KR20230042982A - Earth retaining wall and its construction method - Google Patents

Earth retaining wall and its construction method Download PDF

Info

Publication number
KR20230042982A
KR20230042982A KR1020210125921A KR20210125921A KR20230042982A KR 20230042982 A KR20230042982 A KR 20230042982A KR 1020210125921 A KR1020210125921 A KR 1020210125921A KR 20210125921 A KR20210125921 A KR 20210125921A KR 20230042982 A KR20230042982 A KR 20230042982A
Authority
KR
South Korea
Prior art keywords
retaining
width direction
rail
retaining wall
along
Prior art date
Application number
KR1020210125921A
Other languages
Korean (ko)
Other versions
KR102604260B1 (en
Inventor
안영호
Original Assignee
(주)한국에어로테크
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)한국에어로테크 filed Critical (주)한국에어로테크
Priority to KR1020210125921A priority Critical patent/KR102604260B1/en
Publication of KR20230042982A publication Critical patent/KR20230042982A/en
Application granted granted Critical
Publication of KR102604260B1 publication Critical patent/KR102604260B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Abstract

The present invention relates to an earth retaining wall installed to prevent collapse of an excavation area and surrounding ground in a variety of bed excavation construction and a construction method thereof. The earth retaining wall comprises: a plurality of rail posts separated from each other in a width direction, fixed by driving longitudinal lower portions thereof into the ground, having a rail part on both sides of the width direction in a longitudinal direction, and having a plurality of first insertion holes formed on the front surface thereof to be separated in the longitudinal direction; a plurality of earth retaining panels having a first sliding protrusion in the longitudinal direction on both sides of the width direction to be inserted into the rail part to be slid and coupled, having one or more first fastening groove members on an upper portion thereof in the width direction, and having one or more first insertion part members corresponding to the first fastening groove members on a lower portion thereof in the width direction to be stacked and coupled in the longitudinal direction between the rail posts; and earth retaining wale having a second sliding protrusion in the longitudinal direction on both sides of the width direction to be inserted into the rail part to be slid and coupled, having one or more second fastening groove members corresponding to the first insertion part members on an upper portion thereof in the width direction, having one or more second insertion part members corresponding to the first fastening groove members on a lower portion thereof in the width direction to be coupled to an upper side or a lower side of the earth retaining panels to be interposed between the earth retaining panels, and having a plurality of second insertion holes separated in the width direction.

Description

흙막이 벽체 및 그 시공방법{Earth retaining wall and its construction method}Earth retaining wall and its construction method {Earth retaining wall and its construction method}

본 발명은 흙막이 벽체 및 그 시공방법에 관한 것으로, 구체적으로는 각종 터파기 공사에서 굴토지역과 주변 지반의 붕괴를 방지하기 위해 설치되는 흙막이 벽체 및 그 시공방법에 관한 것이다.The present invention relates to a retaining wall and a construction method thereof, and more specifically, to a retaining wall installed to prevent collapse of excavation areas and surrounding ground in various excavation works and a construction method thereof.

일반적으로 흙막이 공사에는 빔(예컨대, H-Beam)을 일정 간격으로 지반에 청공 작업하여 세운 다음, 그 사이에 벽체용 목재 토류판을 적층하여 벽체를 구성하는 목재 토류판 공법과 여러가지 시트파일(Sheet-Pile)을 연속적으로 항타 설치하여 벽체를 구성하는 시트파일 공법이 주로 사용되고 있다.In general, in earth retaining construction, a beam (eg, H-Beam) is built by clearing the ground at regular intervals, and then a wooden soil board method and various sheet piles (Sheet-Pile) ) is mainly used for the sheet pile construction method, which consists of walls by continuously driving and installing them.

목재 토류판 공법은 흙막이 공사에 보편적으로 적용되고 있는 공법으로 가장 오래된 공법이라 할 수 있다.The wood soil board method is a method that is universally applied to earth retaining construction and can be said to be the oldest method.

이러한 목재 토류판 공법은 많은 문제점을 가지고 있음에도 불구하고 딱히 대체공법이 없다는 이유로 맹적으로 답습되고 있는 실정이다.Despite having many problems, this wood soil board method is blindly being followed because there is no alternative method.

상술한 목재 토류판 공법에 있어서, 목재는 균일성을 보전하기 어려우며, 함수율에 따른 강도의 변화가 큼과 동시에 지하수위를 고려하여 설치하여야 하고, 차수성이 없기 때문에 안정성에 심각한 문제가 있는 것이다.In the above-mentioned wood soil board method, it is difficult to preserve the uniformity of wood, and the change in strength according to the moisture content is large, and at the same time, it must be installed in consideration of the groundwater level, and there is no water repellency, so there is a serious problem in stability.

그리고, 공사 후에는 목재판의 철거를 원칙으로 하지만 토압으로 인해 현실적으로는 해체가 힘들어 H빔만 뽑아내게 된다.After construction, it is in principle to remove the wooden board, but due to earth pressure, it is difficult to dismantle in reality, so only the H-beam is pulled out.

따라서, H빔을 뽑아낸 자리에는 목재판의 배열이 엉키게 되고, 공극이 발생하여 결국은 부실시공이 생기게 되는 것이며, 목재의 부식이 진행되면 지반침하의 위험까지 발생하는 결과가 초래되는 것이다.Therefore, in the place where the H-beam was extracted, the arrangement of the wooden boards is tangled, voids are generated, resulting in poor construction, and when the corrosion of the wood proceeds, the risk of ground subsidence occurs.

또한, 목재 토류판은 단위면적당 설치되는 부재의 수가 많음에도 불구하고 재상용이 불가능하며, 많은 설치 인력과 작업을 필요로함으로써 공사비의 부담이 매우 큰 단점도 있는 것이다.In addition, despite the large number of members installed per unit area, the wood earth plate cannot be reused, and requires a lot of installation manpower and work, so the burden of construction cost is very high.

더불어, 목재 토류판 공법은 장비를 이용한 시공이 불가능하고, H빔의 간격이 일정하지 않기 때문에 자재의 현장 절단작업이 필요하며, 고정을 위해 각재와 겨울목(쐐기)등을 설치하고 못질이나 철선고정 등을 행하여야 하는 등 그 시공성에 있어서도 상당한 문제가 있었다.In addition, the wooden soil board method cannot be constructed using equipment, and since the interval of the H-beam is not constant, on-site cutting of materials is required. There was also a considerable problem in its workability, such as having to do the same.

한편, 시트파일 공법은 차수성이 필요한 곳에 사용되는 공법으로, 쓰레기 매립장의 차수벽 또는 제방 보강공사 등 주로 물막이 공사나 항만구조물 및 토류구조물에 사용되고 있다.On the other hand, the sheet pile method is a method used where water resistance is required, and is mainly used for water barrier construction, port structures, and earthwater structures, such as water barrier walls or embankment reinforcement works in garbage landfills.

이러한 시트파일 공법은 그 구조가 상당히 복잡하나 이를 간략히 살펴보면, 양단이 구멍형 또는 요철로 되어 있어 서로 끼워 맞출 수 있게 되어 있는바, 강널말뚝을 수직으로 땅속에 박고, 이어서 끝부분의 연결부에 다른 강널판의 끝부분을 끼워 맞추며, 역시 땅속에 박아 넣는다.This sheet pile construction method has a very complicated structure, but if you look at it briefly, both ends are hole-shaped or uneven so that they can be fitted with each other. Fit the ends of the planks, and also drive them into the ground.

이것을 반복하여 시행하면 하나의 차수벽(遮水壁)을 만들 수 있는데, 이 차수벽은 그대로 구조물로서 사용되기도 하고, 공사 과정의 임시 물막이인 경우에는 나중에 회수하여 다시 사용하기도 한다.By repeating this process, one water barrier can be created, and this water barrier can be used as a structure or, in the case of a temporary water barrier in the construction process, recovered and reused later.

이와 같은 시트파일 공법 역시 국내 및 국외에서 가장 오래된 보편적인 공법 중의 하나로 많은 문제점을 안고 있으나 특별한 대체공법이 없어 현재도 많이 시행되고 있는 것이다.This sheet pile construction method is also one of the oldest and most common construction methods in Korea and abroad, and has many problems, but is still in use because there is no special alternative construction method.

그러나, 시트파일 공법은 설치시 고가의 항타 장비가 필요하여 비경제적이며, 펀칭(punching)에 의하여 배면 상에 지반침하가 발생할 수 있고, 자체 강성이 크지 않아 휨변형이 발생하는 문제가 있었다.However, the sheet pile method is uneconomical because it requires expensive driving equipment during installation, ground subsidence may occur on the rear surface due to punching, and bending deformation occurs due to low self-stiffness.

그리고, 시공에 있어서 지수제를 이용하여 연결부를 보강하여야만 하는 단점이 있으며, 보강재의 위치 변경이 불가능하고, 버팀대의 수가 많아 작접이 불편함은 물론, 시공 후에도 띠장과 버팀대를 추가로 설치하여야 함으로써, 기초 작업시 상당한 불편함을 초래하는 문제가 있었다.In addition, in construction, there is a disadvantage that the connection must be reinforced using a waterstop agent, the position of the reinforcing material cannot be changed, and the number of braces is inconvenient, as well as additional installation of strips and braces after construction. There was a problem that caused considerable inconvenience during foundation work.

이러한 문제점들을 해소하기 위하여 본 출원인이 선출원한 특허문헌 1에는 지주들 사이에 슬라이드 패널을 설치하여 4각형의 흙막이부를 구성하면서 버팀대를 흙막이부의 내부에 마름모 형태로 설치하여 버팀부를 형성하는 흙막이 벽체의 구조가 게시되어 있다.In order to solve these problems, Patent Document 1 previously filed by the present applicant has a structure of a retaining wall in which a slide panel is installed between the supports to form a rectangular retaining portion and a brace is installed in a diamond shape inside the retaining portion to form a retaining portion. is posted.

그러나, 상술한 슬라이드 패널은, 그 폭 방향 길이가 대략 4m 정도로 장대한 크기를 가지고 있어 버팀부를 형성한다 하더라도 지반의 토압을 견디기 어려워 흙막이 벽체의 안정성이 떨어지는 문제가 있었고, 버팀대들이 흙막이부의 4각 모서리 사이 변의 중앙부만을 지지함과 동시에 버팀부가 마름모 형태로 형성되기 때문에 흙막이부 전체를 균일하게 지지하기 어려운 문제도 있었다.However, the above-described slide panel has a length of about 4 m in the width direction, so even if it forms a support part, it is difficult to withstand the earth pressure of the ground, and there is a problem in that the stability of the retaining wall is poor. There was also a problem that it was difficult to uniformly support the entire earth retaining part because the support part was formed in a rhombic shape while only supporting the central part of the side.

대한민국 등록특허공보 제10-0568988호(2006.04.07. 공고)Republic of Korea Patent Registration No. 10-0568988 (2006.04.07. Notice)

본 발명의 목적은 각종 터파기 공사에서 굴토지역과 주변 지반의 붕괴를 방지하기 위해 설치되는 흙막이 벽체에 있어, 지반의 토압을 안정적으로 견딜 수 있도록 보강하여 흙막이 벽체 안정성의 신뢰를 확보할 수 있도록 하면서도, 흙막이 벽체 전체를 균일하게 지지할 수 있도록 하는 흙막이 벽체 및 그 시공방법을 제공함에 있다.The purpose of the present invention is to secure the reliability of the stability of the retaining wall by reinforcing it to stably withstand the earth pressure of the ground in the retaining wall installed to prevent the collapse of the excavation area and the surrounding ground in various excavation works. To provide a retaining wall and its construction method that can uniformly support the entire retaining wall.

상기 목적을 달성하기 위한 본 발명에 따른 흙막이 벽체는, 상호 폭 방향으로 간격을 이루며 길이방향 하부가 지중에 박혀 고정되고, 폭 방향 양측면에 길이방향을 따라 레일부를 구비하며, 전면에 길이방향을 따라 간격을 이루도록 복수개의 제1삽입홀이 형성된 복수개의 레일지주; 폭 방향 양측면에 길이방향을 따라 제1슬라이딩돌기를 구비하여 상기 레일부에 끼워져 슬라이딩 결합을 이루고, 상부에 폭 방향을 따라 하나 이상의 제1체결홈부재를 구비하며, 하부에 상기 제1체결홈부재에 대응하는 제1끼움구부재를 폭 방향을 따라 하나 이상 구비하여 상기 레일지주들 사이에 길이방향을 따라 복수개가 적층되는 결합을 이루는 흙막이패널; 및 폭 방향 양측면에 길이방향을 따라 제2슬라이딩돌기를 구비하여 상기 레일부에 끼워져 슬라이딩 결합을 이루고, 상부에 상기 제1끼움구부재에 대응하는 제2체결홈부재가 폭 방향을 따라 하나 이상 구비되며, 하부에 상기 제1체결홈부재에 대응하는 제2끼움구부재가 폭 방향을 따라 하나 이상 구비되어 상기 흙막이패널의 상측 또는 하측에 결합을 이루어 상기 흙막이패널들 사이에 개재되고, 폭 방향을 따라 간격을 이루며 복수개의 제2삽입홀이 형성된 흙막이띠장;을 포함한다.The retaining wall according to the present invention for achieving the above object is spaced apart in the width direction and the lower part in the longitudinal direction is embedded and fixed in the ground, and has rails on both sides in the width direction along the longitudinal direction, and along the longitudinal direction on the front side. A plurality of rail struts formed with a plurality of first insertion holes at intervals; A first sliding protrusion is provided on both sides in the width direction along the longitudinal direction to be inserted into the rail to form a sliding coupling, and one or more first fastening groove members are provided on the upper part along the width direction, and the first fastening groove member is provided on the lower part. An earth retaining panel having one or more first fitting members corresponding to each other along the width direction to form a plurality of laminated couplings along the longitudinal direction between the rail supports; And a second sliding protrusion is provided along the longitudinal direction on both sides in the width direction to form a sliding coupling by being inserted into the rail portion, and at least one second fastening groove member corresponding to the first fitting member is provided on the upper portion along the width direction. And, at the bottom, one or more second fitting members corresponding to the first fastening groove member are provided along the width direction, coupled to the upper or lower side of the retaining panel, interposed between the retaining panels, and the width direction It includes; a retaining strip formed at intervals along and having a plurality of second insertion holes.

상기 레일부는, 전방의 제1패널설치레일 및 후방의 제2패널설치레일로 구획 구성되고, 상기 제1패널설치레일 및 제2패널설치레일은 상기 제1슬라이딩돌기 및 제2슬라이딩돌기가 끼워지는 입구측 단부에 길이방향을 따라 상기 제1슬라이딩돌기 및 제2슬라이딩돌기의 이탈을 방지하는 지지턱을 구비할 수 있다.The rail part is divided into a front first panel mounting rail and a rear second panel mounting rail, and the first panel mounting rail and the second panel mounting rail are fitted with the first sliding protrusion and the second sliding protrusion. It may be provided with a support step for preventing separation of the first sliding protrusion and the second sliding protrusion along the longitudinal direction at the inlet side end.

상기 제1삽입홀 및 제2삽입홀에는, 흙막이 벽체에 의해 지지되는 지반에 시공되는 어스앵커가 삽입을 이루는 블록부재가 분리 가능하게 삽입되는 결합을 이룰 수 있다.In the first insertion hole and the second insertion hole, a block member configured to insert an earth anchor installed in the ground supported by the retaining wall may be detachably inserted into the coupling.

상기 블록부재는, 폭 방향으로 간격을 이루며 전방으로 돌출된 한 쌍의 브래킷; 및 한 쌍의 상기 브래킷의 전면에 구비되어 어스앵커가 삽입을 이루는 시공홀을 형성한 지압판;을 포함할 수 있다.The block member comprises: a pair of brackets protruding forward at intervals in the width direction; and a pressure plate provided on the front surface of the pair of brackets to form a construction hole through which an earth anchor is inserted.

한 쌍의 상기 브래킷은 전면에 길이방향을 따라 조절홈이 다단으로 형성되고, 상기 지압판은 후면 폭 방향 양측에 상기 조절홈에 결합을 이루는 조절돌기가 길이방향을 따라 복수개가 돌출 형성되어 어스앵커가 삽입되는 각도를 조절할 수 있다.The pair of brackets are formed with multiple stages of control grooves along the longitudinal direction on the front side, and the pressure plate has a plurality of control protrusions coupled to the control grooves on both sides in the rear width direction protruding along the longitudinal direction, so that the earth anchor is The insertion angle can be adjusted.

상기 제1삽입홀 및 제2삽입홀을 개폐하는 덮개판부재를 더 포함할 수 있다.A cover plate member for opening and closing the first insertion hole and the second insertion hole may be further included.

삼각의 횡단면으로 이루어지고, 상기 레일지주와 간격을 이루며 길이방향 하부가 지중에 박혀 고정되며, 폭 방향 양측면에 길이방향을 따라 레일부를 구비한 코너형지주를 더 포함할 수 있다.It is made of a triangular cross section, and the lower part in the longitudinal direction is fixed to the ground at intervals with the rail post, and may further include a corner type post having a rail part along the longitudinal direction on both sides in the width direction.

상술한 흙막이 벽체의 시공방법으로서, 지중을 터파기하여 작업공간을 확보하는 제1단계; 상기 작업공간에 간격을 이루도록 상기 레일지주들을 설치하는 제2단계; 및 상기 레일지주들 사이에 복수개의 상기 흙막이패널을 설치하여 흙막이 벽체의 하부를 이루도록 하고, 설치된 흙막이패널의 상측에 상기 흙막이띠장을 설치하며, 설치된 흙막이띠장의 상측에 복수개의 상기 흙막이패널을 설치하여 흙막이 벽체의 상부를 이루도록 하는 제3단계;를 포함할 수 있다.As a construction method of the above-mentioned retaining wall, the first step of securing a work space by excavating the ground; A second step of installing the rail posts to form intervals in the work space; And installing a plurality of the retaining panels between the rail supports to form the lower part of the retaining wall, installing the retaining strip on the upper side of the installed retaining panel, and installing a plurality of the retaining panels on the upper side of the installed retaining strip, It may include; a third step of making the upper part of the retaining wall.

상술한 본 발명의 구성에 의하면, 흙막이패널과 일체를 이루는 형상으로 구성된 흙막이띠장이 흙막이패널의 역할을 하면서도 통상의 띠장으로서 기능할 수 있게 됨은 물론, 각 구성들간의 연결과 결합이 편리함에 따른 시공의 용이성도 확보할 수 있는 효과가 있다.According to the configuration of the present invention described above, the retaining strip composed of a shape integral with the retaining panel can function as a normal wale while serving as a retaining panel, as well as construction according to the convenience of connection and combination between each component. There is also an effect that can secure the ease of.

그러면서도, 레일지주와 흙막이띠장에 어스앵커를 삽입하는 시공이 가능해짐에 따라 장대한 크기의 흙막이패널들로 이루어진 흙막이 벽체 전체를 보강할 수 있게 됨으로써, 흙막이 벽체 전체를 지지할 수 있게 되어 흙막이 벽체의 안정성을 견고하게 유지할 수 있는 효과도 있다.At the same time, as the construction of inserting earth anchors into rail supports and retaining strips became possible, it became possible to reinforce the entire retaining wall made up of large-sized retaining panels, enabling it to support the entire retaining wall. It also has the effect of maintaining stability firmly.

도 1 및 도 2는 본 발명에 따른 흙막이 벽체를 개략적으로 나타낸 도면이다.
도 3은 본 발명에 따른 흙막이 벽체의 레일지주를 개략적으로 나타낸 도면이다.
도 4는 본 발명에 따른 흙막이 벽체의 레일지주에 흙막이패널 또는 흙막이띠장이 결합되는 것을 설명하기 위해 나타낸 도면이다.
도 5는 본 발명에 따른 흙막이 벽체의 코너형지주에 흙막이패널 또는 흙막이띠장이 결합되는 것을 설명하기 위해 나타낸 도면이다.
도 6은 본 발명에 따른 흙막이 벽체의 흙막이띠장을 개략적으로 나타낸 도면이다.
도 7은 본 발명에 따른 흙막이 벽체의 블록부재를 설명하기 위해 나타낸 도면이다.
1 and 2 are views schematically showing a retaining wall according to the present invention.
Figure 3 is a view schematically showing the rail support of the retaining wall according to the present invention.
Figure 4 is a view shown to explain the coupling of the retaining panel or the retaining belt to the rail support of the retaining wall according to the present invention.
5 is a view shown to explain that a retaining panel or a retaining belt is coupled to a corner retainer of a retaining wall according to the present invention.
6 is a view schematically showing a retaining strip of a retaining wall according to the present invention.
7 is a view shown to explain the block member of the retaining wall according to the present invention.

이하, 첨부한 도면을 참조하여 상술한 본 발명의 목적을 구현하기 위한 바람직한 실시 구성과 이들 구성에 따른 작용관계에 대하여 설명하겠으며, 종래와 동일 내지 동일 범주에 있는 기술구성에 대한 상세한 설명은 생략하기로 한다.Hereinafter, with reference to the accompanying drawings, preferred implementation configurations for realizing the object of the present invention described above and operational relationships according to these configurations will be described, and detailed descriptions of technical configurations in the same or the same category as the prior art will be omitted. do it with

본 발명은 각종 터파기 공사에서 굴토지역과 주변 지반의 붕괴를 방지하기 위해 설치되는 흙막이 벽체 및 그 시공방법에 관한 것이다.The present invention relates to a retaining wall and a construction method thereof installed to prevent collapse of excavation areas and surrounding ground in various excavation works.

이를 위한 본 발명의 구성은, 도 1 내지 도 7에 도시한 바와 같이, 레일지주(100), 흙막이패널(200), 흙막이띠장(300), 블록부재(400) 및 코너형지주(500)를 포함하여 이루어질 수 있다.As shown in FIGS. 1 to 7, the configuration of the present invention for this purpose includes a rail support 100, a retaining panel 200, a retaining strip 300, a block member 400 and a corner type support 500. can be made including

본 발명의 레일지주(100)는, 상호 폭 방향으로 간격을 이루며 길이방향 하부가 지중에 박혀 고정되고, 폭 방향 양측면에 길이방향을 따라 레일부(110)를 구비하며, 전면에 길이방향을 따라 간격을 이루도록 복수개의 제1삽입홀(120)이 형성된 복수개로 구성된다.The rail support 100 of the present invention is spaced apart in the width direction and the lower part in the longitudinal direction is embedded and fixed in the ground, and has rail parts 110 along the longitudinal direction on both sides in the width direction, and along the longitudinal direction on the front side. It consists of a plurality of first insertion holes 120 formed at intervals.

예컨대, 레일지주(100)들은 지중을 터파기하여 확보된 작업공간의 벽면을 따라 일정 거리를 두고 각각 지중에 박혀 세워지면서, 1개의 H빔 또는 2개의 H빔이 결합을 이룬 상태에서 구성될 수 있고, 하부가 뾰족하게 형성되어 지중에 용이하게 박힐 수 있도록 하는 것이 바람직하다.For example, the rail supports 100 can be constructed in a state in which one H beam or two H beams are combined while being built into the ground at a certain distance along the wall surface of the work space secured by excavating the ground, , it is preferable that the lower part is formed sharp so that it can be easily driven into the ground.

레일부(110)는, 전방의 제1패널설치레일(111) 및 후방의 제2패널설치레일(112)로 구획된 2단으로 구성되어 후술하는 흙막이패널(200) 또는 흙막이띠장(300)이 전후방의 2단으로 설치되도록 할 수 있고, 전방과 후방으로 구획되지 않은 1단으로 구성될 수 있음은 당연하다 할 것이다.The rail unit 110 is composed of two stages partitioned by a first panel installation rail 111 at the front and a second panel installation rail 112 at the rear, and the retaining panel 200 or the retaining strip 300 described below is It will be natural that it can be installed in two stages, front and rear, and can be configured in one stage that is not partitioned into front and rear.

레일부(110)는, 후술하는 흙막이패널(200) 및 흙막이띠장(300)이 길이방향을 따라 슬라이딩 방식으로 결합되도록 레일 형태로 형성된 것으로, 상술한 제1패널설치레일(111) 및 제2패널설치레일(112)은 제1슬라이딩돌기(210) 및 제2슬라이딩돌기(310)가 끼워져 슬라이딩되는 입구측 단부에 길이방향을 따라 제1슬라이딩돌기(210) 및 제2슬라이딩돌기(310)의 이탈을 방지하는 지지턱(113)을 구비한 구성으로 이루어질 수 있다.The rail unit 110 is formed in the form of a rail so that the retaining panel 200 and the retaining strip 300, which will be described later, are coupled in a sliding manner along the longitudinal direction, and the above-described first panel installation rail 111 and the second panel The installation rail 112 has the first sliding protrusion 210 and the second sliding protrusion 310 along the longitudinal direction at the end of the entrance side where the first sliding protrusion 210 and the second sliding protrusion 310 are inserted and the first sliding protrusion 210 and the second sliding protrusion 310 are separated It may be made of a configuration having a support jaw 113 to prevent.

이러한 제1,2패널설치레일(111,112)과 후술하는 제1,2슬라이딩돌기(210,310)는 더브테일(dovetail)형으로 구성되는 등 슬라이딩과 이탈 방지를 위한 모든 형태가 가능하고, 하기에서 설명하는 구성요소 중에서 슬라이딩을 안내하는 부분은 도면에 도시된 것으로 한정되지 않고 더브테일 형태로 형성되는 것도 포함할 수 있다 할 것이다.The first and second panel installation rails 111 and 112 and the first and second sliding protrusions 210 and 310 to be described later can be of any type for sliding and preventing separation, such as a dovetail type, which will be described below. Among the components, the sliding guide portion is not limited to that shown in the drawing and may include a dovetail shape.

복수개의 제1삽입홀(120) 각각에는 후술하는 블록부재(400)가 분리 가능하게 삽입되는 결합을 이루게 됨으로써, 본 발명의 흙막이 벽체에 의해 지지되는 지반에 어스앵커를 삽입하는 시공을 수행하여 지반의 붕괴를 방지하면서도 레일지주(100)를 보강하여 지반의 토압에 의한 변형이나 파손을 예방할 뿐만 아니라 안정성도 확보할 수 있게 된다.In each of the plurality of first insertion holes 120, a block member 400 to be described later is detachably inserted into the coupling, so that the earth anchor is inserted into the ground supported by the retaining wall of the present invention. By reinforcing the rail support 100 while preventing its collapse, it is possible to secure stability as well as prevent deformation or damage due to earth pressure of the ground.

이때, 상술한 제1삽입홀(120)을 개폐하는 덮개판부재(C)를 더 포함하여, 제1삽입홀(120)에 후술하는 블록부재(400)를 결합시키지 않을 경우, 지반으로부터 토사 또는 지하수가 유출되는 것을 방지할 수 있도록 한다.At this time, when the block member 400 to be described later is not coupled to the first insertion hole 120 by further including a cover plate member C for opening and closing the above-described first insertion hole 120, soil or sand from the ground To prevent groundwater seepage.

본 발명의 흙막이패널(200)은, 도 1, 도 2, 도 4, 도 5 및 도 7과 같이, 폭 방향 양측면에 길이방향을 따라 제1슬라이딩돌기(210)를 구비하여 상술한 레일부(110)에 끼워져 슬라이딩 결합을 이루고, 상부에 폭 방향을 따라 하나 이상의 제1체결홈부재(220)를 구비하며, 하부에 제1체결홈부재(220)에 대응하는 제1끼움구부재(230)를 폭 방향을 따라 하나 이상 구비하여 레일지주(100)들 사이에 길이방향을 따라 복수개가 적층되는 결합을 이룬다.As shown in FIGS. 1, 2, 4, 5 and 7, the retaining panel 200 of the present invention is provided with first sliding protrusions 210 along both sides in the width direction along the longitudinal direction, and the above-described rail portion ( 110) to form a sliding coupling, having one or more first fastening groove members 220 along the width direction at the top, and a first fitting member 230 corresponding to the first fastening groove member 220 at the bottom Provided with one or more along the width direction to form a plurality of laminated coupling along the longitudinal direction between the rail support (100).

이러한 흙막이패널(200)은 상술한 제1패널설치레일(111) 또는 제2패널설치레일(112)에 슬라이딩 결합을 이룬 상태에서 각각의 흙막이패널(200)들이 제1체결홈부재(220)에 끼워져 체결을 이루는 제1끼움구부재(230)의 결합을 통해 적층 결합을 이룰 수 있는 것이고, 예컨대 제1체결홈부재(220) 및 제1끼움구부재(230)의 체결이 완료된 상태에서 볼트 등으로 고정시켜 견고한 결합 상태를 유지할 수 있도록 함이 바람직하다.Each of the retaining panels 200 is attached to the first fastening groove member 220 in a state in which the retaining panels 200 are slidably coupled to the first panel installation rail 111 or the second panel installation rail 112 described above. Through the combination of the first fitting member 230 that is inserted and fastened, the stacking combination can be achieved, for example, bolts, etc. It is preferable to fix it so that it can maintain a solid coupling state.

이렇게 각각의 흙막이패널(200)들이 결합을 이루도록 구성된 흙막이 벽체는, 지지하려는 지반의 상태에 따라 선택적으로 상술한 제1패널설치레일(111)에는 흙막이 벽체의 하부를 이루도록 흙막이패널(200)들은 결합시킬 수 있고, 제2패널설치레일(112)에는 흙막이 벽체의 상부를 이루도록 흙막이패널(200)들을 결합시킬 수 있다 할 것이다.In this way, the retaining wall constructed so that each of the retaining panels 200 is coupled to the first panel installation rail 111 described above selectively according to the state of the ground to be supported so that the retaining panels 200 form the lower portion of the retaining wall. It can be done, and the second panel installation rail 112 can be combined with the retaining panels 200 to form the upper part of the retaining wall.

이러한 설치방법과는 반대로 시공할 수 있음은 물론, 상술한 레일부(110)가 1단으로 구성될 경우, 하나의 레일부(110)에 흙막이패널(200)과 후술하는 흙막이띠장(300) 모두를 결합시키는 것도 가능하다.It can be constructed in the opposite way to this installation method, and when the above-described rail part 110 is composed of one stage, both the retaining panel 200 and the retaining strip 300 to be described later are on one rail part 110. It is also possible to combine

본 발명의 흙막이띠장(300)은, 도 1, 도 2, 도 4 내지 도 7과 같이, 폭 방향 양측면에 길이방향을 따라 제2슬라이딩돌기(310)를 구비하여 상술한 레일부(110)에 끼워져 슬라이딩 결합을 이루고, 상부에 제1끼움구부재(230)에 대응하는 제2체결홈부재(320)가 폭 방향을 따라 하나 이상 구비되며, 하부에 제1체결홈부재(220)에 대응하는 제2끼움구부재(330)가 폭 방향을 따라 하나 이상 구비되어 흙막이패널(200)의 상측 또는 하측에 결합을 이루어 흙막이패널(200)들 사이에 개재되고, 폭 방향을 따라 간격을 이루며 복수개의 제2삽입홀(340)이 형성된 구성으로 이루어질 수 있다.As shown in FIGS. 1, 2, and 4 to 7, the earth retaining strip 300 of the present invention is provided with second sliding protrusions 310 along the longitudinal direction on both sides in the width direction to achieve the above-described rail unit 110 It is inserted to form a sliding coupling, and one or more second fastening groove members 320 corresponding to the first fitting hole member 230 are provided along the width direction at the top, and at the bottom corresponding to the first fastening groove member 220 One or more second fitting members 330 are provided along the width direction, coupled to the upper or lower side of the retaining panel 200, interposed between the retaining panels 200, and formed at intervals along the width direction to form a plurality of It may be made of a configuration in which the second insertion hole 340 is formed.

이러한 흙막이띠장(300)은 상술한 흙막이패널(200)과 함께 제1패널설치레일(111) 또는 제2패널설치레일(112)에 슬라이딩 결합을 이룬 상태에서 제1체결홈부재(220)에 끼워져 체결을 이루는 제2끼움구부재(330)의 결합을 통해 흙막이패널(200)의 상측에 결합을 이룰 수 있는 것이고, 흙막이패널(200)의 상측에 결합된 상태에서 제2체결홈부재(320)에는 상측에서 하측의 흙막이띠장(300)에 적층되는 결합을 이루는 흙막이패널(200)의 제1끼움구부재(230)가 체결될 수 있다.This retaining strip 300 is inserted into the first fastening groove member 220 in a state of sliding coupling to the first panel installation rail 111 or the second panel installation rail 112 together with the above-described retaining panel 200, Through the combination of the second fitting member 330 forming the fastening, it is possible to achieve the coupling to the upper side of the retaining panel 200, and the second fastening groove member 320 in a state coupled to the upper side of the retaining panel 200 The first fitting hole member 230 of the retaining panel 200 forming a bond to be laminated to the retaining strip 300 on the lower side from the upper side can be fastened.

예컨대, 제1체결홈부재(220) 및 제2끼움구부재(330)와 제2체결홈부재(320) 및 제1끼움구부재(230)의 체결이 완료된 상태에서 볼트 등으로 고정시켜 견고한 결합 상태를 유지할 수 있도록 함이 바람직하다.For example, in a state in which the fastening of the first fastening groove member 220 and the second fitting hole member 330 and the second fastening groove member 320 and the first fitting hole member 230 are completed, they are firmly coupled by fixing with bolts or the like. It is desirable to be able to maintain the state.

이렇게 각각의 흙막이패널(200)들과 흙막이띠장(300)이 결합을 이루도록 구성된 흙막이 벽체는, 지지하려는 지반의 상태에 따라 선택적으로 상술한 제1패널설치레일(111)에는 흙막이 벽체의 하부를 이루도록 흙막이패널(200)들은 결합시킬 수 있고, 제2패널설치레일(112)에는 흙막이 벽체의 상부를 이루도록 흙막이패널(200)들을 결합시킬 수 있다 할 것이다.In this way, the retaining wall configured so that each of the retaining panels 200 and the retaining strip 300 form a combination is selected according to the state of the ground to be supported, and the above-described first panel installation rail 111 forms the lower part of the retaining wall. The retaining panels 200 may be combined, and the second panel mounting rail 112 may be coupled to the retaining panels 200 to form the upper portion of the retaining wall.

이러한 설치방법과는 반대로 시공할 수 있음은 물론, 상술한 레일부(110)가 1단으로 구성될 경우, 하나의 레일부(110)에 흙막이패널(200)과 후술하는 흙막이띠장(300) 모두를 결합시키는 것도 가능하다.It can be constructed in the opposite way to this installation method, and when the above-described rail part 110 is composed of one stage, both the retaining panel 200 and the retaining strip 300 to be described later are on one rail part 110. It is also possible to combine

더하여, 흙막이띠장(300)의 경우, 지반에 삽입할 어스앵커의 시공 위치에 따라, 길이방향으로 흙막이패널(200) 사이에 개재될 위치를 선택적으로 적용할 수 있다 할 것이고, 상술한 흙막이 벽체를 하부를 이루는 흙막이패널(200)들에 적층될 수 있도록 제1패널설치레일(111)에 설치될 수 있으며, 제2패널설치레일(112)에 설치된 흙막이패널(200)들의 하측에 위치하도록 제2패널설치레일(112)에 슬라이딩 결합할 수도 있다.In addition, in the case of the retaining strip 300, depending on the construction position of the earth anchor to be inserted into the ground, the position to be interposed between the retaining panels 200 in the longitudinal direction can be selectively applied, and the above-described retaining wall It can be installed on the first panel installation rail 111 so that it can be laminated on the retaining panels 200 constituting the lower part, and the second panel installation rail 112 is installed on the lower side of the retaining panels 200 installed on the second panel installation rail 112. It may also be slidably coupled to the panel installation rail 112 .

복수개의 제2삽입홀(340) 각각에는 후술하는 블록부재(400)가 분리 가능하게 삽입되는 결합을 이루게 됨으로써, 본 발명의 흙막이 벽체에 의해 지지되는 지반에 어스앵커를 삽입하는 시공을 수행하여 지반의 붕괴를 방지하면서도 흙막이패널(200)들을 보강하여 지반의 토압에 의한 변형이나 파손을 예방할 뿐만 아니라 안정성도 확보할 수 있게 된다.In each of the plurality of second insertion holes 340, a block member 400 to be described later is detachably inserted into the coupling, so that the earth anchor is inserted into the ground supported by the retaining wall of the present invention. By reinforcing the retaining panels 200 while preventing collapse of the soil, it is possible to secure stability as well as prevent deformation or damage due to earth pressure of the ground.

이때, 상술한 제2삽입홀(340)을 개폐하는 덮개판부재(C)를 더 포함하여, 제2삽입홀(340)에 후술하는 블록부재(400)를 결합시키지 않을 경우, 지반으로부터 토사 또는 지하수가 유출되는 것을 방지할 수 있도록 한다.At this time, when the block member 400 to be described below is not coupled to the second insertion hole 340 by further including a cover plate member C for opening and closing the above-described second insertion hole 340, soil or sand from the ground To prevent groundwater seepage.

본 발명의 블록부재(400)는, 도 1, 도 2 및 도 7과 같이, 상술한 레일지주(100)의 제1삽입홀(120)과 흙막이띠장(300)의 제2삽입홀(340)에 삽입 설치되어 지반의 붕괴를 방지하면서도 흙막이 벽체를 보강하는 것이다.The block member 400 of the present invention, as shown in FIGS. 1, 2 and 7, the first insertion hole 120 of the above-described rail support 100 and the second insertion hole 340 of the retaining strip 300 It is inserted into and installed to reinforce the retaining wall while preventing collapse of the ground.

이러한 블록부재(400)는, 폭 방향으로 간격을 이루며 전방으로 돌출된 한 쌍의 브래킷(410)과, 한 쌍의 브래킷(410)의 전면에 구비되어 어스앵커가 삽입을 이루는 시공홀(421)을 형성한 지압판(420)을 포함한 구성으로 이루어질 수 있다.This block member 400 is formed by a pair of brackets 410 protruding forward at intervals in the width direction, and a construction hole 421 provided on the front of the pair of brackets 410 to form an earth anchor insertion It may be made of a configuration including a pressure plate 420 formed.

이때, 한 쌍의 브래킷(410)은 전면에 길이방향을 따라 조절홈(411)이 다단으로 형성되고, 지압판(420)은 후면 폭 방향 양측에 상술한 조절홈(411)에 결합을 이루는 조절돌기(422)가 길이방향을 따라 복수개가 돌출 형성됨으로써, 다단의 조절홈(411)을 따라 조절돌기(422)를 선택적으로 결합시켜 어스앵커가 지반에 삽입되는 각도를 조절할 수 있다.At this time, the pair of brackets 410 have control grooves 411 formed in multiple stages along the longitudinal direction on the front side, and the pressure plate 420 is a control protrusion coupled to the control grooves 411 described above on both sides in the rear width direction. Since a plurality of 422 protrudes along the longitudinal direction, the angle at which the earth anchor is inserted into the ground can be adjusted by selectively coupling the adjusting protrusion 422 along the multi-stage adjusting groove 411.

본 발명의 코너형지주(500)는, 도 1, 도 2 및 도 5와 같이, 코너형에 맞추어 삼각의 횡단면으로 이루어지고, 상술한 레일지주(100)와 간격을 이루며 길이방향 하부가 지중에 박혀 고정되며, 폭 방향 양측면에 길이방향을 따라 레일부(510)를 구비한 구성으로 이루어질 수 있다.As shown in FIGS. 1, 2 and 5, the corner type post 500 of the present invention has a triangular cross section in accordance with the corner type, and is spaced apart from the rail post 100 described above, and the lower part in the longitudinal direction is in the ground. It is embedded and fixed, and may be configured to have rail units 510 along both sides in the width direction along the longitudinal direction.

예컨대, 코너형지주(500)는 지중을 터파기하여 확보된 작업공간의 모서리부위에서 레일지주(100)와 간격을 이루며 지중에 박혀 세워지도록 하부가 뾰족하게 형성되어 지중에 용이하게 박힐 수 있도록 하는 것이 바람직하다.For example, the corner type post 500 is formed with a sharp bottom so that it can be easily driven into the ground so that it is built into the ground at a distance from the rail post 100 at the corner of the work space secured by excavating the ground. desirable.

레일부(510)는, 전방의 제1패널설치레일(511) 및 후방의 제2패널설치레일(512)로 구획된 2단으로 구성되어 상술한 흙막이패널(200) 또는 흙막이띠장(300)이 전후방의 2단으로 설치되도록 할 수 있고, 전방과 후방으로 구획되지 않은 1단으로 구성될 수 있음 또한 당연하다 할 것이다.The rail unit 510 is composed of two stages divided into a front first panel installation rail 511 and a rear second panel installation rail 512, and the above-described retaining panel 200 or retaining band 300 It is also natural that it can be installed in two stages, front and rear, and can be configured in one stage that is not partitioned into front and rear.

레일부(510)는, 상술한 흙막이패널(200) 및 흙막이띠장(300)이 길이방향을 따라 슬라이딩 방식으로 결합되도록 레일 형태로 형성된 것으로, 제1패널설치레일(511) 및 제2패널설치레일(512)은 제1슬라이딩돌기(210) 및 제2슬라이딩돌기(310)가 끼워져 슬라이딩되는 입구측 단부에 길이방향을 따라 제1슬라이딩돌기(210) 및 제2슬라이딩돌기(310)의 이탈을 방지하는 지지턱(513)을 구비한 구성으로 이루어질 수 있다.The rail unit 510 is formed in the form of a rail so that the above-described retaining panel 200 and the retaining strip 300 are coupled in a sliding manner along the longitudinal direction, the first panel installation rail 511 and the second panel installation rail 512 prevents the first sliding protrusion 210 and the second sliding protrusion 310 from escaping along the lengthwise direction at the inlet end where the first sliding protrusion 210 and the second sliding protrusion 310 are fitted and slid. It may be made of a configuration having a support jaw 513 to do.

도시하지 않았지만, 코너형지주(500) 또한 레일지주(100)와 같이, 길이방향을 따라 복수개의 삽입홀을 형성하여 상술한 블록부재(400)의 결합이 가능함으로써, 본 발명의 흙막이 벽체에 의해 지지되는 지반에 어스앵커를 삽입하는 시공을 수행하여 지반의 붕괴를 방지하면서도 코너형지주(500)를 보강하여 지반의 토압에 의한 변형이나 파손을 예방할 뿐만 아니라 안정성도 확보할 수 있다.Although not shown, the corner type post 500 also forms a plurality of insertion holes along the longitudinal direction, like the rail post 100, so that the above-described block member 400 can be coupled, so that the retaining wall of the present invention It is possible to secure stability as well as prevent deformation or damage due to earth pressure of the ground by reinforcing the corner type post 500 while preventing collapse of the ground by performing construction by inserting an earth anchor into the supported ground.

결국, 본 발명에 따른 흙막이 벽체를 통해, 흙막이패널(200)과 일체를 이루는 형상으로 구성된 흙막이띠장(300)이 흙막이패널(200)의 역할을 하면서도 통상의 띠장으로서 기능할 수 있게 됨은 물론, 각 구성들간의 연결과 결합이 편리함에 따른 시공의 용이성도 확보할 수 있는 것이다.Eventually, through the retaining wall according to the present invention, the retaining strip 300 configured in a shape integral with the retaining panel 200 can function as a normal wale while serving as the retaining panel 200, and each It is also possible to secure the ease of construction according to the convenience of connection and combination between components.

그러면서도, 레일지주(100)와 흙막이띠장(300)에 어스앵커를 삽입하는 시공이 가능해짐에 따라 장대한 크기의 흙막이패널(200)들로 이루어진 흙막이 벽체 전체를 보강할 수 있게 됨으로써, 흙막이 벽체 전체를 지지할 수 있게 되어 흙막이 벽체의 안정성을 견고하게 유지할 수 있는 것이다.At the same time, as the construction of inserting earth anchors into the rail support 100 and the retaining strip 300 becomes possible, it is possible to reinforce the entire retaining wall made of enormous-sized retaining panels 200, so that the entire retaining wall It is possible to support the retaining wall and maintain the stability of the retaining wall firmly.

상술한 본 발명에 따른 흙막이 벽체의 시공방법으로서, 지중을 터파기하여 작업공간을 확보하는 제1단계와, 확보된 작업공간에 간격을 이루도록 레일지주(100)들과 코너형지주(500)를 설치하는 제2단계와, 각각의 레일지주(100)들 사이와, 코너형지주(500)와 레일지주(100) 사이에 복수개의 흙막이패널(200)을 설치하여 흙막이 벽체의 하부를 이루도록 하고, 설치된 흙막이패널(200)의 상측에 흙막이띠장(300)을 설치하며, 설치된 흙막이띠장(300)의 상측에 복수개의 흙막이패널(300)을 설치하여 흙막이 벽체의 상부를 이루도록 하는 제3단계를 포함한 구성으로 이루어질 수 있다.As a method of constructing a retaining wall according to the present invention described above, the first step of securing a working space by excavating the ground, and installing rail supports 100 and corner pillars 500 to form a gap in the secured working space In the second step of doing, a plurality of retaining panels 200 are installed between each rail support 100 and between the corner type support 500 and the rail support 100 to form the lower part of the retaining wall, and installed A configuration including a third step of installing a retaining strip 300 on the upper side of the retaining panel 200 and installing a plurality of retaining panels 300 on the upper side of the installed retaining strip 300 to form the upper part of the retaining wall It can be done.

이렇게 제1단계 내지 제3단계를 거친 후에는 제1삽입홀(120) 및 제2삽입홀(340)에 삽입되는 결합을 이룬 블록부재(400) 지압판(420)의 시공홀(421)에 어스앵커를 삽입하여 지반에 삽입되도록 하는 시공을 이룸으로써, 본 발명의 흙막이 벽체가 견고하게 지반을 지지하여 지반이 붕괴되는 것을 예방할 수 있게 된다.After passing through the first to third steps in this way, the block member 400 formed the coupling inserted into the first insertion hole 120 and the second insertion hole 340, the earth into the construction hole 421 of the pressure plate 420 By inserting anchors to achieve construction to be inserted into the ground, the retaining wall of the present invention can firmly support the ground and prevent the ground from collapsing.

본 발명에서 상기 실시 형태는 하나의 예시로서 본 발명이 여기에 한정되는 것은 아니다. 본 발명의 특허청구범위에 기재된 기술적 사상과 실질적으로 동일한 구성을 갖고 동일한 작용효과를 이루는 것은 어떠한 것이라도 본 발명의 기술적 범위에 포함된다.The above embodiment in the present invention is an example, and the present invention is not limited thereto. Anything having substantially the same configuration as the technical concept described in the claims of the present invention and achieving the same operational effect is included in the technical scope of the present invention.

100 : 레일지주 110 : 레일부
111 : 제1패널설치레일 112 : 제2패널설치레일
113 : 지지턱 120 : 제1삽입홀
200 : 흙막이패널 210 : 제1슬라이딩돌기
220 : 제1체결홈부재 230 : 제1끼움구부재
300 : 흙막이띠장 310 : 제2슬라이딩돌기
320 : 제2체결홈부재 330 : 제2끼움구부재
340 : 제2삽입홀 400 : 블록부재
410 : 브래킷 411 : 조절홈
420 : 지압판 421 : 시공홀
422 : 조절돌기 500 : 코너형지주
510 : 레일부 511 : 제1패널설치레일
512 : 제2패널설치레일 513 : 지지턱
C : 덮개판부재
100: rail support 110: rail part
111: first panel mounting rail 112: second panel mounting rail
113: support jaw 120: first insertion hole
200: retaining panel 210: first sliding protrusion
220: first fastening groove member 230: first fitting member
300: retaining strip 310: second sliding protrusion
320: second fastening groove member 330: second fitting member
340: second insertion hole 400: block member
410: bracket 411: control groove
420: pressure plate 421: construction hole
422: control protrusion 500: corner type post
510: rail part 511: first panel installation rail
512: second panel installation rail 513: support jaw
C: cover plate member

Claims (8)

상호 폭 방향으로 간격을 이루며 길이방향 하부가 지중에 박혀 고정되고, 폭 방향 양측면에 길이방향을 따라 레일부를 구비하며, 전면에 길이방향을 따라 간격을 이루도록 복수개의 제1삽입홀이 형성된 복수개의 레일지주;
폭 방향 양측면에 길이방향을 따라 제1슬라이딩돌기를 구비하여 상기 레일부에 끼워져 슬라이딩 결합을 이루고, 상부에 폭 방향을 따라 하나 이상의 제1체결홈부재를 구비하며, 하부에 상기 제1체결홈부재에 대응하는 제1끼움구부재를 폭 방향을 따라 하나 이상 구비하여 상기 레일지주들 사이에 길이방향을 따라 복수개가 적층되는 결합을 이루는 흙막이패널; 및
폭 방향 양측면에 길이방향을 따라 제2슬라이딩돌기를 구비하여 상기 레일부에 끼워져 슬라이딩 결합을 이루고, 상부에 상기 제1끼움구부재에 대응하는 제2체결홈부재가 폭 방향을 따라 하나 이상 구비되며, 하부에 상기 제1체결홈부재에 대응하는 제2끼움구부재가 폭 방향을 따라 하나 이상 구비되어 상기 흙막이패널의 상측 또는 하측에 결합을 이루어 상기 흙막이패널들 사이에 개재되고, 폭 방향을 따라 간격을 이루며 복수개의 제2삽입홀이 형성된 흙막이띠장;을 포함하는 흙막이 벽체.
A plurality of rails are spaced apart in the width direction, the lower parts in the longitudinal direction are embedded and fixed in the ground, rails are provided on both sides in the width direction along the longitudinal direction, and a plurality of first insertion holes are formed on the front surface at intervals along the longitudinal direction. landlord;
A first sliding protrusion is provided on both sides in the width direction along the longitudinal direction to be inserted into the rail to form a sliding coupling, and one or more first fastening groove members are provided on the upper part along the width direction, and the first fastening groove member is provided on the lower part. An earth retaining panel having one or more first fitting members corresponding to each other along the width direction to form a plurality of laminated couplings along the longitudinal direction between the rail supports; and
A second sliding protrusion is provided along the longitudinal direction on both side surfaces in the width direction to form a sliding coupling by being fitted into the rail portion, and at least one second fastening groove member corresponding to the first fitting member is provided along the width direction at the top. , At the bottom, one or more second fitting members corresponding to the first fastening groove member are provided along the width direction, coupled to the upper or lower side of the retaining panel, interposed between the retaining panels, and along the width direction A retaining wall including a retaining strip formed with a plurality of second insertion holes at intervals.
제1항에 있어서,
상기 레일부는,
전방의 제1패널설치레일 및 후방의 제2패널설치레일로 구획 구성되고,
상기 제1패널설치레일 및 제2패널설치레일은 상기 제1슬라이딩돌기 및 제2슬라이딩돌기가 끼워지는 입구측 단부에 길이방향을 따라 상기 제1슬라이딩돌기 및 제2슬라이딩돌기의 이탈을 방지하는 지지턱을 구비함을 특징으로 하는 흙막이 벽체.
According to claim 1,
The rail part,
Consists of a front first panel installation rail and a rear second panel installation rail,
The first panel mounting rail and the second panel mounting rail support the first sliding protrusion and the second sliding protrusion to prevent separation along the longitudinal direction at the end of the entrance side into which the first sliding protrusion and the second sliding protrusion are fitted. A retaining wall characterized in that it has a ledge.
제1항에 있어서,
상기 제1삽입홀 및 제2삽입홀에는,
흙막이 벽체에 의해 지지되는 지반에 시공되는 어스앵커가 삽입을 이루는 블록부재가 분리 가능하게 삽입되는 결합을 이룸을 특징으로 하는 흙막이 벽체.
According to claim 1,
In the first insertion hole and the second insertion hole,
A retaining wall characterized in that the earth anchor constructed in the ground supported by the retaining wall forms a combination in which the block member forming the insertion is detachably inserted.
제3항에 있어서,
상기 블록부재는,
폭 방향으로 간격을 이루며 전방으로 돌출된 한 쌍의 브래킷; 및
한 쌍의 상기 브래킷의 전면에 구비되어 어스앵커가 삽입을 이루는 시공홀을 형성한 지압판;을 포함함을 특징으로 하는 흙막이 벽체.
According to claim 3,
The block member,
a pair of brackets protruding forward at intervals in the width direction; and
A retaining wall characterized by comprising a; pressure plate provided on the front surface of the pair of brackets to form a construction hole through which the earth anchor is inserted.
제4항에 있어서,
한 쌍의 상기 브래킷은 전면에 길이방향을 따라 조절홈이 다단으로 형성되고, 상기 지압판은 후면 폭 방향 양측에 상기 조절홈에 결합을 이루는 조절돌기가 길이방향을 따라 복수개가 돌출 형성되어 어스앵커가 삽입되는 각도를 조절함을 특징으로 하는 흙막이 벽체.
According to claim 4,
The pair of brackets are formed with multiple stages of control grooves along the longitudinal direction on the front side, and the pressure plate has a plurality of control protrusions coupled to the control grooves on both sides in the rear width direction protruding along the longitudinal direction, so that the earth anchor is Retaining wall, characterized in that the insertion angle is adjusted.
제1항에 있어서,
상기 제1삽입홀 및 제2삽입홀을 개폐하는 덮개판부재를 더 포함함을 특징으로 하는 흙막이 벽체.
According to claim 1,
The retaining wall characterized in that it further comprises a cover plate member for opening and closing the first insertion hole and the second insertion hole.
제1항에 있어서,
삼각의 횡단면으로 이루어지고, 상기 레일지주와 간격을 이루며 길이방향 하부가 지중에 박혀 고정되며, 폭 방향 양측면에 길이방향을 따라 레일부를 구비한 코너형지주를 더 포함함을 특징으로 하는 흙막이 벽체.
According to claim 1,
Retaining wall, characterized in that it is made of a triangular cross section, is spaced apart from the rail support, and the lower part in the longitudinal direction is embedded in the ground and fixed, and further comprises a corner type support having rail parts along the longitudinal direction on both sides in the width direction.
제1항에 의한 흙막이 벽체의 시공방법으로서,
지중을 터파기하여 작업공간을 확보하는 제1단계;
상기 작업공간에 간격을 이루도록 상기 레일지주들을 설치하는 제2단계; 및
상기 레일지주들 사이에 복수개의 상기 흙막이패널을 설치하여 흙막이 벽체의 하부를 이루도록 하고, 설치된 흙막이패널의 상측에 상기 흙막이띠장을 설치하며, 설치된 흙막이띠장의 상측에 복수개의 상기 흙막이패널을 설치하여 흙막이 벽체의 상부를 이루도록 하는 제3단계;를 포함함을 특징으로 하는 흙막이 벽체 및 그 시공방법.
As a construction method of the retaining wall according to claim 1,
A first step of securing a work space by excavating the ground;
A second step of installing the rail posts to form intervals in the work space; and
A plurality of the retaining panels are installed between the rail supports to form the lower part of the retaining wall, the retaining strip is installed on the upper side of the installed retaining panel, and a plurality of the retaining panels are installed on the upper side of the installed retaining strip to form a retaining wall. A retaining wall and its construction method comprising the; third step of forming the upper part of the wall.
KR1020210125921A 2021-09-23 2021-09-23 Earth retaining wall and its construction method KR102604260B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210125921A KR102604260B1 (en) 2021-09-23 2021-09-23 Earth retaining wall and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020210125921A KR102604260B1 (en) 2021-09-23 2021-09-23 Earth retaining wall and its construction method

Publications (2)

Publication Number Publication Date
KR20230042982A true KR20230042982A (en) 2023-03-30
KR102604260B1 KR102604260B1 (en) 2023-11-20

Family

ID=85985915

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210125921A KR102604260B1 (en) 2021-09-23 2021-09-23 Earth retaining wall and its construction method

Country Status (1)

Country Link
KR (1) KR102604260B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200389266Y1 (en) * 2005-04-14 2005-07-07 (주)한국에어로테크 Slide rail type shoring apparatus
KR100568988B1 (en) 2003-11-27 2006-04-07 (주)한국에어로테크 a retaining panel and manufacturing process
KR20110000607U (en) * 2009-07-13 2011-01-20 (주)진산이엔지 Earth Retaining Wall With Devided Waling
KR101474515B1 (en) * 2014-05-30 2014-12-22 (주)한국에어로테크 Earth retaining wall using support and panel, method for constructing the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100568988B1 (en) 2003-11-27 2006-04-07 (주)한국에어로테크 a retaining panel and manufacturing process
KR200389266Y1 (en) * 2005-04-14 2005-07-07 (주)한국에어로테크 Slide rail type shoring apparatus
KR20110000607U (en) * 2009-07-13 2011-01-20 (주)진산이엔지 Earth Retaining Wall With Devided Waling
KR101474515B1 (en) * 2014-05-30 2014-12-22 (주)한국에어로테크 Earth retaining wall using support and panel, method for constructing the same

Also Published As

Publication number Publication date
KR102604260B1 (en) 2023-11-20

Similar Documents

Publication Publication Date Title
KR100882831B1 (en) Reformed sheet plate and the method of installation of the same
KR102162467B1 (en) Thrust pile with prestress and self-supporting type pile construction using it
KR20080026014A (en) Establishment method of soil guard structure
KR101474515B1 (en) Earth retaining wall using support and panel, method for constructing the same
KR100977206B1 (en) A retaining wall structure for using slide rail and installation method
KR100584701B1 (en) A method of construction for temporary retaining wall
KR101171040B1 (en) Pre-fabricated earth retaining wall structure constructing method using prestressed tendon
KR101474338B1 (en) Furlable earth retaining structure for provisional facilities and construction method thereof
KR100648409B1 (en) A method of construction for temporary retaining wall
KR100869764B1 (en) Earth of building land-side protection wall structure
KR100477195B1 (en) wale for construction method for defending earth using prestress
KR200492883Y1 (en) Braced wall
KR20230042982A (en) Earth retaining wall and its construction method
KR102617795B1 (en) Retaining wall system combine H-piles with steel reinforcement structure
KR20090116251A (en) Pit shoring structure
KR100458821B1 (en) The length adjustable lagging and its using method of braced wall construction
KR200247053Y1 (en) wale for construction method for defending earth using prestress
KR100568988B1 (en) a retaining panel and manufacturing process
KR101545330B1 (en) Prefab type land-side protection wall device
KR20230130783A (en) Self-supporting retaining structure and its construction method
KR102079981B1 (en) Soil retaining plate and soil retaining plate assembly having the same
KR200258921Y1 (en) construction of panel
KR20120088929A (en) Structure of Temporary Retaning wall
KR20020096596A (en) construction method for defending earth using prestressed wale used therefor
KR101787368B1 (en) A Retaining wall using Precast pile and Construction method thereof

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant