|
US4384483A
(en)
|
1981-08-11 |
1983-05-24 |
Mobil Oil Corporation |
Preventing buckling in drill string
|
|
US4382381A
(en)
|
1981-08-28 |
1983-05-10 |
Mobil Oil Corporation |
Determining stresses and length changes in well production tubing
|
|
US4675147A
(en)
|
1983-04-06 |
1987-06-23 |
Westinghouse Electic Corp. |
Generating an integrated graphic display of the safety status of a complex process plant
|
|
US4549431A
(en)
|
1984-01-04 |
1985-10-29 |
Mobil Oil Corporation |
Measuring torque and hook load during drilling
|
|
AU608503B2
(en)
|
1985-07-15 |
1991-04-11 |
Chevron Research And Technology Company |
Method of avoiding stuck drilling equipment
|
|
US4760735A
(en)
|
1986-10-07 |
1988-08-02 |
Anadrill, Inc. |
Method and apparatus for investigating drag and torque loss in the drilling process
|
|
US4848144A
(en)
|
1988-10-03 |
1989-07-18 |
Nl Sperry-Sun, Inc. |
Method of predicting the torque and drag in directional wells
|
|
US5044198A
(en)
*
|
1988-10-03 |
1991-09-03 |
Baroid Technology, Inc. |
Method of predicting the torque and drag in directional wells
|
|
US4972703A
(en)
*
|
1988-10-03 |
1990-11-27 |
Baroid Technology, Inc. |
Method of predicting the torque and drag in directional wells
|
|
US5660239A
(en)
|
1989-08-31 |
1997-08-26 |
Union Oil Company Of California |
Drag analysis method
|
|
US5508915A
(en)
|
1990-09-11 |
1996-04-16 |
Exxon Production Research Company |
Method to combine statistical and engineering techniques for stuck pipe data analysis
|
|
US5431046A
(en)
|
1994-02-14 |
1995-07-11 |
Ho; Hwa-Shan |
Compliance-based torque and drag monitoring system and method
|
|
CN1145446A
(zh)
*
|
1995-09-13 |
1997-03-19 |
霍华山 |
柔性基准的井眼阻力与扭矩监测系统与方法
|
|
FR2750159B1
(fr)
|
1996-06-24 |
1998-08-07 |
Inst Francais Du Petrole |
Methode et systeme d'estimation en temps reel d'au moins un parametre lie au comportement d'un outil de fond de puits
|
|
FR2750160B1
(fr)
|
1996-06-24 |
1998-08-07 |
Inst Francais Du Petrole |
Methode et systeme d'estimation en temps reel d'au moins un parametre lie au deplacement d'un outil de forage
|
|
US6026912A
(en)
|
1998-04-02 |
2000-02-22 |
Noble Drilling Services, Inc. |
Method of and system for optimizing rate of penetration in drilling operations
|
|
US7188058B2
(en)
|
2000-04-04 |
2007-03-06 |
Conocophillips Company |
Method of load and failure prediction of downhole liners and wellbores
|
|
US6374914B1
(en)
*
|
2000-05-17 |
2002-04-23 |
Fmc Corporation |
Duel completion bop centralizer
|
|
US6443242B1
(en)
|
2000-09-29 |
2002-09-03 |
Ctes, L.C. |
Method for wellbore operations using calculated wellbore parameters in real time
|
|
US6401838B1
(en)
|
2000-11-13 |
2002-06-11 |
Schlumberger Technology Corporation |
Method for detecting stuck pipe or poor hole cleaning
|
|
US6526819B2
(en)
|
2001-02-08 |
2003-03-04 |
Weatherford/Lamb, Inc. |
Method for analyzing a completion system
|
|
FR2842245B1
(fr)
|
2002-07-11 |
2005-01-21 |
Inst Francais Du Petrole |
Systeme et methode de gestion de la fatigue de tubulaires de forage
|
|
WO2005091019A1
(en)
*
|
2004-03-04 |
2005-09-29 |
Halliburton Energy Services, Inc. |
Multiple distributed force measurements
|
|
US20160237804A1
(en)
|
2004-06-14 |
2016-08-18 |
Stylianos Papadimitriou |
Stress engineering assessment of risers and riser strings
|
|
US8074720B2
(en)
|
2004-09-28 |
2011-12-13 |
Vetco Gray Inc. |
Riser lifecycle management system, program product, and related methods
|
|
US7412368B2
(en)
|
2004-11-15 |
2008-08-12 |
Landmark Graphics Corporation |
Methods and computer-readable media for determining design parameters to prevent tubing buckling in deviated wellbores
|
|
CN101133312B
(zh)
|
2005-12-15 |
2013-07-17 |
杰富意钢铁株式会社 |
钢管的局部压曲性能评价方法、钢管的设计方法、钢管的制造方法和钢管
|
|
US20080308272A1
(en)
|
2007-06-12 |
2008-12-18 |
Thomeer Hubertus V |
Real Time Closed Loop Interpretation of Tubing Treatment Systems and Methods
|
|
US20090192731A1
(en)
|
2008-01-24 |
2009-07-30 |
Halliburton Energy Services, Inc. |
System and Method for Monitoring a Health State of Hydrocarbon Production Equipment
|
|
WO2009109745A1
(en)
|
2008-03-05 |
2009-09-11 |
Schlumberger Holdings Limited |
Flexible pipe fatigue monitoring below the bend stiffener of a flexible riser
|
|
BRPI0919556B8
(pt)
|
2008-10-03 |
2019-07-30 |
Halliburton Energy Services Inc |
método, sistema para perfurar um poço, e, meio legível por computador
|
|
WO2010064031A1
(en)
|
2008-12-02 |
2010-06-10 |
National Oilwell Varco, L.P. |
Method and apparatus for estimating the instantaneous rotational speed of a bottom hole assembly
|
|
AU2009334819B2
(en)
|
2008-12-31 |
2013-12-12 |
Shell Internationale Research Maatschappij B.V. |
Method for monitoring deformation of well equipment
|
|
GB2466812B
(en)
|
2009-01-08 |
2011-10-19 |
Schlumberger Holdings |
Drillstring dynamics
|
|
US20110083845A1
(en)
*
|
2009-10-09 |
2011-04-14 |
Impact Guidance Systems, Inc. |
Datacoil™ Downhole Logging System
|
|
US9091139B2
(en)
|
2009-12-11 |
2015-07-28 |
Schlumberger Technology Corporation |
Method for determining characteristics of tubing deployed in a wellbore
|
|
US8544339B2
(en)
|
2009-12-30 |
2013-10-01 |
Schlumberger Technology Corporation |
Life monitor for a well access line
|
|
US8453764B2
(en)
|
2010-02-01 |
2013-06-04 |
Aps Technology, Inc. |
System and method for monitoring and controlling underground drilling
|
|
US8504308B2
(en)
|
2010-07-13 |
2013-08-06 |
Schlumberger Technology Corporation |
System and method for fatigue analysis of a bottom hole assembly
|
|
US9103736B2
(en)
|
2010-12-03 |
2015-08-11 |
Baker Hughes Incorporated |
Modeling an interpretation of real time compaction modeling data from multi-section monitoring system
|
|
US20120143525A1
(en)
|
2010-12-03 |
2012-06-07 |
Baker Hughes Incorporated |
Interpretation of Real Time Compaction Monitoring Data Into Tubular Deformation Parameters and 3D Geometry
|
|
US20120143523A1
(en)
|
2010-12-03 |
2012-06-07 |
Baker Hughes Incorporated |
Interpretation of Real Time Casing Image (RTCI) Data Into 3D Tubular Deformation Image
|
|
WO2012174057A1
(en)
|
2011-06-13 |
2012-12-20 |
Schlumberger Canada Limited |
Coiled tubing useful life monitor and technique
|
|
CN104024571B
(zh)
|
2011-06-24 |
2016-07-06 |
界标制图有限公司 |
确定井眼内两同心管的力矩和力的系统和方法
|
|
CA2852765C
(en)
|
2011-11-02 |
2015-09-15 |
Landmark Graphics Corporation |
Method and system for predicting a drill string stuck pipe event
|
|
US10030499B2
(en)
|
2011-12-06 |
2018-07-24 |
Bp Corporation North America Inc. |
Geological monitoring console
|
|
BR112014013553B1
(pt)
*
|
2011-12-28 |
2021-03-30 |
Halliburton Energy Services, Inc |
Método e sistema para otimizar medições de peso em operações de perfuração, e, mídia legível por computador
|
|
AU2012370482B2
(en)
|
2012-02-24 |
2016-06-30 |
Landmark Graphics Corporation |
Determining optimal parameters for a downhole operation
|
|
US9659113B2
(en)
|
2012-03-15 |
2017-05-23 |
Schlumberger Technology Corporation |
Technique for establishing predictive reach through a deviated well
|
|
US9953114B2
(en)
|
2012-03-27 |
2018-04-24 |
Exxonmobil Upstream Research Company |
Designing a drillstring
|
|
US10253582B2
(en)
|
2012-05-14 |
2019-04-09 |
Dril-Quip, Inc. |
Riser monitoring and lifecycle management system and method
|
|
US9022140B2
(en)
|
2012-10-31 |
2015-05-05 |
Resource Energy Solutions Inc. |
Methods and systems for improved drilling operations using real-time and historical drilling data
|
|
WO2014133505A1
(en)
|
2013-02-27 |
2014-09-04 |
Landmark Graphics Corporation |
Method and system for performing friction factor calibration
|
|
BR112015017950A2
(pt)
|
2013-02-27 |
2017-07-11 |
Landmark Graphics Corp |
método e sistema para prever eventos de perfuração, e, meio legível por computador não transitório
|
|
US10428637B2
(en)
|
2013-03-04 |
2019-10-01 |
Fereidoun Abbassian |
System and console for monitoring and managing well site operations
|
|
US9416652B2
(en)
|
2013-08-08 |
2016-08-16 |
Vetco Gray Inc. |
Sensing magnetized portions of a wellhead system to monitor fatigue loading
|
|
US9845671B2
(en)
|
2013-09-16 |
2017-12-19 |
Baker Hughes, A Ge Company, Llc |
Evaluating a condition of a downhole component of a drillstring
|
|
RU2627329C1
(ru)
|
2013-09-17 |
2017-08-07 |
Хэллибертон Энерджи Сервисиз, Инк. |
Оценка и калибровка условий изгиба в скважине
|
|
SG11201600529VA
(en)
|
2013-09-25 |
2016-02-26 |
Landmark Graphics Corp |
Method and load analysis for multi-off-center tools
|
|
DE112013007476T5
(de)
|
2013-09-30 |
2016-06-30 |
Landmark Graphics Corporation |
Verfahren und Analyse zur holistischen Futterrohrkonstruktion zum Planen und in Echtzeit
|
|
US9857271B2
(en)
|
2013-10-10 |
2018-01-02 |
Baker Hughes, A Ge Company, Llc |
Life-time management of downhole tools and components
|
|
CN104564019A
(zh)
*
|
2013-10-27 |
2015-04-29 |
中国石油化工集团公司 |
一种大位移井摩阻扭矩监测方法
|
|
CA2925887C
(en)
|
2013-10-28 |
2018-07-31 |
Landmark Graphics Corporation |
Ratio-based mode switching for optimizing weight-on-bit
|
|
RU2630002C1
(ru)
|
2013-11-14 |
2017-09-05 |
Хэллибертон Энерджи Сервисиз, Инк. |
Привязка по глубине, нагрузке и крутящему моменту в скважине
|
|
NO347693B1
(en)
|
2013-12-06 |
2024-02-26 |
Halliburton Energy Services Inc |
Managing wellbore operations using uncertainty calculations
|
|
GB2539794B
(en)
*
|
2013-12-17 |
2020-10-21 |
Halliburton Energy Services Inc |
Drilling modeling calibration, including estimation of drill string stretch and twist
|
|
NO3074325T3
(es)
|
2013-12-23 |
2018-02-24 |
|
|
|
MX2016006281A
(es)
|
2014-01-02 |
2017-01-19 |
Landmark Graphics Corp |
Metodo y aparato para la estimacion del espesor de la tuberia de revestimiento.
|
|
SG11201604472PA
(en)
*
|
2014-01-30 |
2016-07-28 |
Landmark Graphics Corp |
Depth range manager for drill string analysis
|
|
GB2522709B
(en)
|
2014-02-04 |
2017-07-19 |
Aquaterra Energy Ltd |
An offshore pipe monitoring system
|
|
EP3087249B1
(en)
|
2014-02-28 |
2023-12-13 |
Landmark Graphics Corporation |
Estimation and monitoring of casing wear during a drilling operation using casing wear maps
|
|
US10352148B2
(en)
|
2014-04-02 |
2019-07-16 |
Landmark Graphics Corporation |
Estimating casing wear using models incorporating bending stiffness
|
|
US10323502B2
(en)
*
|
2014-05-02 |
2019-06-18 |
Kongsberg Oil And Gas Technologies As |
System and console for monitoring and managing tripping operations at a well site
|
|
WO2015187027A1
(en)
|
2014-06-05 |
2015-12-10 |
National Oilwell Varco Norway As |
Method and device for estimating downhole string variables
|
|
WO2016022337A1
(en)
|
2014-08-04 |
2016-02-11 |
Landmark Graphics Corporation |
Modeling casing/riser wear and friction factor using discrete inversion techniques
|
|
US9945223B2
(en)
|
2014-08-14 |
2018-04-17 |
Schlumberger Technology Corporation |
Fatigue calculator generation system
|
|
WO2016028537A1
(en)
|
2014-08-19 |
2016-02-25 |
Halliburton Energy Services, Inc. |
Behind pipe evaluation of cut and pull tension prediction in well abandonment and intervention operations
|
|
US20170306726A1
(en)
|
2014-09-02 |
2017-10-26 |
King Abdullah University Of Science And Technology |
Stuck pipe prediction
|
|
WO2016040573A1
(en)
|
2014-09-11 |
2016-03-17 |
Board Of Regents, The University Of Texas System |
Lmi-based control of stick-slip oscillations in drilling
|
|
US10648296B2
(en)
|
2014-10-15 |
2020-05-12 |
Schlumberger Technology Corporation |
Borehole casing deployment detection
|
|
US10487640B2
(en)
|
2014-10-17 |
2019-11-26 |
Landmark Graphics Corporation |
Casing wear prediction using integrated physics-driven and data-driven models
|
|
GB2547808B
(en)
|
2014-11-10 |
2021-09-01 |
Halliburton Energy Services Inc |
Methods and apparatus for monitoring wellbore tortuosity
|
|
AU2015346001A1
(en)
|
2014-11-12 |
2017-05-25 |
Globaltech Corporation Pty Ltd |
Apparatus and method for measuring drilling parameters of a down-the-hole drilling operation for mineral exploration
|
|
US9689250B2
(en)
|
2014-11-17 |
2017-06-27 |
Tesco Corporation |
System and method for mitigating stick-slip
|
|
AU2015378622A1
(en)
|
2015-01-23 |
2017-07-20 |
Landmark Graphics Corporation |
Determining stresses in a pipe under non-uniform exterior loads
|
|
WO2016130155A1
(en)
|
2015-02-13 |
2016-08-18 |
Halliburton Energy Services, Inc. |
Real-time tracking and mitigating of bending fatigue in coiled tubing
|
|
CA2973063C
(en)
|
2015-02-13 |
2019-08-27 |
Halliburton Energy Services, Inc. |
Real-time tracking of bending fatigue in coiled tubing
|
|
AU2016223235B2
(en)
|
2015-02-26 |
2019-05-02 |
Halliburton Energy Services, Inc. |
Improved estimation of wellbore dogleg from tool bending moment measurements
|
|
CA2977943C
(en)
|
2015-04-01 |
2021-04-13 |
Landmark Graphics Corporation |
Model generation for real-time rate of penetration prediction
|
|
WO2016182799A1
(en)
|
2015-05-08 |
2016-11-17 |
Schlumberger Technology Corporation |
Real time drilling monitoring
|
|
WO2016182798A1
(en)
|
2015-05-08 |
2016-11-17 |
Schlumberger Technology Corporation |
Fatigue analysis procedure for drill string
|
|
GB2554198B
(en)
|
2015-05-12 |
2022-04-06 |
Halliburton Energy Services Inc |
Enhancing oilfield operations with cognitive computing
|
|
WO2016186646A1
(en)
|
2015-05-18 |
2016-11-24 |
Halliburton Energy Services Inc. |
Condition based maintenance program based on life-stress acceleration model and time-varying stress model
|
|
CA2984415A1
(en)
|
2015-06-05 |
2016-12-08 |
Halliburton Energy Services, Inc. |
Estimating deformation of a completion string caused by an eccentric tool coupled thereto
|
|
WO2016200395A1
(en)
|
2015-06-12 |
2016-12-15 |
Landmark Graphics Corporation |
Estimating casing wear due to drill string reciprocation
|
|
WO2016200397A1
(en)
|
2015-06-12 |
2016-12-15 |
Landmark Graphics Corporation |
Estimating casing wear during drilling using multiple wear factors along the drill string
|
|
AU2015400157A1
(en)
|
2015-06-26 |
2017-11-16 |
Landmark Graphics Corporation |
Visualization of quantitative drilling operations data related to a stuck pipe event
|
|
US10876391B2
(en)
|
2015-08-27 |
2020-12-29 |
Halliburton Energy Services, Inc. |
Tuning predictions of wellbore operation parameters
|
|
CA2992710A1
(en)
|
2015-08-27 |
2017-03-02 |
Halliburton Energy Services, Inc. |
Determining sources of erroneous downhole predictions
|
|
AU2015408204A1
(en)
|
2015-09-01 |
2018-02-08 |
Landmark Graphics Corporation |
Tubular wear volume determination using adjustable wear factors
|
|
US9593568B1
(en)
|
2015-10-09 |
2017-03-14 |
General Electric Company |
System for estimating fatigue damage
|
|
AU2015411331A1
(en)
|
2015-10-09 |
2018-03-15 |
Landmark Graphics Corporation |
Tubular wear volume determination using elasticity correction
|
|
WO2017074380A1
(en)
|
2015-10-29 |
2017-05-04 |
Landmark Graphics Corporation |
Tubular wear volume determination using stretch correction
|
|
AU2015413369B2
(en)
|
2015-10-30 |
2021-07-08 |
Halliburton Energy Services, Inc. |
Enhancing drilling operations with cognitive computing
|
|
US20170145810A1
(en)
|
2015-11-23 |
2017-05-25 |
Schlumberger Technology Corporation |
System and methodology for establishing a fatigue life of a subsea landing string
|
|
US10450851B2
(en)
|
2015-11-30 |
2019-10-22 |
Weatherford Technology Holdings, Llc |
Calculating downhole card in deviated wellbore using parameterized segment calculations
|
|
CA3005431A1
(en)
|
2015-12-15 |
2017-06-22 |
Halliburton Energy Services, Inc. |
Real time tracking of bending forces and fatigue in a tubing guide
|
|
WO2017105430A1
(en)
|
2015-12-16 |
2017-06-22 |
Landmark Graphics Corporation |
Optimized coiled tubing string design and analysis for extended reach drilling
|
|
NO341053B1
(en)
|
2016-01-26 |
2017-08-14 |
Exebenus AS |
A method for planning and executing real time automated decision support in oil and gas wells
|
|
WO2017142540A1
(en)
|
2016-02-18 |
2017-08-24 |
Halliburton Energy Services, Inc. |
Game theoretic control architecture for drilling system automation
|
|
CA3015621C
(en)
|
2016-02-26 |
2020-09-29 |
Baker Hughes, A Ge Company, Llc |
Real-time tension, compression and torque data monitoring system
|
|
WO2017180124A1
(en)
|
2016-04-14 |
2017-10-19 |
Landmark Graphics Corporation |
Parameter based roadmap generation for downhole operations
|
|
EP3443198A4
(en)
|
2016-04-15 |
2020-02-19 |
Landmark Graphics Corporation |
OPTIMIZATION AND REAL-TIME VISUALIZATION OF PARAMETERS FOR DRILLING OPERATIONS
|
|
GB2550192A
(en)
|
2016-05-12 |
2017-11-15 |
Xodus Group Ltd |
Pipework Fatigue Lifetime Measurement
|
|
NL2016859B1
(en)
|
2016-05-30 |
2017-12-11 |
Engie Electroproject B V |
A method of and a device for estimating down hole speed and down hole torque of borehole drilling equipment while drilling, borehole equipment and a computer program product.
|
|
WO2017206182A1
(en)
|
2016-06-03 |
2017-12-07 |
Schlumberger Technology Corporation |
Detecting events in well reports
|
|
US10287870B2
(en)
|
2016-06-22 |
2019-05-14 |
Baker Hughes, A Ge Company, Llc |
Drill pipe monitoring and lifetime prediction through simulation based on drilling information
|
|
US20170370203A1
(en)
|
2016-06-28 |
2017-12-28 |
Nabors Drilling Technologies Usa, Inc. |
Stick-Slip Reduction Using Combined Torsional and Axial Control
|
|
US10066473B2
(en)
|
2016-06-30 |
2018-09-04 |
Wipro Limited |
Method and a system for determining slip status of a drill string
|
|
GB2552939A
(en)
|
2016-08-08 |
2018-02-21 |
Datacloud Int Inc |
Method and system for analysing drilling data
|
|
EP3504400B1
(en)
|
2016-08-23 |
2020-06-10 |
BP Corporation North America Inc. |
System and method for drilling rig state determination
|
|
US9797234B1
(en)
|
2016-09-06 |
2017-10-24 |
Baker Hughes Incorporated |
Real time untorquing and over-torquing of drill string connections
|
|
US10233740B2
(en)
|
2016-09-13 |
2019-03-19 |
Nabors Drilling Technologies Usa, Inc. |
Stick-slip mitigation on direct drive top drive systems
|
|
US10428639B2
(en)
|
2016-09-15 |
2019-10-01 |
Landmark Graphics Corporation |
Determining damage to a casing string in a wellbore
|
|
US10883894B2
(en)
|
2016-09-16 |
2021-01-05 |
Onesubsea Ip Uk Limited |
Conduit fatigue management systems and methods
|
|
CN106437513B
(zh)
*
|
2016-09-26 |
2018-07-27 |
中国石油大学(华东) |
一种复杂结构井减摩阻及动力钻具工具面调整方法
|
|
US10380280B2
(en)
|
2016-11-17 |
2019-08-13 |
Baker Hughes, A Ge Company, Llc |
Optimal storage of load data for lifetime prediction for equipment used in a well operation
|
|
CA3041236C
(en)
|
2016-12-09 |
2021-10-19 |
Halliburton Energy Services, Inc. |
Downhole drilling methods and systems with top drive motor torque commands based on a dynamics model
|
|
WO2018112062A1
(en)
|
2016-12-14 |
2018-06-21 |
Trendsetter Vulcan Offshore, Inc. |
Monitoring system for marine risers
|
|
US20180171774A1
(en)
|
2016-12-21 |
2018-06-21 |
Schlumberger Technology Corporation |
Drillstring sticking management framework
|