KR930019940A - Eye beam reinforcement method for bridge reinforcement and reinforced beam structure - Google Patents

Eye beam reinforcement method for bridge reinforcement and reinforced beam structure Download PDF

Info

Publication number
KR930019940A
KR930019940A KR1019920003779A KR920003779A KR930019940A KR 930019940 A KR930019940 A KR 930019940A KR 1019920003779 A KR1019920003779 A KR 1019920003779A KR 920003779 A KR920003779 A KR 920003779A KR 930019940 A KR930019940 A KR 930019940A
Authority
KR
South Korea
Prior art keywords
web portion
lower flanges
bridge
eye
bolt hole
Prior art date
Application number
KR1019920003779A
Other languages
Korean (ko)
Other versions
KR950010090B1 (en
Inventor
임병구
Original Assignee
임병구
주식회사 표준개발
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 임병구, 주식회사 표준개발 filed Critical 임병구
Priority to KR1019920003779A priority Critical patent/KR950010090B1/en
Publication of KR930019940A publication Critical patent/KR930019940A/en
Application granted granted Critical
Publication of KR950010090B1 publication Critical patent/KR950010090B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 교량의 아이빔 보강방법 및 보강된 빔 구조에 관한 것으로, 기존 아이빔의 웨브부(3)와 상부 및 하부플랜지(2a,2b) 표면이 녹이 슨 부위를 벗겨내고 아이빔(4)의 길이방향과 세로방향으로 일정한 간격(d)을 유지하면서 보울트구멍이 형성되어지고, 이 보울트구멍이 대응되는 보울트구멍이 형성된 강철판이나 앵글이 보울트(5)를 매개로 체결되며, 이렇게 체결된 상태에 상부 및 하부플랜지(2a,2b)와 웨브부(3) 사이 공간에 모울타르나 콘크리트가 타설된 구조로 되어, 기존의 부재와 역학적으로 일체가되어 가중된 하중을 효과적으로 지지하여 주도록 되어 있다.The present invention relates to a method for reinforcing an i-beam of a bridge and a reinforced beam structure. The bolt hole is formed while maintaining a constant distance (d) in the vertical direction, and the steel plate or angle on which the bolt hole is formed is fastened through the bolt (5). A structure in which mortar or concrete is poured into the space between the lower flanges 2a and 2b and the web part 3 is integrated with the existing member to support the weighted load effectively.

Description

교량의 보강용 아이빔 보강방법 및 보강된 빔구조Eye beam reinforcement method for bridge reinforcement and reinforced beam structure

본 내용은 요부공개 건이므로 전문내용을 수록하지 않았음Since this is an open matter, no full text was included.

제1도는 아이빔 단면도1 is a cross-sectional view of the i-beam

제2(a)도는 본 발명 아이빔에 강철판을 보울팅한 상태를 나타내는 정단면도.Figure 2 (a) is a front sectional view showing a state in which the steel plate bowling on the eye beam of the present invention.

제2(b)도는 제2(a)도의 아이빔 한쪽에만 콘트리트를 타설한 상태를 나타내는 Ⅱ-Ⅱ 선단면도.FIG. 2 (b) is a sectional view of II-II showing a state in which concrete is poured only on one eye beam of FIG.

제3(a)도는 본 발명에 따른 다른 실시예의 정단면도.Figure 3 (a) is a front sectional view of another embodiment according to the present invention.

제3(b)도는 제3(a)도의 Ⅲ-Ⅲ 선단면도이다.FIG. 3 (b) is a sectional view taken along the line III-III of FIG. 3 (a).

Claims (3)

아이빔(4)의 상부 및 하부플랜지(2a,2b)와 웨브부(3)의 표면에 녹이 슬거나 노후된 부위(t)를 벗겨 제거시키는 제거단계와, 상기 아이빔(4)의 웨브부(3)의 상부 및 하부부근에 아이빔(4)의 길이방향으로 일정한 간격(d)를 유지하면서 보울트구멍을 형성시킴과 더불어 상기 웨브부(3)의 세로방향으로 상기 간격(d)을 유지하면서 보울트 구멍을 형성시키는 보울트구멍 형성단계, 상기 웨브부(3) 양쪽에 상기 웨브부(3)의 보울트 구멍이 형성된 수평 및 수직강철판(6,7)을 보울트(5)를 매개로 각각 체결시키는 체결단계 및, 상기 웨브부(3) 양옆과 상부 및 하부 플랜지(2a,2b) 사이 공간에 콘크리트(8)를 타설하는 콘크리트 타설단계로 이루어진 교량의 아이빔 보강방법.A removal step of peeling off and removing the rusted or aged part (t) on the upper and lower flanges (2a, 2b) and the surface of the web portion (3) of the i-beam (4), and the web portion (3) of the i-beam (4) While forming the bolt hole while maintaining a constant distance (d) in the longitudinal direction of the eye beam (4) in the upper and lower portions of the while the bolt hole while maintaining the distance (d) in the longitudinal direction of the web portion (3) A bolt hole forming step of forming, a fastening step of fastening horizontal and vertical steel plates 6 and 7 having the bolt holes of the web part 3 formed on both sides of the web part 3 through the bolt 5; The method of reinforcing the bridge of the bridge consisting of a concrete casting step of placing the concrete (8) in the space between the side of the web portion and the upper and lower flanges (2a, 2b). 상부 및 하부플랜지(2a,2b)와 이 상부 및 하부 플랜지(2a,2b)의 중간에 일체로 연결된 웨브부(3)로 된 아이빔(4)과, 이 아이빔(4)의 웨브부(3) 양쪽 옆에 보울트(5)를 매개로 체결된 수평 및 수직강철판(6,7) 및, 이 아이빔(1)의 웨브부(3)와 상부 및 하부플랜지(2a,2b) 사이 공간에 타설된 콘크리드(8)로 구성된 보강된 빔(1) 구조.An eye beam 4 composed of upper and lower flanges 2a and 2b and a web portion 3 integrally connected between the upper and lower flanges 2a and 2b, and a web portion 3 of the eye beam 4 Horizontal and vertical steel plates 6 and 7 fastened via bolts 5 on both sides, and cones placed in the space between the web portion 3 of the i-beam 1 and the upper and lower flanges 2a and 2b. Reinforced beam (1) structure consisting of creed (8). 제2항에 있어서, 상기 수직강철판(7) 안쪽 또는 바깥쪽에 철근(22)이 수직과 수평으로 조밀하게 조합되어 용접시켜진 것을 특징으로 하는 보강된 빔(1) 구조.3. Reinforced beam (1) structure according to claim 2, characterized in that the reinforcing bar (22) is welded in a vertically and horizontally tight combination in the inside or the outside of the vertical steel sheet (7). ※ 참고사항 : 최초출원 내용에 의하여 공개되는 것임.※ Note: This is to be disclosed by the original application.
KR1019920003779A 1992-03-07 1992-03-07 Method of reinforcing i-beam bridge KR950010090B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019920003779A KR950010090B1 (en) 1992-03-07 1992-03-07 Method of reinforcing i-beam bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019920003779A KR950010090B1 (en) 1992-03-07 1992-03-07 Method of reinforcing i-beam bridge

Publications (2)

Publication Number Publication Date
KR930019940A true KR930019940A (en) 1993-10-19
KR950010090B1 KR950010090B1 (en) 1995-09-06

Family

ID=19330106

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019920003779A KR950010090B1 (en) 1992-03-07 1992-03-07 Method of reinforcing i-beam bridge

Country Status (1)

Country Link
KR (1) KR950010090B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100427405B1 (en) * 2001-03-07 2004-04-17 박재만 Pssc complex girder

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100427405B1 (en) * 2001-03-07 2004-04-17 박재만 Pssc complex girder

Also Published As

Publication number Publication date
KR950010090B1 (en) 1995-09-06

Similar Documents

Publication Publication Date Title
KR910006579A (en) Truss and this reinforced precast concrete slab
KR100615471B1 (en) Steel plate girder bridge and it's construction method is using a steel composite horizontal beam
JPH08199510A (en) Execution method of cast-in-place floor slab section of precast concrete girder and form thereof
KR100310619B1 (en) Cast support structure of top plate of reinforced concrete building
FI72369B (en) BYGGNADSSYSTEM
JP2002030614A (en) Corrugated steel plate for bridge
KR930019940A (en) Eye beam reinforcement method for bridge reinforcement and reinforced beam structure
JPH04228710A (en) Road slab for bridge
KR20020007818A (en) Steel bridge reinforcement equipment
KR960031717A (en) Prevention method of main girder collapse that occurs when the top of the composite girder is replaced with the precast top
KR200235400Y1 (en) Sheeting iron mat of upper slav
KR960007962A (en) Rebar Support
JPH0521522Y2 (en)
FI69176B (en) BYGGSYSTEM
CN213142757U (en) Novel corrugated steel web beam member for bridge
KR102559951B1 (en) Steel composite rahmen structure and construction method thereof
SU1361225A1 (en) Steel-ferroconcrete bridge span structure and method of erecting same
JPH11324174A (en) Structure of aseismatic wall
KR200386506Y1 (en) Steel Plate Girder Structure for Reduction of Noise and Vibration
KR102151567B1 (en) Steel composite bridge
KR100456320B1 (en) Method and structure for prevention of generation of negative moment in upper plate slab of bridge
KR200275849Y1 (en) A Apparatus for Set Establish Form for Upper Slab of Bridge
JPH0348285B2 (en)
KR200240446Y1 (en) Sheeting iron mat of upper slab
US3136521A (en) Hanger assembly

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
G160 Decision to publish patent application
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20080903

Year of fee payment: 14

LAPS Lapse due to unpaid annual fee