KR950010520B1 - Fabrication method of precasted segment for bridge - Google Patents
Fabrication method of precasted segment for bridge Download PDFInfo
- Publication number
- KR950010520B1 KR950010520B1 KR1019920008379A KR920008379A KR950010520B1 KR 950010520 B1 KR950010520 B1 KR 950010520B1 KR 1019920008379 A KR1019920008379 A KR 1019920008379A KR 920008379 A KR920008379 A KR 920008379A KR 950010520 B1 KR950010520 B1 KR 950010520B1
- Authority
- KR
- South Korea
- Prior art keywords
- segment
- segments
- concrete
- bridge
- manufacturing
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
- Moulds, Cores, Or Mandrels (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
Description
첨부도면은 본 발명을 실시하기 위한 예시 참고도이다.The accompanying drawings are exemplary reference drawings for carrying out the present invention.
제 1 도는 프리캐스트 세그먼트로 조립된 교량의 일부 사시도.1 is a partial perspective view of a bridge assembled from precast segments.
제 2 도는 프리캐스트 세그먼트로 조립된 교량의 일부 정면도.2 is a partial front view of a bridge assembled from precast segments.
제 3 도는 프리캐스트 세그먼트를 제조하는 도량형 몰드장의 횡단면도.3 is a cross-sectional view of a metrological mold length for producing precast segments.
제 4 도는 제 3 도의 길이방향으로 나타낸 축소 종단면도.4 is a reduced longitudinal section in the longitudinal direction of FIG.
제 5 도는 프리캐스트 세그먼트 작업순서의 설명도.5 is an explanatory diagram of a precast segment workflow.
제 6 도는 프리캐스트 세그먼트 작업순서의 설명도.6 is an explanatory diagram of a precast segment workflow.
제 7 도는 본 발명에 의하여 제조된 프리캐스트 세그먼트의 사시도.7 is a perspective view of a precast segment made in accordance with the present invention.
본 발명은 장대(長大)한 교량 건설에 연결되는 다수의 프리캐스트 세그먼트(Precast Segment)를 신속 정확하게 제조하는 방법에 관한 것이다.The present invention is directed to a method for quickly and accurately manufacturing a number of precast segments that are connected to grand bridge construction.
최근 장대 교량의 건설에 프리캐스트 세그먼트의 연결공법을 채택하고 있는 이유는 공기(工期)의 단축과 공사비를 절약할 수 있기 때문이다.The reason for adopting the precast segment connecting method in the construction of long bridges is that it can shorten the air and save construction cost.
그런데 상기한 공법에서 가장 중요한 것은 프리캐스트 세그먼트(이하 “세그먼트”라 함)의 정밀하고도 신속한 제조라 할 수 있는데 종래의 제조방법을 설명하면 아래와 같은 문제점이 있음을 알 수 있다.By the way, the most important thing in the above-described method is the precise and rapid manufacturing of the precast segment (hereinafter referred to as "segment"). If the conventional manufacturing method is explained, the following problems can be seen.
설계된 교량의 크기에 맞는 세그먼트를 제조하기 위하여는 각 분절된 세그먼트마다 정밀한 설계도를 제작하여야 하고(현재로서는 외국기술진에 의존하고 있는 실정임) 이에 따른 내외 거푸집도 설계 제작한 다음, 측량작업에 의하여 내외 거푸집을 정밀하게 설치하는 한편, 조립된 철근 구성물을 배치하고 내부 거푸집 설치로 제조형틀을 완성한다. 완성된 제조형틀내에 콘크리트 반죽물을 타설한 다음 콘트리트가 일부 양생되면 거푸집을 제거하고 양생설비가 있는 장소로 운반하여 소요강도로 양생시켜 하나의 세그먼트를 완성하여 왔다.In order to manufacture a segment that fits the size of the designed bridge, a precise design must be produced for each segmented segment (currently depending on foreign technicians). The formwork is precisely installed, while the assembled reinforcing bar is placed and the interior formwork completes the manufacturing mold. After placing the concrete dough in the finished manufacturing mold, if the concrete is partially cured, the formwork is removed and transported to the place where the curing facility is provided to cure with the required strength to complete one segment.
이와같은 종래의 세그먼트 제조방법의 문제점을 살펴보면, 세그먼트가 매우 크기 때문에 한개의 제작대에서 1개의 세그먼트만을 제작할 수 밖에 없는 것이므로 제조할때마다 복잡한 콤퓨터 계산, 측량, 검축 및 제작된 세그먼트의 이동작업등등의 대단히 번잡스러운 작업과정이 수반되는 데다가 각 세그먼트를 연결할때 접합면의 정밀도도 우수하지 못하여 조립작업이 곤란한 등의 비능률적인 문제점으로 지적되고 있는 실정이 상기 문제점들 중에서 가장 큰 문제점으로 지적되고 있는 중의 하나는 교량 하나를 가설하기 위한 전체의 세그먼트들의 제조기간이 너무나 오래 걸리는 것이고, 다른 하나는 각 세그먼트의 조립시에 맞결합되는 접합면 및 요철부의 정밀도가 정확치 않아서 틈새가 벌어지는 등의 결합상의 애로가 극심한 것이다.Looking at the problem of the conventional method of manufacturing a segment, since the segment is very large, only one segment can be manufactured in one manufacturing platform, so each time manufacturing, complicated computer calculation, surveying, inspection, and movement of the manufactured segment, etc. The situation is pointed out as one of the most inefficient problems such as the intricate work process of the process and the difficulty of the assembly work due to the poor precision of the joint surface when connecting each segment. One is that it takes too long to manufacture the entire segment for the construction of one bridge, and the other is the difficulty in joining such as gaps due to the inaccurate precision of the joint surface and the uneven portion that are joined during assembly of each segment. It is extreme.
이와같은 종래의 제반 문제점들을 해결할 수 있도록 개발한 본 발명은 교량의 전장(全長) 또는 소정의 길이에 해당하는 제작대를 설치하고 그 내부에 세그먼트 형틀을 하나 건너 하나씩 설치하는데 예를들면, 세그먼트의 수가 14개이라면 먼저 홀수 아니면 짝수부터 형틀을 설치하여 콘크리트 반죽물을 타설하여 하나 건너씩 세그먼트를 제조하고 그 다음에는 기성형된 세그먼트에 이완제를 발라서 별도의 전후면의 형틀없이 기성형된 세그먼트가 형틀 역활을 하도록 하여 거푸집만을 설치하고 콘크리트 반죽물을 타설하면 교량 전장에 이르는 세그먼트가 결합된 상태로 제조한 후 양생처리하는 것이다.The present invention, developed to solve such problems in the related art, installs a workbench corresponding to the entire length of a bridge or a predetermined length and installs one segment across one segment frame, for example, If the number is 14, install the mold from odd or even number first, then cast the concrete dough to make the segments one by one, and then apply the release agent to the preformed segment and form the preformed segment without a separate front and back mold. If only the formwork is installed and the concrete dough is poured, the segments that reach the bridge length are manufactured and cured.
이와같은 제조방법은 최단기간내에 세그먼트를 제조할 수 있음과 동시에 맞결합되는 접합면 및 요철부가 완전하여 시공상의 애로점이 일체 발생치 않는 등등의 여러가지 특징을 가지는 제조방법이다.Such a manufacturing method is a manufacturing method having various characteristics such as being able to manufacture a segment in the shortest period of time and at the same time, the joint surface and the uneven portion to be joined to each other are completely free from any difficulties in construction.
본 발명을 실시하기 위하여는 몰드장과 거푸집의 준비 및 거푸집의 설치, 탈형시에 필요한 유압장치와 조정시설의 설치가 필요하다.In order to implement the present invention, it is necessary to install a hydraulic device and an adjustment facility necessary for the preparation of a mold yard and formwork, installation of formwork, and demoulding.
몰드장은 제 3 도에 도시된 바와같이 지면(11) 밑으로 제조하고저 하는 세그먼트(Ps)의 상면이 하위가 되는 깊이로 파고 콘크리트층(12)을 구성한다. 이 콘크리트층(12)은 지면(11) 밑으로 도량형을 이루고 있는데 그 길이는 교량의 전장 또는 소정의 길이(예를 들면 제 2 도의 길이)에 해당하는 길이로 구성하고, 콘크리트층(12)의 양상단에 양생천막(13)을 간편히 설치할 수 있는 레일(14)(14')을 설치하면 기타 크레인 시설등을 제외하고는 세그먼트의 제조준비가 완료된다.As shown in FIG. 3, the mold sheet is dug to a depth where the upper surface of the segment Ps to be manufactured under the ground 11 is lowered to form the concrete layer 12. The concrete layer 12 forms a metrology below the ground 11, the length of which is composed of a length corresponding to the total length of the bridge or a predetermined length (for example, the length of FIG. 2). If the rail 14, 14 'can be easily installed on the side end of the curing tent 13, the manufacturing preparation of the segment is completed except for other crane facilities.
상기한 제조준비가 완료된 다음의 제조공정을 설명한다.Next, the following manufacturing process will be described.
제 1 공정1st process
도면 제 5 도에 표시된 바와같이 좌로부터 우로 가면서 하나의 세그먼트(Ps)를 이루는 7,5,3,1,2',4',6'번 부분에 조립된 철근을 넣고 거푸집을 설치한 뒤 콘크리트 반죽물을 타설한다.As shown in FIG. 5, from left to right, the assembled reinforcing bar is installed in the 7,5,3,1,2 ', 4', 6 'part forming one segment Ps, and the formwork is installed. Pour the dough.
제 2 공정2nd process
제 1 공정에서 타설한 콘크리트가 일부 양생되면 마구리 거푸집(길이방향으로 양면에 설치된 거푸집)을 제거한 뒤에 기제조된 세그먼트의 콘크리트면에 이완제를 바르고, 제 6 도에 도시된 6,4,2,1',3',5',7'번 부분(제 1 공정에서 얻어진 세그먼트의 사이 부분)에 조립된 철근을 넣고 먼저 설치된 내부 거푸집을 이동시키고 콘크리트 반죽물을 타설한다.When the concrete poured in the first process is partially cured, the loose molds (forms installed on both sides in the length direction) are removed, and then the release agent is applied to the concrete surface of the manufactured segment, and 6,4,2,1 shown in FIG. Put the reinforcing bars in the ', 3', 5 ', and 7' part (between the segments obtained in the first step), move the internal formwork installed first and pour the concrete dough.
제 3 공정3rd process
제 2 공정에서 타설된 콘크리트가 일부 양생되면 내외 거푸집을 탈형한 뒤에 양생천막을 덮어서 소요강도에 도달할때까지 양생시킨다.When the concrete poured in the second process is partially cured, the mold is demolded inside and outside, and the curing tent is covered and cured until the required strength is reached.
이상의 공정에 의하여 제조된 세그먼트는 순번적으로 한개씩 분리시키면서 상차하여 현장 또는 야적장으로 번호순대로 이동하고 다시 상기 공정을 반복하여 세그먼트를 생산한다.Segments manufactured by the above process are sequentially separated one by one, moved to the field or yard in number order, and the process is repeated again to produce the segments.
이와같은 본 발명의 제조방법은 제 1 공정에서 하나 건너 하나씩 1차적으로 세그먼트를 먼저 제조하고난 다음 먼저 제조된 세그먼트에 이완제만 바르고 형틀 대신 이용하여 각 세그먼트 사이사이의 세그먼트를 제조하는 방법이어서 종래와 같이 정밀한 계산, 설계, 측량작업을 하지 않아도 각 세그먼트간의 접합면과 맞결합되는 요철부가 정밀하게 형성되어 현장조립작업이 편리함은 물론이고 시공상태가 매우 깨끗하고도 정밀하게 조립되는 효과가 있고, 그 전체적인 제조기간도 단축할 수 있는데도 효과가 있다.Such a manufacturing method of the present invention is a method of manufacturing the segments between each segment by first manufacturing the segments first one by one in the first step and then applying only the release agent to the first manufactured segment instead of the mold. Even without precise calculation, design, and surveying work, the uneven part that is joined to the joint surface between each segment is precisely formed, which makes the assembling work convenient and the construction state is very clean and precise. It is effective to shorten the overall manufacturing period.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019920008379A KR950010520B1 (en) | 1992-05-18 | 1992-05-18 | Fabrication method of precasted segment for bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019920008379A KR950010520B1 (en) | 1992-05-18 | 1992-05-18 | Fabrication method of precasted segment for bridge |
Publications (2)
Publication Number | Publication Date |
---|---|
KR930023549A KR930023549A (en) | 1993-12-21 |
KR950010520B1 true KR950010520B1 (en) | 1995-09-19 |
Family
ID=19333234
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019920008379A KR950010520B1 (en) | 1992-05-18 | 1992-05-18 | Fabrication method of precasted segment for bridge |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR950010520B1 (en) |
-
1992
- 1992-05-18 KR KR1019920008379A patent/KR950010520B1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
KR930023549A (en) | 1993-12-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3665227B2 (en) | Precast segment shape management method and bridge construction method by precast segment method | |
KR100369757B1 (en) | Incremental launching method type pc box girder bridge making mold system and segment making method thereof | |
JP2018053709A (en) | Method for manufacturing precast segment | |
KR950010520B1 (en) | Fabrication method of precasted segment for bridge | |
JP2023042601A (en) | Construction device for concrete structure | |
JPH0684607B2 (en) | Method of joining members | |
JP4538368B2 (en) | Manufacturing method of corrugated steel web PC girder | |
JP7120897B2 (en) | Joining method of precast members | |
JP3471604B2 (en) | Mold for molding a PC product, method for manufacturing a PC product using the mold, and method for constructing a pillar using the PC product | |
JPH0533491A (en) | Pc column form | |
JP2686555B2 (en) | Formwork for step molding | |
JP2625159B2 (en) | Method for manufacturing formwork assembly for concrete structure and formwork assembly | |
JP7045778B2 (en) | Manufacturing method of precast segment | |
JP2002061320A (en) | Raising construction method for concrete skeleton, and form fixture for concrete form plate | |
KR200189807Y1 (en) | Precast concrete panel form | |
JPH08333723A (en) | Manufacture of precast concrete floor slab and connecting method thereof | |
KR200189326Y1 (en) | Incremental launching method type pc box girder bridge making mold system | |
JP3048333B2 (en) | Stairs and their manufacturing method | |
JPH116296A (en) | Concrete placing work execution method | |
JPH04194228A (en) | Caisson and manufacture thereof | |
JPH0473361A (en) | Construction of concrete step | |
JPS6337902A (en) | Manufacture of concrete product | |
CN115822076A (en) | Construction method of prefabricated component | |
CN117027378A (en) | Standard floor landing section structure of residence and construction method thereof | |
JPS61274855A (en) | Manufacture of copying model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
G160 | Decision to publish patent application | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
LAPS | Lapse due to unpaid annual fee |