CN1059726C - Construction method and apparatus against gap leakage between panel and pipe - Google Patents

Construction method and apparatus against gap leakage between panel and pipe Download PDF

Info

Publication number
CN1059726C
CN1059726C CN 95110566 CN95110566A CN1059726C CN 1059726 C CN1059726 C CN 1059726C CN 95110566 CN95110566 CN 95110566 CN 95110566 A CN95110566 A CN 95110566A CN 1059726 C CN1059726 C CN 1059726C
Authority
CN
China
Prior art keywords
holder
pipeline
floor
positioning rule
chi
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 95110566
Other languages
Chinese (zh)
Other versions
CN1123866A (en
Inventor
张善青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 95110566 priority Critical patent/CN1059726C/en
Publication of CN1123866A publication Critical patent/CN1123866A/en
Application granted granted Critical
Publication of CN1059726C publication Critical patent/CN1059726C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention discloses a leakage preventing construction method and equipment for gaps between floorslabs and pipelines, which can be widely used in the installation construction of story penetrating drainage pipelines in toilets, scouring chambers and kitchens in various houses with multiple layers and communal buildings. The present invention is characterized in that prefabricated parts are positioned by a positioning rule; pea gravel concrete slurry is poured into gaps between pipelines and the prefabricated parts firstly, and waterproof ointment is poured into the gaps then. The present invention ensures the qualification of one time operation and has no leakage. The construction method is convenient and easy, and matching parts and specific tools can be manufactured easily and can be used by every building construction unit.

Description

A kind of floor and pipeline gap anti-seepage construction method and equipment
The invention belongs to building construction technology, particularly floor and pipeline gap anti-seepage construction technology and equipment.
Pipeline is all installed down in the dwelling house of multilayer and the washroom of public building, the chamber of scrubbing, and sewer pipe and floor junction are easy to occur seepage usually, and the resident of lower floor usually is subjected to the hardship of dripping of last layer seepage.Bury with wooden unit at preparation place, tubulature road when job practices commonly used at present is the pouring floor, just cut off as tensile reinforcement.During pipe laying such as reserved opening not canonical chisel reaming up and down, irritate with concrete grout at floor and pipeline gap the fixing back of pipeline, produce seepage because of easily producing micro gap between concrete and cast-iron pipe, simultaneously because of cutting off the intensity effect construction quality that the part reinforcing bar reduces floor.
The purpose of this invention is to provide a kind of hot-water heating pipe fitting and floor ground joint portion once construct qualified non-leakage job practices and supporting with it accessory and instrument of guaranteeing.
The present invention realizes by following manner, propped up after template ties up reinforcing bar on a last floor ground, reserving the pre-square-outside and round-inside of placing in pipe hole place, and circular hole is greater than the precast unit of outer diameter tube 4-5cm, positioning rule on the card in component hole, by the positioning rule centre bore vertical that hangs down, mobile precast unit utilizes vertical that itself and the precast unit center of following one deck with pipe hole are aligned, the levelling level, after the correction precast unit exposed steel bar and floor ground are tied up the system reinforcing bar and weld, placing of concrete is made floor ground then.During pipe laying cast-iron pipe passed the precast unit circular hole, be connected with levels, press close to snake joint holder on the holder floor face card, pour into a mould the pea gravel concreten of about 1/2nd thickness to pipeline and precast unit slit, the next day water full slit with waterproofing unction again, remove the holder of snake joint after the initial set.
Positioning rule is for to make the mutually perpendicular Cross ruler of axis with same material, the scale of ruler is that initial point is to cubic graduation with the axes intersect point, on orthogonal chi face, a spirit level is installed respectively, with the initial point center circular centre hole of making a call to a 10-15mm, the aperture of on each chi face, beating the installing and locating jump ring every 10mm, jump ring be two apertures that 10mm at interval arranged with arc curved its horizontal ends of spring leaf for the fixing usefulness of positioning rule, also can on each chi, connect chi with increase chi face length degree as required with screw.
The annulus that snake joint holder is combined into for polylith arc wooden unit has the countersunk that installs and fixes bolt on the circular diameter direction of wooden unit, internal radius is identical with institute tubulature road external diameter, and cylindrical is with an adjustable circular boop and a bolt.
Member and special tool that job practices provided by the invention has easy to use, easy construction, employing are easy to make, simple to operate, the construction precision height, because good weatherability can both be combined closely and have to waterproofing unction and pipeline and concrete, guarantee that seepage does not appear in pipeline and floor gap so have once construction with the pipeline of this process Installation, avoided simultaneously because of staying pipe hole to cut off the problem that reinforcing bar influences floor strength, thereby improved the washroom, the construction quality in drainage pipe room is arranged between scrubbing etc.
Further the present invention is set forth below in conjunction with accompanying drawing.
Fig. 1 is the construction generalized section.
Fig. 2 is the positioning rule structural representation.
Fig. 3 is the jump ring structural representation.
Fig. 4 is for connecing the chi structure chart.
Fig. 5 is snake joint holder structure schematic diagram.
Fig. 6 asks A-A to sectional view for the snake joint.
As shown in Figure 1, before pouring floor 1, concrete component 2 is fixed in and pacifies pipeline location with positioning rule, welded the snake joint holder 6 on the underfloor card of reinforcement installation pipeline 4 backs, the pea gravel concreten of about 1/2nd thickness of cast starches 5 earlier in the precast unit hole, and the next day fills with waterproofing unction again.
As Fig. 2, Fig. 3, shown in Figure 4, positioning rule is for to make the mutually perpendicular Cross ruler 7,11 of axis with same material, the scale of ruler is that initial point is to cubic graduation with the axes intersect point, with the initial point is that the center is made a call to a centre bore 9, a spirit level 8,12 respectively is installed on the chi face, on each chi face, be equipped with the fixedly equidistant aperture 10 of jump ring 13, all but attaching chi 14 is to increase length for ruler, and jump ring is an arcuate bombing leaf, and its horizontal ends is equipped with the aperture identical with the chi interplanar distance.
As Fig. 5, shown in Figure 6, the annulus that the holder of snake joint is combined into for polylith arc wooden unit 15 has the countersunk that installs and fixes bolt 16 on the wooden unit circular diameter direction, and its cylindrical is fixing with adjustable circular boop 18 and bolt 17.

Claims (3)

1, a kind of floor and pipeline gap anti-seepage construction method, it is characterized in that: propped up after template ties up reinforcing bar in floor ground, place a square-outside and round-inside and circular hole precast unit (2) greater than outer diameter tube 4-5cm at reservation pipe hole place, positioning rule on the card in component hole, by the positioning rule centre bore vertical that hangs down, mobile precast unit utilizes vertical that itself and the precast unit center of following one deck with pipe hole are aligned, the levelling level, proofread and correct back welded unit and floor ground reinforcing bar, placing of concrete is made floor ground (1) pipeline (4) is passed the precast unit circular hole, be connected with levels, pressing close to the holder floor face is stuck in snake joint holder (6) on the pipeline, pour into a mould the pea gravel concreten (5) of about 1/2nd thickness to pipeline and precast unit slit, the next day water full residue slit with waterproofing unction again, remove the holder of snake joint after the initial set.
2, implement the equipment positioning rule of the described job practices of claim 1, it is characterized in that: positioning rule is for to make the mutually perpendicular Cross ruler of axis (7), (11) with same material, the scale of ruler is that initial point is to cubic graduation with the axes intersect point, with the initial point is that the center is made a call to a centre bore (9), a spirit level (8), (12) respectively are installed on the chi face, on each chi face, be equipped with the fixedly equidistant aperture (10) of jump ring (13), but the equal attaching chi (14) of ruler is to increase length, jump ring is an arcuate bombing leaf, and its horizontal ends is equipped with two apertures identical with the chi interplanar distance.
3, implement the equipment snake joint holder of the described job practices of claim 1, it is characterized in that: the annulus that the holder of snake joint is combined into for polylith arc wooden unit (15), on the wooden unit circular diameter direction countersunk that installs and fixes bolt (16) is arranged, its cylindrical is fixing with adjustable circular boop (18) and bolt (17).
CN 95110566 1995-08-08 1995-08-08 Construction method and apparatus against gap leakage between panel and pipe Expired - Fee Related CN1059726C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 95110566 CN1059726C (en) 1995-08-08 1995-08-08 Construction method and apparatus against gap leakage between panel and pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 95110566 CN1059726C (en) 1995-08-08 1995-08-08 Construction method and apparatus against gap leakage between panel and pipe

Publications (2)

Publication Number Publication Date
CN1123866A CN1123866A (en) 1996-06-05
CN1059726C true CN1059726C (en) 2000-12-20

Family

ID=5077937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 95110566 Expired - Fee Related CN1059726C (en) 1995-08-08 1995-08-08 Construction method and apparatus against gap leakage between panel and pipe

Country Status (1)

Country Link
CN (1) CN1059726C (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101781935B (en) * 2009-12-30 2014-05-14 中国瑞林工程技术有限公司 Method for substituting pre-embedded waterproof casing pipe in concrete structure
CN101841143B (en) * 2010-05-20 2012-09-26 朱成三 Assembly construction method for PVC wire pipe hidden lying
CN103089007A (en) * 2013-01-15 2013-05-08 中冶天工上海十三冶建设有限公司 Cast-in-place concrete floor punching pipe seal template device and using method
CN103243911A (en) * 2013-04-03 2013-08-14 广西建工集团第一建筑工程有限责任公司 Integral setting and one-step in-position construction method for steel sleeves of inner pipelines of vertical shaft of building
CN103485420B (en) * 2013-09-02 2016-04-27 东莞市彩丽建筑维护技术有限公司 A kind of method and connection assembly preventing and treating water breakthrough leakage in terrace
CN103672181A (en) * 2014-01-03 2014-03-26 永升建设集团有限公司 Water supply and drainage pipeline sleeve pre-embedding construction method
CN105587938A (en) * 2016-03-29 2016-05-18 山东天齐置业集团股份有限公司 Toilet pipe root blocking structure and construction process thereof
CN106764096B (en) * 2017-01-24 2019-01-11 河海大学 Toilet floor pre-embedded downcomer leakage preventing structure device
CN107190984A (en) * 2017-06-29 2017-09-22 天津新滨工程技术检测有限公司 A kind of concreting casing construction method

Also Published As

Publication number Publication date
CN1123866A (en) 1996-06-05

Similar Documents

Publication Publication Date Title
CN1059726C (en) Construction method and apparatus against gap leakage between panel and pipe
US20210017755A1 (en) Composite wall and methods of constructing a composite wall
CN109797988A (en) A kind of co-layer draining hard-cover precast block toilet of outer wall provided pipe line groove hole
CN211313074U (en) Integrated building external wall panel convenient to install
CN116181019A (en) Supporting structure for assembled integral bathroom through-door stone and construction method
JPH08269984A (en) Construction of basement in outside waterproofing construction method
KR20200095062A (en) Variable Roof Drain
CN109779319A (en) A kind of co-layer draining blank precast block toilet of outer wall provided pipe line groove hole
JP4087959B2 (en) Building floor panels and construction methods
CN111779157A (en) Underground outdoor wall structure and construction method thereof
JP3803905B2 (en) Outside heat insulation foundation structure
EP0434725A1 (en) A method and device for laying waste pipes in hollow flooring blocks
CN216108347U (en) Prefabricated assembled ditch
CN220184365U (en) Polyethylene modified concrete grouting structure for filling steel structure building
CN213926967U (en) Precast concrete U type groove is with layer drainage structures
JP4222580B2 (en) Building foundation construction method
CN214739575U (en) Netted drainage structures and ground drainage system and floor structure
CN212453483U (en) Waterproof connection structure of flue
KR200389942Y1 (en) Reservoir structure having sandwich type weldingless wal
JPS59177429A (en) Underground reinforced concrete structure
JP4173230B2 (en) Ceiling construction method and its suspension
KR20010026041A (en) Drain Board and Drainage method using the same
KR200257149Y1 (en) water supply pipe supporter
KR200261901Y1 (en) Assembly concreted manhole structure
CN105507381B (en) Direct-burried cutting-off type sleeve pipe drainage management construction method

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee