MX2015014002A - Pre-blended dry cement mortar for covering underground works and slopes. - Google Patents
Pre-blended dry cement mortar for covering underground works and slopes.Info
- Publication number
- MX2015014002A MX2015014002A MX2015014002A MX2015014002A MX2015014002A MX 2015014002 A MX2015014002 A MX 2015014002A MX 2015014002 A MX2015014002 A MX 2015014002A MX 2015014002 A MX2015014002 A MX 2015014002A MX 2015014002 A MX2015014002 A MX 2015014002A
- Authority
- MX
- Mexico
- Prior art keywords
- rock
- cement mortar
- tunnels
- slopes
- boulders
- Prior art date
Links
Abstract
The present disclosure is related to a cement mortar that can be used in mining tunnels, designed to be thrown to the walls, shoulders and roofs of underground tunnels in the mining industry for supporting fragmented rocks and/or rock boulders. Among the advantages of this cement mortar, the following should be considered: Safe application in walls, shoulders and roofs of underground mining tunnels; high strength and rigidity improving fragmented rock and rock boulders support, preventing the rock from giving up and therefore also preventing the tunnel from collapsing; resistant to vibrations caused by explosive detonations in underground tunnels; the present invention also can be used in conjunction with electro welded or cyclonic mesh, reinforcing the fragmented rock or rock boulders support.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
MX2015014002A MX2015014002A (en) | 2015-10-02 | 2015-10-02 | Pre-blended dry cement mortar for covering underground works and slopes. |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
MX2015014002A MX2015014002A (en) | 2015-10-02 | 2015-10-02 | Pre-blended dry cement mortar for covering underground works and slopes. |
Publications (1)
Publication Number | Publication Date |
---|---|
MX2015014002A true MX2015014002A (en) | 2017-04-03 |
Family
ID=59067366
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MX2015014002A MX2015014002A (en) | 2015-10-02 | 2015-10-02 | Pre-blended dry cement mortar for covering underground works and slopes. |
Country Status (1)
Country | Link |
---|---|
MX (1) | MX2015014002A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109578021A (en) * | 2018-11-29 | 2019-04-05 | 长安大学 | A kind of economical high-strength fast grouting strengthening method of injecting paste material and soft rock tunnel firmly |
-
2015
- 2015-10-02 MX MX2015014002A patent/MX2015014002A/en unknown
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109578021A (en) * | 2018-11-29 | 2019-04-05 | 长安大学 | A kind of economical high-strength fast grouting strengthening method of injecting paste material and soft rock tunnel firmly |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
PH12018500543A1 (en) | Tunnel construction method using pre-support and post-support and apparatus suitable for same | |
EA201890135A1 (en) | ANTI-SCALE CONSTRUCTION FOR ROLLING OUT ON METHOD 110 UNDERGROUND DEVELOPMENT WITH DESTRUCTION OF ROOF | |
BR112012021093A2 (en) | underground mining | |
EA201590327A1 (en) | METHOD OF STRENGTHENING A PART IN THE FORM OF A SUPPORT OF PASSING NEXT PARALLEL TUNNELS BY ARMATURE RODS AND METHOD OF DEVELOPMENT | |
RU2015111958A (en) | A method for predicting coal methane resources in a phase of a liquidated mine | |
MX2015014002A (en) | Pre-blended dry cement mortar for covering underground works and slopes. | |
Mohamad et al. | Effect of geological structure and blasting practice in fly rock accident at Johor, Malaysia | |
IL272862A (en) | Reinforcement system for the concrete lining of the inner shell of a tunnel construction | |
RU2498065C1 (en) | Method to mine mineral beds | |
RU2607131C1 (en) | Thick flat dipping ore deposits at big depths development method | |
RU2399766C1 (en) | Removal method of mechanical complex of mining face | |
RU2010148178A (en) | METHOD FOR INSULATING AN EMERGENCY SITE IN THE UNDERGROUND DEVELOPMENT OF COAL SEAMS | |
Part | Engineering Geological Problems in Deep Seated | |
MX2014002711A (en) | Cable mining anchor for reinforcing rock. | |
UA126759U (en) | CURRENT MIXTURE FOR MOUNTING OF COAL MINE PRODUCTS | |
GR1008797B (en) | Multi-use brick characterised by great dimensions and verticals voids | |
UA106514U (en) | A method of development of ore deposits | |
UA105413U (en) | Device for the erection of underground structures | |
RU2013148961A (en) | METHOD FOR DRAWING DIAMOND-CONTAINING ORES FROM WHOLE | |
RU144480U1 (en) | FORMWORK FOR CONSTRUCTION OF CONCRETE FASTENERS OF TUNNELS | |
RU2568447C1 (en) | Development of thick inflammable steeply inclined coal beds | |
CA186920S (en) | Grout anchored rock bolt | |
RU2013111577A (en) | INTEGRATED METHOD FOR PRELIMINARY DEGASATION OF THE WORKING COAL LAYER, THE SPACE AND SURGEONS AND MANAGED HEAVY ROOF DAMAGE | |
PL413826A1 (en) | Method and system for increasing the progress of the exploited longwall excavation with the longwall gallery excavations | |
RU147961U1 (en) | CLEANING SYSTEM OF THE DEVELOPMENT OF STEEP ORE BODIES |