KR940008462Y1 - Hand rail post for building - Google Patents

Hand rail post for building Download PDF

Info

Publication number
KR940008462Y1
KR940008462Y1 KR92011074U KR920011074U KR940008462Y1 KR 940008462 Y1 KR940008462 Y1 KR 940008462Y1 KR 92011074 U KR92011074 U KR 92011074U KR 920011074 U KR920011074 U KR 920011074U KR 940008462 Y1 KR940008462 Y1 KR 940008462Y1
Authority
KR
South Korea
Prior art keywords
hand bar
fixed
handrail
building
support
Prior art date
Application number
KR92011074U
Other languages
Korean (ko)
Other versions
KR940001186U (en
Inventor
노상도
Original Assignee
노상도
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 노상도 filed Critical 노상도
Priority to KR92011074U priority Critical patent/KR940008462Y1/en
Publication of KR940001186U publication Critical patent/KR940001186U/en
Application granted granted Critical
Publication of KR940008462Y1 publication Critical patent/KR940008462Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

내용 없음.No content.

Description

건축용 난간 지주대Construction railing

제1도는 본고안의 사시도.1 is a perspective view of the present invention.

제2도는 본고안의 요부 단면도.2 is a sectional view of main parts of the present article.

제3도는 본고안의 성형 과정도.3 is a molding process of the present paper.

제4도는 본고안의 부분 확대도.4 is a partial enlarged view of the present article.

제5도는 제4도의 단면도.5 is a cross-sectional view of FIG.

재6도는 공지된 지주대의 단면도.6 is a cross-sectional view of a known prop.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

1 : 지주대 2 : 보조지주간1: Landlord 2: Auxiliary holding week

3 : 융출관부 4 : 삽지공3: melt pipe part 4: insertion hole

5 : 연결핀 5a : 핀축5: connecting pin 5a: pin shaft

5b : 체결공 5c : 체결볼트5b: Fastening hole 5c: Fastening bolt

6 :핸드바 7 : 요입부6: hand bar 7: recessed part

본 고안은 각종 건물의 계단이나 베란다에 설치하는 난간 지주대의 연결구조를 개량한 것으로 본 고안의 특징은 지주대의 측방에 부착 설치하는 보조지주를 용접이나 삽입 방식에 의하지 아니하고 지주대측에 융출관부를 돌설시켜 보조 지주를 삽입하므로서 지주대와 보조지주의 결합 강도를 높이고 외관미를 개선하며 또한 수직 지주대 상단에 횡설하는 가로대 즉 핸드바측에는 하부에 요입홈을 요설하여 이에 지주대 상단에 축설한 편심축 상태의 연결핀을 결합할 수 있도록하여 핸드바와 지주대와의 조립 작업이 용이하고 경사도 조절이 자재롭도록한 것이다.The present invention is an improvement of the connection structure of handrail props installed on stairs or verandas of various buildings. The feature of the present design is that the supporting column is attached to the side of the props without welding or inserting. By inserting auxiliary struts, it is possible to increase the coupling strength of the struts and the supporting struts, to improve the appearance and the eccentric shaft which is laid on the top of the struts by arranging the recess in the lower part of the horizontal bar, or the hand bar, By connecting the connecting pins in the state, it is easy to assemble the hand bar and the support stand and adjust the inclination.

일반적으로 계단용 또는 난간용 지주대는 공간 장식과 안전 방책의 기능을 달성하기 위하여 지주대와 지주대 사이에 보조지주를 양측으로 연결시키고 상부측에 핸드바를 가로로 설치하는바 종래의 난간용 지주대는 보조지주와 핸드바의 연결구조가 용접 또는 볼팅 방식에 의존하게 되므로 구조가 복잡하고 시공비가 고가하며 시공후 외관미도 저조한 등의 문제점이 있었다.In general, staircases for staircases or railings are connected to both sides of the supporters and the supporters in order to achieve the function of space decoration and safety measures, and the hand bar is installed horizontally on the upper side. Since the connection structure of the auxiliary column and the hand bar depends on the welding or bolting method, there is a problem such as a complicated structure, high construction cost, and poor appearance after construction.

본 고안은 이와 같은 종래의 문제점에 착안하여 난간용 지주대에 보조지주간과 핸드바를 작업 공정이 간편하면서 매우 견고하게 결합할 수 있도록한 것으로 이를 첨부 도면에 의하여 상세히 설명하면 다음과 같다.The present invention has been made in view of the above-described conventional problems so that the auxiliary holding period and the hand bar to the handrail for the handrail can be easily and very firmly coupled to the handrail as described in detail with reference to the accompanying drawings.

계단용 핸드바6)의 고정 또는 난간용 가이드바의 고정용 지주대(1)를 구성함에 있어서, 파이프 관체로된 지주대(1)의 상하면에 삽지공(4)을 천공한 후 이 삽지공(4) 외주면을 프레스 공정으로 융출관부(3)를 외향으로 융설시켜 이 융출관부(3)의 삽지공(4)에 보조지주간(2)의 상하단을 끼우고 2차 프레서 공정으로 융출관부(3)를 보조지주관(2)의 외주면에 압착(壓着) 고정시키며 보조지주간(2)의 상단에는 연결핀(5)을 핀축(5a)에 편심되게 축설하여 이 연결핀(5)을 가로대인 핸드바(6)의 저면축 요입부(7)에 삽입하여 볼트(5c)로 고정시킨 것이다.In the construction of the holding post 1 for fixing the hand bar 6 for staircases or the guide bar for handrails, the insertion hole 4 after the insertion hole 4 is drilled on the upper and lower surfaces of the support post 1 made of pipes. ) The outer periphery surface is melted outward by discharging the fusing pipe part 3 by the pressing process, and the upper and lower ends of the auxiliary holding parts 2 are inserted into the insertion hole 4 of the fusing pipe part 3, and the fusing pipe part 3 is subjected to the second presser process. Is fixed to the outer circumferential surface of the auxiliary support pipe (2), and the connecting pin (5) is eccentrically arranged on the pin shaft (5a) at the upper end of the auxiliary support (2) to cross the connecting pin (5). It is inserted into the bottom shaft recessed part 7 of the hand bar 6, and fixed with the bolt 5c.

도면중 미설명 부호 5b는 연결핀(5)을 볼트(5c)로서 핸드바(6)의 요입부(7)에 고정시켜 주기 위한 결합공이다.In the figure, reference numeral 5b is a coupling hole for fixing the connecting pin 5 to the recess 7 of the hand bar 6 as a bolt 5c.

이와 같이된 본 고안은 고정 지주대(1)에 보조지주간(2)의 상하단을 결합시킴에 있어서, 용접 방식을 취하지 않고 지주대(1)의 상하측에 융출관부(3)를 외향으로 융성(隆設)시켜 이에 보조지주간(2)의 상하단을 끼우고 2차 프레스 가공으로 융출관부(3)가 보조지주간(2)에 압착 고정되게 하여 조립하는 것으로 이에 의하면 보조지주간(2)이 고정지주대(1)에 매우 견고하게 조립이 되고 특히 이음부의 융출관부(3)가 보조지주간(2)의 외주면에 강제적으로 압착 고정되어 일체화 되므로서 제품의 양산성이 보장되고 불량품의 방생율이 극히 적으며 제품 완성후 외관미가 미려하게 된다.The present invention as described above combines the upper and lower ends of the auxiliary support section 2 to the fixed support post 1, and the outflow pipe part 3 is swelled outward on the upper and lower sides of the support post 1 without taking a welding method. (隆 設) by inserting the upper and lower ends of the auxiliary holding station (2) and the melted pipe part (3) is pressed and fixed to the auxiliary holding station (2) by the second press processing, according to which the auxiliary holding station (2) It is very firmly assembled on the fixed support 1, and in particular, the fusing pipe part 3 of the joint is forcibly compressed and fixed to the outer circumferential surface of the auxiliary support 2, thereby ensuring mass productivity of the product and preventing defects. The yield is extremely low and the appearance is beautiful after the product is finished.

융출관부(3)의 형성은 제3도와 같이 지주대(1)에 삽지공(4)을 약간 작게 천공하고 내부측에서 특수 금형치구를 삽입하여 프레스 방식으로 외향 압출시켜서 융출관부(3)를 형성하면 된다.The formation of the melt pipe part 3 is made by drilling the insertion hole 4 into the support base 1 slightly smaller as shown in FIG. 3 and inserting a special mold jig from the inside to extrude outward to form a melt pipe part 3. do.

그리고 본 고안은 고정지주대(1)상에 연결핀(5)이 핀축(5a)에 의해 축설되어 있어서 연결핀(5)은 그 경사도(θ)가 임의조절 가능하므로 핸드바(6)의 경사도가 대소 가변되더라도 이 연결핀(5)은 항상 핸드바(6)의 경사도에 적응하여 경사 조절될 수 있어 조립 작업이 아주 간편하고 또한 연결핀(5)은 핸드바(6)의 하측 요입부(7)의 내벽면에 밀착이 이루어져 볼트(5c)에 의해 조립되므로 조립후의 견고성도 일반 용접방식의 경우에 비하여 하등 손색이 없고 차후에 핸드바(6)의 손상이 발생할 경우 이를 분해하여 새로운 핸드바를 조립하는 공정도 간편 용이하게 된다.In the present invention, since the connecting pin 5 is arranged on the fixing support 1 by the pin shaft 5a, the connecting pin 5 can be arbitrarily adjusted so that the inclination of the hand bar 6 can be adjusted. Even if the variable is large and small, the connecting pin (5) can always be inclined to adjust the inclination of the hand bar (6) assembling work is very easy and the connecting pin (5) is the lower recess of the hand bar ( 7) It is closely attached to the inner wall surface and assembled by bolts (5c), so the rigidity after assembling is not inferior to that of the general welding method, and if the damage of the hand bar 6 occurs later, it is disassembled and a new hand bar is assembled. The process is also easy and easy.

이상과 같이 본 고안은 난간용 지주대(1)에 보조지주간(2)을 착설함에 있어서, 용접 방식을 취하지 않고 융출관부(3)의 융설로서 견고한 조립이 이루어지게 하므로서 제품의 양산성과 견고성을 보장할 수 있고 완성후 제품의 외관미를 크게 향상시킬 수 있으며 또한 핸드바(6)와 고정지주(1)를 경사 조절이 가능한 편심 상태의 연결핀(5)에 의해 조립하므로서 핸드바의 경사도에 적응하여 시공을 간편 용이하게 할 수 있고 조립후의 견고성도 충분히 보장되어 매우 실용적인 고안이다.As described above, the present invention, while installing the auxiliary holding period (2) on the handrail for the handrail (1), without the welding method to ensure a solid assembly as the melting of the melt pipe part (3), the mass production and robustness of the product It is possible to guarantee and greatly improve the appearance of the product after completion, and also by assembling the hand bar 6 and the holding column 1 by the connecting pin 5 of the eccentric state, which is capable of tilt adjustment. It can be easily and easily constructed by adapting, and it is a very practical design because it is sufficiently secured after assembly.

Claims (1)

난간용 지주의 결합장치에 있어서, 고정지주대(1)에 천공된 삽지공(4) 외주면을 외향 돌출시켜 융출관부(3)를 형성한 다음 이에 보조지주간(2)의 양단을 끼워 고정하고, 고정지주대(1)의 상단에는 연결핀(5)을 핀축(5a)으로 편심되게 축설하여 핸드바(6)의 하부측 요입부(7)에 끼워 넣은후 볼트로 고정하여서된 건축용 난간지주대.In the coupling device of the handrail for holding, the outer peripheral surface of the insertion hole (4) perforated in the fixed support (1) to protrude outward to form a flux pipe (3) and then fixed to both ends of the auxiliary support (2), On the upper end of the fixed support 1, a handrail for construction, which is eccentrically arranged with a pin shaft 5a, is inserted into the lower recess 7 of the hand bar 6 and fixed with bolts. .
KR92011074U 1992-06-17 1992-06-17 Hand rail post for building KR940008462Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR92011074U KR940008462Y1 (en) 1992-06-17 1992-06-17 Hand rail post for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR92011074U KR940008462Y1 (en) 1992-06-17 1992-06-17 Hand rail post for building

Publications (2)

Publication Number Publication Date
KR940001186U KR940001186U (en) 1994-01-03
KR940008462Y1 true KR940008462Y1 (en) 1994-12-21

Family

ID=19335221

Family Applications (1)

Application Number Title Priority Date Filing Date
KR92011074U KR940008462Y1 (en) 1992-06-17 1992-06-17 Hand rail post for building

Country Status (1)

Country Link
KR (1) KR940008462Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100763645B1 (en) * 2006-05-12 2007-10-05 김오형 Non-welding type balustrde

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100763645B1 (en) * 2006-05-12 2007-10-05 김오형 Non-welding type balustrde

Also Published As

Publication number Publication date
KR940001186U (en) 1994-01-03

Similar Documents

Publication Publication Date Title
KR20000068157A (en) Dismountable facade scaffold
US2558142A (en) Iron railing
US4386761A (en) Baluster
KR940008462Y1 (en) Hand rail post for building
KR102049362B1 (en) Connecting elements in balustrade
US5402610A (en) Standardized step module for building prefabricated staircases, process for producing such module, prefabricated staircase and process for assemblying prefabricated staircases
KR100575455B1 (en) Built-up balustrade
KR101036707B1 (en) Newel post assembly
JP3261405B2 (en) Handrail support and construction method
JPH0643335Y2 (en) Handrail railing support device
CN205444736U (en) Standardized assembled stair and staircase structure
JP3324816B2 (en) Standing method of handrail support
KR102543262B1 (en) Assembly stairs handrail
KR200322170Y1 (en) Balustrade
JPS6217550Y2 (en)
CN213143661U (en) Connection structure of railing of archaize building
JP2501728B2 (en) Building unit with balcony and its manufacturing method
JPH043059Y2 (en)
KR200201319Y1 (en) Prop for fixing balustrade
JP3505272B2 (en) Prop support brackets and post erecting method
KR200277663Y1 (en) A stairway railing
JP3534871B2 (en) Joint structure between horizontal member and column and its bracket
KR200341307Y1 (en) assemble equipment of iron doorframe
KR200290839Y1 (en) Handrail connecting rod
KR200251474Y1 (en) Mold fabricated as one

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20031223

Year of fee payment: 11

LAPS Lapse due to unpaid annual fee