NL1035733C2 - Steel hook anchor structure for hanging of steel or precast concrete floor slab in balcony of building, has hook shoe comprising hook that is attached to base plate by using nuts, and faceplate arranged between base plate and hook shoe - Google Patents

Steel hook anchor structure for hanging of steel or precast concrete floor slab in balcony of building, has hook shoe comprising hook that is attached to base plate by using nuts, and faceplate arranged between base plate and hook shoe Download PDF

Info

Publication number
NL1035733C2
NL1035733C2 NL1035733A NL1035733A NL1035733C2 NL 1035733 C2 NL1035733 C2 NL 1035733C2 NL 1035733 A NL1035733 A NL 1035733A NL 1035733 A NL1035733 A NL 1035733A NL 1035733 C2 NL1035733 C2 NL 1035733C2
Authority
NL
Netherlands
Prior art keywords
hook
shoe
base plate
steel
building
Prior art date
Application number
NL1035733A
Other languages
Dutch (nl)
Inventor
Frank Boudewijn Smits
Original Assignee
Frank Boudewijn Smits
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Frank Boudewijn Smits filed Critical Frank Boudewijn Smits
Priority to NL1035733A priority Critical patent/NL1035733C2/en
Application granted granted Critical
Publication of NL1035733C2 publication Critical patent/NL1035733C2/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/003Balconies; Decks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The structure has an anchor hook (4) comprising an end plate (5), and a hook (8) welded to the end plate. A hook shoe (9) has a hook (10) that is attached to a base plate (13) by using nuts, and a side plate (12) is arranged between the hook of the hook shoe and the anchor shoe. A faceplate (17) is arranged between the base plate and the hook shoe, and heavy set screws are attached to pressure anchors.

Description

««

Haakanker ten behoeve van het ophangen van een balkon of vloerplaat aan een gebouwHook anchor for hanging a balcony or floor plate on a building

De uitvinding heeft betrekking op een stalen haakanker-constructie ten behoeve van het ophangen van stalen of prefab betonnen balkons of vloerplaten aan een gebouw.The invention relates to a steel hook anchor construction for suspending steel or prefab concrete balconies or floor slabs on a building.

5 Met de uitvinding wordt beoogd een stalen of prefab betonnen vloerplaat, balkon of galerij aan een gebouw op te hangen, zonder gebruik te maken van een ondersteunings-constructie, console of een vaste verbinding met het gebouw, waarbij de constructie zo is ontworpen dat er een mogelijkheid is om de vloerplaat in alle richtingen na te stellen.The object of the invention is to suspend a steel or prefab concrete floor plate, balcony or gallery from a building, without using a support structure, console or a fixed connection to the building, the structure being designed such that one possibility is to adjust the floor plate in all directions.

Volgens de uitvinding kan dit worden bereikt door een haakanker welke een vaste 10 verbinding heeft met de vloerplaat aan een haakschoen te hangen welke gemonteerd is op de basisplaat welke een vaste verbinding heeft met de vloerconstructie van een gebouw. Met behulp van een tussen de basisplaat en de haakschoen opgenomen stelplaat is de hoogte na te stellen. Met behulp van een stelplaat tussen de haakschoen en het haakanker is de diepte na te stellen. Met behulp van een stelbout die ook de drukkrachten vanuit de vloerplaat via een 15 anker op het gebouw overbrengt, is de vloerplaat waterpas te stellen.According to the invention this can be achieved by hanging a hook anchor which has a fixed connection to the floor plate on a hook shoe which is mounted on the base plate which has a fixed connection to the floor construction of a building. The height can be adjusted with the aid of an adjusting plate included between the base plate and the hook shoe. The depth can be adjusted with the aid of an adjusting plate between the hook shoe and the hook anchor. With the aid of an adjusting bolt that also transmits the compressive forces from the floor plate to the building via an anchor, the floor plate can be leveled.

De uitvinding zal hieronder nader worden uiteengezet aan de hand van een in figuren weergegeven uitvoeringsvoorbeeld van de constructie volgens de uitvinding.The invention will be explained in more detail below with reference to an exemplary embodiment of the construction according to the invention shown in figures.

Figuur 1 toont een verticale doorsnede van een prefab betonnen balkonplaat (1) die met 20 behulp van de haakanker-constructie (2) aan de vloerconstructie van een gebouw (3) is opgehangen.Figure 1 shows a vertical section of a prefab concrete balcony plate (1) which is suspended from the floor construction of a building (3) by means of the hook anchor construction (2).

Figuur 2 toont een horizontale doorsnede / bovenaanzicht van de prefab betonnen balkonplaat (1) van figuur 1, waarbij de twee haakanker-constructies (2) waarmee de prefab betonnen 25 balkonplaat (1) aan de vloerconstructie (3) is opgehangen, zichtbaar zijn.Figure 2 shows a horizontal section / top view of the prefab concrete balcony plate (1) of figure 1, wherein the two hook anchor constructions (2) with which the prefab concrete balcony plate (1) is suspended from the floor construction (3) are visible.

Figuur 3 toont een verticale doorsnede van de haakanker-constructie bij een prefab betonnen balkonplaat (1). De kopplaat (5) van het haakanker (4) is voorzien van aangelaste trekstaven (6) en beugelwapening (7) die in de balkonplaat (1) zijn opgenomen. Aan de kopplaat (5) van 30 het haakanker (4) zit een haak (8) gelast, die over de haak (10) van de haakschoen (9) wordt gehangen. De haak (10) van de haakschoen (9) zit gelast op de voetplaat (11). Tussen de haak (8) en de haak (10) zit een stelplaat (12). De haakschoen (S) is op de basisplaat (13) bevestigd en met behulp van moeren (14) vastgezet. De moeren (14) zijn op aan de basisplaat (13) vastgelaste draadeinden (15) gedraaid. De basisplaat (13) zit met aangelaste ankers (16) 35 aan de vloerconstructie van het gebouw (3) bevestigd. Tussen de basisplaat (13) en de haakschoen (9) zit een stelplaat(17). Onderin de vloerconstructie van het gebouw (3) zijn drukankers (18) opgenomen. In deze drukankers (18) zitten zware stelhouten (19) waarmee het prefab betonnen balkonplaat (1) waterpas kan worden gesteld.Figure 3 shows a vertical section of the hook anchor construction at a prefab concrete balcony plate (1). The head plate (5) of the hook anchor (4) is provided with welded tie rods (6) and bracket reinforcement (7) which are received in the balcony plate (1). A hook (8) is welded to the head plate (5) of the hook anchor (4), which hook is hung over the hook (10) of the hook shoe (9). The hook (10) of the hook shoe (9) is welded to the base plate (11). Between the hook (8) and the hook (10) is an adjusting plate (12). The hook shoe (S) is attached to the base plate (13) and secured with nuts (14). The nuts (14) are screwed onto threaded ends (15) welded to the base plate (13). The base plate (13) is attached to the floor structure of the building (3) with welded-on anchors (16). Between the base plate (13) and the hook shoe (9) is an adjusting plate (17). Pressure anchors (18) are included at the bottom of the floor construction of the building (3). These pressure anchors (18) contain heavy leveling wooden (19) with which the prefab concrete balcony plate (1) can be leveled.

40 1035733 240 1035733 2

Figuur 4 toont een horizontale doorsnede van de haakanker-constructie bij een prefab betonnen balkonplaat (1). De kopplaat (5) van het haakanker (4) is voorzien van aangelaste trekstaven (6) die in de balkonplaat (1) zijn opgenomen. Aan de kopplaat van het haakanker (4) zit een haak (8) gelast, die over de haak (10) van de haakschoen (9) wordt gehangen.Figure 4 shows a horizontal cross-section of the hook anchor construction at a prefab concrete balcony plate (1). The head plate (5) of the hook anchor (4) is provided with welded tie rods (6) which are received in the balcony plate (1). A hook (8) is welded to the head plate of the hook anchor (4), which hook is hung over the hook (10) of the hook shoe (9).

5 Tussen de haak (8) en de haak (10) zit een stelplaat (12). De haakschoen (9) is op de basisplaat (13) bevestigd met behulp van moeren (14).5 Between the hook (8) and the hook (10) is an adjusting plate (12). The hook shoe (9) is attached to the base plate (13) by means of nuts (14).

Figuur 5 toont de verticale doorsnede van het haakanker welke ingestort dient te worden in de prefab balk of vloerplaat. De kopplaat (5) van het haakanker is voorzien van aangelaste 10 trekstaven (6) en beugelwapening (7). Aan de kopplaat van het haakanker zit een haak (8) gelast.Figure 5 shows the vertical section of the hook anchor which must be cast into the prefab beam or floor plate. The head plate (5) of the hook anchor is provided with welded tie rods (6) and bracket reinforcement (7). A hook (8) is welded to the head plate of the hook anchor.

Figuur 6 toont de verticale doorsnede van de haakschoen. De haak (10) van de haakschoen zit gelast op de voetplaat (11).Figure 6 shows the vertical section of the hook shoe. The hook (10) of the hook shoe is welded to the foot plate (11).

1515

Figuur 7 toont de verticale doorsnede van de basisplaat die aan de vloerconstructie van het gebouw vastgestort dient te worden. Op de basisplaat zitten vastgelaste draadeinden (15). De basisplaat is voorzien van aangelaste ankers (16).Figure 7 shows the vertical section of the base plate to be fixed to the floor construction of the building. There are welded wire ends (15) on the base plate. The base plate has welded anchors (16).

20 103573320 1035733

Claims (1)

1. Een stalen haakanker-constructie voor het aanhangen van stalen of prefab betonnen balkon of vloerplaten aan een gebouw, met een stelmogelijkheid in meerdere richtingen, 5 met het kenmerk dat de constructie behoudens de stelplaten en stelhouten, bestaat uit drie onderdelen, het haakanker, de haakschoen en de basisplaat. 10 10357331. A steel hook anchor construction for attaching steel or prefab concrete balcony or floor slabs to a building, with a multi-directional adjustment possibility, characterized in that the structure consists of three parts, apart from the adjusting plates and adjusting timber, the hook anchor, the hook shoe and the base plate. 10 1035733
NL1035733A 2008-07-22 2008-07-22 Steel hook anchor structure for hanging of steel or precast concrete floor slab in balcony of building, has hook shoe comprising hook that is attached to base plate by using nuts, and faceplate arranged between base plate and hook shoe NL1035733C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
NL1035733A NL1035733C2 (en) 2008-07-22 2008-07-22 Steel hook anchor structure for hanging of steel or precast concrete floor slab in balcony of building, has hook shoe comprising hook that is attached to base plate by using nuts, and faceplate arranged between base plate and hook shoe

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL1035733A NL1035733C2 (en) 2008-07-22 2008-07-22 Steel hook anchor structure for hanging of steel or precast concrete floor slab in balcony of building, has hook shoe comprising hook that is attached to base plate by using nuts, and faceplate arranged between base plate and hook shoe
NL1035733 2008-07-22

Publications (1)

Publication Number Publication Date
NL1035733C2 true NL1035733C2 (en) 2010-01-25

Family

ID=41728564

Family Applications (1)

Application Number Title Priority Date Filing Date
NL1035733A NL1035733C2 (en) 2008-07-22 2008-07-22 Steel hook anchor structure for hanging of steel or precast concrete floor slab in balcony of building, has hook shoe comprising hook that is attached to base plate by using nuts, and faceplate arranged between base plate and hook shoe

Country Status (1)

Country Link
NL (1) NL1035733C2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015162507A1 (en) * 2014-04-22 2015-10-29 B&R N.V. Device and method for anchoring an overhanging element to a construction
EP3056620A1 (en) * 2015-02-10 2016-08-17 Vbi Ontwikkeling B.V. A mounting system and a method for mounting a cantilever building element to an edge of a floor construction of a building
EP3112541A1 (en) * 2015-07-03 2017-01-04 H.J.J. Evers Beheer B.V. Mounting assembly and method for mounting a balcony on a part of a building, and auxiliary means therefor
WO2017086777A1 (en) * 2015-11-16 2017-05-26 T&R Engineering B.V. Building and balcony

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1126092A1 (en) * 2000-02-18 2001-08-22 MEA MEISINGER Stahl und Kunststoff GmbH Mounting support system
DE19928757C2 (en) * 1999-06-23 2001-11-08 Mea Meisinger Stahl & Kunststo Mounting bracket system and method for mounting a prefabricated component on a building part

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19928757C2 (en) * 1999-06-23 2001-11-08 Mea Meisinger Stahl & Kunststo Mounting bracket system and method for mounting a prefabricated component on a building part
EP1126092A1 (en) * 2000-02-18 2001-08-22 MEA MEISINGER Stahl und Kunststoff GmbH Mounting support system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015162507A1 (en) * 2014-04-22 2015-10-29 B&R N.V. Device and method for anchoring an overhanging element to a construction
BE1021992B1 (en) * 2014-04-22 2016-02-02 B&R Nv APPARATUS AND METHOD FOR ANCHORING AN EXCELLENT ELEMENT TO A CONSTRUCTION
US10227769B2 (en) 2014-04-22 2019-03-12 B&R N.V. Device and method for anchoring an overhanging element to a construction
EA032184B1 (en) * 2014-04-22 2019-04-30 Биэндар Н.В. Device and method for anchoring an overhanging element to a construction
AU2015249488B2 (en) * 2014-04-22 2019-09-12 B&R N.V. Device and method for anchoring an overhanging element to a construction
EP3056620A1 (en) * 2015-02-10 2016-08-17 Vbi Ontwikkeling B.V. A mounting system and a method for mounting a cantilever building element to an edge of a floor construction of a building
EP3112541A1 (en) * 2015-07-03 2017-01-04 H.J.J. Evers Beheer B.V. Mounting assembly and method for mounting a balcony on a part of a building, and auxiliary means therefor
WO2017086777A1 (en) * 2015-11-16 2017-05-26 T&R Engineering B.V. Building and balcony
NL2017754A (en) * 2015-11-16 2017-06-02 T&R Eng B V Building and facade element

Similar Documents

Publication Publication Date Title
NL1035733C2 (en) Steel hook anchor structure for hanging of steel or precast concrete floor slab in balcony of building, has hook shoe comprising hook that is attached to base plate by using nuts, and faceplate arranged between base plate and hook shoe
US8667755B1 (en) Dual panel composite truss apparatus
NL2017754B1 (en) Building and facade element
US8950133B2 (en) Bracket and an arrangement for supporting a precast slab element of concrete on a precast structure element of concrete
CN105637159A (en) Formwork element
CN202882446U (en) Horse stool suspended by steel bars
EP2935712B1 (en) Column shoe
US20150040499A1 (en) Precast concrete module which can be adapted internally to multiple uses
CN105839912A (en) Molding bracket for shear wall of building
BE1021211B1 (en) SUPPORT DEVICE FOR MASONRY
NL2005368C2 (en) METHOD FOR EXTENDING A BUILDING, SUPPORT ELEMENT, MODULAR BUILDING UNIT AND BUILDING WITH SUCH UNIT.
JP2011058228A (en) Erection beam with vertical adjustment function
NL1024287C1 (en) Hanging strip for securing safety rail to sand lime brick wall, contains tongue with slot for rail post bracket
KR101057312B1 (en) Prefab Window Hanger Structures
CN106149563B (en) Steel anchor beam accurate positioning device and installation method built in free-standing Sarasota
EP2666918A2 (en) Balcony
KR101230011B1 (en) Beam molding frame supporter for concrete building
JP6960835B2 (en) Joining structure of concrete beam and viscous damping wall, and joining method of concrete beam and viscous damping wall
NL2017771B1 (en) Assembly, floor element, balcony plate and connecting means.
RU107198U1 (en) BALCONY REINFORCEMENT DESIGN
PL218793B1 (en) Façade panel suspension
KR20090003717U (en) Safety railing socle for bean mold
KR20110116950A (en) Reinforcement structure
NL2015774B1 (en) Improved support structure for carrying a floor and applying it.
CZ305028B6 (en) Connecting modules for building structures

Legal Events

Date Code Title Description
PD2B A search report has been drawn up
V1 Lapsed because of non-payment of the annual fee

Effective date: 20130201