KR20210029069A - Underwater concrete block structure and construruction method therefor - Google Patents
Underwater concrete block structure and construruction method therefor Download PDFInfo
- Publication number
- KR20210029069A KR20210029069A KR1020200028144A KR20200028144A KR20210029069A KR 20210029069 A KR20210029069 A KR 20210029069A KR 1020200028144 A KR1020200028144 A KR 1020200028144A KR 20200028144 A KR20200028144 A KR 20200028144A KR 20210029069 A KR20210029069 A KR 20210029069A
- Authority
- KR
- South Korea
- Prior art keywords
- concrete
- ground
- concrete block
- underwater
- vertical
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 32
- 238000010276 construction Methods 0.000 claims abstract description 30
- 230000001681 protective effect Effects 0.000 claims description 43
- 239000012528 membrane Substances 0.000 claims description 22
- 230000015572 biosynthetic process Effects 0.000 claims description 19
- 230000002787 reinforcement Effects 0.000 claims description 11
- 238000005553 drilling Methods 0.000 claims description 10
- 238000004519 manufacturing process Methods 0.000 claims description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 10
- 238000004078 waterproofing Methods 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 4
- 239000000203 mixture Substances 0.000 claims description 2
- 229910000831 Steel Inorganic materials 0.000 description 13
- 239000010959 steel Substances 0.000 description 13
- 239000013535 sea water Substances 0.000 description 9
- 230000003014 reinforcing effect Effects 0.000 description 6
- 238000003780 insertion Methods 0.000 description 3
- 230000037431 insertion Effects 0.000 description 3
- 239000004576 sand Substances 0.000 description 3
- 238000005056 compaction Methods 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 238000005422 blasting Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000009751 slip forming Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D25/00—Joining caissons, sinkers, or other units to each other under water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0061—Production methods for working underwater
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Revetment (AREA)
Abstract
Description
본 발명은 항만 등을 위한 접안시설, 해안에 설치되는 소파용 구조물, 방파제 등 다양한 목적으로 해상 또는 강가에 설치되는 수중 콘크리트 블록 구조물 및 그 시공 방법에 관한 것이다.The present invention relates to an underwater concrete block structure installed on the sea or along a river for various purposes, such as a berthing facility for a port, a sofa structure installed on the shore, a breakwater, and a construction method thereof.
항만 등을 위한 접안시설, 해안에 설치되는 소파용 구조물, 방파제 등 다양한 목적으로 수중에 수중 구조물이 설치된다. 상기 및 이하에서 수중 구조물이란, 수중 구조물의 하부가 수중에 잠긴 상태로 설치되는 것을 말하며, 수중 구조물의 상부는 수면 위로 돌출되거나 혹은 수면 아래에 위치될 수 있다.Underwater structures are installed underwater for various purposes, such as berthing facilities for ports, sofa structures installed on the shore, and breakwaters. In the above and below, the underwater structure means that the lower part of the underwater structure is installed in a submerged state, and the upper part of the underwater structure may protrude above the water surface or be located under the water surface.
수중 구조물의 시공에서 널리 알려진 시공 기법은 대형 케이슨 공법이다. 대형 케이슨 공법은 대형 파랑에도 견딜 수 있다는 장점이 있지만, 매우 큰 구조의 대형 케이슨을 육상에서 제작하고 이를 설치 지점으로 운반한 후 수중에 설치해야 하기 때문에 운반비 및 공사비가 매우 많이 소요되며, 여러가지 제약 조건이 많다.A widely known construction technique in the construction of underwater structures is the large caisson method. The large caisson construction method has the advantage of being able to withstand large waves, but because a large caisson with a very large structure must be manufactured on land and installed underwater after transporting it to the installation point, transportation and construction costs are very high, and various constraints There are a lot of them.
이와 같은 대형 케이슨 공법의 문제점을 해결하기 위하여 소형 콘크리트 블록을 수심에 따라 여러 단으로 쌓아 올려 수중 구조물을 형성하는 방법이 알려져 있다.In order to solve the problem of such a large caisson method, a method of forming an underwater structure by stacking small concrete blocks in several stages according to the water depth is known.
본 발명자는 대한민국 특허등록 제10-1355805호 "수중 콘크리트 블록 구조물 시공 방법 및 수중 콘크리트 블록 구조물"(2014. 1. 15. 등록)을 제안하여, 콘크리트 기둥에 의하여 상부의 콘크리트 블록과 하부의 콘크리트 블록이 구조적 일체성을 가지도록 하여 대형 태풍 등으로 인한 파랑에도 수중 콘크리트 블록 구조물이 충분한 구조적 안정성을 가질 수 있는 기술을 제시하였다.The inventor of the present invention proposes Korean Patent Registration No. 10-1355805 "Aquatic Concrete Block Structure Construction Method and Underwater Concrete Block Structure" (2014. 1. 15. Registration), and by using a concrete column, the concrete block in the upper part and the concrete block in the lower part. To have this structural integrity, a technology that allows underwater concrete block structures to have sufficient structural stability even against waves caused by large typhoons was proposed.
한편 대형 케이슨 공법과 같은 수중 구조물의 안정성은, 수중 구조물의 중량과 마찰력(즉 수중 구조물의 지반 접촉 면적과, 수중 구조물과 기초 지반간의 마찰 계수)에 의하여 결정하는 것이 일반적이다.Meanwhile, the stability of an underwater structure such as the large caisson method is generally determined by the weight and frictional force of the underwater structure (ie, the ground contact area of the underwater structure, and the coefficient of friction between the underwater structure and the foundation ground).
이러한 안정성 결정 방법은, 수중 구조물이 기초 지반에 단순 적재되어 있다는 것을 전제로 한 것이다.This method of determining stability is based on the premise that the underwater structure is simply loaded on the foundation ground.
따라서 수중 구조물이 복수의 콘크리트 블록으로 일체화된 구조인 경우에도 그 수중 구조물의 안정성은, 수중 구조물의 중량과 마찰력에 의해서만 결정된다.Therefore, even if the underwater structure is a structure integrated with a plurality of concrete blocks, the stability of the underwater structure is determined only by the weight and frictional force of the underwater structure.
이와 같은 문제로 인하여 수중 구조물이 복수의 콘크리트 블록으로 일체화되는 구조임에도 여전히 대형 케이슨과 동일한 크기로 수중 구조물이 건설되어야 한다는 문제가 있다.Due to this problem, even though the underwater structure is a structure in which a plurality of concrete blocks are integrated, there is still a problem that the underwater structure must be constructed with the same size as the large caisson.
한편 본 발명자는 대한민국 공개특허 제10-2019-0010203호 "콘크리트 팩 삽입장치 및 이를 이용한 콘크리트 블록 구조물 시공 방법과 이를 통해 시공된 콘크리트 블록 구조물"(2019. 1. 30. 공개)을 제안하였으며, 이 종래 기술은, 방수막에 상하방향으로 연장되는 형태의 철근부 및 콘크리트를 삽입하여 밀봉한 콘크리트 팩을 준비하고, 상하방향으로 연장되는 중공관 형태의 관체 내부에 상기 콘크리트 팩을 수용한 상태로 상기 관체를 콘크리트 블록 적층체의 상하방향 기둥홈에 삽입한 후 상기 콘크리트 팩을 남겨두면서 상기 관체를 상기 상하방향 기둥홈으로부터 이탈시킴으로써 상기 콘크리트 팩이 상기 상하방향 기둥홈에 삽입되도록 하고 있다.Meanwhile, the present inventors have proposed Korean Patent Laid-Open Publication No. 10-2019-0010203 "Concrete pack insertion device and concrete block structure construction method using the same and concrete block structure constructed through the same" (published on January 30, 2019). The prior art is to prepare a concrete pack sealed by inserting concrete and reinforcing bars extending in the vertical direction into a waterproof membrane, and receiving the concrete pack in a hollow tube-shaped tube extending in the vertical direction. After inserting the pipe body into the vertical column groove of the concrete block stack, the concrete pack is inserted into the vertical column groove by removing the pipe body from the vertical column groove while leaving the concrete pack.
여기에서 관체는 콘크리트 팩을 편리하게 삽입하기 위하여 콘크리트 팩과 함께 콘크리트 블록 적층체의 상하방향 기둥홈에 삽입되는 것으로서, 천공 작업과는 전혀 무관하다.Here, the pipe body is inserted into the vertical column groove of the concrete block stacked body together with the concrete pack in order to conveniently insert the concrete pack, and is completely irrelevant to the drilling work.
한편 대한민국 등록특허 제10-1650231호 "파력발전기를 갖춘 반투과성 방파제 축조구조물"(2016. 8. 16. 등록)이 알려져 있으며, 이 종래 기술에서는, 하부후팅의 유도강관 내에 근입강관을 집어넣으면서 근입강관을 지반에 압입한 후, RCD 비트를 이용하여 근입강관 내부에서 소정의 깊이까지 굴착한 후, 근입강관 내부에 철근망을 집어넣고 콘크리트 타설하여 근입강관과 일체화된 현장타설 말뚝을 형성한 후, 복수의 현장타설 말뚝을 이용하여 각종 콘크리트 블록을 설치하게 된다.Meanwhile, Korean Patent Registration No. 10-1650231 "Semi-permeable breakwater construction structure with wave power generator" (registered on August 16, 2016) is known, and in this prior art, the near-entrance steel pipe is inserted into the guided steel pipe of the lower hooking while inserting the near-entrance steel pipe. After press-fitting into the ground, excavating to a predetermined depth from the inside of the near-entrance steel pipe using RCD bits, inserting a reinforcing bar net into the inside of the near-incoming steel pipe, pouring concrete, and forming an on-site casting pile integrated with the near-incoming steel pipe, and then plural Various concrete blocks are installed using cast-in-place piles.
여기에서 현장타설 말뚝은, 근입강관과 그 내부에 삽입된 철근망 및 콘크리트로 이루어지는 구조이므로, 현장타설 말뚝용 근입강관은 제거가 불가능하다. 즉 이 종래 기술은 근입강관을 재사용할 수 없게되어 공사비 등이 매우 증가한다는 문제가 있다.Here, since the cast-in-place pile is a structure composed of a steel pipe, reinforcing bar mesh and concrete inserted therein, it is impossible to remove the steel pipe for cast-in-place piles. That is, this prior art has a problem that the construction cost and the like are greatly increased since the near-entry steel pipe cannot be reused.
또한 이 종래 기술은 현장타설 말뚝에 각종 콘크리트 블록을 설치하나, 현장타설 말뚝과 콘크리트 블록이 완전히 일체화되지 못하고 단순 조립되는 구조이므로, 시간의 경과에 따라 구조적인 취약성을 가지게 된다.In addition, in this prior art, various concrete blocks are installed on the cast-in-place pile, but since the cast-in-place pile and the concrete block are not completely integrated and are simply assembled, structural fragility arises over time.
또한 이 종래 기술은 해저 지반에 미리 설치된 하부후팅의 유도강관 내에 근입강관을 집어넣으면서 근입강관을 해저 지반에 압입하게 되나, 근입강관의 상부를 안내할 수 있는 구조물이 전혀 없으므로, 근입강관을 수직으로 압입하는 것이 대단히 어렵게 되며, 근입강관의 수직도가 정밀하지 않을 경우 이에 조립되는 콘크리트 블록을 설치하는 작업이 어려워지게 된다.In addition, this prior art press-fits the near-entry steel pipe into the submarine ground while inserting the near-entry steel pipe into the guided steel pipe of the lower hooking pre-installed on the submarine ground. It becomes very difficult to press-in, and if the verticality of the near-entry steel pipe is not precise, it becomes difficult to install a concrete block to be assembled thereto.
본 발명은 상기와 같은 종래 기술의 문제점을 해결하기 위하여 안출된 것으로서, 복수의 콘크리트 블록에 의하여 콘크리트 블록 집합체를 형성하고, 상기 콘크리트 블록 집합체의 콘크리트 기둥용 통공부를 통하여 콘크리트 기둥용 통공부의 하부에 지반 천공부를 형성하고, 콘크리트 기둥용 통공부와 지반 천공부를 따라 콘크리트 기둥이 형성되도록 하여, 수중 콘크리트 블록 구조물의 안정성을 대폭 높일 수 있는 새로운 형태의 시공 방법 및 새로운 구조의 수중 콘크리트 블록 구조물을 제안하고자 한다.The present invention is conceived to solve the problems of the prior art as described above, forming a concrete block assembly by a plurality of concrete blocks, and the lower portion of the through hole for a concrete column through the through hole for a concrete column of the concrete block assembly. A new type of construction method and a new structure of underwater concrete block structure that can significantly increase the stability of underwater concrete block structures by forming a ground perforation in the ground and forming a concrete column along the through hole for concrete pillars and the ground perforation. I would like to propose.
상기의 과제를 해결하기 위하여 본 발명은, 제1직경으로 상하방향으로 연장되는 상하방향 관통구가 형성되는 복수의 콘크리트 블록을 제작하는 콘크리트 블록 제작 단계 ; 상기 콘크리트 블록 제작 단계에서 제작된 복수의 콘크리트 블록을 수중 지반의 상부에 설치하여 상기 복수의 콘크리트 블록이 수평방향으로 연속하여 배치된 콘크리트 블록 집합체를 형성하되, 상기 콘크리트 블록의 상하방향 관통구는 하단부가 상기 수중 지반에 의하여 막히며 상단부가 개방되면서 제1직경으로 상하방향으로 연장되는 콘크리트 기둥용 통공부를 형성하는 콘크리트 블록 집합체 형성 단계 ; 상기 콘크리트 블록 집합체 형성 단계 이후, 제1직경보다 작은 직경인 제2직경으로 상하방향으로 연장되는 형태의 보호관을 상기 콘크리트 기둥용 통공부를 통하여 수직 방향으로 상기 수중 지반에 삽입하면서 상기 콘크리트 기둥용 통공부의 하부에 위치한 수중 지반을 천공하여 상기 콘크리트 기둥용 통공부와 연속되는 공간이면서 제1직경보다 작은 직경으로 상하방향으로 연장되는 지반 천공부를 형성하되, 상기 삽입된 보호관은 상기 콘크리트 기둥용 통공부 및 상기 지반 천공부에 걸쳐 위치되며, 상기 삽입된 보호관의 내부에 상기 지반 천공부가 형성되는 지반 천공부 형성 단계 ; 상기 지반 천공부 형성 단계 이후, 상하방향으로 형성된 상하방향 철근부를 상기 상하방향 철근부의 하부 및 측부를 방수막으로 감싼 상태로 상기 보호관에 삽입하고 상기 방수막의 내부에 콘크리트를 타설하여 상기 콘크리트 기둥용 통공부와 상기 지반 천공부를 따라 콘크리트 기둥을 형성하되, 상기 타설된 콘크리트가 경화되기 전에 상기 보호관을 제거하여 상기 방수막은 상기 타설된 콘크리트의 압력으로 상기 수중 지반 및 상기 콘크리트 블록에 밀착되며, 상기 콘크리트 기둥은 상기 콘크리트 기둥용 통공부에 위치하면서 제1직경으로 상하방향으로 연장되는 제1콘크리트 기둥부와 상기 지반 천공부에 위치하면서 제2직경으로 상하방향으로 연장되는 제2콘크리트 기둥부를 포함하여 이루어지는 콘크리트 기둥 형성 단계 ; 를 포함하여 이루어지는 것을 특징으로 한다.In order to solve the above problems, the present invention is a concrete block manufacturing step of manufacturing a plurality of concrete blocks having vertical through holes extending in a vertical direction with a first diameter; A plurality of concrete blocks produced in the concrete block manufacturing step are installed on the upper part of the underwater ground to form a concrete block assembly in which the plurality of concrete blocks are continuously arranged in a horizontal direction, wherein the vertical through hole of the concrete block has a lower end. A concrete block assembly forming step of forming a through hole for a concrete column that is blocked by the underwater ground and extends in a vertical direction with a first diameter while the upper end is opened; After the step of forming the concrete block assembly, a protective tube having a shape extending in a vertical direction with a second diameter smaller than the first diameter is inserted into the underwater ground in a vertical direction through the through hole for the concrete column, while the cylinder for the concrete column The underwater ground located in the lower part of the study is perforated to form a ground perforation that is a continuous space with the through-hole for the concrete column and extends vertically with a diameter smaller than the first diameter, and the inserted protective tube is the barrel for the concrete column. A ground perforation forming step in which the ground perforation portion is formed in the study and located across the ground perforation portion, and the ground perforation portion is formed inside the inserted protective tube; After the step of forming the ground perforation, the vertical reinforcement part formed in the vertical direction is inserted into the protective tube while the lower and side parts of the vertical reinforcement part are wrapped with a waterproofing film, and concrete is poured into the waterproofing film. A concrete column is formed along the study and the ground perforation, but the protective tube is removed before the poured concrete is hardened, so that the waterproofing membrane is in close contact with the underwater ground and the concrete block under the pressure of the poured concrete, and the concrete The pillar comprises a first concrete pillar portion positioned in the through hole for the concrete pillar and extending in the vertical direction with a first diameter and a second concrete pillar portion positioned in the ground perforation portion and extending in the vertical direction with a second diameter. Concrete column formation step; It characterized in that it comprises a.
상기에 있어서, 상기 콘크리트 블록 집합체 형성 단계는, 상기 복수의 콘크리트 블록이 수평방향 및 상하방향으로 연속하여 배치된 콘크리트 블록 집합체를 형성하되, 상기 상하방향으로 연속하여 배치된 복수의 콘크리트 블록의 상하방향 관통구가 상하방향으로 연속되면서 하단부가 상기 수중 지반에 의하여 막히며 상단부가 개방된 콘크리트 기둥용 통공부가 형성될 수 있다.In the above, wherein the forming of the concrete block assembly comprises forming a concrete block assembly in which the plurality of concrete blocks are continuously arranged in a horizontal direction and in a vertical direction, and the vertical direction of a plurality of concrete blocks continuously arranged in the vertical direction As the through hole is continuous in the vertical direction, a through hole for a concrete column may be formed at a lower end portion being blocked by the underwater ground and an upper end portion being opened.
상기에 있어서, 상기 콘크리트 블록 집합체의 상부 표면은 수면보다 높게 위치되며, 상기 지반 천공부 형성 단계에서 삽입된 보호관의 상단은 상기 콘크리트 블록 집합체의 상부 표면으로부터 돌출되는 것이 바람직하다.In the above, it is preferable that the upper surface of the concrete block assembly is positioned higher than the water surface, and the upper end of the protective tube inserted in the ground perforation forming step protrudes from the upper surface of the concrete block assembly.
상기에 있어서, 상기 콘크리트 기둥 형성 단계에서, 상기 방수막의 내부에 콘크리트를 점차적으로 타설함과 함께 상기 보호관을 점차적으로 상승시켜 상기 보호관을 제거하는 것이 바람직하다.In the above, in the step of forming the concrete column, it is preferable to remove the protective pipe by gradually pouring concrete into the waterproof membrane and gradually raising the protective pipe.
상기에 있어서, 상기 수중 지반은 수중 콘크리트 블록 구조물을 위하여 인공적으로 조성된 기초 지반을 포함하며, 상기 콘크리트 블록 집합체 형성 단계 이전에 상기 기초 지반을 조성하는 기초 지반 조성 단계가 포함되며, 상기 기초 지반은, 기초 사석 지반, 치환 사석 지반, 심층혼합처리 지반, 연약지반개량처리된 지반 중 어느 하나 또는 이들을 복합한 것일 수 있다.In the above, the underwater ground includes a foundation ground artificially constructed for an underwater concrete block structure, and a foundation ground composition step of forming the foundation ground prior to the step of forming the concrete block assembly is included, and the foundation ground is , It may be any one of a basic stony ground, a substituted stony ground, a deep mixed-processed ground, a soft ground improved-treated ground, or a combination thereof.
상기에 있어서, 상기 콘크리트 기둥 형성 단계 이후, 상기 콘크리트 블록 집합체의 상부에 상치 콘크리트를 형성하는 상치 콘크리트 형성 단계가 부가될 수 있다.In the above, after the step of forming the concrete column, a step of forming a stand-alone concrete may be added to the upper portion of the concrete block assembly.
상기에 있어서, 상기 콘크리트 블록은 내부에 속채움용 공간이 형성되며, 상기 콘크리트 블록 집합체 형성 단계 이후 상기 속채움용 공간에 속채움재를 채우는 속채움 단계가 부가될 수 있다.In the above, the concrete block has a space for filling inside, and after the step of forming the concrete block assembly, an inside filling step of filling the inside filling space in the inside filling space may be added.
본 발명의 다른 사상으로, 상기의 수중 콘크리트 블록 구조물 시공방법에 의하여 시공된 수중 콘크리트 블록 구조물이 제공된다.In another aspect of the present invention, an underwater concrete block structure constructed by the above underwater concrete block structure construction method is provided.
본 발명의 또다른 사상으로, 수중 콘크리트 블록 구조물에 있어서, 제1직경으로 상하방향으로 연장되는 상하방향 관통구가 형성되는 복수의 콘크리트 블록이 수중 지반의 상부에 설치되어 상기 복수의 콘크리트 블록이 적어도 수평방향으로 연속하여 배치된 콘크리트 블록 집합체와, 상기 상하방향 관통구와 상기 상하방향 관통구의 하부에 위치하며 상기 제1직경보다 작은 직경으로 상기 수중 지반이 천공되어 형성된 지반 천공부를 따라 형성된 복수의 콘크리트 기둥을 포함하여 이루어지며 ; 상기 콘크리트 기둥은 상기 상하방향 관통구에 위치하면서 제1직경으로 상하방향으로 연장되는 제1콘크리트 기둥부와 상기 지반 천공부에 위치하면서 상기 제1직경보다 작은 직경인 제2직경으로 상하방향으로 연장되는 제2콘크리트 기둥부를 포함하여 이루어지며 ; 상기 콘크리트 기둥은, 상하방향으로 형성되어 상기 상하방향 관통구와 상기 지반 천공부에 걸쳐 배치된 상하방향 철근부와, 상기 상하방향 철근부의 하부 및 측부를 감싸면서 상기 수중 지반 및 상기 콘크리트 블록에 밀착된 방수막과 상기 방수막의 내부에 타설되어 양생된 콘크리트를 포함하여 이루어지며 ; 상기 콘크리트 블록 집합체의 복수의 콘크리트 블록은 상기 콘크리트 기둥에 의하여 상기 수중 지반에 결속되는 것 ; 을 특징으로 한다.In another idea of the present invention, in the underwater concrete block structure, a plurality of concrete blocks having vertical through holes extending in a vertical direction with a first diameter are installed on the upper part of the underwater ground, so that the plurality of concrete blocks are at least A concrete block assembly arranged in a horizontal direction, and a plurality of concrete formed along the ground perforation formed by perforating the underwater ground with a diameter smaller than the first diameter and located under the vertical through-hole and the up-down through-hole Consists of including pillars; The concrete pillar extends in the vertical direction to a second diameter smaller than the first diameter while being positioned in the vertical through hole and extending in the vertical direction to the first diameter and the ground perforation. It is made including a second concrete column portion; The concrete column is formed in a vertical direction and is in close contact with the underwater ground and the concrete block while surrounding the vertical reinforcement portion disposed across the vertical through hole and the ground perforation, and the lower and side portions of the vertical reinforcement portion. It comprises a waterproof membrane and concrete cured by pouring into the inside of the waterproof membrane; The plurality of concrete blocks of the concrete block assembly are bound to the underwater ground by the concrete pillars; It features.
상기에 있어서, 상기 콘크리트 블록 집합체는 상기 복수의 콘크리트 블록이 수평방향 및 상하방향으로 연속하여 배치된 것이며, 상기 콘크리트 기둥은 상기 상하방향으로 연속하여 배치된 복수의 콘크리트 블록의 상하방향 관통구가 상하방향으로 연속되면서 형성된 콘크리트 기둥용 통공부와 상기 콘크리트 기둥용 통공부의 하부에 위치한 상기 수중 지반이 천공되어 형성된 지반 천공부를 따라 형성된 것일 수 있다.In the above, the concrete block assembly is one in which the plurality of concrete blocks are arranged in a horizontal direction and in a vertical direction, and the concrete column has a vertical penetration hole of a plurality of concrete blocks continuously arranged in the vertical direction. It may be formed along a through hole for a concrete column formed while continuing in a direction and a ground hole formed by drilling the underwater ground located under the through hole for a concrete column.
상기에 있어서, 상기 콘크리트 블록 집합체의 상부 표면은 수면보다 높게 위치되는 것이 바람직하다.In the above, it is preferable that the upper surface of the concrete block assembly is located higher than the water surface.
상기와 같이 본 발명은, 복수의 콘크리트 블록에 의하여 콘크리트 블록 집합체를 형성하고, 상기 콘크리트 블록 집합체의 콘크리트 기둥용 통공부를 통하여 콘크리트 기둥용 통공부의 하부에 지반 천공부를 형성하고, 콘크리트 기둥용 통공부와 지반 천공부를 따라 콘크리트 기둥이 형성되도록 하여, 수중 콘크리트 블록 구조물의 안정성을 대폭 높일 수 있는 새로운 형태의 시공 방법 및 새로운 구조의 수중 콘크리트 블록 구조물을 제공한다.As described above, the present invention forms a concrete block assembly by a plurality of concrete blocks, and forms a ground perforation in the lower part of the through hole for a concrete column through the through hole for a concrete column of the concrete block assembly, and A new type of construction method and a new structure of an underwater concrete block structure are provided that can significantly increase the stability of an underwater concrete block structure by allowing a concrete column to be formed along the through hole and the ground perforation.
이에 의하여 콘크리트 블록 집합체를 이루는 복수의 콘크리트 블록이 콘크리트 기둥에 의하여 수중 지반에 결속된 상태가 되어 수중 콘크리트 블록 구조물의 안정성이 대폭 향상된다.Accordingly, a plurality of concrete blocks constituting a concrete block assembly are bound to the underwater ground by a concrete column, thereby greatly improving the stability of the underwater concrete block structure.
또한 이와 같이 안정성이 향상된 결과, 기존의 대형 케이슨 공법 등과 비교할 때 수중 콘크리트 블록 구조물을 획기적으로 소형화시키는 것이 가능하게 된다.In addition, as a result of the improved stability, it is possible to significantly reduce the size of the underwater concrete block structure compared to the existing large caisson method.
이는 수중 콘크리트 블록 구조물의 중량 및 수중 콘크리트 블록 구조물의 수중 지반에 대한 마찰력을 감소시키는 경우에도 콘크리트 기둥에 의한 수중 지반에의 결속력이 이를 보완하여 충분한 안정성을 가질 수 있기 때문이다.This is because even when the weight of the underwater concrete block structure and the frictional force of the underwater concrete block structure against the underwater ground are reduced, the binding force to the underwater ground by the concrete column can compensate for this and have sufficient stability.
도 1은 본 발명의 제1실시예에 의한 수중 콘크리트 블록 구조물의 시공 방법에 사용되는 콘크리트 블록의 사시도,
도 2는 도 1의 콘크리트 블록을 설치하여 수중 지반의 상부에 콘크리트 블록 집합체를 형성한 상태의 평면 개념도,
도 3은 도 2의 단면 개념도,
도 4는 도 3의 콘크리트 블록 집합체 형성 이후 지반 천공부를 형성한 상태의 도면,
도 5 내지 도 8은 도 4의 지반 천공부 형성 이후 콘크리트 기둥을 형성하는 과정을 순서대로 도시한 도면,
도 9는 본 발명의 제2실시예에 의한 수중 콘크리트 블록 구조물의 시공 방법에 사용되는 콘크리트 블록의 단면도,
도 10은 도 9의 콘크리트 블록의 사시도,
도 11은 도 9의 콘크리트 블록을 설치하여 수중 지반의 상부에 콘크리트 블록 집합체를 형성한 상태의 도면,
도 12는 도 11의 콘크리트 블록 집합체 형성 이후 지반 천공부를 형성한 상태의 도면,
도 13 내지 도 16은 도 12의 지반 천공부 형성 이후 콘크리트 기둥을 형성하는 과정을 순서대로 도시한 도면,
도 17은 본 발명의 제3실시예에 의하여 시공된 수중 콘크리트 블록 구조물의 단면도,
도 18은 도17에 이용된 복수의 콘크리트 블록의 단면을 분리하여 도시한 도면,
도 19는 본 발명의 제4실시예에 의하여 시공된 수중 콘크리트 블록 구조물의 단면도,
도 20은 본 발명의 제5실시예에 의한 수중 콘크리트 블록 구조물의 시공 방법에 사용되는 콘크리트 블록의 사시도,
도 21은 도 21의 콘크리트 블록의 단면도,
도 22는 본 발명의 제5실시예에 의하여 시공된 수중 콘크리트 블록 구조물의 단면도.1 is a perspective view of a concrete block used in the construction method of the underwater concrete block structure according to the first embodiment of the present invention,
FIG. 2 is a schematic plan view of a state in which a concrete block assembly is formed on the upper part of the underwater ground by installing the concrete block of FIG. 1;
3 is a schematic cross-sectional view of FIG. 2;
4 is a view of a state in which a ground perforation portion is formed after the formation of the concrete block assembly of FIG. 3;
5 to 8 are views sequentially showing a process of forming a concrete column after the formation of the ground perforation of FIG. 4;
9 is a cross-sectional view of a concrete block used in the construction method of the underwater concrete block structure according to the second embodiment of the present invention,
10 is a perspective view of the concrete block of FIG. 9,
11 is a view of a state in which a concrete block assembly is formed on the upper part of the underwater ground by installing the concrete block of FIG. 9;
12 is a view of a state in which a ground perforation portion is formed after the formation of the concrete block assembly of FIG. 11;
13 to 16 are views sequentially showing a process of forming a concrete column after the formation of the ground perforation of FIG. 12;
17 is a cross-sectional view of an underwater concrete block structure constructed according to a third embodiment of the present invention,
FIG. 18 is a view showing a separate cross-section of a plurality of concrete blocks used in FIG. 17;
19 is a cross-sectional view of an underwater concrete block structure constructed according to a fourth embodiment of the present invention,
20 is a perspective view of a concrete block used in the construction method of the underwater concrete block structure according to the fifth embodiment of the present invention,
Figure 21 is a cross-sectional view of the concrete block of Figure 21,
22 is a cross-sectional view of an underwater concrete block structure constructed according to a fifth embodiment of the present invention.
아래에서는 첨부한 도면을 참조하여 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예를 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 그리고 도면에서 본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 부여하였다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings so that those of ordinary skill in the art can easily implement the present invention. However, the present invention may be implemented in various different forms and is not limited to the embodiments described herein. In the drawings, parts irrelevant to the description are omitted in order to clearly describe the present invention, and similar reference numerals are assigned to similar parts throughout the specification.
명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다.Throughout the specification, when a certain part "includes" a certain component, it means that other components may be further included rather than excluding other components unless specifically stated to the contrary.
먼저 본 발명에 의한 제1실시예에 의한 수중 콘크리트 블록 구조물의 시공 방법을 설명한다.First, the construction method of the underwater concrete block structure according to the first embodiment according to the present invention will be described.
도 1은 본 발명의 제1실시예에 의한 수중 콘크리트 블록 구조물의 시공 방법에 사용되는 콘크리트 블록의 사시도이며, 도 2는 도 1의 콘크리트 블록을 설치하여 수중 지반의 상부에 콘크리트 블록 집합체를 형성한 상태의 평면 개념도이며, 도 3은 도 2의 단면 개념도이며, 도 4는 도 3의 콘크리트 블록 집합체 형성 이후 지반 천공부를 형성한 상태의 도면이며, 도 5 내지 도 8은 도 4의 지반 천공부 형성 이후 콘크리트 기둥을 형성하는 과정을 순서대로 도시한 도면이다.1 is a perspective view of a concrete block used in the construction method of an underwater concrete block structure according to a first embodiment of the present invention, and FIG. 2 is a concrete block assembly formed on the upper part of the underwater ground by installing the concrete block of FIG. A plan view of the state, FIG. 3 is a cross-sectional conceptual view of FIG. 2, FIG. 4 is a view of a state in which a ground perforation portion is formed after the concrete block assembly of FIG. 3 is formed, and FIGS. 5 to 8 are a ground perforation portion of FIG. 4 It is a diagram showing the process of forming a concrete column after formation in order.
(1) 콘크리트 블록 제작 단계(1) Concrete block production stage
도 1과 같은 콘크리트 블록(10)을 제작한다.A
콘크리트 블록(10)의 형태는 다양하게 형성될 수 있지만, 적어도 상하방향으로 연장되는 상하방향 관통구(11)가 둘 이상 형성되는 것이 바람직하다.Although the shape of the
상하방향 관통구(11)는 제1직경(D1)으로 상하방향으로 연장된다.The vertical through
실시예에 따라서 콘크리트 블록(10)에는 속채움용 공간이 형성되거나 기타 다른 용도의 공간이나 다른 용도의 형상이 형성될 수 있다.Depending on the embodiment, a space for filling may be formed in the
상하방향 관통구(11)는, 도 1과 같이 콘크리트 블록(10)에 형성된 구멍일 수도 있지만, 도 20 및 도 21과 같이 중공관을 콘크리트 블록에 삽입하여 중공관의 내부를 상하방향 관통구로 이용할 수도 있다.The vertical through-
도 1 등의 콘크리트 블록(10)에서는, 이해의 편의를 위하여, 상하방향 관통구(11)의 크기를 매우 과장되게 도시하고 있다.In the
(2) 콘크리트 블록 집합체 형성 단계(2) Concrete block assembly formation step
콘크리트 블록 제작 단계에서 제작된 복수의 콘크리트 블록(10)을 도 3과 같이 수중 지반(20)의 상부에 설치하여, 도 2와 같이 복수의 콘크리트 블록(10)이 수평방향으로 연속하여 배치된 콘크리트 블록 집합체(100)를 형성한다.Concrete in which a plurality of concrete blocks 10 produced in the concrete block manufacturing step are installed on the upper part of the
도 2는 설치된 상태의 평면도이며, 도 2는 설치된 상태의 단면도이다.2 is a plan view of the installed state, and FIG. 2 is a cross-sectional view of the installed state.
콘크리트 블록 집합체(100)를 이루는 콘크리트 블록(10)의 상하방향 관통구(11)는, 하단부가 수중 지반(20)에 의하여 막히며 상단부가 개방된 콘크리트 기둥용 통공부(101)를 형성한다.The vertical through-
즉 본 실시예에서 콘크리트 블록은 대형으로 제작되어 상하방향으로는 오직 1단으로만 설치되며, 각 콘크리트 블록(10)의 각 상하방향 관통구(11)가 콘크리트 기둥용 통공부(101)로 기능한다.That is, in this embodiment, the concrete block is manufactured in a large size and is installed only in one step in the vertical direction, and each vertical through
따라서 콘크리트 기둥용 통공부(101)는 제1직경(D1)으로 상하방향으로 연장되는 형태이다.Therefore, the through
본 실시예의 수중 지반(20)은 인위적으로 조성되지 않은 수중 지반, 즉 해저면에 해당하지만, 실시예에 따라서 수중 지반(20)은 수중 콘크리트 블록 구조물을 위하여 인공적으로 조성한 기초 지반을 포함하는 개념이다.The
수중 지반(20)의 상부에 기초 지반이 조성되고 그 이후 콘크리트 블록 집합체(100)를 형성한다면, 콘크리트 블록 집합체 형성 단계 이전에 기초 지반을 조성하는 기초 지반 조성 단계가 더 필요하다.If the foundation ground is formed on the upper part of the
기초 지반은, 기초 사석 지반, 치환 사석 지반, 심층혼합처리 지반, 연약지반개량처리된 지반 중 어느 하나 또는 이들을 복합한 것일 수 있다.The foundation ground may be any one or a combination of the ground sandstone ground, the substituted sandstone ground, the deep mixed ground ground, the soft ground improvement ground ground.
연약지반개량처리된 지반이란, 지반이 연약하여 필요한 지지력을 얻을 수 없을 때 치환공법, 압밀공법, 탈수공법, 배수공법, 진동다짐공법, 다짐모래 말뚝공법, 폭파공법, 약액주입공법 등에 따라 지반을 개량하는 연약지반개량공법에 따라 개량 처리된 지반을 말한다.When the ground is soft and the necessary support cannot be obtained, the ground is replaced according to the replacement method, consolidation method, dewatering method, drainage method, vibration compaction method, compaction sand pile method, blasting method, chemical injection method, etc. It refers to the ground that has been improved according to the improved soft ground improvement method.
도 3에서는 콘크리트 블록 집합체의 단면도를 도시하고 있지만, 콘크리트 블록 집합체(100)는 도 2와 같이 수평방향으로도 복수의 콘크리트 블록(10)이 연속적으로 배치되어 있는 상태이다.Although FIG. 3 shows a cross-sectional view of the concrete block assembly, the
(3) 지반 천공부 형성 단계(3) Ground perforation formation step
콘크리트 블록 집합체 형성 단계 이후, 도 4와 같이 콘크리트 기둥용 통공부(101)의 하부에 위치한 수중 지반(20)을 천공하여 콘크리트 기둥용 통공부(101)와 연속되는 공간인 지반 천공부(102)를 형성한다.After the step of forming the concrete block assembly, as shown in FIG. 4, the
본 실시예에서는, 제2직경(D2)으로 상하방향으로 연장되는 형태의 보호관(30)을 콘크리트 기둥용 통공부(101)를 통하여 수직 방향으로 수중 지반(20)에 삽입하면서 콘크리트 기둥용 통공부(101)의 하부에 위치한 수중 지반(20)을 천공한다.In this embodiment, while inserting the
이와 같이 지반 천공부(102)를 형성하면, 삽입된 보호관(30)은 콘크리트 기둥용 통공부(101) 및 지반 천공부(102)에 걸쳐 위치되며, 보호관(30)의 내부에 지반 천공부(102)가 형성된다.When the
이때 보호관(30)은 천공 작업 도중 혹은 천공 후에 주변의 수중 지반(20)이 지반 천공부(102)로 붕괴되거나 혹은 각종 이물질이 지반 천공부(102)로 유입되는 것을 방지한다. At this time, the
또한 보호관(30)은 후술하는 상하방향 철근부(111) 및 방수막(112)을 삽입할 때 방수막(112)을 보호하는 역할을 한다.In addition, the
보호관(30)의 길이는 콘크리트 기둥용 통공부(101)의 길이와 지반 천공부(102)의 길이의 합보다 길게 형성되는 것이 바람직하다. 이에 의하여 방수막(112) 삽입 작업을 간편하게 진행할 수 있다.The length of the
즉 도 4에 도시된 바와 같이 콘크리트 블록 집합체(100)의 상부 표면은 수면보다 높게 위치되며, 지반 천공부 형성 단계에서 삽입된 보호관(30)의 상단은 콘크리트 블록 집합체(100)의 상부 표면으로부터 돌출되어 있다. 즉 보호관(30)의 상단은 수면보다 높게 위치되며 또한 콘크리트 블록 집합체(100)의 상부 표면보다 높게 위치된다. 따라서 보호관(30)으로 방수막(112) 등을 삽입하는 작업이 매우 간편하게 이루어질 수 있다.That is, as shown in Figure 4, the upper surface of the
또한 보호관(30)은 중공관 형태로서, 보호관(30)의 제2직경(D2)는 콘크리트 기둥용 통공부(101)의 제1직경(D1)보다 작다. 이에 의하여 보호관(30)의 삽입 작업이 편리하게 된다. 즉, 보호관(30)의 삽입시 또는 보호관(30)의 제거시, 보호관(30)이 콘크리트 기둥용 통공부(101)에 끼이는 것을 방지한다.In addition, the
또한 보호관(30)의 삽입시 콘크리트 기둥용 통공부(101)를 참조하여 보호관(30)을 삽입하면, 보호관(30)은 비교적 정밀한 수직도를 가지면서 삽입될 수 있다.In addition, when the
한편 보호관(30)은 지반 천공부 형성 단계 이후 제거되는 것이 바람직하다. Meanwhile, the
한편 수중 지반(20)을 천공하는 작업을 위하여는 천공 장비가 필요하며, 본 실시예는 콘크리트 블록 집합체(100)의 상부 표면은 수면보다 높게 위치하므로, 천공 장비가 콘크리트 블록 집합체(100)의 상부 표면에 배치되어 천공 작업을 수행한다면 이는 건식 작업이 되어(즉 바지선에서 작업하는 습식 작업이 불필요하게 됨.), 육상 작업과 동일한 환경에서 작업하여 작업 효율을 높일 수 있다.Meanwhile, a drilling equipment is required for the operation of drilling the
(4) 콘크리트 기둥 형성 단계(4) Concrete pillar formation stage
지반 천공부 형성 단계 이후, 콘크리트 기둥용 통공부(101)와 지반 천공부(102)를 따라 콘크리트 기둥(110)을 형성한다.After the ground perforation forming step, the
본 실시예의 콘크리트 기둥 형성 단계는 도 5 내지 도 8과 같이 단계적으로 이루어진다.The step of forming a concrete column in this embodiment is performed in stages as shown in FIGS. 5 to 8.
먼저 도 5 및 도 6과 같이, 상하방향으로 형성된 상하방향 철근부(111)를 콘크리트 기둥용 통공부(101) 및 지반 천공부(102)에 삽입한다.First, as shown in FIGS. 5 and 6, the vertical reinforcing
본 실시예에서는 이미 보호관(30)이 콘크리트 기둥용 통공부(101) 및 지반 천공부(102)에 위치되어 있으므로, 상하방향 철근부(111)를 보호관(30) 내부에 삽입한다.In this embodiment, since the
이때 상하방향 철근부(111)의 하부 및 측부를 방수막(112)으로 감싼 상태로 콘크리트 기둥용 통공부(101) 및 지반 천공부(102)에 삽입한다.At this time, the bottom and side portions of the vertical reinforcing
한편 보호관(30)을 통하여 방수막(112) 등이 삽입되므로, 방수막(112)이 수중 지반(20) 등에 접촉하면서 찢기거나 훼손될 위험이 없다.Meanwhile, since the
이와 같이 방수막(112)으로 감싸인 상하방향 철근부(111)가 보호관(30) 내부에 삽입된 후, 도 7 및 도 8과 같이 방수막(112)의 내부에 콘크리트(113)를 타설하여 콘크리트 기둥(110)을 형성한다.In this way, after the
도 7은 방수막(112)의 내부에 콘크리트(113) 소량을 타설하면서 보호관(30)을 조금 상승시킨 상태의 도면이다.7 is a view of a state in which the
즉 도 7에서 보호관(30)의 하단은 지반 천공부(102)를 막 벗어난 상태를 가지도록 보호관(30)을 상승시킨 상태이며, 방수막(112)의 내부에는 지반 천공부(102) 영역에 필요한 콘크리트(113)가 타설된 상태이다.That is, the lower end of the
이에 의하여 지반 천공부(102)에 위치한 방수막(112)은 콘크리트(113)의 압력에 의하여 수중 지반(20)에 밀착된다.Thereby, the
이와 같은 방식으로, 방수막(112)의 내부에 콘크리트(113)를 점차적으로 타설함과 함께 보호관(30)을 점차적으로 상승시켜, 최종적으로 도 8과 같이 보호관(30)을 완전히 제거하는 한편 콘크리트 기둥용 통공부(101)와 지반 천공부(102) 전체에 콘크리트(113)를 타설하는 작업을 완료한다.In this way, the concrete 113 is gradually poured into the
즉 보호관(30)은, 타설된 콘크리트(113)가 경화되기 전에 제거될 수 있다.That is, the
이와 같이 콘크리트(113)가 방수막(112)의 내부에 타설되면 방수막(112)은 콘크리트(113)의 압력으로 수중 지반(20) 및 콘크리트 블록(10)에 밀착되며, 이후 양생 과정을 거쳐 콘크리트 기둥(110)이 된다.In this way, when the concrete 113 is poured into the
만일 방수막(112)의 내부에 콘크리트(113)를 한꺼번에 타설하고 이후 보호관(30)을 상승시켜 보호관(30)을 제거할 수도 있지만, 이 경우 방수막(112)이 콘크리트(113)의 압력으로 보호관(30) 내부에 강하게 밀착되어 보호관(30)을 방수막(112)으로부터 분리하는 것이 어려울 수 있다.If the concrete 113 is poured into the
이와 같이 콘크리트 블록 집합체(100)에 콘크리트 기둥(110)이 형성되어 수중 콘크리트 블록 구조물(200)이 형성된다.In this way, the
즉 콘크리트 기둥(110)은, 콘크리트 기둥용 통공부(101)에 위치하면서 제1직경으로 상하방향으로 연장되는 제1콘크리트 기둥부(110a)와, 지반 천공부(102)에 위치하면서 제2직경으로 상하방향으로 연장되는 제2콘크리트 기둥부(110b)를 포함하여 이루어진다.That is, the
수중 콘크리트 블록 구조물(200)에서 콘크리트 기둥(110)의 역할을 설명한다.The role of the
또한 콘크리트 블록 집합체(100)를 이루는 복수의 콘크리트 블록(10)이 콘크리트 기둥(110)에 의하여 수중 지반(20)에 결속된 상태가 된다.In addition, a plurality of
따라서 본 실시예의 수중 콘크리트 블록 구조물(200)의 안정성을 평가하기 위하여는, 수중 콘크리트 블록 구조물(200)의 중량과, 수중 콘크리트 블록 구조물(200)의 수중 지반(20)에 대한 마찰력 이외에도, 콘크리트 기둥(110)에 의한 수중 지반(20)에의 결속력을 함께 고려하여야 한다.Therefore, in order to evaluate the stability of the underwater
즉 수중 콘크리트 블록 구조물(200)은 콘크리트 기둥(110)에 의한 수중 지반(20)에의 결속력으로 인하여 안정성이 획기적으로 향상된다.That is, the underwater
이와 같이 안정성이 향상되는 결과, 기존의 대형 케이슨과 동일한 안정성을 가지는 것으로 충분한 경우에는 수중 콘크리트 블록 구조물(200)을 획기적으로 소형화시키는 것이 가능하다. As a result of improving the stability as described above, if it is sufficient to have the same stability as the existing large caisson, it is possible to significantly reduce the underwater
즉 수중 콘크리트 블록 구조물(200)의 중량과, 수중 콘크리트 블록 구조물(200)의 수중 지반(20)에 대한 마찰력을 감소시키는 경우에도 콘크리트 기둥(110)에 의한 수중 지반(20)에의 결속력이 이를 보완하여 충분한 안정성을 가질 수 있다.That is, even when the weight of the underwater
이하 본 발명에 의한 제2실시예를 설명한다.Hereinafter, a second embodiment according to the present invention will be described.
도 9는 본 발명의 제2실시예에 의한 수중 콘크리트 블록 구조물의 시공 방법에 사용되는 콘크리트 블록의 단면도이며, 도 10은 도 9의 콘크리트 블록의 사시도이며, 도 11은 도 9의 콘크리트 블록을 설치하여 수중 지반의 상부에 콘크리트 블록 집합체를 형성한 상태의 도면이며, 도 12는 도 11의 콘크리트 블록 집합체 형성 이후 지반 천공부를 형성한 상태의 도면이며, 도 13 내지 도 16은 도 12의 지반 천공부 형성 이후 콘크리트 기둥을 형성하는 과정을 순서대로 도시한 도면이다.9 is a cross-sectional view of a concrete block used in the construction method of an underwater concrete block structure according to a second embodiment of the present invention, FIG. 10 is a perspective view of the concrete block of FIG. 9, and FIG. 11 is a concrete block of FIG. Thus, it is a view of a state in which a concrete block assembly is formed on the upper part of the underwater ground, FIG. 12 is a view in a state in which a ground perforation part is formed after the formation of the concrete block assembly of FIG. 11, and FIGS. 13 to 16 are the ground fabric of FIG. It is a drawing showing the process of forming a concrete column after the formation of the study.
이하에서는 제1실시예와의 차이점만을 주로 설명하며, 제1실시예와 동일한 부분은 설명을 생략한다.Hereinafter, only differences from the first embodiment will be mainly described, and descriptions of the same parts as those of the first embodiment will be omitted.
(1) 콘크리트 블록 제작 단계(1) Concrete block production stage
본 실시예의 경우 도 9 및 도 10과 같은 비교적 작은 크기의 콘크리트 블록(10)을 제작한다.In the case of this embodiment, a
(2) 콘크리트 블록 집합체 형성 단계(2) Concrete block assembly formation step
콘크리트 블록 제작 단계에서 제작된 복수의 콘크리트 블록(10)을 수중 지반(20)의 상부에 설치하여 도 11과 같이 복수의 콘크리트 블록(10)이 수평방향 및 상하방향으로 연속하여 배치된 콘크리트 블록 집합체(100)를 형성한다.A concrete block assembly in which a plurality of
도 11에서는 콘크리트 블록(10)이 상하방향으로 연속하여 배치된 상태를 확인할 수 있지만, 콘크리트 블록 집합체(100)는 수평방향으로도 복수의 콘크리트 블록(10)이 연속적으로 배치되어 있는 상태이다. 이와 같은 수평방향으로의 복수의 콘크리트 블록(10)의 연속적인 배치 구조는 일반적인 기술이므로 상세한 설명을 생략한다.In FIG. 11, it can be seen that the concrete blocks 10 are continuously arranged in the vertical direction, but the
콘크리트 블록 집합체(100)에는, 상하방향으로 연속하여 배치된 복수의 콘크리트 블록(10)의 상하방향 관통구(11)가 상하방향으로 연속되면서 하단부가 수중 지반(20)에 의하여 막히며 상단부가 개방된 콘크리트 기둥용 통공부(101)가 형성된다. In the
즉 본 실시예에서 콘크리트 블록(10)들은 상하방향으로는 2단 이상으로 설치되며, 상하방향으로 적층된 복수의 콘크리트 블록(10)의 상하방향 관통구(11)가 조합되어 하나의 콘크리트 기둥용 통공부(101)가 형성된다.That is, in this embodiment, the concrete blocks 10 are installed in two or more stages in the vertical direction, and the vertical through
이후 (3) 지반 천공부 형성 단계, (4) 콘크리트 기둥 형성 단계가 순차적으로 실시된다.Thereafter, (3) the step of forming the ground perforation and (4) the step of forming the concrete column are sequentially performed.
본 실시예에의 수중 콘크리트 블록 구조물(200)에서 콘크리트 기둥(110)의 역할을 설명한다.The role of the
본 실시예는 제1실시예와 대비할 때, 복수의 콘크리트 블록(10)이 콘크리트 기둥(110)에 의하여 수중 지반(20)에 결속된 상태가 될 뿐만 아니라, 상하방향으로 연속하여 배치된 복수의 콘크리트 블록(10)이 콘크리트 기둥(110)에 의하여 서로 결속되면서, 콘크리트 블록 집합체(100)가 구조적 일체성을 가지게 된다.In contrast to the first embodiment, this embodiment is in a state in which a plurality of
이하 본 발명의 제3실시예에 의하여 시공된 수중 콘크리트 블록 구조물을 설명한다.Hereinafter, an underwater concrete block structure constructed according to a third embodiment of the present invention will be described.
도 17은 본 발명의 제3실시예에 의하여 시공된 수중 콘크리트 블록 구조물의 단면도이며, 도 18은 도17에 이용된 복수의 콘크리트 블록의 단면을 분리하여 도시한 도면이다.FIG. 17 is a cross-sectional view of an underwater concrete block structure constructed according to a third embodiment of the present invention, and FIG. 18 is a view showing a separate cross-section of a plurality of concrete blocks used in FIG. 17.
도 17에서는 수중 지반(20)의 일부가 굴착된 후 기초 지반으로서 치환 사석 지반(21)이 조성되고 치환 사석 지반(21)의 상부에 기초 사석 지반(22)이 조성된 후, 기초 사석 지반(22)의 상부에 수중 콘크리트 블록 구조물(200)이 시공되었다.In FIG. 17, after a part of the
즉 콘크리트 블록 집합체 형성 단계 이전에 기초 지반 조성 단계가 실행되었다.That is, the foundation ground construction step was carried out before the concrete block aggregate formation step.
또한 도 17에서는 콘크리트 블록 집합체(100) 및 콘크리트 기둥(110)이 형성된 후 속채움 단계 및 상치 콘크리트 형성 단계가 더 부가되었다.In addition, in FIG. 17, after the
즉 도 18에서 확인되는 바와 같이 복수의 콘크리트 블록(10)의 내부에 속채움용 공간(12)이 형성되어 있다.That is, as shown in FIG. 18, a space for filling the inside of the plurality of concrete blocks 10 is formed.
이와 같은 콘크리트 블록(10)의 속채움용 공간(12)은, 콘크리트 블록 집합체(100)를 형성한 후, 속채움재(120)(모래, 자갈 또는 사석 등)를 채운다.The
또한 콘크리트 기둥(110)이 형성된 후, 콘크리트 블록 집합체(100)의 상부에 상치 콘크리트(130)를 형성한다.In addition, after the
즉 콘크리트 기둥 형성 단계 이후, 상치 콘크리트 형성 단계가 더 부가될 수 있다.That is, after the step of forming the concrete column, the step of forming a standing concrete may be further added.
이하 본 발명의 제4실시예에 의하여 시공된 수중 콘크리트 블록 구조물을 설명한다.Hereinafter, an underwater concrete block structure constructed according to a fourth embodiment of the present invention will be described.
도 19는 본 발명의 제3실시예에 의하여 시공된 수중 콘크리트 블록 구조물의 단면도이다.19 is a cross-sectional view of an underwater concrete block structure constructed according to a third embodiment of the present invention.
도 19에서는 수중 지반(20)의 일부를 심층혼합처리 지반(23)으로 개량한 후, 심층혼합처리 지반(23)의 상부에 기초 사석 지반(22)이 조성된 후, 기초 사석 지반(22)의 상부에 수중 콘크리트 블록 구조물(200)이 시공되었다.In FIG. 19, after a part of the
즉 본 실시예에서는 기초 지반으로서, 심층혼합처리 지반(23)과 기초 사석 지반(22)을 복합 조성하였다.That is, in the present embodiment, as the foundation ground, the deep mixed-processed
즉 콘크리트 블록 집합체 형성 단계 이전에 기초 지반 조성 단계가 실행되었다.That is, the foundation ground construction step was carried out before the concrete block aggregate formation step.
또한 도 19에서는 콘크리트 블록 집합체(100) 및 콘크리트 기둥(110)이 형성된 후 속채움 단계 및 상치 콘크리트 형성 단계가 더 부가되었다.In addition, in FIG. 19, after the
즉, 콘크리트 블록 집합체(100)를 형성한 후, 속채움재(120)(모래, 자갈 또는 사석 등)를 채우며, 콘크리트 블록 집합체(100)의 상부에 상치 콘크리트(130)를 형성한다.That is, after forming the
이하 본 발명의 제5실시예에 의하여 시공된 수중 콘크리트 블록 구조물을 설명한다.Hereinafter, an underwater concrete block structure constructed according to a fifth embodiment of the present invention will be described.
도 20은 본 발명의 제5실시예에 의한 수중 콘크리트 블록 구조물의 시공 방법에 사용되는 콘크리트 블록의 사시도이며, 도 21은 도 21의 콘크리트 블록의 단면도이며, 도 22는 본 발명의 제5실시예에 의하여 시공된 수중 콘크리트 블록 구조물의 단면도이다.Figure 20 is a perspective view of a concrete block used in the construction method of the underwater concrete block structure according to the fifth embodiment of the present invention, Figure 21 is a cross-sectional view of the concrete block of Figure 21, Figure 22 is a fifth embodiment of the present invention It is a cross-sectional view of an underwater concrete block structure constructed by.
본 실시예의 콘크리트 블록(10)은, 도 20 및 도 21에 도시된 바와 같이, 콘크리트 상판(13)과 콘크리트 하판(14)과 해수 유동 및 블록 결속용 수직관(15)으로 이루어진다.The
콘크리트 상판(13)과 콘크리트 하판(14)은 상하방향으로 서로 이격되어 배치되어 그 사이로 해수가 유동할 수 있다.The concrete
실시예에 따라서 콘크리트 상판(13)과 콘크리트 하판(14) 사이에 다른 구성요소가 부가될 수도 있다.Depending on the embodiment, other components may be added between the concrete
해수 유동 및 블록 결속용 수직관(15)은, 상단부가 콘크리트 상판(13)에 삽입 결합되고 하단부가 콘크리트 하판(14)에 삽입 결합되고 상하방향 중간부가 콘크리트 상판(13)과 콘크리트 하판(14)의 사이에서 외부로 노출된다.In the
아울러 해수 유동 및 블록 결속용 수직관(15)은, 상하방향으로 상하방향 관통구(11)가 형성되는 중공관 형태이다.In addition, the
이와 같은 콘크리트 블록(10)을 이용하여 도 22와 같은 수중 콘크리트 블록 구조물(200)을 형성한다.Using such a
도 22에서 콘크리트 기둥(110)은, 해수 유동 및 블록 결속용 수직관(15)의 상하방향 관통구(11)가 상하로 연속하여 형성된 콘크리트 기둥용 통공부 및 지반 천공부를 따라 형성된다.In FIG. 22, the
도 22에서는 수중 지반(20)의 상부에 기초 사석 지반(22)을 미리 조성한 후, 기초 사석 지반(22)의 상부에 수중 콘크리트 블록 구조물(200)이 시공되었다.In FIG. 22, after the
아울러 기초 사석 지반(22)의 일측에는 근고용 콘크리트 블록(24)이 배치되며, 근고용 콘크리트 블록(24) 또한 상하방향 관통구가 형성되어 있다.In addition, a near-
근고용 콘크리트 블록(24)은 도 9의 변형된 형태로 볼 수 있다.The near-
상기와 같이 콘크리트 블록 집합체 형성 단계 이전에 기초 지반 조성 단계가 실행되었다.As described above, the foundation ground construction step was performed before the concrete block assembly formation step.
이와 같은 본 실시예의 수중 콘크리트 블록 구조물(200)은 내부로 해수가 자유롭게 유동할 수 있는 환경을 조성한다.The underwater
즉 해수 유동 및 블록 결속용 수직관(15)의 외부를 통하여 해수가 자유롭게 유동할 수 있으며, 해수 유동 및 블록 결속용 수직관(15)의 내부를 통하여 콘크리트 기둥이 형성되어 복수의 콘크리트 블록이 서로 결속된다.That is, seawater can flow freely through the outside of the
본 실시예를 통하여 콘크리트 블록의 형태는 매우 다양하게 변형될 수 있다는 것을 알 수 있다.It can be seen from this embodiment that the shape of the concrete block can be modified in a wide variety.
전술한 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형이 가능하다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것일 뿐 한정적이 아닌 것으로 이해되어야만 한다. 예를 들어, 단일형으로 설명되어 있는 각 구성 요소는 분산되어 실시될 수도 있으며, 마찬가지로 분산된 것으로 설명되어 있는 구성 요소들도 결합된 형태로 실시될 수 있다.The above description of the present invention is for illustrative purposes only, and those of ordinary skill in the art to which the present invention pertains will be able to understand that other specific forms can be easily modified without changing the technical spirit or essential features of the present invention. will be. Therefore, it should be understood that the embodiments described above are illustrative in all respects and not limiting. For example, each component described as a single type may be implemented in a distributed manner, and similarly, components described as being distributed may also be implemented in a combined form.
본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.The scope of the present invention is indicated by the claims to be described later rather than the detailed description, and all changes or modified forms derived from the meaning and scope of the claims and their equivalent concepts should be construed as being included in the scope of the present invention. do.
10 : 콘크리트 블록
11 : 상하방향 관통구
20 : 수중 지반
30 : 보호관
100 : 콘크리트 블록 집합체
101 : 콘크리트 기둥용 통공부
102 : 지반 천공부
110 : 콘크리트 기둥
111 : 상하방향 철근부
112 : 방수막
113 : 콘크리트
120 : 속채움재
130 : 상치 콘크리트
200 : 수중 콘크리트 블록 구조물10: concrete block 11: vertical through hole
20: underwater ground
30: protective tube
100: concrete block assembly 101: concrete column through-hole
102: ground perforation
110: concrete column 111: vertical reinforcement
112: waterproof membrane 113: concrete
120: filling material
130: standing concrete
200: underwater concrete block structure
Claims (11)
상기 콘크리트 블록 제작 단계에서 제작된 복수의 콘크리트 블록을 수중 지반의 상부에 설치하여 상기 복수의 콘크리트 블록이 수평방향으로 연속하여 배치된 콘크리트 블록 집합체를 형성하되, 상기 콘크리트 블록의 상하방향 관통구는 하단부가 상기 수중 지반에 의하여 막히며 상단부가 개방되면서 제1직경으로 상하방향으로 연장되는 콘크리트 기둥용 통공부를 형성하는 콘크리트 블록 집합체 형성 단계 ;
상기 콘크리트 블록 집합체 형성 단계 이후, 제1직경보다 작은 직경인 제2직경으로 상하방향으로 연장되는 형태의 보호관을 상기 콘크리트 기둥용 통공부를 통하여 수직 방향으로 상기 수중 지반에 삽입하면서 상기 콘크리트 기둥용 통공부의 하부에 위치한 수중 지반을 천공하여 상기 콘크리트 기둥용 통공부와 연속되는 공간이면서 제1직경보다 작은 직경으로 상하방향으로 연장되는 지반 천공부를 형성하되, 상기 삽입된 보호관은 상기 콘크리트 기둥용 통공부 및 상기 지반 천공부에 걸쳐 위치되며, 상기 삽입된 보호관의 내부에 상기 지반 천공부가 형성되는 지반 천공부 형성 단계 ;
상기 지반 천공부 형성 단계 이후, 상하방향으로 형성된 상하방향 철근부를 상기 상하방향 철근부의 하부 및 측부를 방수막으로 감싼 상태로 상기 보호관에 삽입하고 상기 방수막의 내부에 콘크리트를 타설하여 상기 콘크리트 기둥용 통공부와 상기 지반 천공부를 따라 콘크리트 기둥을 형성하되, 상기 타설된 콘크리트가 경화되기 전에 상기 보호관을 제거하여 상기 방수막은 상기 타설된 콘크리트의 압력으로 상기 수중 지반 및 상기 콘크리트 블록에 밀착되며, 상기 콘크리트 기둥은 상기 콘크리트 기둥용 통공부에 위치하면서 제1직경으로 상하방향으로 연장되는 제1콘크리트 기둥부와 상기 지반 천공부에 위치하면서 제2직경으로 상하방향으로 연장되는 제2콘크리트 기둥부를 포함하여 이루어지는 콘크리트 기둥 형성 단계 ;
를 포함하여 이루어지는 것을 특징으로 하는 수중 콘크리트 블록 구조물 시공방법.
A concrete block manufacturing step of manufacturing a plurality of concrete blocks having vertical through holes extending in the vertical direction with a first diameter;
A plurality of concrete blocks produced in the concrete block manufacturing step are installed on the upper part of the underwater ground to form a concrete block assembly in which the plurality of concrete blocks are continuously arranged in a horizontal direction, wherein the vertical through hole of the concrete block has a lower end. A concrete block assembly forming step of forming a through hole for a concrete column that is blocked by the underwater ground and extends in a vertical direction with a first diameter while the upper end is opened;
After the step of forming the concrete block assembly, a protective tube having a shape extending in a vertical direction with a second diameter smaller than the first diameter is inserted into the underwater ground in a vertical direction through the through hole for the concrete column, while the cylinder for the concrete column The underwater ground located in the lower part of the study is perforated to form a ground perforation that is a continuous space with the through-hole for the concrete column and extends vertically with a diameter smaller than the first diameter, and the inserted protective tube is the barrel for the concrete column. A ground perforation forming step in which the ground perforation portion is formed in the study and located over the ground perforation portion and in the inserted protective tube;
After the step of forming the ground perforation, the vertical reinforcement part formed in the vertical direction is inserted into the protective tube while the lower and side parts of the vertical reinforcement part are wrapped with a waterproofing film, and concrete is poured into the waterproofing film. A concrete column is formed along the study and the ground perforation, but the protective tube is removed before the poured concrete is hardened, so that the waterproofing membrane is in close contact with the underwater ground and the concrete block under the pressure of the poured concrete, and the concrete The pillar comprises a first concrete pillar portion positioned in the through hole for the concrete pillar and extending in the vertical direction with a first diameter and a second concrete pillar portion positioned in the ground perforation portion and extending in the vertical direction with a second diameter. Concrete column formation step;
Construction method of an underwater concrete block structure comprising a.
상기 콘크리트 블록 집합체 형성 단계는, 상기 복수의 콘크리트 블록이 수평방향 및 상하방향으로 연속하여 배치된 콘크리트 블록 집합체를 형성하되, 상기 상하방향으로 연속하여 배치된 복수의 콘크리트 블록의 상하방향 관통구가 상하방향으로 연속되면서 하단부가 상기 수중 지반에 의하여 막히며 상단부가 개방된 콘크리트 기둥용 통공부가 형성되는 것을 특징으로 하는 수중 콘크리트 블록 구조물 시공방법.
The method of claim 1,
In the step of forming the concrete block assembly, a concrete block assembly in which the plurality of concrete blocks are continuously arranged in a horizontal direction and an up-down direction is formed, and the vertical through holes of the plurality of concrete blocks continuously arranged in the vertical direction are vertically arranged. A method of constructing an underwater concrete block structure, characterized in that while continuing in a direction, the lower end is blocked by the underwater ground and a through hole for the concrete column is formed with the upper end open.
상기 콘크리트 블록 집합체의 상부 표면은 수면보다 높게 위치되며, 상기 지반 천공부 형성 단계에서 삽입된 보호관의 상단은 상기 콘크리트 블록 집합체의 상부 표면으로부터 돌출되는 것을 특징으로 하는 수중 콘크리트 블록 구조물 시공방법.
The method according to claim 1 or 2,
The upper surface of the concrete block assembly is positioned higher than the water surface, and the upper end of the protective pipe inserted in the ground perforation forming step protrudes from the upper surface of the concrete block assembly.
상기 콘크리트 기둥 형성 단계에서, 상기 방수막의 내부에 콘크리트를 점차적으로 타설함과 함께 상기 보호관을 점차적으로 상승시켜 상기 보호관을 제거하는 것을 특징으로 하는 수중 콘크리트 블록 구조물 시공방법.
The method according to claim 1 or 2,
In the step of forming the concrete column, concrete is gradually poured into the waterproof membrane and the protective pipe is gradually raised to remove the protective pipe.
상기 수중 지반은 수중 콘크리트 블록 구조물을 위하여 인공적으로 조성된 기초 지반을 포함하며,
상기 콘크리트 블록 집합체 형성 단계 이전에 상기 기초 지반을 조성하는 기초 지반 조성 단계가 포함되며,
상기 기초 지반은, 기초 사석 지반, 치환 사석 지반, 심층혼합처리 지반, 연약지반개량처리된 지반 중 어느 하나 또는 이들을 복합한 것인 것을 특징으로 하는 수중 콘크리트 블록 구조물 시공방법.
The method according to claim 1 or 2,
The underwater ground includes a foundation ground artificially constructed for an underwater concrete block structure,
A foundation ground composition step of forming the foundation ground prior to the concrete block assembly formation step is included,
The foundation ground is an underwater concrete block structure construction method, characterized in that any one or a combination of these foundations, sandstone ground, substituted sandstone ground, deep mixed ground, and soft ground improved ground.
상기 콘크리트 기둥 형성 단계 이후, 상기 콘크리트 블록 집합체의 상부에 상치 콘크리트를 형성하는 상치 콘크리트 형성 단계가 부가되는 것을 특징으로 하는 수중 콘크리트 블록 구조물 시공방법.
The method according to claim 1 or 2,
After the step of forming the concrete column, the step of forming a standing concrete on top of the concrete block assembly is added.
상기 콘크리트 블록은 내부에 속채움용 공간이 형성되며, 상기 콘크리트 블록 집합체 형성 단계 이후 상기 속채움용 공간에 속채움재를 채우는 속채움 단계가 부가되는 것을 특징으로 하는 수중 콘크리트 블록 구조물 시공방법.
The method according to claim 1 or 2,
The concrete block is an underwater concrete block structure construction method, characterized in that the inner filling space is formed therein, and after the step of forming the concrete block assembly, an inner filling step of filling the inner filling material into the inner filling space is added.
An underwater concrete block structure constructed by the underwater concrete block structure construction method according to claim 1 or 2.
상기 콘크리트 기둥은 상기 상하방향 관통구에 위치하면서 제1직경으로 상하방향으로 연장되는 제1콘크리트 기둥부와 상기 지반 천공부에 위치하면서 상기 제1직경보다 작은 직경인 제2직경으로 상하방향으로 연장되는 제2콘크리트 기둥부를 포함하여 이루어지며 ;
상기 콘크리트 기둥은, 상하방향으로 형성되어 상기 상하방향 관통구와 상기 지반 천공부에 걸쳐 배치된 상하방향 철근부와, 상기 상하방향 철근부의 하부 및 측부를 감싸면서 상기 수중 지반 및 상기 콘크리트 블록에 밀착된 방수막과 상기 방수막의 내부에 타설되어 양생된 콘크리트를 포함하여 이루어지며 ;
상기 콘크리트 블록 집합체의 복수의 콘크리트 블록은 상기 콘크리트 기둥에 의하여 상기 수중 지반에 결속되는 것 ;
을 특징으로 하는 수중 콘크리트 블록 구조물.
A plurality of concrete blocks having vertical through-holes extending in the vertical direction with a first diameter are installed on the upper part of the underwater ground, and the plurality of concrete blocks are continuously arranged in at least a horizontal direction, and a concrete block assembly, in which the vertical direction It comprises a through hole and a plurality of concrete pillars located below the vertical through hole and formed along a ground hole formed by drilling the underwater ground with a diameter smaller than the first diameter;
The concrete pillar extends in the vertical direction to a second diameter smaller than the first diameter while being positioned in the vertical through hole and extending in the vertical direction to the first diameter and the ground perforation. It is made including a second concrete column portion;
The concrete pillar is formed in a vertical direction and is in close contact with the underwater ground and the concrete block while surrounding the vertical reinforcement portion disposed across the vertical through hole and the ground perforation, and the lower and side portions of the vertical reinforcement portion. It comprises a waterproof membrane and concrete cured by pouring into the inside of the waterproof membrane;
The plurality of concrete blocks of the concrete block assembly are bound to the underwater ground by the concrete pillars;
Underwater concrete block structure, characterized in that.
상기 콘크리트 블록 집합체는 상기 복수의 콘크리트 블록이 수평방향 및 상하방향으로 연속하여 배치된 것이며,
상기 콘크리트 기둥은 상기 상하방향으로 연속하여 배치된 복수의 콘크리트 블록의 상하방향 관통구가 상하방향으로 연속되면서 형성된 콘크리트 기둥용 통공부와 상기 콘크리트 기둥용 통공부의 하부에 위치한 상기 수중 지반이 천공되어 형성된 지반 천공부를 따라 형성된 것을 특징으로 하는 수중 콘크리트 블록 구조물.
The method of claim 9,
The concrete block assembly is that the plurality of concrete blocks are continuously arranged in a horizontal direction and an up-down direction,
The concrete column is formed by the vertical through-holes of the plurality of concrete blocks continuously arranged in the vertical direction and the through hole for the concrete column formed in the vertical direction and the underwater ground located under the through hole for the concrete column is perforated. Underwater concrete block structure, characterized in that formed along the formed ground perforation.
상기 콘크리트 블록 집합체의 상부 표면은 수면보다 높게 위치되는 것을 특징으로 하는 수중 콘크리트 블록 구조물.The method of claim 9 or 10,
Underwater concrete block structure, characterized in that the upper surface of the concrete block assembly is located higher than the water surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020200028144A KR20210029069A (en) | 2020-03-06 | 2020-03-06 | Underwater concrete block structure and construruction method therefor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020200028144A KR20210029069A (en) | 2020-03-06 | 2020-03-06 | Underwater concrete block structure and construruction method therefor |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020190110350 Division | 2019-09-05 | 2019-09-05 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20210029069A true KR20210029069A (en) | 2021-03-15 |
Family
ID=75134682
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020200028144A KR20210029069A (en) | 2020-03-06 | 2020-03-06 | Underwater concrete block structure and construruction method therefor |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20210029069A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102478778B1 (en) * | 2022-03-29 | 2022-12-16 | 강태욱 | Integrated structure and its manufacturing method by block assemble type caisson construction method using round bar anchor |
US20220412030A1 (en) * | 2020-03-10 | 2022-12-29 | Yujoo Co., Ltd. | Construction method for underwater concrete block structure |
KR102483534B1 (en) * | 2022-03-29 | 2022-12-30 | 강태욱 | Sofa block caisson and its installation method |
KR102483537B1 (en) * | 2022-03-29 | 2022-12-30 | 강태욱 | Seawater penetrating block caisson and its installation method |
KR102493308B1 (en) * | 2022-03-29 | 2023-01-27 | 강태욱 | Block assembly type caisson construction method |
KR102521883B1 (en) * | 2022-05-20 | 2023-04-14 | (주)아진건설 | Construction method of reinforcement earth block |
WO2024014729A1 (en) * | 2022-07-14 | 2024-01-18 | (주)유주 | Underwater concrete structure for preventing subsidence at seabed soft ground, and construction method therefor |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101355805B1 (en) | 2013-03-13 | 2014-01-24 | (주)유주 | Structure of concrete blocks and construction method therof |
KR101650231B1 (en) | 2014-03-24 | 2016-08-22 | 김상훈 | Construction structures with wave power generator of semipermeable breakwater |
KR20190010203A (en) | 2017-07-21 | 2019-01-30 | (주)유주 | Inserting apparatus for concrete pack and contruction method for constructure of concrete blocks with the same and constructure of the concrete blocks |
-
2020
- 2020-03-06 KR KR1020200028144A patent/KR20210029069A/en unknown
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101355805B1 (en) | 2013-03-13 | 2014-01-24 | (주)유주 | Structure of concrete blocks and construction method therof |
KR101650231B1 (en) | 2014-03-24 | 2016-08-22 | 김상훈 | Construction structures with wave power generator of semipermeable breakwater |
KR20190010203A (en) | 2017-07-21 | 2019-01-30 | (주)유주 | Inserting apparatus for concrete pack and contruction method for constructure of concrete blocks with the same and constructure of the concrete blocks |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20220412030A1 (en) * | 2020-03-10 | 2022-12-29 | Yujoo Co., Ltd. | Construction method for underwater concrete block structure |
US11933011B2 (en) * | 2020-03-10 | 2024-03-19 | Yujoo Co., Ltd. | Construction method for underwater concrete block structure |
KR102478778B1 (en) * | 2022-03-29 | 2022-12-16 | 강태욱 | Integrated structure and its manufacturing method by block assemble type caisson construction method using round bar anchor |
KR102483534B1 (en) * | 2022-03-29 | 2022-12-30 | 강태욱 | Sofa block caisson and its installation method |
KR102483537B1 (en) * | 2022-03-29 | 2022-12-30 | 강태욱 | Seawater penetrating block caisson and its installation method |
KR102493308B1 (en) * | 2022-03-29 | 2023-01-27 | 강태욱 | Block assembly type caisson construction method |
KR102521883B1 (en) * | 2022-05-20 | 2023-04-14 | (주)아진건설 | Construction method of reinforcement earth block |
WO2024014729A1 (en) * | 2022-07-14 | 2024-01-18 | (주)유주 | Underwater concrete structure for preventing subsidence at seabed soft ground, and construction method therefor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20210029069A (en) | Underwater concrete block structure and construruction method therefor | |
CA3127315C (en) | Method of constructing underwater concrete block structure | |
US11933011B2 (en) | Construction method for underwater concrete block structure | |
KR100758113B1 (en) | Cast-in-place large diameter piling method by casing rotator in underwater rock conditions | |
JP5445351B2 (en) | Filling reinforcement structure | |
KR100975988B1 (en) | The Method for Constructing Underwater Structure | |
KR20010096389A (en) | Construction Method of Direct Foundation for using Caisson | |
JP2004108142A (en) | Method for construction of a control type revetment | |
KR100360462B1 (en) | Method to construct a structure on soft soil and the structure thereof | |
JP2008019561A (en) | Construction method of countermeasure against liquefaction under breakwater caused by creation of underground wall | |
JP4504864B2 (en) | Dam body reinforcement structure with wave-dissipating function | |
JP6989900B2 (en) | Bamboo drain material and liquefaction countermeasure construction method | |
JP3967494B2 (en) | Sinking method for sinking body and sinking body used for the method | |
KR100477357B1 (en) | Construction method for retaining of earth | |
JP2008081960A (en) | Ocean wave protection structure | |
CN114108555B (en) | Construction method of suction type combined pile dam for emergency rescue of river channel | |
JP2784314B2 (en) | How to set up an open caisson | |
KR102557753B1 (en) | U-shaped caisson and its buoyancy launch method | |
CN210151661U (en) | Pile foundation type breakwater with breakwater | |
JPH01226921A (en) | Earthquake-proof reinforced revetment construction | |
JP3407066B2 (en) | Method of forming drainage wall continuously in the ground and casing for placing plate-like drainage material | |
JP2007154575A (en) | Earthquake resistance structure | |
JP2003074076A (en) | Construction method of building having underground part | |
JP2022108444A (en) | Reinforcement method for existing bank | |
AU2020204118A1 (en) | Barrier wall |