MD4011C2 - Process for the erection of the cast-in-situ reinforced pile and auxiliary mounter for realization thereof - Google Patents
Process for the erection of the cast-in-situ reinforced pile and auxiliary mounter for realization thereofInfo
- Publication number
- MD4011C2 MD4011C2 MDA20090086A MD20090086A MD4011C2 MD 4011 C2 MD4011 C2 MD 4011C2 MD A20090086 A MDA20090086 A MD A20090086A MD 20090086 A MD20090086 A MD 20090086A MD 4011 C2 MD4011 C2 MD 4011C2
- Authority
- MD
- Moldova
- Prior art keywords
- jig
- reinforcing cage
- installation
- cage
- fixed
- Prior art date
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention relates to construction, particularly to processes and devices for erection of the cast-in-situ reinforced pile of different destination, poured upon installation.The process includes formation of the bore, installation therein of the reinforcing cage and placement of the borehole. Before the installation of the reinforcing cage, a mounter is introduced therein comprising locating fixtures and a rigid jig, the length of which exceeds the length of the reinforcing cage, and the dimensions of the cross section of which are smaller than the dimensions of the cross section of the reinforcing cage and on one end face of which there are fixed mounting ears, and on the other end face it is fixed a dismountable supporting element. The reinforcing cage is fixed on the jig by means of the locating fixtures and it is carried out the conjoint sinking of the jig with the cage fixed thereon into the bore. Upon completion of sinking, it is carried out fixation of the upper end face of the cage into the bore mouth and its release from the jig, it is retrieved the jig and it is placed the borehole.The result of the invention consists in increasing the quality of works due to the prevention of reinforcing cage deformation during its installation, reducing the works labour content due to the utilization of the standard boring-hoisting equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
MDA20090086A MD4011C2 (en) | 2009-08-26 | 2009-08-26 | Process for the erection of the cast-in-situ reinforced pile and auxiliary mounter for realization thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
MDA20090086A MD4011C2 (en) | 2009-08-26 | 2009-08-26 | Process for the erection of the cast-in-situ reinforced pile and auxiliary mounter for realization thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
MD4011B1 MD4011B1 (en) | 2010-01-29 |
MD4011C2 true MD4011C2 (en) | 2010-08-31 |
Family
ID=43568883
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
MDA20090086A MD4011C2 (en) | 2009-08-26 | 2009-08-26 | Process for the erection of the cast-in-situ reinforced pile and auxiliary mounter for realization thereof |
Country Status (1)
Country | Link |
---|---|
MD (1) | MD4011C2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
MD1057Z (en) * | 2015-12-23 | 2017-02-28 | Григоре ЧАПА | Process for the erection of the cast-in-situ reinforced pile and auxiliary mounter for realization thereof |
CN105464066B (en) * | 2015-12-29 | 2017-03-29 | 中国水利水电第八工程局有限公司 | The construction method that a kind of Bailey bracket of the high drop beam slab closing of large span is removed |
Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU777144A1 (en) * | 1978-09-27 | 1980-11-07 | Киевский Отдел Всесоюзного Научно- Исследовательского Института Гидромеханизации, Санитарно-Технических И Специальных Строительных Работ (Ко Вниигс) | Method of making built-in-place pile-casing |
SU1677180A1 (en) * | 1989-03-31 | 1991-09-15 | Институт Горного Дела Со Ан Ссср | Method of manufacturing reinforced cast-in-place pile |
EP1277887A2 (en) * | 2001-07-17 | 2003-01-22 | Compagnie Du Sol | Displacement drilling tool and equipment using said tool |
RU2231596C2 (en) * | 2002-06-28 | 2004-06-27 | Ющубе Сергей Васильевич | Method of pile forming in preliminary formed well |
RU2236506C2 (en) * | 2002-08-05 | 2004-09-20 | Новосибирский государственный архитектурно-строительный университет | Method and device for cast-in-place pile forming |
RU2238366C1 (en) * | 2003-03-04 | 2004-10-20 | Полищук Анатолий Иванович | Method of injection pile building |
WO2004101897A1 (en) * | 2003-05-15 | 2004-11-25 | Pass, Jonathan, Charles | A method of constructing a pile |
RU2304198C2 (en) * | 2005-06-03 | 2007-08-10 | Игорь Сергеевич Арутюнов | Injection pile erection method |
RU2318960C2 (en) * | 2005-12-26 | 2008-03-10 | Николай Сергеевич Соколов | Method for cast-in-place pile erection |
KR100867385B1 (en) * | 2008-01-18 | 2008-11-06 | 이인귀 | Extension type ground anchor structure that construction a method |
RU2338033C1 (en) * | 2007-03-16 | 2008-11-10 | Анатолий Никифорович Саурин | Method of erection of concrete in situ piles in laminated driven wells |
EP2001736A2 (en) * | 2006-02-28 | 2008-12-17 | Seahorse Equipment Corporation | Battered column tension leg platform |
KR100876129B1 (en) * | 2008-03-03 | 2008-12-26 | 주식회사 주영산업개발 | Ground anchor using steel strand and ground reinforcement method using the same |
KR100880690B1 (en) * | 2008-05-22 | 2009-01-28 | 박이근 | The anchor method which uses the ground anchor |
JP2009046879A (en) * | 2007-08-20 | 2009-03-05 | Jfe Steel Kk | Pile head structure of double tube type |
JP2009046896A (en) * | 2007-08-21 | 2009-03-05 | Shusuke Ito | Soil bearing capacity increasing technique for soft ground |
EP2038483A2 (en) * | 2006-06-25 | 2009-03-25 | Basem Hazzan | Device and method for improved pile casting |
-
2009
- 2009-08-26 MD MDA20090086A patent/MD4011C2/en not_active IP Right Cessation
Patent Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU777144A1 (en) * | 1978-09-27 | 1980-11-07 | Киевский Отдел Всесоюзного Научно- Исследовательского Института Гидромеханизации, Санитарно-Технических И Специальных Строительных Работ (Ко Вниигс) | Method of making built-in-place pile-casing |
SU1677180A1 (en) * | 1989-03-31 | 1991-09-15 | Институт Горного Дела Со Ан Ссср | Method of manufacturing reinforced cast-in-place pile |
EP1277887A2 (en) * | 2001-07-17 | 2003-01-22 | Compagnie Du Sol | Displacement drilling tool and equipment using said tool |
RU2231596C2 (en) * | 2002-06-28 | 2004-06-27 | Ющубе Сергей Васильевич | Method of pile forming in preliminary formed well |
RU2236506C2 (en) * | 2002-08-05 | 2004-09-20 | Новосибирский государственный архитектурно-строительный университет | Method and device for cast-in-place pile forming |
RU2238366C1 (en) * | 2003-03-04 | 2004-10-20 | Полищук Анатолий Иванович | Method of injection pile building |
WO2004101897A1 (en) * | 2003-05-15 | 2004-11-25 | Pass, Jonathan, Charles | A method of constructing a pile |
RU2304198C2 (en) * | 2005-06-03 | 2007-08-10 | Игорь Сергеевич Арутюнов | Injection pile erection method |
RU2318960C2 (en) * | 2005-12-26 | 2008-03-10 | Николай Сергеевич Соколов | Method for cast-in-place pile erection |
EP2001736A2 (en) * | 2006-02-28 | 2008-12-17 | Seahorse Equipment Corporation | Battered column tension leg platform |
EP2038483A2 (en) * | 2006-06-25 | 2009-03-25 | Basem Hazzan | Device and method for improved pile casting |
RU2338033C1 (en) * | 2007-03-16 | 2008-11-10 | Анатолий Никифорович Саурин | Method of erection of concrete in situ piles in laminated driven wells |
JP2009046879A (en) * | 2007-08-20 | 2009-03-05 | Jfe Steel Kk | Pile head structure of double tube type |
JP2009046896A (en) * | 2007-08-21 | 2009-03-05 | Shusuke Ito | Soil bearing capacity increasing technique for soft ground |
KR100867385B1 (en) * | 2008-01-18 | 2008-11-06 | 이인귀 | Extension type ground anchor structure that construction a method |
KR100876129B1 (en) * | 2008-03-03 | 2008-12-26 | 주식회사 주영산업개발 | Ground anchor using steel strand and ground reinforcement method using the same |
KR100880690B1 (en) * | 2008-05-22 | 2009-01-28 | 박이근 | The anchor method which uses the ground anchor |
Also Published As
Publication number | Publication date |
---|---|
MD4011B1 (en) | 2010-01-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
FR2904637A1 (en) | METHOD FOR DISASSEMBLING A TENSILE CABLE, SYSTEM AND ASSOCIATED DEVICES | |
KR20130026445A (en) | Wind power plant foundation and wind power plant | |
MX2012015136A (en) | Guy anchor reinforcement. | |
MY178235A (en) | A means of stripping concrete formwork from a concrete surface | |
CN105155553A (en) | Green dismantling construction method combining concrete support static crush and splitting method | |
EA200802085A1 (en) | METHOD AND INSTALLATION FOR COOLING ANODES | |
MD4011C2 (en) | Process for the erection of the cast-in-situ reinforced pile and auxiliary mounter for realization thereof | |
CN205502025U (en) | Stagnant water stake is gone along with sb. to guard him to foundation ditch and shaped steel encloses connection structure between purlin | |
WO2009044405A3 (en) | Anchor plate for use with fall protection and maintenance equipment. | |
JP4903294B1 (en) | Pipe support bracket | |
JP2009184756A (en) | Tower crane support structure and building method thereof | |
CN101748899B (en) | Method for pore forming by embedding assistant bonded rebar in reinforced concrete structure | |
CN204401627U (en) | To pull-type prestressed pipe pile pit supporting construction | |
CN201268953Y (en) | Single-face support mold apparatus | |
RU2011111974A (en) | METHOD FOR FULL UNLOADING REINFORCED CONCRETE CONSOLE OF THE COLUMN FROM THE INFLUENCE OF CRANE BEAMS | |
CN205134546U (en) | But quick detachable I -steel built -in fitting of encorbelmenting of cyclic utilization | |
GB2469031A (en) | Setting out a floor of a building | |
CN205637650U (en) | Concrete sump fast -assembling nipple joint | |
CN205046856U (en) | Concrete excellent slant control guide rail that vibrates | |
CN204252513U (en) | The disassembled anchor device of a kind of common builder's jack shaped steel end | |
CN104975597A (en) | Cast-in situ bored pile post-inserted steel reinforcement cage multi-point delivery device and use method | |
KR101977762B1 (en) | Anchor Bolt Hole making device to make hole for Anchor Bolt on Concrete depositing and Method thereof | |
KR200442551Y1 (en) | Bracket for supporting a mold | |
JP2010281114A (en) | Anchor bolt with base | |
CN211735027U (en) | Conical socket bracket and pier body provided with same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FG4A | Patent for invention issued | ||
KA4A | Patent for invention lapsed due to non-payment of fees (with right of restoration) | ||
MK4A | Patent for invention expired | ||
KA4A | Patent for invention lapsed due to non-payment of fees (with right of restoration) | ||
MM4A | Patent for invention definitely lapsed due to non-payment of fees |