KR20210048065A - Post piping installation method for air conditioner refrigerant piping - Google Patents

Post piping installation method for air conditioner refrigerant piping Download PDF

Info

Publication number
KR20210048065A
KR20210048065A KR1020190131900A KR20190131900A KR20210048065A KR 20210048065 A KR20210048065 A KR 20210048065A KR 1020190131900 A KR1020190131900 A KR 1020190131900A KR 20190131900 A KR20190131900 A KR 20190131900A KR 20210048065 A KR20210048065 A KR 20210048065A
Authority
KR
South Korea
Prior art keywords
pipe
air conditioner
piping
box
frame
Prior art date
Application number
KR1020190131900A
Other languages
Korean (ko)
Other versions
KR102292271B1 (en
Inventor
심하운
Original Assignee
심하운
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 심하운 filed Critical 심하운
Priority to KR1020190131900A priority Critical patent/KR102292271B1/en
Publication of KR20210048065A publication Critical patent/KR20210048065A/en
Application granted granted Critical
Publication of KR102292271B1 publication Critical patent/KR102292271B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
    • E04G15/063Re-usable forms
    • E04G15/068Re-usable forms for channels open towards the surface
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/70Drying or keeping dry, e.g. by air vents
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/48Special adaptations of floors for incorporating ducts, e.g. for heating or ventilating
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/08Vertical ducts; Channels, e.g. for drainage for receiving utility lines, e.g. cables, pipes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/04Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
    • E04G15/061Non-reusable forms
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • F24F1/06Separate outdoor units, e.g. outdoor unit to be linked to a separate room comprising a compressor and a heat exchanger
    • F24F1/26Refrigerant piping
    • F24F1/32Refrigerant piping for connecting the separate outdoor units to indoor units
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/04Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings
    • E04F2019/044Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings with conduits

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • General Engineering & Computer Science (AREA)
  • Other Air-Conditioning Systems (AREA)

Abstract

The present invention is to install air conditioning piping and boxes without deforming or cutting a reinforcement of a wall reinforcement structure by installing the air conditioning piping after a frame work step is completed, thereby capable of ensuring the safety of a building, and preventing damage to the air conditioning piping in advance due to various factors occurring in the frame work. Thus, the present invention has the effect of forming a more stable and efficient working environment. The present invention includes a frame work step.

Description

에어컨배관용 후배관 설치공법 { Post piping installation method for air conditioner refrigerant piping }Post piping installation method for air conditioner refrigerant piping}

본 발명은 에어컨배관용 후배관 설치공법에 관한 것으로서 보다 상세하게는 에어컨배관 및 배관박스 설치작업 시 시공된 벽체철근구조의 철근을 절단하지 않고도 작업이 가능하며 에어컨배관 설치작업 시 다양한 요인으로 인하여 시공된 에어컨배관이 파손되는 것을 미연에 방지하고, 에어컨배관의 파손 및 하자발생시 이미 시공된 골조구조의 손상 없이 보수작업이 가능하도록 에어컨배관 및 배관박스를 골조작업 이후 설치하는 에어컨배관용 후배관 설치공법에 관한 것이다.The present invention relates to a post-pipe installation method for air conditioner piping, and more specifically, it is possible to work without cutting the rebar of the wall reinforcement structure constructed during the installation work of air conditioner piping and piping box, and construction due to various factors during the installation work of air conditioner piping. Post piping installation method for air conditioner piping to install air conditioner piping and piping box after framing work to prevent damage to air conditioner piping in advance and to enable repair work without damage to already constructed frame structure in case of damage or defect of air conditioner piping It is about.

일반적으로 에어컨은 저온저압 상태의 냉매를 고온고압 상태로 압축하는 압축기 및 압축기에서 토출된 고온고압의 냉매를 응축액화 시키는 응축기로 구성된 실외기와 상기 응축액화된 냉매를 급속하게 팽창시키는 팽창밸브 및 상기 팽창된 저온저압의 냉매를 외기와 열교환 시키는 증발기로 구성된 실내기로 구분된다.In general, an air conditioner consists of a compressor that compresses a refrigerant in a low temperature and low pressure state into a high temperature and high pressure state, an outdoor unit consisting of a condenser that condenses the high temperature and high pressure refrigerant discharged from the compressor, and an expansion valve that rapidly expands the condensed refrigerant, and the expansion. It is classified as an indoor unit consisting of an evaporator that heats the cold and low pressure refrigerant to outside air.

상기 실내기와 실외기는 냉매 이동 연결배관과 전원케이블 및 제어케이블을 통해 상호 연결되게 되는데, 필요에 따라 하나의 외장관 내에 통합한 통합매립관이 주로 사용되고 있으며 최근 주거환경의 고급화와 실내인테리어를 중요시 하는 추세에 따라 벽체 내에 매설 즉, 골조작업시 함께 매설하여 외부로 노출시키지 않게 시공하는 방법이 주로 실시되고 있다.The indoor unit and the outdoor unit are interconnected through a refrigerant moving connection pipe, a power cable, and a control cable, and an integrated buried pipe integrated into one exterior pipe is mainly used as needed. In accordance with the trend, the method of installing in the wall, that is, buried together during frame work, so as not to be exposed to the outside, is mainly implemented.

이러한 종래의 기술문헌으로 국내등록특허 제10-1545534호가 개시되었다.As such a conventional technical document, Korean Patent No. 10-1545534 has been disclosed.

이와 같은 에어컨설치를 위한 종래의 배관설치공법은 도 1 에 도시된 바와 같이 설치하고자 하는 배관박스의 두께가 벽표면과 철근골조부재의 사이의 벽면두께보다 규격이 크며, 또한 기존의 원형관 형태의 에어컨배관에 의하여 규격축소가 불가능하므로 부득이 철근골조를 절단해야만 시공이 가능하였다.In the conventional piping installation method for installing such an air conditioner, as shown in Fig. 1, the thickness of the pipe box to be installed is larger than the thickness of the wall surface between the wall surface and the reinforced frame member. Since it was impossible to reduce the standard by air conditioning piping, construction was possible only by cutting the reinforcing steel frame.

따라서, 철근골조의 절단하는 작업이 매우 난해하며, 작업 시 소음진동과 건물의 골격을 이루고 있는 철근골조의 중간부분을 절단함으로써 건물의 내구성을 저하시키는 커다란 문제점이 있었다.Therefore, the work of cutting the reinforcement frame is very difficult, and there is a big problem of reducing the durability of the building by cutting the middle part of the reinforcement frame forming the frame of the building and noise vibration during the operation.

또한, 건축물의 골조작업 공정과 함께 배관설치작업이 진행되어야만 함으로 에어컨배관 설치 작업자가 건축물의 골조작업 기간 동안 해당 현장에 상주해야 함으로 불필요하게 인력이 낭비되는 것은 물론 전체적인 공사기간이 길어지게 되며 건축물의 골조를 형성하는 골조작업과 동시에 작업이 진행되어 이후 다양한 공정과 상황에 의하여 설치된 에어컨배관이 쉽게 변형 또는 파손될 수 있고, 상기 건축물의 골조작업 또는 에어컨설치 이후에 미리 설치된 에어컨배관에 하자가 발생될 경우 콘크리트 부분을 다시 할석하여 에어컨배관을 교체 및 정비해야 하고, 이로 인하여 난해한 공사가 진행되어 불필요하게 과도한 작업비용이 발생되는 문제점이 있었다.In addition, since the piping installation work must be carried out along with the framing work process of the building, the air conditioner piping installation worker must reside at the site during the framing work of the building, thus unnecessarily wasting manpower and lengthening the overall construction period. If the work is carried out at the same time as the frame work to form the frame, the installed air conditioner pipe can be easily deformed or damaged due to various processes and circumstances, and a defect occurs in the pre-installed air conditioner pipe after the frame work or air conditioner installation of the building. There is a problem in that the concrete part has to be replaced and the air conditioner piping needs to be replaced and maintained, and because of this, complicated construction proceeds, which unnecessarily incurs excessive work costs.

본 발명은 상기와 같은 종래 기술의 문제점을 해결하기 위해 창작된 것으로 본 발명의 목적은 골조작업단계가 마무리된 이후에 에어컨배관을 설치하여 벽체철근구조의 철근을 변형하거나 절단하지 않고 에어컨배관 및 박스를 설치하는 것으로 건축물의 안전성을 확보할 수 있으며, 골조작업에서 발생하는 다양한 요인으로 인해 에어컨배관이 파손되는 것을 미연에 방지하는 것으로 보다 안정적이며 효율적인 작업환경을 형성하는 에어컨배관용 후배관 설치공법을 제공함에 있다.The present invention was created to solve the problems of the prior art as described above, and an object of the present invention is to install air conditioner pipes after the framing work step is completed, without deforming or cutting the reinforcing bars of the wall reinforcement structure. The safety of the building can be secured by installing the structure, and the post-pipe installation method for air conditioner piping creates a more stable and efficient working environment by preventing the air conditioner piping from being damaged due to various factors occurring in the framing work. It is in the offering.

상기한 목적을 달성하기 위한 본 발명에 의한 에어컨배관용 후배관 설치공법은 건축시공시 에어컨배관을 설치하는 설치공법으로서 건축시공시 거푸집의 표면에 정해진 형상의 형상틀을 부착한 후 콘크리트를 타설하는 골조작업단계와; 상기 거푸집을 제거하여 콘크리트 벽면에 상기 형상틀의 형상으로 안착홈을 형성시키는 홈형성단계와; 상기 안착홈의 내부에 실외기박스 또는 실내기박스 중 어느 하나의 배관박스를 설치하는 배관박스설치단계와; 상기 배관박스의 하부에 상기 에어컨배관이 이동되도록 파이프형상의 배관몰딩을 설치하는 배관몰딩설치단계와; 상기 에어컨배관을 상기 배관몰딩의 내부로 안착시킨 후 고정하고, 상기 배관박스의 내부로 삽입하는 배관삽입단계와; 상기 에어컨배관을 상기 실외기박스와 실내기박스의 사이에 배열하며 상기 골조작업단계시 형성된 바닥면에 고정하는 배관고정단계와; 상기 실내기박스로 삽입된 에어컨배관의 말단부를 용접하고, 실외기박스로 삽입된 에어컨배관의 말단부에 압력게이지와 니플을 설치한 후 질소를 충전하는 배관밀봉단계와; 상기 에어컨배관이 고정된 바닥면에 기포콘크리트 및 마감모르타르를 타설하여 바닥을 마감하는 방통작업단계로 이루어진 것을 특징으로 한다.The post-pipe installation method for air conditioner piping according to the present invention to achieve the above object is an installation method for installing air conditioner pipes during construction, and after attaching a shape frame of a predetermined shape to the surface of a formwork during construction construction, concrete is poured. A frame work step; A groove forming step of removing the formwork to form a seating groove on the concrete wall in the shape of the shape frame; A piping box installation step of installing either an outdoor unit box or an indoor unit box inside the seating groove; A pipe molding installation step of installing a pipe-shaped pipe molding to move the air conditioner pipe under the pipe box; A pipe insertion step of seating and fixing the air conditioner pipe into the pipe molding, and inserting the air conditioner pipe into the pipe box; A pipe fixing step of arranging the air conditioner pipes between the outdoor unit box and the indoor unit box and fixing the air conditioner pipes to the floor surface formed during the framing operation step; A pipe sealing step of welding an end portion of the air conditioner pipe inserted into the indoor unit box, installing a pressure gauge and a nipple at the end portion of the air conditioner pipe inserted into the outdoor unit box, and filling nitrogen; It characterized in that the air conditioner pipe is formed by pouring foamed concrete and finished mortar on the fixed floor to finish the floor, characterized in that consisting of a telecom work step.

상기 골조작업단계에는 상기 형상틀의 하부에 상기 에어컨배관이 하부로 내려가다 수직으로 절곡되도록 정해진 각도로 경사진 수절목틀을 배치하는 배관꺽임유도단계가 포함된 것을 특징으로 한다.The framing operation step includes a pipe bending induction step of arranging a water-cutting frame inclined at a predetermined angle so that the air conditioner pipe descends downward and bends vertically under the shape frame.

상기 골조작업단계에는 에어컨에서 발생된 물이 배출되도록 상기 안착홈의 내부로 드레인배관을 설치하는 드레인배관설치단계가 포함된 것을 특징으로 한다.The frame working step may include a drain pipe installation step of installing a drain pipe into the seating groove so that water generated from the air conditioner is discharged.

상기 골조작업단계에는 상기 에어컨배관의 관로상 옹벽이 있을 경우 그 옹벽에 관통슬리브를 설치하는 관통슬리브설치단계가 포함된 것을 특징으로 한다.The framing operation step includes a through sleeve installation step of installing a through sleeve on the retaining wall when there is a retaining wall in the pipeline of the air conditioner piping.

상기 형상틀은 상기 배관박스와 동일한 크기의 박스틀부와, 상기 박스틀부의 일면에 연결되며 상기 에어컨배관의 직경과 동일한 크기의 배관틀부로 이루어지고; 상기 안착홈은 상기 박스틀부로 형성된 박스홈과, 상기 배관틀부로 형성된 배관홈으로 이루어진 것을 특징으로 한다.The shape frame includes a box frame part having the same size as the pipe box, and a pipe frame part connected to one surface of the box frame part and having the same size as the diameter of the air conditioner pipe; The seating groove is characterized in that it consists of a box groove formed by the box frame portion and a pipe groove formed by the pipe frame portion.

상기 배관홈에는 상기 에어컨배관이 수용되도록 사각 파이프형상의 배관몰딩이 안착되고; 상기 배관몰딩은 상기 배관홈의 내벽에 밀착된 몰딩본체와, 상기 몰딩본체의 일면을 커버하는 몰딩커버로 구성된 것을 특징으로 한다.A pipe molding in the shape of a square pipe is seated in the pipe groove to accommodate the air conditioner pipe; The pipe molding is characterized in that it is composed of a molding body in close contact with the inner wall of the pipe groove and a molding cover covering one surface of the molding body.

이와 같이 본 발명에 따른 에어컨배관용 후배관 설치공법은 효과는 다음과 같다.As described above, the post-pipe installation method for air conditioning piping according to the present invention has the following effects.

첫째, 건축시공시 거푸집의 표면에 정해진 형상의 형상틀을 부착하여 콘크리트를 타설하는 골조작업단계를 통하여 벽면 안착홈을 형성함으로써, 기존 배관박스의 설치시 철근의 일부를 절단한 후 상기 배관박스를 고정하는 작업이 불필요해져 건물의 붕괴를 미연에 방지하고 건축물의 안전성을 확보할 수 있고,First, during construction, by attaching a shape frame of a predetermined shape to the surface of the formwork to form a wall mounting groove through the framing operation step of pouring concrete, a part of the reinforcing bar is cut when installing the existing pipe box, and then the pipe box is removed. Since fixing work becomes unnecessary, it is possible to prevent collapse of the building in advance and secure the safety of the building.

둘째, 에어컨배관을 골조작업단계가 마무리된 이후 설치함으로써, 공사기간이 단축되고 불필요한 인력이 낭비되는 것을 방지하며 골조작업으로 형성된 벽면등으로 외부 날씨 및 기온등을 차단하여 굉장히 안정적인 작업환경을 형성할 수 있으며,Second, by installing the air conditioner piping after the framing work stage is completed, the construction period is shortened, unnecessary manpower is prevented, and external weather and temperature are blocked by a wall formed by framing work to form a very stable work environment. Can,

셋째, 에어컨배관을 골조작업단계가 마무리된 이후 설치함으로써, 골조작업에서 발생된 다양한 요인으로 에어컨배관이 파손되는 것을 미연에 방지할 수 있고,Third, by installing the air conditioner piping after the framing work step is completed, it is possible to prevent the air conditioner piping from being damaged due to various factors generated in the framing work.

넷째, 에어컨배관을 골조작업단계가 마무리된 이후 설치함으로써, 에어컨배관의 이상유무를 바로 확인할 수 있고 이상이 있을 시 골조구조까지 할석할 필요없어 즉각적인 조치를 취할 수 있는 것과 더불어 정비 및 보수비용을 대폭 절감시킬 수 있으며,Fourth, by installing the air conditioner piping after the framing work stage is completed, it is possible to immediately check whether there is an abnormality in the air conditioner piping, and if there is an abnormality, it is not necessary to allocate the frame structure so that immediate action can be taken, and maintenance and repair costs are greatly reduced Can be saved,

다섯째, 에어컨이 설치된 이후에 설치된 배관에서 하자가 발생된 경우 벽체에 시공된 배관몰딩의 커버부분만을 탈부착하는 것으로 에어컨배관을 쉽게 교체 또는 정비할 수 있는 효과가 있다.Fifth, when a defect occurs in a pipe installed after the air conditioner is installed, only the cover part of the pipe molding installed on the wall is attached and detached, thereby making it possible to easily replace or maintain the air conditioner pipe.

도 1은 종래기술에 따른 에어컨배관의 매립구조를 나타내 보인 사시도 및 단면도이고,
도 2는 본 발명에 따른 에어컨배관의 매립구조를 나타내 보인 사시도 및 단면도이며,
도 3은 본 발명에 따른 에어컨배관의 매립구조를 나타내 보인 부분확대 분해사시도이고,
도 4은 본 발명에 따른 에어컨배관용 후배관 설치공법을 나타내 보인 공정도이고,
도 5는 본 발명에 따른 골조작업단계를 나타내 보인 공정도이며,
도 6 본 발명에 따른 형상틀 및 안착홈을 나타내 보인 사시도이고,
도 7는 본 발명에 따른 배관몰딩을 나타내 보인 사시도이다.
1 is a perspective view and a cross-sectional view showing a buried structure of an air conditioner piping according to the prior art,
2 is a perspective view and a cross-sectional view showing a buried structure of an air conditioner pipe according to the present invention,
3 is a partially enlarged exploded perspective view showing the buried structure of an air conditioner piping according to the present invention,
Figure 4 is a process chart showing the post-pipe installation method for air conditioning piping according to the present invention,
Figure 5 is a process chart showing a frame working step according to the present invention,
6 is a perspective view showing a shape frame and a seating groove according to the present invention,
7 is a perspective view showing a pipe molding according to the present invention.

이하, 첨부된 도면을 참조하여 본 발명의 일 실시예를 상세히 설명하면 다음과 같다.Hereinafter, an exemplary embodiment of the present invention will be described in detail with reference to the accompanying drawings.

본 발명에 따른 에어컨배관용 후배관 설치공법은 도 2 내지 도 4에 도시된 바와 같이 건축시공시 에어컨배관(P)을 설치하는 설치공법으로서 건축시공시 거푸집(T)의 표면에 정해진 형상의 형상틀(10)을 부착한 후 콘크리트를 타설하는 골조작업단계(S10)와; 상기 거푸집(T)을 제거하여 콘크리트 벽면(W)에 상기 형상틀(10)의 형상으로 안착홈(20)을 형성시키는 홈형성단계(S20)와; 상기 안착홈(20)의 내부에 실외기박스(31) 또는 실내기박스(32) 중 어느 하나의 배관박스(30)를 설치하는 배관박스설치단계(S30)와; 상기 배관박스(30)의 하부에 상기 에어컨배관(P)이 이동되도록 파이프형상의 배관몰딩(50)을 설치하는 배관몰딩설치단계(S40)와; 상기 에어컨배관(P)을 상기 배관몰딩(50)의 내부로 안착시킨 후 고정하고, 상기 배관박스(30)의 내부로 삽입하는 배관삽입단계(S50)와; 상기 에어컨배관(P)을 상기 실외기박스(31)와 실내기박스(32)의 사이에 배열하며 상기 골조작업단계(S10)시 형성된 바닥면에 고정하는 배관고정단계(S60)와; 상기 실내기박스(32)로 삽입된 에어컨배관(P)의 말단부를 용접하고, 실외기박스(31)로 삽입된 에어컨배관(P)의 말단부에 압력게이지와 니플을 설치한 후 질소를 충전하는 배관밀봉단계(S70)와; 상기 에어컨배관(P)이 고정된 바닥면에 기포콘크리트 및 마감모르타르를 타설하여 바닥을 마감하는 방통작업단계(S80)로 이루어진다.The post pipe installation method for air conditioner piping according to the present invention is an installation method for installing air conditioner pipes (P) during construction as shown in Figs. 2 to 4, and the shape of the shape determined on the surface of the formwork (T) during construction After attaching the frame 10, the frame work step (S10) of pouring concrete; A groove forming step (S20) of removing the formwork (T) to form a seating groove (20) in the shape of the shape frame (10) on the concrete wall surface (W); A piping box installation step (S30) of installing any one piping box 30 of the outdoor unit box 31 or the indoor unit box 32 in the seating groove 20; A pipe molding installation step (S40) of installing a pipe-shaped pipe molding (50) under the pipe box (30) so that the air conditioner pipe (P) is moved; A pipe insertion step (S50) of seating the air conditioner pipe (P) into the pipe molding (50), fixing it, and inserting it into the pipe box (30); A pipe fixing step (S60) of arranging the air conditioner pipe (P) between the outdoor unit box (31) and the indoor unit box (32) and fixing the air conditioner pipe (P) to the floor surface formed during the frame working step (S10); The end of the air conditioner pipe (P) inserted into the indoor unit box 32 is welded, a pressure gauge and a nipple are installed at the end of the air conditioner pipe (P) inserted into the outdoor unit box (31), and then sealed with nitrogen. Step S70; The air conditioner pipe (P) consists of a distribution operation step (S80) of finishing the floor by pouring foamed concrete and finished mortar on the fixed floor.

한편, 상기 에어컨배관(P)의 내부에는 통신선 및 전원선이 함께 포함되고, 상기 배관밀봉단계(S70)에서 충전되는 질소는 압력 3.43MPa이상으로 24시간 누설 확인 후 1.47MPa 이상의 압력으로 유지시키는 것이 바람직하다.On the other hand, the inside of the air conditioner pipe (P) includes a communication line and a power line together, and the nitrogen charged in the pipe sealing step (S70) is maintained at a pressure of 1.47 MPa or more after checking for a leak at a pressure of 3.43 MPa or more for 24 hours. desirable.

여기서, 상기 에어컨배관(P)은 일반적인 원형이 아닌 타원형으로 형성되어 그 높이가 낮아지는 슬림형 에어컨배관(P)으로 이루어지는 것이 바람직하다.Here, the air conditioner pipe (P) is preferably made of a slim air conditioner pipe (P) that is formed in an elliptical shape rather than a general circular shape to lower its height.

또한, 상기 실외기박스(31) 및 실내기박스(32)에는 개방부를 커버하는 커버부가 구비되고, 상기 방통작업단계(S80) 이전에 상기 커버부를 체결하는 것이 바람직하다.In addition, it is preferable that the outdoor unit box 31 and the indoor unit box 32 are provided with a cover unit for covering an opening, and the cover unit is fastened before the communication operation step (S80).

한편, 상기 배관삽입단계(S50)시 상기 에어컨배관(P)을 상기 배관박스(30)의 3분의 2지점까지 인출하여 설치하는 것이 바람직하다.On the other hand, in the pipe insertion step (S50), the air conditioner pipe (P) is preferably installed by drawing out to two-thirds of the pipe box (30).

또한, 상기 실외기박스(31) 및 실내기박스(32), 배관몰딩(50)에 이격이 발생될 경우 실리콘 및 아크릴코트등으로 매꾸어 작업을 마무리하는 것이 바람직하다.In addition, when a gap occurs in the outdoor unit box 31, the indoor unit box 32, and the pipe molding 50, it is preferable to finish the work by filling it with silicone or acrylic coat.

그리고, 상기 배관박스(30)와 배관몰딩(50)의 개방부에는 내부를 밀폐하는 커버가 구비되는데 상기 커버는 상기 방통작업단계(S80)이전에 장착되는 것이 바람직하다.In addition, a cover for sealing the inside is provided at the opening of the pipe box 30 and the pipe molding 50, and the cover is preferably mounted before the communication operation step (S80).

그리고, 상기 골조작업단계(S10)에는 도 5에 도시된 바와 같이 상기 형상틀(10)의 하부에 상기 에어컨배관(P)이 하부로 내려가다 수직으로 절곡되도록 정해진 각도로 경사진 수절목틀(40)을 배치하는 배관꺽임유도단계(S11)가 포함된다.In addition, in the frame working step (S10), as shown in FIG. 5, the air conditioner pipe (P) is lowered to the lower portion of the shape frame (10) and is inclined at a predetermined angle so that it is bent vertically. A pipe bending induction step (S11) to arrange 40) is included.

또한, 상기 골조작업단계(S10)에는 에어컨에서 발생된 물이 배출되도록 상기 안착홈(20)의 내부로 드레인배관(P1)을 설치하는 드레인배관설치단계(S12)가 포함된다.In addition, the frame working step (S10) includes a drain pipe installation step (S12) of installing a drain pipe (P1) into the seating groove (20) so that water generated from the air conditioner is discharged (S12).

한편, 상기 드레인배관(P1)은 콘크리트 벽면의 내부에 매립되는 일반형 드레인배관 또는 육가에 연결되는 육가형 드레인배관 중 어느 하나의 구조로 선택되어지는 것이 바람직하다.On the other hand, the drain pipe (P1) is preferably selected in any one of a general type drain pipe embedded in the interior of the concrete wall or a six-sided drain pipe connected to the six-sided wall.

이때, 상기 안착홈(20)으로 설치된 드레인배관(P1)은 상기 배관몰딩(50)의 내부로 안착된 후 상기 배관박스(30)의 3분의 2지점까지 인출하여 설치하는 것이 바람직하다.At this time, it is preferable to install the drain pipe (P1) installed in the mounting groove (20) after being seated in the pipe molding (50) and then drawing out to two-thirds of the pipe box (30).

그리고, 상기 골조작업단계(S10)에는 상기 에어컨배관(P)의 관로상 옹벽이 있을 경우 그 옹벽에 관통슬리브(S)를 설치하는 관통슬리브설치단계(S13)가 포함된다In addition, the frame work step (S10) includes a through sleeve installation step (S13) of installing a through sleeve (S) on the retaining wall when there is a retaining wall on the conduit of the air conditioner pipe (P).

또한, 상기 형상틀(10)은 도 6에 도시된 바와 같이 상기 배관박스(30)와 동일한 크기의 박스틀부(11)와, 상기 박스틀부(11)의 일면에 연결되며 상기 에어컨배관의 직경과 동일한 크기의 배관틀부(12)로 이루어지고; 상기 안착홈(20)은 상기 박스틀부(11)로 형성된 박스홈(21)과, 상기 배관틀부(12)로 형성된 배관홈(22)으로 이루어진다.In addition, the shape frame 10 is connected to a box frame part 11 having the same size as the pipe box 30 and one surface of the box frame part 11, as shown in FIG. 6, and the diameter of the air conditioner pipe It is made of the pipe frame portion 12 of the same size; The seating groove 20 includes a box groove 21 formed of the box frame part 11 and a pipe groove 22 formed of the pipe frame part 12.

그리고, 상기 배관홈(22)에는 도 7에 도시된 바와 같이 상기 에어컨배관(P)이 수용되도록 사각 파이프형상의 배관몰딩(50)이 안착되고; 상기 배관몰딩(50)은 상기 배관홈(22)의 내벽에 밀착된 몰딩본체(51)와, 상기 몰딩본체(51)의 일면을 커버하는 몰딩커버(52)로 구성된다.In addition, a pipe molding 50 in the shape of a square pipe is seated in the pipe groove 22 so that the air conditioner pipe P is accommodated as shown in FIG. 7; The pipe molding 50 includes a molding body 51 in close contact with the inner wall of the pipe groove 22 and a molding cover 52 that covers one surface of the molding body 51.

한편, 상기 냉매배관밀봉단계(S70) 이후 상기 배관박스(30)와 배관몰딩(50)의 개방부를 덥어주도록 상기 몰딩커버(52)와 박스커버(미도시)를 상기 배관박스(30)와 배관몰딩(50)에 장착하는 커버장착단계가 더 포함되는 것이 바람직하다.On the other hand, after the refrigerant pipe sealing step (S70), the molding cover 52 and the box cover (not shown) are connected to the pipe box 30 to heat the opening of the pipe box 30 and the pipe molding 50. It is preferable that a cover mounting step of mounting on the molding 50 is further included.

상기와 같은 구성으로 이루어진 본 발명에 따른 에어컨배관용 후배관 설치공법의 작용을 살펴보면 다음과 같다.Looking at the action of the post-pipe installation method for air conditioner piping according to the present invention having the configuration as described above is as follows.

본 발명에 따른 에어컨배관용 후배관 설치공법은 건축시공시 에어컨배관(P)을 설치하는 설치공법이다.The post pipe installation method for air conditioner piping according to the present invention is an installation method of installing an air conditioner pipe (P) during construction.

즉, 도 2 내지 도 7에 도시된 바와 같이 건축시공시 거푸집(T)을 설치하여 콘크리트를 타설하는 골조작업단계(S10)와; 상기 골조작업단계(S10) 이후 상기 에어컨배관(P)을 상기 골조작업단계(S10)시 형성된 바닥면에 고정하는 배관고정단계(S60)와; 상기 에어컨배관(P)의 양측 말단부를 용접하고, 압력게이지와 니플을 설치한 후 질소를 충전하는 배관밀봉단계(S70)와; 상기 에어컨배관(P)이 고정된 바닥면에 기포콘크리트 및 마감모르타르를 타설하여 바닥을 마감하는 방통작업단계(S80)로 진행됨으로써, 종래기술과 같이 상기 골조작업단계(S10)와 함께 매립하는 것이 아닌 상기 골조작업단계(S10)이후 그 바닥면에 설치함으로써, 건축물의 골조작업 이후 배관설치가 진행되어 에어컨 시공작업자가 건축물의 골조작업 기간동안 해당 현장에 상주하는 것이 불필요해져 인력이 낭비되는 것을 미연에 방지할 수 있게 된다.That is, as shown in FIGS. 2 to 7, a frame work step (S10) of installing a formwork (T) to place concrete during construction construction (S10); A pipe fixing step (S60) of fixing the air conditioner pipe (P) to the floor surface formed during the frame working step (S10) after the frame working step (S10); A pipe sealing step (S70) of welding both ends of the air conditioner pipe (P), installing a pressure gauge and a nipple, and filling nitrogen; By pouring foamed concrete and finished mortar on the floor on which the air conditioner pipe (P) is fixed, and finishing the floor, it is carried out with the frame working step (S10) as in the prior art. By installing on the floor after the framing work step (S10), piping installation proceeds after the framing work of the building, making it unnecessary for the air conditioner construction worker to reside at the site during the framing work period of the building, resulting in wasted manpower. To be able to prevent it.

그리고, 상기 에어컨배관(P)을 상기 골조작업단계(S10)가 마무리된 이후 설치함으로써, 골조작업으로 형성된 벽면등으로 외부 날씨 및 기온등을 차단하여 굉장히 안정적인 작업환경을 형성할 수 있게 된다.And, by installing the air conditioner pipe (P) after the frame work step (S10) is finished, it is possible to form a very stable work environment by blocking external weather and temperature with a wall surface formed by the frame work.

또한, 건축시공시 거푸집(T)의 표면에 정해진 형상의 형상틀(10)을 부착하여 콘크리트를 타설하는 골조작업단계(S10)를 통하여 벽면(W)에 상기 형상틀(10)의 형상인 안착홈(20)을 형성함으로써, 상기 안착홈(20)의 내부에 실외기박스(31) 또는 실내기박스(32) 중 어느 하나의 배관박스(30)를 설치할 수 있게 되어 기존 배관박스의 설치시 철근의 일부를 절단한 후 상기 배관박스를 고정하는 작업으로 발생되는 건물붕괴를 방지하여 건축물의 안전성을 확보할 수 있게 된다.In addition, the shape of the frame 10 is mounted on the wall surface W through the frame work step (S10) in which concrete is poured by attaching the shape frame 10 of a predetermined shape to the surface of the formwork T during construction. By forming the groove 20, it is possible to install either the outdoor unit box 31 or the indoor unit box 32 in the interior of the seating groove 20, It is possible to secure the safety of the building by preventing the collapse of the building caused by the work of fixing the pipe box after cutting a part.

그리고, 상기 에어컨배관(P)을 상기 골조작업단계(S10)가 마무리된 이후 설치함으로써, 기존 골조작업과 같이 에어컨배관(P)을 매립할 경우 골조작업시 사용되는 다양한 건축자재로 인하여 에어컨배관(P)이 쉽게 파손되는 것을 방지할 수 있게 된다.And, by installing the air conditioner pipe (P) after the frame work step (S10) is completed, when the air conditioner pipe (P) is buried like the existing frame work, the air conditioner pipe ( P) can be prevented from being easily damaged.

한편, 상기 에어컨배관(P)의 건축작업시 파손된 상태로 바닥공사 즉, 방통작업까지 마무리되면 이후 입주자에 방통작업시 형성된 바닥구조와 골조작업으로 형성된 골조구조를 모두 할석하여 배관을 교체해야 하고, 이를 다시 매꿔야하는 대공사가 발생되는 문제점이 있었다.On the other hand, when the air conditioner piping (P) is damaged during the construction work, that is, when the floor work, that is, the telecom work is completed, all the floor structure formed during the telecom work and the frame structure formed by the frame work must be allocated to the tenant to replace the pipe. However, there was a problem that large constructions that had to be refilled were generated.

그러나, 본 발명에 따른 에어컨배관(P)은 상기 골조작업단계(S10)가 마무리된 이후 설치함으로써, 방통작업시 형성된 바닥구조만을 할석하고 매꿔야하는 상대적으로 작은 공사로 마무리는 것으로 작업비용이 절감할 수 있게 된다.However, the air conditioner piping (P) according to the present invention is installed after the frame work step (S10) is completed, thereby reducing the work cost by completing a relatively small construction requiring only the floor structure formed during the telecom work. You can do it.

또한, 상기 골조작업단계(S10)에는 도 2 및 도 5에 도시된 바와 같이 상기 형상틀(10)의 하부에 상기 에어컨배관(P)이 하부로 내려가다 수직으로 절곡되도록 정해진 각도로 경사진 수절목틀(40)을 배치하는 배관꺽임유도단계(S11)가 포함됨으로써, 상기 에어컨배관(P)이 상기 배관박스(30)의 내부로 꺽여 진입될 경우 상기 에어컨배관(P)의 꺽인 부분이 방통작업시 타설된 바닥의 상부로 노출되는 것을 미연에 방지할 수 있게 된다.In addition, in the frame work step (S10), as shown in Figs. 2 and 5, the number of inclined at a predetermined angle so that the air conditioner pipe (P) is lowered downward and bent vertically as shown in Figs. By including the pipe bending induction step (S11) of arranging the cutting frame 40, when the air conditioner pipe (P) is bent into the inside of the pipe box (30), the bent part of the air conditioner pipe (P) is It is possible to prevent in advance from being exposed to the top of the poured floor during work.

그리고, 상기 골조작업단계(S10)에는 에어컨에서 발생된 물이 배출되도록 상기 안착홈(20)의 내부로 드레인배관(P1)을 설치하는 드레인배관설치단계(S12)가 포함됨으로써, 에어컨에서 배출되는 물을 외부로 용이하게 배출시킬 수 있게 된다.In addition, the frame work step (S10) includes a drain pipe installation step (S12) of installing a drain pipe (P1) into the seating groove 20 so that water generated from the air conditioner is discharged (S12), thereby being discharged from the air conditioner. Water can be easily discharged to the outside.

또한, 상기 골조작업단계(S10)에는 상기 에어컨배관(P)의 관로상 옹벽이 있을 경우 그 옹벽에 관통슬리브(S)를 설치하는 관통슬리브설치단계(S13)가 포함됨으로써, 골조작업단계(S10)이후 옹벽을 천공하거나 할석하는 작업이 불필요해져 작업의 편이성을 향상시킬 수 있게 된다.In addition, the frame work step (S10) includes a through sleeve installation step (S13) of installing a through sleeve (S) on the retaining wall when there is a retaining wall on the conduit of the air conditioner pipe (P), thereby, the frame work step (S10) After), the work of drilling or partitioning the retaining wall becomes unnecessary, and the convenience of work can be improved.

본 발명은 상술한 특정의 바람직한 실시 예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.The present invention is not limited to the specific preferred embodiments described above, and any person having ordinary knowledge in the technical field to which the present invention pertains without departing from the gist of the present invention claimed in the claims can implement various modifications. Of course, such changes are intended to be within the scope of the description of the claims.

<도면의 주요 부분에 대한 부호 설명>
P : 에어컨배관 P1 : 드레인배관
T : 거푸집 W : 벽면
10 : 형상틀 11 : 박스틀부
12 : 배관틀부 20 : 안착홈
21 : 박스홈 22 : 배관홈
30 : 배관박스 31 : 실외기박스
32 : 실내기박스 40 : 수절목틀
50 : 배관몰딩 51 : 몰딩본체
52 : 몰딩커버 S : 관통슬리브
S10 : 골조작업단계 S11 : 배관꺽임유도단계
S12 : 드레인배관설치단계 S13 : 관통슬리브설치단계
S20 : 홈형성단계 S30 : 배관박스설치단계
S40 : 배관몰딩설치단계 S50 : 배관삽입단계
S60 : 배관고정단계 S70 : 배관밀봉단계
S80 : 방통작업단계
<Description of symbols for major parts of drawings>
P: Air conditioner piping P1: Drain piping
T: formwork W: wall
10: shape frame 11: box frame portion
12: pipe frame part 20: seating groove
21: box groove 22: piping groove
30: piping box 31: outdoor unit box
32: indoor unit box 40: water frame
50: pipe molding 51: molding body
52: molding cover S: through sleeve
S10: Frame work step S11: Pipe bending induction step
S12: Drain piping installation step S13: Through sleeve installation step
S20: Groove formation step S30: Piping box installation step
S40: pipe molding installation step S50: pipe insertion step
S60: Pipe fixing step S70: Pipe sealing step
S80: Broadcasting work stage

Claims (6)

건축시공시 에어컨배관(P)을 설치하는 설치공법에 있어서,
건축시공시 거푸집(T)의 표면에 정해진 형상의 형상틀(10)을 부착한 후 콘크리트를 타설하는 골조작업단계(S10)와;
상기 거푸집(T)을 제거하여 콘크리트 벽면(W)에 상기 형상틀(10)의 형상으로 안착홈(20)을 형성시키는 홈형성단계(S20)와;
상기 안착홈(20)의 내부에 실외기박스(31) 또는 실내기박스(32) 중 어느 하나의 배관박스(30)를 설치하는 배관박스설치단계(S30)와;
상기 배관박스(30)의 하부에 상기 에어컨배관(P)이 이동되도록 파이프형상의 배관몰딩(50)을 설치하는 배관몰딩설치단계(S40)와;
상기 에어컨배관(P)을 상기 배관몰딩(50)의 내부로 안착시킨 후 고정하고, 상기 배관박스(30)의 내부로 삽입하는 배관삽입단계(S50)와;
상기 에어컨배관(P)을 상기 실외기박스(31)와 실내기박스(32)의 사이에 배열하며 상기 골조작업단계(S10)시 형성된 바닥면에 고정하는 배관고정단계(S60)와;
상기 실내기박스(32)로 삽입된 에어컨배관(P)의 말단부를 용접하고, 실외기박스(31)로 삽입된 에어컨배관(P)의 말단부에 압력게이지와 니플을 설치한 후 질소를 충전하는 배관밀봉단계(S70)와;
상기 에어컨배관(P)이 고정된 바닥면에 기포콘크리트 및 마감모르타르를 타설하여 바닥을 마감하는 방통작업단계(S80)로 이루어진 것을 특징으로 하는 에어컨배관용 후배관 설치공법.
In the installation method of installing air conditioner piping (P) during construction,
A frame work step (S10) of pouring concrete after attaching the shape frame (10) of a predetermined shape to the surface of the formwork (T) during construction construction;
A groove forming step (S20) of removing the formwork (T) to form a seating groove (20) in the shape of the shape frame (10) on the concrete wall surface (W);
A pipe box installation step (S30) of installing any one of the outdoor unit box (31) or the indoor unit box (32) in the seating groove (20);
A pipe molding installation step (S40) of installing a pipe-shaped pipe molding (50) under the pipe box (30) so that the air conditioner pipe (P) is moved;
A pipe insertion step (S50) of seating the air conditioner pipe (P) into the pipe molding (50), fixing it, and inserting it into the pipe box (30);
A pipe fixing step (S60) of arranging the air conditioner pipe (P) between the outdoor unit box (31) and the indoor unit box (32) and fixing the air conditioner pipe (P) to the floor surface formed during the frame working step (S10);
The end of the air conditioner pipe (P) inserted into the indoor unit box 32 is welded, a pressure gauge and a nipple are installed at the end of the air conditioner pipe (P) inserted into the outdoor unit box (31), and then sealed with nitrogen. Step (S70) and;
The post-pipe installation method for air conditioner piping, characterized in that consisting of the air conditioning work step (S80) of pouring foamed concrete and finished mortar on the floor on which the air conditioner piping (P) is fixed to finish the floor.
제 1 항에 있어서,
상기 골조작업단계(S10)시 상기 형상틀(10)의 하부에 상기 에어컨배관(P)이 하부로 내려가다 수직으로 절곡되도록 정해진 각도로 경사진 수절목틀(40)을 배치하는 배관꺽임유도단계(S11)가 포함된 것을 특징으로 하는 에어컨배관용 후배관 설치공법.
The method of claim 1,
In the frame work step (S10), a pipe bending induction step in which the air conditioner pipe (P) is placed under the shape frame (10) and is inclined at a predetermined angle so that the air conditioner pipe (P) goes down and is bent vertically. (S11) post-pipe installation method for air conditioning piping, characterized in that it includes.
제 1 항에 있어서,
상기 골조작업단계(S10)에는 에어컨에서 발생된 물이 배출되도록 상기 안착홈(20)의 내부로 드레인배관(P1)을 설치하는 드레인배관설치단계(S12)가 포함된 것을 특징으로 하는 에어컨배관용 후배관 설치공법.
The method of claim 1,
The frame working step (S10) includes a drain pipe installation step (S12) of installing a drain pipe (P1) into the seating groove (20) so that water generated from the air conditioner is discharged (S12). Post piping installation method.
제 1 항에 있어서,
상기 골조작업단계(S10)에는 상기 에어컨배관(P)의 관로상 옹벽이 있을 경우 그 옹벽에 관통슬리브(S)를 설치하는 관통슬리브설치단계(S13)가 포함된 것을 특징으로 하는 에어컨배관용 후배관 설치공법.
The method of claim 1,
After the air conditioner piping, characterized in that the frame work step (S10) includes a through sleeve installation step (S13) of installing a through sleeve (S) on the retaining wall when there is a retaining wall on the conduit of the air conditioner pipe (P). Piping installation method.
제 1 항에 있어서,
상기 형상틀(10)은 상기 배관박스(30)와 동일한 크기의 박스틀부(11)와, 상기 박스틀부(11)의 일면에 연결되며 상기 에어컨배관의 직경과 동일한 크기의 배관틀부(12)로 이루어지고;
상기 안착홈(20)은 상기 박스틀부(11)로 형성된 박스홈(21)과, 상기 배관틀부(12)로 형성된 배관홈(22)으로 이루어진 것을 특징으로 하는 에어컨배관용 후배관 설치공법.
The method of claim 1,
The shape frame 10 includes a box frame part 11 having the same size as the pipe box 30 and a pipe frame part 12 connected to one surface of the box frame part 11 and having the same size as the diameter of the air conditioner pipe. Done;
The mounting groove 20 is a post-pipe installation method for air conditioner piping, characterized in that consisting of a box groove (21) formed of the box frame portion (11) and a pipe groove (22) formed of the pipe frame portion (12).
제 5 항에 있어서,
상기 배관홈(22)에는 상기 에어컨배관(P)이 수용되도록 사각 파이프형상의 배관몰딩(50)이 안착되고;
상기 배관몰딩(50)은 상기 배관홈(22)의 내벽에 밀착된 몰딩본체(51)와, 상기 몰딩본체(51)의 일면을 커버하는 몰딩커버(52)로 구성된 것을 특징으로 하는 에어컨배관용 후배관 설치공법.
The method of claim 5,
A square pipe-shaped pipe molding 50 is seated in the pipe groove 22 so that the air conditioner pipe P is accommodated;
The pipe molding 50 comprises a molding body 51 in close contact with the inner wall of the pipe groove 22 and a molding cover 52 covering one surface of the molding body 51. Post piping installation method.
KR1020190131900A 2019-10-23 2019-10-23 Post piping installation method for air conditioner refrigerant piping KR102292271B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020190131900A KR102292271B1 (en) 2019-10-23 2019-10-23 Post piping installation method for air conditioner refrigerant piping

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020190131900A KR102292271B1 (en) 2019-10-23 2019-10-23 Post piping installation method for air conditioner refrigerant piping

Publications (2)

Publication Number Publication Date
KR20210048065A true KR20210048065A (en) 2021-05-03
KR102292271B1 KR102292271B1 (en) 2021-08-20

Family

ID=75911084

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020190131900A KR102292271B1 (en) 2019-10-23 2019-10-23 Post piping installation method for air conditioner refrigerant piping

Country Status (1)

Country Link
KR (1) KR102292271B1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR950004174U (en) * 1993-07-23 1995-02-17 박춘경 Piping device of building cold and hot water pipe
JPH109482A (en) * 1996-06-27 1998-01-13 Inatome Hizuru Protecting cover for air conditioning piping
KR200238229Y1 (en) * 2001-03-21 2001-10-08 윤근철 Reclamation type connect equipment of aircon fan
KR200300026Y1 (en) * 2002-09-30 2003-01-06 태성프라스틱(주) piping structure for air controller
KR20140139815A (en) * 2013-05-28 2014-12-08 황성수 Apparatus of fixing pressure gauge for air conditioner

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR950004174U (en) * 1993-07-23 1995-02-17 박춘경 Piping device of building cold and hot water pipe
JPH109482A (en) * 1996-06-27 1998-01-13 Inatome Hizuru Protecting cover for air conditioning piping
KR200238229Y1 (en) * 2001-03-21 2001-10-08 윤근철 Reclamation type connect equipment of aircon fan
KR200300026Y1 (en) * 2002-09-30 2003-01-06 태성프라스틱(주) piping structure for air controller
KR20140139815A (en) * 2013-05-28 2014-12-08 황성수 Apparatus of fixing pressure gauge for air conditioner

Also Published As

Publication number Publication date
KR102292271B1 (en) 2021-08-20

Similar Documents

Publication Publication Date Title
KR200417925Y1 (en) piping inspect of a wall reclamation style
CN102095033B (en) One-time embedded water-stop section for construction engineering drainage and construction method thereof
KR102292271B1 (en) Post piping installation method for air conditioner refrigerant piping
KR200457795Y1 (en) Vertical Pipe Fixture
KR101975700B1 (en) Finishing materials and remodeling window including the same
KR200415779Y1 (en) Terminal box for connecting pipes of air conditioner
CN1059726C (en) Construction method and apparatus against gap leakage between panel and pipe
EP3219867A1 (en) Pipe mount
JP2004308772A (en) Sleeve for pipe
KR100988270B1 (en) Level spacer device
JP3545699B2 (en) Secondary lining method for steel segments
KR20200109663A (en) Duct integrated fire prevention sleeve
KR20100067782A (en) System window and construction method thereof
JP4446302B2 (en) sleeve
CN214784886U (en) Cast-in-place integration heat preservation system of outer wall
KR20190139578A (en) The Construction sleeve with adjustable ring With micro-height control and anti-rotation function
KR100762012B1 (en) Length variable pipe protect sleeve
CN114319678A (en) Water stopping structure and water stopping construction method for water-containing room
KR102407289B1 (en) Open-type faucet supporter having separable connectors
KR20080042327A (en) Floor drain sleeve
KR200254715Y1 (en) Apparatus box for exhaust condensation water of a aircon
KR200338297Y1 (en) Water supply system having drainpipe
KR102000573B1 (en) Method for constructing outside insulation of remodeling house
KR20120047018A (en) A heat exchanger
KR102180899B1 (en) the improved hollow core slab structure with Light Weight material

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant