MX2010009897A - Interfase de usuario para programar asignaciones de recurso. - Google Patents
Interfase de usuario para programar asignaciones de recurso.Info
- Publication number
- MX2010009897A MX2010009897A MX2010009897A MX2010009897A MX2010009897A MX 2010009897 A MX2010009897 A MX 2010009897A MX 2010009897 A MX2010009897 A MX 2010009897A MX 2010009897 A MX2010009897 A MX 2010009897A MX 2010009897 A MX2010009897 A MX 2010009897A
- Authority
- MX
- Mexico
- Prior art keywords
- project
- tasks
- resource
- view
- scheduling
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Se proporciona una interfase de usuario de programación de recursos de manejo de proyecto, en donde la información de recurso puede presentarse en una línea de tiempo condensada para cada recurso en la duración de un proyecto. Las tareas individuales o grupos de tareas presentadas en la vista programación de recursos de manejo de proyecto pueden ser movidas desde un recurso hacia otro recurso mientras respeten las imitaciones y dependencias de proyecto. Las tareas no asignadas y no programadas pueden ser arrastradas en la vista de programación y pueden dejarse caer en un recurso dado en una ubicación de tiempo requerida por el proyecto. Las tareas pueden verse de acuerdo con una relación jerárquica entre las tareas de un proyecto dado. La vista de programación puede utilizarse en combinación con una vista de cuadro Gantt de tareas de proyecto para permitir una vista de programación tanto basada en tarea como basada en recurso.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/049,282 US20090234699A1 (en) | 2008-03-15 | 2008-03-15 | User Interface For Scheduling Resource Assignments |
PCT/US2009/034076 WO2009117195A2 (en) | 2008-03-15 | 2009-02-13 | User interface for scheduling resource assignments |
Publications (1)
Publication Number | Publication Date |
---|---|
MX2010009897A true MX2010009897A (es) | 2010-09-30 |
Family
ID=41064026
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MX2010009897A MX2010009897A (es) | 2008-03-15 | 2009-02-13 | Interfase de usuario para programar asignaciones de recurso. |
Country Status (13)
Country | Link |
---|---|
US (1) | US20090234699A1 (es) |
EP (1) | EP2266079A4 (es) |
JP (1) | JP2011515759A (es) |
KR (1) | KR20100126508A (es) |
CN (1) | CN101971197A (es) |
AU (1) | AU2009226062A1 (es) |
BR (1) | BRPI0908380A2 (es) |
CA (1) | CA2717324A1 (es) |
IL (1) | IL207622A0 (es) |
MX (1) | MX2010009897A (es) |
RU (1) | RU2010138120A (es) |
WO (1) | WO2009117195A2 (es) |
ZA (1) | ZA201005836B (es) |
Families Citing this family (73)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8583465B1 (en) * | 2008-09-25 | 2013-11-12 | Bank Of America Corporation | Supply management and reporting system and method for resource management |
EP2224384A1 (en) * | 2009-02-25 | 2010-09-01 | Siemens Aktiengesellschaft | Method and system for scheduling a manufacturing process |
US9607275B2 (en) * | 2009-04-28 | 2017-03-28 | Ca, Inc. | Method and system for integration of systems management with project and portfolio management |
US8423088B2 (en) * | 2009-07-22 | 2013-04-16 | Microsoft Corporation | Aggregated, interactive communication timeline |
ES2627910T3 (es) | 2009-12-29 | 2017-08-01 | Gamida-Cell Ltd. | Métodos para potenciar la proliferación y la actividad de células destructoras naturales |
US10640357B2 (en) | 2010-04-14 | 2020-05-05 | Restaurant Technology Inc. | Structural food preparation systems and methods |
US20140136366A1 (en) | 2012-11-12 | 2014-05-15 | Restaurant Technology Inc. | System and method for receiving and managing remotely placed orders |
GB2483223A (en) * | 2010-08-25 | 2012-03-07 | Chp Consulting Ltd | A method of modifying a displayed scheduling profile |
US8843587B2 (en) * | 2012-02-07 | 2014-09-23 | Microsoft Corporation | Retrieving availability information from published calendars |
US10496942B2 (en) * | 2013-02-28 | 2019-12-03 | P800X, Llc | Method and system for automated project management of excavation requests |
US20150046856A1 (en) * | 2013-08-06 | 2015-02-12 | SmartSheet.com, Inc. | Interactive Charts For Collaborative Project Management |
US20150051933A1 (en) * | 2013-08-16 | 2015-02-19 | International Business Machines Corporation | Asynchronous feed of tagged content based on time criteria |
CN103530742B (zh) * | 2013-10-28 | 2019-01-29 | 金蝶软件(中国)有限公司 | 提高排程运算速度的方法及装置 |
US10241654B2 (en) * | 2013-12-20 | 2019-03-26 | Dassault Systemes Americas Corp. | Computer method and apparatus for automated scheduling |
AU2014200481A1 (en) * | 2014-01-29 | 2015-08-13 | Render Networks Pty Ltd | Method and System for Managing Geospatial Deployment |
US9423943B2 (en) | 2014-03-07 | 2016-08-23 | Oracle International Corporation | Automatic variable zooming system for a project plan timeline |
US9710571B2 (en) * | 2014-03-07 | 2017-07-18 | Oracle International Corporation | Graphical top-down planning system |
US20150278736A1 (en) * | 2014-03-25 | 2015-10-01 | Innotas | Framework to optimize the selection of projects and the allocation of resources within a structured business organization under time, resource and budget constraints |
US9418348B2 (en) | 2014-05-05 | 2016-08-16 | Oracle International Corporation | Automatic task assignment system |
US9818076B2 (en) * | 2014-06-02 | 2017-11-14 | Oracle International Corporation | Visual resource allocation system |
US10192181B2 (en) | 2014-06-26 | 2019-01-29 | Oracle International Corporation | Resource demand-based project team staffing |
US9575799B2 (en) * | 2014-07-11 | 2017-02-21 | International Business Machines Corporation | Task association analysis in application maintenance service delivery |
US10628765B2 (en) | 2014-07-14 | 2020-04-21 | Oracle International Corporation | Project chart with soft constraint |
US9405810B2 (en) | 2014-11-24 | 2016-08-02 | Asana, Inc. | Server side system and method for search backed calendar user interface |
EP3241158A1 (en) | 2014-12-31 | 2017-11-08 | Servicenow, Inc. | Permitted assignment user interface |
US10769826B2 (en) | 2014-12-31 | 2020-09-08 | Servicenow, Inc. | Visual task board visualization |
US10643157B2 (en) | 2015-02-03 | 2020-05-05 | Oracle International Corporation | Task progress update history visualization system |
US10496943B2 (en) | 2015-03-30 | 2019-12-03 | Oracle International Corporation | Visual task assignment system |
US20170076247A1 (en) * | 2015-09-14 | 2017-03-16 | Bank Of America Corporation | Work management with claims caching and dynamic work allocation |
US20170076242A1 (en) * | 2015-09-14 | 2017-03-16 | Bank Of America Corporation | Work management with claims/priority assignment and dynamic work allocation |
US10496940B2 (en) * | 2015-12-01 | 2019-12-03 | Sap Se | Presenting resource utilization in a user interface |
US10423443B2 (en) * | 2017-04-03 | 2019-09-24 | Oracle International Corporation | Task management interface |
US10956506B1 (en) * | 2017-06-08 | 2021-03-23 | Amazon Technologies, Inc. | Query-based data modification |
US10977434B2 (en) | 2017-07-11 | 2021-04-13 | Asana, Inc. | Database model which provides management of custom fields and methods and apparatus therfor |
US20190050811A1 (en) * | 2017-08-14 | 2019-02-14 | Brian Kang | Project scheduling system and method |
US10740726B2 (en) * | 2017-10-05 | 2020-08-11 | Servicenow, Inc. | Systems and methods for providing message templates in an enterprise system |
CN108229923A (zh) * | 2018-01-29 | 2018-06-29 | 联合建管(北京)国际工程科技有限责任公司 | 连续型项目进度计划的展示方法及装置 |
US10623359B1 (en) | 2018-02-28 | 2020-04-14 | Asana, Inc. | Systems and methods for generating tasks based on chat sessions between users of a collaboration environment |
US11138021B1 (en) | 2018-04-02 | 2021-10-05 | Asana, Inc. | Systems and methods to facilitate task-specific workspaces for a collaboration work management platform |
US10613735B1 (en) | 2018-04-04 | 2020-04-07 | Asana, Inc. | Systems and methods for preloading an amount of content based on user scrolling |
US10785046B1 (en) | 2018-06-08 | 2020-09-22 | Asana, Inc. | Systems and methods for providing a collaboration work management platform that facilitates differentiation between users in an overarching group and one or more subsets of individual users |
US10616151B1 (en) | 2018-10-17 | 2020-04-07 | Asana, Inc. | Systems and methods for generating and presenting graphical user interfaces |
US20200160254A1 (en) * | 2018-11-19 | 2020-05-21 | Sap Se | Group Assignments |
US10956845B1 (en) | 2018-12-06 | 2021-03-23 | Asana, Inc. | Systems and methods for generating prioritization models and predicting workflow prioritizations |
US11568366B1 (en) | 2018-12-18 | 2023-01-31 | Asana, Inc. | Systems and methods for generating status requests for units of work |
US11113667B1 (en) | 2018-12-18 | 2021-09-07 | Asana, Inc. | Systems and methods for providing a dashboard for a collaboration work management platform |
US10684870B1 (en) | 2019-01-08 | 2020-06-16 | Asana, Inc. | Systems and methods for determining and presenting a graphical user interface including template metrics |
US11782737B2 (en) | 2019-01-08 | 2023-10-10 | Asana, Inc. | Systems and methods for determining and presenting a graphical user interface including template metrics |
US11204683B1 (en) | 2019-01-09 | 2021-12-21 | Asana, Inc. | Systems and methods for generating and tracking hardcoded communications in a collaboration management platform |
CN109993497A (zh) * | 2019-02-20 | 2019-07-09 | 深圳大维理文科技有限公司 | 项目管理方法 |
US20200394572A1 (en) * | 2019-06-12 | 2020-12-17 | Toshiba Tec Kabushiki Kaisha | Reservation order processing system and reservation order processing method |
US11341445B1 (en) | 2019-11-14 | 2022-05-24 | Asana, Inc. | Systems and methods to measure and visualize threshold of user workload |
US11783253B1 (en) | 2020-02-11 | 2023-10-10 | Asana, Inc. | Systems and methods to effectuate sets of automated actions outside and/or within a collaboration environment based on trigger events occurring outside and/or within the collaboration environment |
US11599855B1 (en) | 2020-02-14 | 2023-03-07 | Asana, Inc. | Systems and methods to attribute automated actions within a collaboration environment |
US11282011B2 (en) * | 2020-04-01 | 2022-03-22 | Chevron U.S.A. Inc. | Task management interface for well operations |
US11455601B1 (en) | 2020-06-29 | 2022-09-27 | Asana, Inc. | Systems and methods to measure and visualize workload for completing individual units of work |
US20210406332A1 (en) * | 2020-06-30 | 2021-12-30 | Microsoft Technology Licensing, Llc | Creation of a timeline view of work product and working relationships of individuals within an organization |
US11449836B1 (en) | 2020-07-21 | 2022-09-20 | Asana, Inc. | Systems and methods to facilitate user engagement with units of work assigned within a collaboration environment |
US11568339B2 (en) | 2020-08-18 | 2023-01-31 | Asana, Inc. | Systems and methods to characterize units of work based on business objectives |
US11769115B1 (en) | 2020-11-23 | 2023-09-26 | Asana, Inc. | Systems and methods to provide measures of user workload when generating units of work based on chat sessions between users of a collaboration environment |
US11405435B1 (en) | 2020-12-02 | 2022-08-02 | Asana, Inc. | Systems and methods to present views of records in chat sessions between users of a collaboration environment |
US11694162B1 (en) | 2021-04-01 | 2023-07-04 | Asana, Inc. | Systems and methods to recommend templates for project-level graphical user interfaces within a collaboration environment |
US11676107B1 (en) | 2021-04-14 | 2023-06-13 | Asana, Inc. | Systems and methods to facilitate interaction with a collaboration environment based on assignment of project-level roles |
US11553045B1 (en) | 2021-04-29 | 2023-01-10 | Asana, Inc. | Systems and methods to automatically update status of projects within a collaboration environment |
US11803814B1 (en) | 2021-05-07 | 2023-10-31 | Asana, Inc. | Systems and methods to facilitate nesting of portfolios within a collaboration environment |
US11792028B1 (en) | 2021-05-13 | 2023-10-17 | Asana, Inc. | Systems and methods to link meetings with units of work of a collaboration environment |
US11809222B1 (en) | 2021-05-24 | 2023-11-07 | Asana, Inc. | Systems and methods to generate units of work within a collaboration environment based on selection of text |
US11756000B2 (en) | 2021-09-08 | 2023-09-12 | Asana, Inc. | Systems and methods to effectuate sets of automated actions within a collaboration environment including embedded third-party content based on trigger events |
US11635884B1 (en) | 2021-10-11 | 2023-04-25 | Asana, Inc. | Systems and methods to provide personalized graphical user interfaces within a collaboration environment |
US11997425B1 (en) | 2022-02-17 | 2024-05-28 | Asana, Inc. | Systems and methods to generate correspondences between portions of recorded audio content and records of a collaboration environment |
US11836681B1 (en) | 2022-02-17 | 2023-12-05 | Asana, Inc. | Systems and methods to generate records within a collaboration environment |
US11863601B1 (en) | 2022-11-18 | 2024-01-02 | Asana, Inc. | Systems and methods to execute branching automation schemes in a collaboration environment |
CN115981825B (zh) * | 2023-02-06 | 2023-08-01 | 上海交通大学 | 基于混合式共享状态视图架构的集群并行调度系统 |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7092894B1 (en) * | 1994-09-01 | 2006-08-15 | Harris Corporation | Cost reactive scheduler and method |
US6571215B1 (en) * | 1997-01-21 | 2003-05-27 | Microsoft Corporation | System and method for generating a schedule based on resource assignments |
US5995940A (en) * | 1997-03-20 | 1999-11-30 | Microsoft Corporation | Method and system for editing multivalued properties of an object |
US6308164B1 (en) * | 1997-04-28 | 2001-10-23 | Jeff Nummelin | Distributed project management system and method |
JP2001101289A (ja) * | 1999-09-30 | 2001-04-13 | Toshiba Corp | スケジュール生成装置、スケジュール生成方法およびスケジュール生成プログラムを格納する記録媒体 |
US8306841B2 (en) * | 2001-04-17 | 2012-11-06 | 4Sight Technologies, Inc. | Enterprise project management system and method therefor |
US7089193B2 (en) * | 2001-05-09 | 2006-08-08 | Prochain Solutions, Inc. | Multiple project scheduling system |
US20030061090A1 (en) * | 2001-06-13 | 2003-03-27 | Siemens Medical Solution Health Services Corporation | Method, apparatus, system and user interface for scheduling tasks |
US20060167736A1 (en) * | 2002-10-01 | 2006-07-27 | Weiss Paul F | Schedule chart for project management |
US20040117046A1 (en) * | 2002-12-12 | 2004-06-17 | Renzo Colle | User interface for scheduling tasks |
US20050165631A1 (en) * | 2004-01-28 | 2005-07-28 | Microsoft Corporation | Time management representations and automation for allocating time to projects and meetings within an online calendaring system |
US20050278208A1 (en) * | 2004-06-15 | 2005-12-15 | Microsoft Corporation | Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data |
US20060178921A1 (en) * | 2005-02-04 | 2006-08-10 | Taiwan Semiconductor Manufacturing Co., Ltd. | Project management system and method therefor |
US20070083411A1 (en) * | 2005-03-25 | 2007-04-12 | Yosef Alberton | Schedule coordinates method for project scheduling |
JP5657189B2 (ja) * | 2005-11-09 | 2015-01-21 | 株式会社神戸製鋼所 | スケジュール修正装置及びスケジュール修正プログラム、並びにスケジュール修正方法 |
-
2008
- 2008-03-15 US US12/049,282 patent/US20090234699A1/en not_active Abandoned
-
2009
- 2009-02-13 JP JP2011500829A patent/JP2011515759A/ja active Pending
- 2009-02-13 CA CA2717324A patent/CA2717324A1/en not_active Abandoned
- 2009-02-13 RU RU2010138120/08A patent/RU2010138120A/ru not_active Application Discontinuation
- 2009-02-13 KR KR1020107023006A patent/KR20100126508A/ko not_active Application Discontinuation
- 2009-02-13 CN CN2009801098964A patent/CN101971197A/zh active Pending
- 2009-02-13 EP EP09722215A patent/EP2266079A4/en not_active Withdrawn
- 2009-02-13 MX MX2010009897A patent/MX2010009897A/es unknown
- 2009-02-13 WO PCT/US2009/034076 patent/WO2009117195A2/en active Application Filing
- 2009-02-13 BR BRPI0908380-4A patent/BRPI0908380A2/pt not_active IP Right Cessation
- 2009-02-13 AU AU2009226062A patent/AU2009226062A1/en not_active Abandoned
-
2010
- 2010-08-15 IL IL207622A patent/IL207622A0/en unknown
- 2010-08-16 ZA ZA2010/05836A patent/ZA201005836B/en unknown
Also Published As
Publication number | Publication date |
---|---|
JP2011515759A (ja) | 2011-05-19 |
KR20100126508A (ko) | 2010-12-01 |
BRPI0908380A2 (pt) | 2015-08-11 |
US20090234699A1 (en) | 2009-09-17 |
RU2010138120A (ru) | 2012-03-27 |
CN101971197A (zh) | 2011-02-09 |
ZA201005836B (en) | 2011-10-26 |
CA2717324A1 (en) | 2009-09-24 |
EP2266079A2 (en) | 2010-12-29 |
WO2009117195A3 (en) | 2009-11-12 |
EP2266079A4 (en) | 2011-07-06 |
AU2009226062A1 (en) | 2009-09-24 |
WO2009117195A2 (en) | 2009-09-24 |
IL207622A0 (en) | 2010-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MX2010009897A (es) | Interfase de usuario para programar asignaciones de recurso. | |
IN2014MU03857A (es) | ||
WO2012092556A3 (en) | System and method for online communications management | |
WO2012064819A9 (en) | Enhanced multiple resource planning and forecasting | |
ATE496350T1 (de) | System zur verwaltung des lebenszyklus einer dienstorientierten architektur | |
WO2007025220A3 (en) | Automated resource planning tool and user interface | |
ATE538568T1 (de) | Paketanordnungsmethode | |
WO2010135122A3 (en) | Summary tasks for top-down project planning | |
GB2487852A (en) | A system and method for budget-compliant, fair and efficient manpower management | |
WO2011009067A3 (en) | Project progress display and monitoring | |
WO2012082584A3 (en) | Simulation-based risk analysis for finite capacity scheduling | |
WO2011037987A3 (en) | Process management system and method | |
GB201311421D0 (en) | Central management and control of user-contributed content in a web-based collaboration enviroment and management console therefor | |
EP2135214A4 (en) | RESOURCE PLANNING WITH RETURNING ABOUT RULE INJURIES | |
GB2483811A (en) | Method and system for integrated analysis | |
GB2447812B (en) | Aggregated management system | |
WO2005103998A3 (en) | System for processing and planning treatment data | |
ATE387663T1 (de) | Verfahren und vorichtungen zur erzielung der thermischen verwaltung unter verwendung von verarbeitungs-task-einteilung | |
WO2006068943A3 (en) | Method and apparatus for supporting soft real-time behavior | |
GB2470492A (en) | A system and method to manage a workflow in delivering healthcare | |
EP2728473A3 (en) | Systems and methods for instruction entity allocation and scheduling on multi-processors | |
EP2581829A3 (en) | Dynamic scheduling for frames representing views of a geographic information environment | |
WO2012139061A3 (en) | Resource consumption with enhanced requirement-capability definitions | |
GB201208228D0 (en) | Determining information relating to occupancy of a space | |
EP2633383A4 (en) | INFORMED USER INTERFACE FROM A GUIDED ORIENTATION FOR BUSINESS RESOURCE PLANNING |