technical principle of the invention is described above in combination with the embodiments. These descriptions are intended only to explain the principle of the invention and shall not be construed as limitation to the scope of protection of the invention in any way. Based on the explanation herein, the technicians in this field can associate with other embodiments of the invention without creative efforts, which will fall within the scope of protection of the invention.
Claims (10)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011634361.3A CN112658518B (en) | 2020-12-31 | 2020-12-31 | Construction method of main propeller base of deep water dynamic positioning crude oil conveying device |
Publications (2)
Publication Number | Publication Date |
---|---|
NL2028601A true NL2028601A (en) | 2022-07-21 |
NL2028601B1 NL2028601B1 (en) | 2022-10-10 |
Family
ID=75413326
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
NL2028601A NL2028601B1 (en) | 2020-12-31 | 2021-07-01 | A construction method for a main propulsor bsea of a deep-water dynamic positioning crude oil cargo transfer vessel |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN112658518B (en) |
NL (1) | NL2028601B1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113879481B (en) * | 2021-10-28 | 2023-07-25 | 中船黄埔文冲船舶有限公司 | Method for mounting lower sealing plate of full-rotation propeller base |
CN114655384B (en) * | 2022-03-11 | 2023-04-18 | 浙江国际海运职业技术学院 | Installation method of ship telescopic azimuth thruster |
CN116748725B (en) * | 2023-05-26 | 2024-10-18 | 南通中远海运船务工程有限公司 | Processing and mounting method for offshore wind power operation and maintenance stern propeller base |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0460851A1 (en) * | 1990-06-05 | 1991-12-11 | Metro Machine Corporation | Vessel hull and construction method |
EP0550992A1 (en) * | 1992-01-09 | 1993-07-14 | Metro Machine Corporation | Vessel hull construction and related methods |
US20030205188A1 (en) * | 2002-01-25 | 2003-11-06 | Fmc Technologies, Inc. | Method for constructing a very large turret mooring arrangement |
EP1445192A1 (en) * | 2001-10-23 | 2004-08-11 | Japan Hamworthy & Co., Ltd | Steering engine installation method and rotary vane steering engine |
WO2010030901A2 (en) * | 2008-09-11 | 2010-03-18 | Horton Deepwater Development Systems, Inc. | System and method for modular, high volume deepwater facility production |
WO2017217516A1 (en) * | 2016-06-16 | 2017-12-21 | Jfeスチール株式会社 | Welded structure having excellent brittle crack arrest characteristics |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2756945B2 (en) * | 1996-01-26 | 1998-05-25 | 正光 鈴木 | Welding jig |
CN102513664B (en) * | 2011-12-29 | 2013-06-26 | 江南造船(集团)有限责任公司 | Actual ship assembly welding process for ultra-large high-precision base |
CN105397253A (en) * | 2014-09-11 | 2016-03-16 | 佳木斯电机股份有限公司 | Technique for manufacturing motor base of primary helium circulator driving motor |
CN205950064U (en) * | 2016-08-26 | 2017-02-15 | 厦门新长诚钢构工程有限公司 | Groove preparation device of annular plate frock |
CN207512555U (en) * | 2017-11-20 | 2018-06-19 | 徐工集团工程机械股份有限公司 | A kind of welding wheel body |
-
2020
- 2020-12-31 CN CN202011634361.3A patent/CN112658518B/en active Active
-
2021
- 2021-07-01 NL NL2028601A patent/NL2028601B1/en active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0460851A1 (en) * | 1990-06-05 | 1991-12-11 | Metro Machine Corporation | Vessel hull and construction method |
EP0550992A1 (en) * | 1992-01-09 | 1993-07-14 | Metro Machine Corporation | Vessel hull construction and related methods |
EP1445192A1 (en) * | 2001-10-23 | 2004-08-11 | Japan Hamworthy & Co., Ltd | Steering engine installation method and rotary vane steering engine |
US20030205188A1 (en) * | 2002-01-25 | 2003-11-06 | Fmc Technologies, Inc. | Method for constructing a very large turret mooring arrangement |
WO2010030901A2 (en) * | 2008-09-11 | 2010-03-18 | Horton Deepwater Development Systems, Inc. | System and method for modular, high volume deepwater facility production |
WO2017217516A1 (en) * | 2016-06-16 | 2017-12-21 | Jfeスチール株式会社 | Welded structure having excellent brittle crack arrest characteristics |
Also Published As
Publication number | Publication date |
---|---|
CN112658518A (en) | 2021-04-16 |
NL2028601B1 (en) | 2022-10-10 |
CN112658518B (en) | 2023-01-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NL2028601B1 (en) | A construction method for a main propulsor bsea of a deep-water dynamic positioning crude oil cargo transfer vessel | |
CN110773845B (en) | Assembling and welding method for ship superstructure subsection | |
CN103785932B (en) | Cut deal I unclear welding procedure of type groove wide arc gap | |
JPH01500099A (en) | Formation of large sandwich-like structural members | |
CN107813146A (en) | Board material splice streamline and board material splice method | |
CN101474727A (en) | Laser-arc hybrid welding method of light sheet T type joint | |
CN106628009A (en) | Marine opening and closing hinge installation tool and method | |
CN104110069A (en) | Box-type X-shaped section intersection node and special mold frame, clamp and machining method for box-type X-shaped section intersection node | |
CN111761168A (en) | Steel-aluminum composite joint connection method for ships | |
CN111843102A (en) | T-shaped joint groove welding method | |
CN103659012A (en) | Efficient combined welding technological method for large and thick plates | |
CN104259636A (en) | Back-gouging-free welding process for double U shaped grooves of medium-thickness plates | |
CN104763049A (en) | Multi-weld-joint crossed steel member and fabrication method thereof | |
CN107598379A (en) | A kind of slab double-sided laser MIG composite weldings and MIG cover welding new methods | |
CN212332880U (en) | Ship anchor platform structure | |
CN110979550A (en) | Ship bulkhead toe end structure and design method thereof | |
CN111645824B (en) | High-precision construction method for torsion box of container ship | |
CN110722252B (en) | Method for assembling and positioning composite joint and aluminum alloy light enclosure wall | |
CN107378193A (en) | The automatic welding method of blade assemblies in rail vehicle truck | |
NL2028573B1 (en) | A welding method for a main propulsor base of a deep-water dynamic positioning crude oil cargo transfer vessel | |
CN204148756U (en) | A kind of subway carriage plate Quick splicing device | |
CN115180092A (en) | Hull sheet sectional connection method and hull | |
CN115338601B (en) | Preparation method of girder with triangular structure | |
CN105414784A (en) | Round steel butt welding technique | |