KR20200116874A - Prefabricated precast pier and construction method thereof - Google Patents

Prefabricated precast pier and construction method thereof Download PDF

Info

Publication number
KR20200116874A
KR20200116874A KR1020200122265A KR20200122265A KR20200116874A KR 20200116874 A KR20200116874 A KR 20200116874A KR 1020200122265 A KR1020200122265 A KR 1020200122265A KR 20200122265 A KR20200122265 A KR 20200122265A KR 20200116874 A KR20200116874 A KR 20200116874A
Authority
KR
South Korea
Prior art keywords
coping
cap
insertion hole
bracket
pile
Prior art date
Application number
KR1020200122265A
Other languages
Korean (ko)
Inventor
이준호
이동혁
Original Assignee
(주)네오테크
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)네오테크 filed Critical (주)네오테크
Priority to KR1020200122265A priority Critical patent/KR20200116874A/en
Publication of KR20200116874A publication Critical patent/KR20200116874A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/24Bridges or similar structures, based on land or on a fixed structure and designed to give access to ships or other floating structures
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed
    • E01D2101/285Composite prestressed concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a prefabricated precast pier comprising: a pile (100) installed upwards from the ground surface; a coping bracket (200) including a cap (210) which has a hollow first insertion hole (212) with an open lower side, and a support plate (220) which is formed on a lower end of the cap (210) to protrude towards the outside in a radial direction along an outer circumference of the cap (210); and a coping (300) which has a hollow second insertion hole (310) with an open lower side. An upper end unit of the pile (100) is inserted into the first insertion hole (212), and the cap (210) is inserted into the second insertion hole (310). A lower surface of the coping (300) is settled on the support plate (220). An upper end unit of the pile (100) is inserted into the second insertion hole (310). Accordingly, the coping (300) is supported in a stable manner by a minimum simple configuration such that the manufacturing cost and construction cost of each component can be reduced, and the construction period can be reduced as well.

Description

조립식 프리캐스트 잔교 및 그 시공방법{PREFABRICATED PRECAST PIER AND CONSTRUCTION METHOD THEREOF}Precast pier and construction method thereof {PREFABRICATED PRECAST PIER AND CONSTRUCTION METHOD THEREOF}

본 발명은 조립식 프리캐스트 잔교 및 그 시공방법에 관한 것으로, 더욱 상세하게는, 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있는 조립식 프리캐스트 잔교 및 그 시공방법에 관한 것이다.The present invention relates to a prefabricated precast pier and a construction method thereof, and more particularly, to a prefabricated precast pier capable of reducing manufacturing cost and construction cost and shortening the construction period, and a construction method thereof.

항만 또는 어항시설을 개발/보수하거나 마리나, 해상공원, 해안산책로 등을 만들기 위해 잔교 형식의 교량설치가 증가하고 있다. 잔교 형식의 교량에는 조립식 프리캐스트 교량의 구조 및 시공방법이 사용될 수 있다.The installation of bridges in the form of piers is increasing to develop/repair ports or fishing port facilities, or to create marinas, marine parks, and coastal walkways. The structure and construction method of the precast precast bridge can be used for the pier type bridge.

여기에서, 조립식 프리캐스트 교량은 파일(pile), 코핑(coping), 거더(girder), 슬래브(slab)와 같은 교량을 구성하는 요소를 미리 제작하고 이를 현장에서 일괄 가설하여 완성시키는 것으로, 프리캐스트 부재를 이용하여 단기간 내에 시공이 가능하고 공정을 최소화할 수 있다. 이와 관련된 선행기술은 다음과 같다.Here, the prefabricated precast bridge is the pre-fabrication of elements constituting the bridge such as piles, copings, girders, and slabs, and is completed by collectively installing them on site. By using the member, it can be constructed within a short period of time and the process can be minimized. The related prior art is as follows.

한국등록특허 제10-1939132호는 모듈러식 라멘 구조물 및 이의 시공방법에 관한 것으로, 거더 몸체의 길이 방향을 따라 설치된 복수개의 강선을 구비하고, 상기 거더 몸체의 길이 방향으로 중앙부에 일정 길이 구비된 프리스트레스 도입부; 및 상기 프리스트레스 도입부의 양단에 길이 방향으로 일정 길이 구비된 프리스트레스 부분도입부를 포함하며, 상기 거더 몸체의 일단 또는 양단에 노출되는 루프 철근을 구비하고, 상기 루프 철근은 거더 몸체의 단부에서 길이 방향 외측으로 연장되다 상부 방향으로 굴곡되어 거더 몸체의 상부를 향해 길이 방향 내측으로 다시 연장되어 루프 이음되는 것을 특징으로 한다.Korean Patent Registration No. 10-1939132 relates to a modular ramen structure and a construction method thereof, comprising a plurality of steel wires installed along the longitudinal direction of the girder body, and a prestress having a predetermined length in the central portion in the longitudinal direction of the girder body. Introduction; And a prestressed partial introduction part provided at both ends of the prestressed introduction part in a lengthwise direction, and including a loop reinforcement exposed at one end or both ends of the girder body, wherein the loop reinforcement is longitudinally outward from the end of the girder body It is extended and bent in the upper direction, and is extended inward in the longitudinal direction toward the upper part of the girder body to be loop-joined.

그러나 이러한 시공방법은 제조비용과 공사비용이 증가하고 공사기간이 길어진다는 문제가 있다.However, this construction method has a problem that the manufacturing cost and construction cost increase and the construction period is lengthened.

등록특허공보 제1939132호Registered Patent Publication No. 1939132

본 발명은 상술한 문제점을 해결하기 위해 안출된 것으로, 본 발명의 실시예들은 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있는 조립식 프리캐스트 잔교 및 그 시공방법을 제공하는 데 그 목적이 있다.The present invention was conceived to solve the above-described problems, and embodiments of the present invention provide a prefabricated precast pier capable of reducing manufacturing cost and construction cost and shortening the construction period and a construction method thereof. There is a purpose.

또한, 본 발명의 실시예들은 제조 또는 시공상의 오차에도 불구하고 시공 과정에서 이를 쉽게 바로잡을 수 있는 조립식 프리캐스트 잔교 및 그 시공방법을 제공하는 데 그 목적이 있다.In addition, embodiments of the present invention is to provide a prefabricated precast pier and a construction method thereof that can be easily corrected in the construction process despite errors in manufacturing or construction.

또한, 본 발명의 실시예들은 조립이 이루어지는 파일과 코핑을 강하게 결속시키는 조립식 프리캐스트 잔교 및 그 시공방법을 제공하는 데 그 목적이 있다.In addition, an object of the present invention is to provide an assembly-type precast pier and a construction method thereof that strongly binds a pile and a coping to be assembled.

또한, 본 발명의 실시예들은 파일에 설치되는 코핑에 대한 지지력이 강화되는 조립식 프리캐스트 잔교 및 그 시공방법을 제공하는 데 그 목적이 있다.In addition, embodiments of the present invention is to provide a prefabricated precast pier and a construction method thereof in which the support for coping installed on a pile is strengthened.

또한, 본 발명의 실시예들은 교량의 지지력, 안정성, 내구력이 향상되는 조립식 프리캐스트 잔교 및 그 시공방법을 제공하는 데 그 목적이 있다.In addition, embodiments of the present invention is to provide a prefabricated precast pier and a construction method for improving the support, stability, and durability of the bridge.

또한, 본 발명의 실시예들은 코핑을 파일에 용이하게 설치할 수 있는 조립식 프리캐스트 잔교 및 그 시공방법을 제공하는 데 그 목적이 있다.In addition, an object of the present invention is to provide a prefabricated precast pier capable of easily installing coping on a pile and a method of construction thereof.

상술한 과제를 해결하기 위해 본 발명은, 지면으로부터 상방으로 설치되는 파일(100); 하부가 개방된 중공의 제1삽입홀(212)이 형성되는 캡(210) 및 상기 캡(210)의 하단에 캡(210)의 외주를 따라 반경방향 외측으로 돌출형성되는 지지판(220)을 포함하여 구성되는 코핑브라켓(200); 및 하부가 개방된 중공의 제2삽입홀(310)이 형성되는 코핑(300)을 포함하는, 조립식 프리캐스트 잔교를 제공한다.The present invention in order to solve the above-described problem, the file 100 installed upward from the ground; Includes a cap 210 in which a hollow first insertion hole 212 is formed with an open lower part and a support plate 220 protruding radially outward along the outer circumference of the cap 210 at the lower end of the cap 210 Coping bracket 200 configured by; And a coping 300 in which a hollow second insertion hole 310 is formed with an open lower portion thereof.

상기 제1삽입홀(212)에는 상기 파일(100)의 상단부가 삽입되며 상기 제2삽입홀(310)에는 상기 캡(210)이 삽입되고, 상기 코핑(300)의 하면은 상기 지지판(220)에 안착되고, 상기 파일(100)의 상단부는 상기 제2삽입홀(310)의 내측에 삽입되어 위치한다.The upper end of the pile 100 is inserted into the first insertion hole 212, the cap 210 is inserted into the second insertion hole 310, and the lower surface of the coping 300 is the support plate 220 And the upper end of the pile 100 is inserted and positioned inside the second insertion hole 310.

일 실시예에서, 상기 캡(210)의 상면에는 그레이팅(216)이 형성되거나 상기 캡의 상면 또는 측면에는 관통공(214)이 형성되고, 상기 그레이팅(216) 또는 관통공(214)을 통해 상기 제1삽입홀(212)에 제1충진재가 타설된다.In one embodiment, a grating 216 is formed on the upper surface of the cap 210, or a through hole 214 is formed on the upper surface or side of the cap, and the through hole 214 is formed through the grating 216 or the through hole 214. The first filler is poured into the first insertion hole 212.

일 실시예에서, 상기 코핑브라켓(200)의 하단부에는 패킹부재(260)가 구비된다.In one embodiment, a packing member 260 is provided at the lower end of the coping bracket 200.

일 실시예에서, 상기 파일(100)은 상부가 개방된 중공부(110)를 가지고, 상기 중공부(110)에는 중공부(110)의 상단으로부터 소정의 높이를 두고 아래에 중공부(110)를 가로막는 채움마감판(120)이 설치된다.In one embodiment, the pile 100 has a hollow portion 110 with an open upper portion, and the hollow portion 110 has a predetermined height from the upper end of the hollow portion 110 and a hollow portion 110 below the hollow portion 110 Filling finish plate 120 is installed to block.

일 실시예에서, 상기 채움마감판(120)의 상면에는 상방으로 돌출되는 결합봉(122)이 형성된다.In one embodiment, a coupling rod 122 protruding upward is formed on the upper surface of the filling finish plate 120.

일 실시예에서, 상기 캡(210)은 양쪽 측면을 관통하여 대향설치되는 볼트(270) 쌍을 구비하고, 상기 볼트(270)의 일단부는 상기 제1삽입홀(212)에 삽입된 상기 파일(100)과 접촉한다.In one embodiment, the cap 210 includes a pair of bolts 270 installed opposite to each other through both sides, and one end of the bolt 270 is the pile inserted into the first insertion hole 212 ( 100).

일 실시예에서, 상기 볼트(270)는 상기 캡(210)의 전후 및 좌우 측면에 대향설치된다.In one embodiment, the bolt 270 is installed opposite to the front and rear and left and right sides of the cap 210.

일 실시예에서, 상기 코핑브라켓(200)은, 상기 캡(210)의 하단으로부터 하방으로 연장되는 연장부(230); 및 상기 지지판(220)의 하면에 반경방향으로 설치되는 제1수평면부(242), 상기 연장부(230)의 외주면에 상하방향으로 설치되는 제1수직면부(244) 및 상기 제1수평면부(242)와 제1수직면부(244)를 연결하는 제1연결부(246)를 포함하여 구성되는 제1보강리브(240)를 더 포함한다.In one embodiment, the coping bracket 200 includes an extension 230 extending downward from the lower end of the cap 210; And a first horizontal surface portion 242 installed in a radial direction on a lower surface of the support plate 220, a first vertical surface portion 244 installed in a vertical direction on an outer peripheral surface of the extension portion 230, and the first horizontal surface portion ( It further includes a first reinforcing rib 240 configured to include a first connecting portion 246 connecting the 242 and the first vertical surface portion 244 to each other.

상기 제1보강리브(240)는 상기 연장부(230)의 중심축을 중심으로 하여 둘레방향을 따라 복수 개가 배치된다.A plurality of the first reinforcing ribs 240 are disposed along the circumferential direction around the central axis of the extension part 230.

일 실시예에서, 상기 코핑브라켓(200)은, 상기 지지판(220)의 상면에 반경방향으로 설치되는 제2수평면부(252), 상기 캡(210)의 외주면에 상하방향으로 설치되는 제2수직면부(254) 및 상기 제2수평면부(252)와 제2수직면부(254)를 연결하는 제2연결부(256)를 포함하여 구성되는 제2보강리브(250)를 더 포함한다.In one embodiment, the coping bracket 200 includes a second horizontal surface portion 252 radially installed on the upper surface of the support plate 220, and a second vertical surface vertically installed on the outer peripheral surface of the cap 210 It further includes a second reinforcing rib 250 comprising a portion 254 and a second connection portion 256 connecting the second horizontal surface portion 252 and the second vertical surface portion 254.

상기 제2보강리브(250)는 상기 캡(210)의 중심축을 중심으로 하여 둘레방향을 따라 복수 개가 배치된다.A plurality of the second reinforcing ribs 250 are disposed along the circumferential direction around the central axis of the cap 210.

일 실시예에서, 상기 캡(210)의 중심축으로부터 상기 제2수평면부(252)의 반경방향 외측 단부까지의 거리(d3)가 상기 캡(210)의 중심축으로부터 상기 지지판(220)의 측단면까지의 거리(d1)보다 작다.In one embodiment, the distance d3 from the central axis of the cap 210 to the radially outer end of the second horizontal surface portion 252 is the side of the support plate 220 from the central axis of the cap 210 It is smaller than the distance to the section (d1).

일 실시예에서, 상기 캡(210)의 중심축으로부터 상기 제2수평면부(252)의 반경방향 외측 단부까지의 거리(d3)가 상기 연장부(230)의 중심축으로부터 상기 제1수평면부(242)의 반경방향 외측 단부까지의 거리(d2)보다 작다.In one embodiment, the distance d3 from the central axis of the cap 210 to the radially outer end of the second horizontal surface portion 252 is from the central axis of the extension portion 230 to the first horizontal surface portion ( It is less than the distance d2 to the radially outer end of 242).

일 실시예에서, 상기 제2삽입홀(310)은 상부가 개방된다.In one embodiment, the upper portion of the second insertion hole 310 is open.

일 실시예에서, 상기 개방된 상부를 통해 상기 제2삽입홀(310)에 제2충진재가 타설된다.In one embodiment, a second filler is poured into the second insertion hole 310 through the open upper part.

일 실시예에서, 상기 코핑(300)의 상면의 높이는 상기 제2삽입홀(310)에 삽입된 상기 캡(210)의 상면의 높이에 대응된다.In one embodiment, the height of the upper surface of the coping 300 corresponds to the height of the upper surface of the cap 210 inserted into the second insertion hole 310.

일 실시예에서, 상기 제2삽입홀(310)은 단면적이 일정한 크기로 유지되는 상부영역(312) 및 상기 상부영역(312)보다 단면적이 크고 상부로 갈수록 단면적이 작아지는 하부영역(314)을 포함하여 구성된다.In one embodiment, the second insertion hole 310 includes an upper region 312 having a constant cross-sectional area and a lower region 314 having a larger cross-sectional area than the upper region 312 and decreasing upwardly. It consists of including.

일 실시예에서, 상기 조립식 프리캐스트 잔교는 상기 파일(100), 상기 코핑브라켓(200) 및 상기 코핑(300)을 각각 복수 개 포함하고, 상기 복수 개의 파일(100)은 상기 복수 개의 코핑브라켓(200)의 캡(210)에 각각 삽입되고, 상기 복수 개의 코핑(300)에는 각각 복수 개의 상기 제2삽입홀(310)이 형성된다.In one embodiment, the prefabricated precast pier includes a plurality of the pile 100, the coping bracket 200, and the coping 300, respectively, and the plurality of piles 100 includes the plurality of coping brackets ( Each of the caps 210 of 200) is inserted, and a plurality of second insertion holes 310 are formed in the plurality of copings 300, respectively.

복수 개의 상기 제2삽입홀(310) 중에서 적어도 일부의 제2삽입홀(310)은 상부가 개방되고, 각각의 상기 코핑(300)에 형성된 적어도 한 개의 상기 제2삽입홀(310)은 다른 코핑(300)에 형성된 제2삽입홀(310)과 상하방향으로 연통되게 배치된다.At least some of the second insertion holes 310 of the plurality of second insertion holes 310 have an open top, and at least one of the second insertion holes 310 formed in each of the copings 300 are different copings. It is disposed to be in vertical communication with the second insertion hole 310 formed in 300.

상기 복수 개의 캡(210) 중에서 적어도 일부는 각각 상기 연통되게 배치된 복수 개의 제2삽입홀(310)에 한꺼번에 관통삽입된다.At least some of the plurality of caps 210 are respectively inserted through the plurality of second insertion holes 310 arranged in communication at a time.

일 실시예에서, 상기 코핑(300)은 일단부 및 타단부에 각각 상기 제2삽입홀(310)이 형성되고, 상기 코핑(300)의 일단부 또는 타단부는 상기 다른 코핑(300)의 타단부 또는 일단부와 상하방향으로 적층배치되어 두 개의 코핑(300)에 형성된 상기 제2삽입홀(310)이 서로 연통된다.In one embodiment, the coping 300 has the second insertion hole 310 formed at one end and the other end, respectively, and one end or the other end of the coping 300 is The second insertion holes 310 formed in the two copings 300 by being stacked and disposed with the end or one end in the vertical direction are in communication with each other.

상기 적층배치된 일단부 및 타단부는 상기 코핑(300) 및 상기 다른 코핑(300)에서 내측상방 또는 내측하방으로 단차지게 형성되어 서로 맞물린다.The stacked one end and the other end are formed to be stepped inwardly upward or downwardly in the coping 300 and the other coping 300 so as to mesh with each other.

상기 적층배치된 일단부 및 타단부의 두께를 합산한 값이 상기 코핑(300)의 두께와 대응된다.A value obtained by summing the thicknesses of one end portion and the other end portion arranged in the stack corresponds to the thickness of the coping 300.

또한 상술한 과제를 해결하기 위해 본 발명은, 상기 파일(100)을 지면에 설치하는 파일설치단계(S610); 상기 파일(100)의 상단부를 상기 제1삽입홀(212)에 삽입하는 코핑브라켓설치단계(S620); 상기 제1삽입홀(212)에 제1충진재를 타설하는 코핑브라켓고정단계(S630); 상기 코핑브라켓(200)의 캡(210)을 상기 제2삽입홀(310)에 삽입하는 코핑설치단계(S640); 상기 제2삽입홀(310)에 제2충진재를 타설하는 코핑고정단계(S650); 및 슬래브(400)를 상기 코핑(300)의 상면에 설치하는 슬래브설치단계(S660)를 포함하는, 조립식 프리캐스트 잔교의 시공방법을 제공한다.In addition, the present invention in order to solve the above-described problem, the file installation step (S610) of installing the file 100 on the ground; Coping bracket installation step (S620) of inserting the upper end of the pile 100 into the first insertion hole 212; Coping bracket fixing step (S630) of pouring a first filler into the first insertion hole 212; A coping installation step (S640) of inserting the cap 210 of the coping bracket 200 into the second insertion hole 310; Coping fixing step (S650) of pouring a second filler into the second insertion hole 310; And a slab installation step (S660) of installing the slab 400 on the upper surface of the coping 300.

일 실시예에서, 상기 코핑브라켓고정단계(S650)에서는 상기 볼트(270)를 조작하여 상기 코핑브라켓(200)의 위치 또는 기울기를 조절한 후에 상기 제1충진재를 타설한다.In one embodiment, in the coping bracket fixing step (S650), the first filler is poured after adjusting the position or slope of the coping bracket 200 by manipulating the bolt 270.

본 발명의 실시예들에 따르면, 조립식 프리캐스트 잔교가 지면으로부터 상방으로 설치되는 파일(100); 하부가 개방된 중공의 제1삽입홀(212)이 형성되는 캡(210) 및 상기 캡(210)의 하단에 캡(210)의 외주를 따라 반경방향 외측으로 돌출형성되는 지지판(220)을 포함하여 구성되는 코핑브라켓(200); 및 하부가 개방된 중공의 제2삽입홀(310)이 형성되는 코핑(300)을 포함하고, 상기 제1삽입홀(212)에는 상기 파일(100)의 상단부가 삽입되며 상기 제2삽입홀(310)에는 상기 캡(210)이 삽입되고, 상기 코핑(300)의 하면은 상기 지지판(220)에 안착되고, 상기 파일(100)의 상단부는 상기 제2삽입홀(310)의 내측에 삽입되어 위치할 수 있다. 따라서, 최소한의 단순한 구성으로 코핑(300)이 안정적으로 지지되므로 각 구성의 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있다.According to embodiments of the present invention, the precast pier is installed upward from the ground pile 100; Includes a cap 210 in which a hollow first insertion hole 212 is formed with an open lower part and a support plate 220 protruding radially outward along the outer circumference of the cap 210 at the lower end of the cap 210 Coping bracket 200 configured by; And a coping 300 in which a hollow second insertion hole 310 is formed with an open lower portion thereof, and an upper end of the pile 100 is inserted into the first insertion hole 212 and the second insertion hole ( 310), the cap 210 is inserted, the lower surface of the coping 300 is seated on the support plate 220, and the upper end of the pile 100 is inserted into the second insertion hole 310 Can be located. Therefore, since the coping 300 is stably supported with a minimal and simple configuration, the manufacturing cost and construction cost of each component can be reduced, and the construction period can be shortened.

본 발명의 실시예에 따르면, 캡(210)의 상면에는 그레이팅(216)이 형성되거나 캡의 상면 또는 측면에는 관통공(214)이 형성되고, 그레이팅(216) 또는 관통공(214)을 통해 제1삽입홀(212)에 제1충진재가 타설될 수 있다. 이에 따라, 캡(210)에 파일(100)을 삽입한 후에 캡(210) 및 파일(100) 사이에 빈 공간이 발생하더라도 제1충진재가 빈 공간을 채울 수 있으므로, 코핑브라켓(200)이 파일(100)과 강하게 결속될 수 있다. 나아가, 제1충진재로 빈 공간을 채울 수 있어서 제1삽입홀(212)의 단면적 크기를 파일(100)의 단면적 크기보다 크게 형성할 수 있으므로, 제조 또는 시공상의 오차에도 불구하고 코핑브라켓(200)을 파일(100) 상단에 올바른 기울기로 설치하거나 올바른 위치에 설치할 수 있다.According to an embodiment of the present invention, a grating 216 is formed on the upper surface of the cap 210 or a through hole 214 is formed on the upper surface or side surface of the cap, and through the grating 216 or the through hole 214 The first filler may be poured into the 1 insertion hole 212. Accordingly, even if an empty space occurs between the cap 210 and the pile 100 after inserting the pile 100 into the cap 210, the first filler can fill the empty space, so that the coping bracket 200 Can be strongly bound with (100). Further, since the empty space can be filled with the first filler, the size of the cross-sectional area of the first insertion hole 212 can be formed larger than the size of the cross-sectional area of the pile 100, so that the coping bracket 200 Can be installed on the top of the pile 100 at a correct slope or at a correct position.

본 발명의 실시예에 따르면, 코핑브라켓(200) 하단에는 패킹부재(260)가 구비될 수 있다. 이에 따라, 제1충진재가 아래로 흐르는 것을 방지할 수 있다.According to an embodiment of the present invention, a packing member 260 may be provided below the coping bracket 200. Accordingly, it is possible to prevent the first filler from flowing downward.

본 발명의 실시예에 따르면, 중공부(110)에는 중공부(110)의 상단으로부터 소정의 높이를 두고 아래에 중공부(110)를 가로막는 채움마감판(120)이 설치될 수 있다. 이에 따라, 제1충진재가 아래로 흐르는 것을 방지할 수 있다.According to an embodiment of the present invention, a filling finish plate 120 may be installed in the hollow portion 110 to block the hollow portion 110 under a predetermined height from the top of the hollow portion 110. Accordingly, it is possible to prevent the first filler from flowing downward.

본 발명의 실시예에 따르면, 채움마감판(120)의 상면에는 상방으로 돌출되는 결합봉(122)이 형성될 수 있다. 이에 따라, 중공부(110)에 충진된 제1충진재가 결합봉(122)과 결합될 수 있으므로 결합봉(122)은 제1충진재와 파일(100)을 강하게 결속시킬 수 있다. 나아가, 제1충진재는 코핑브라켓(100)과도 결속되므로, 결합봉(122)은 파일(100)과 코핑브라켓(200)을 강하게 결속시킬 수 있다.According to an embodiment of the present invention, a coupling rod 122 protruding upward may be formed on the upper surface of the filling finish plate 120. Accordingly, since the first filler filled in the hollow part 110 can be combined with the coupling rod 122, the coupling rod 122 can strongly bind the first filler and the file 100. Furthermore, since the first filler is also bound to the coping bracket 100, the coupling rod 122 can strongly bind the pile 100 and the coping bracket 200.

본 발명의 실시예에 따르면, 캡(210)은 양쪽 측면을 관통하여 대향설치되는 볼트(270) 쌍을 구비할 수 있고 볼트(270)의 일단부는 제1삽입홀(212)에 삽입된 상기 파일(100)과 접촉할 수 있다. 이에 따라, 제조 또는 시공상의 오차에도 불구하고 코핑브라켓(200)을 올바른 기울기로 설치하거나 올바른 위치에 설치할 수 있다.According to an embodiment of the present invention, the cap 210 may have a pair of bolts 270 installed opposite to each other through both sides, and one end of the bolt 270 is inserted into the first insertion hole 212. Can contact 100. Accordingly, in spite of manufacturing or construction errors, the coping bracket 200 may be installed at a correct inclination or may be installed at a correct position.

본 발명의 실시예에 따르면, 볼트(270)는 캡(210)의 전후 및 좌우 측면에 대향설치될 수 있다. 이에 따라, 코핑브라켓(200)의 위치 또는 기울기를 빠르고 정확하게 조절할 수 있다.According to an embodiment of the present invention, the bolt 270 may be installed opposite to the front and rear and left and right sides of the cap 210. Accordingly, the position or slope of the coping bracket 200 can be quickly and accurately adjusted.

본 발명의 실시예에 따르면, 코핑브라켓(200)은, 캡(210)의 하단으로부터 하방으로 연장되는 연장부(230); 및 지지판(220)의 하면에 반경방향으로 설치되는 제1수평면부(242), 연장부(230)의 외주면에 상하방향으로 설치되는 제1수직면부(244) 및 제1수평면부(242)와 제1수직면부(244)를 연결하는 제1연결부(246)를 포함하여 구성되는 제1보강리브(240)를 더 포함할 수 있고, 제1보강리브(240)는 연장부(230)의 중심축을 중심으로 하여 둘레방향을 따라 복수 개가 배치될 수 있다. 이에 따라, 코핑(300)을 지지하는 지지판(220)의 지지력이 강화될 수 있다.According to an embodiment of the present invention, the coping bracket 200 includes an extension 230 extending downward from the lower end of the cap 210; And a first horizontal surface portion 242 installed radially on the lower surface of the support plate 220, a first vertical surface portion 244 and a first horizontal surface portion 242 installed vertically on the outer peripheral surface of the extension portion 230, and A first reinforcing rib 240 configured including a first connecting portion 246 connecting the first vertical surface portion 244 may be further included, and the first reinforcing rib 240 is a center of the extension portion 230 A plurality of pieces may be disposed along the circumferential direction around the axis. Accordingly, the support force of the support plate 220 supporting the coping 300 may be strengthened.

본 발명의 실시예에 따르면, 캡(210)의 중심축으로부터 제2수평면부(252)의 반경방향 외측 단부까지의 거리(d3)가 캡(210)의 중심축으로부터 지지판(220)의 측단면까지의 거리(d1)보다 작을 수 있다. 이에 따라, 지지판(220)에 제2보강리브(250)가 구비되더라도 코핑(300)의 하면이 지지판(220)에 안정적으로 안착될 수 있다.According to an embodiment of the present invention, the distance d3 from the central axis of the cap 210 to the radially outer end of the second horizontal surface portion 252 is the side cross-section of the support plate 220 from the central axis of the cap 210 It may be less than the distance to (d1). Accordingly, even if the second reinforcing rib 250 is provided on the support plate 220, the lower surface of the coping 300 may be stably seated on the support plate 220.

본 발명의 실시예에 따르면, 캡(210)의 중심축으로부터 제2수평면부(252)의 반경방향 외측 단부까지의 거리(d3)가 연장부(230)의 중심축으로부터 제1수평면부(242)의 반경방향 외측 단부까지의 거리(d2)보다 작을 수 있다. 이에 따라, 코핑(300)의 하면이 안착된 지지판(220) 부분이 제1보강리브(240)에 의해 지지될 수 있으므로, 코핑(300)을 지지하는 지지판(220)의 지지력이 강화될 수 있다.According to an embodiment of the present invention, the distance d3 from the central axis of the cap 210 to the radially outer end of the second horizontal surface portion 252 is from the central axis of the extension portion 230 to the first horizontal surface portion 242 ) May be smaller than the distance d2 to the outer end in the radial direction. Accordingly, since the portion of the support plate 220 on which the lower surface of the coping 300 is seated may be supported by the first reinforcing rib 240, the support force of the support plate 220 supporting the coping 300 may be strengthened. .

본 발명의 실시예에 따르면, 제2삽입홀(310)의 상부가 개방될 수 있고 개방된 상부를 통해 제2삽입홀(310)에 제2충진재가 타설될 수 있다. 이에 따라, 코핑(300)에 캡(210)을 삽입한 후에 코핑(300) 및 캡(210) 사이에 빈 공간이 발생하더라도 제2충진재가 빈 공간을 채울 수 있으므로, 코핑(300)이 코핑브라켓(200)과 강하게 결속될 수 있다. 나아가, 제2충진재로 빈 공간을 채울 수 있어서 제2삽입홀(310)의 단면적 크기를 캡(210)의 단면적 크기보다 크게 형성할 수 있으므로, 제조 또는 시공상의 오차에도 불구하고 코핑(300)을 올바른 기울기로 설치하거나 올바른 위치에 설치할 수 있다.According to an embodiment of the present invention, the upper portion of the second insertion hole 310 may be opened, and a second filler may be poured into the second insertion hole 310 through the open upper portion. Accordingly, even if an empty space occurs between the coping 300 and the cap 210 after inserting the cap 210 into the coping 300, the second filler can fill the empty space, so that the coping 300 It can be strongly bound with (200). Furthermore, since the empty space can be filled with the second filler, the size of the cross-sectional area of the second insertion hole 310 can be formed larger than the size of the cross-sectional area of the cap 210, so that the coping 300 is It can be installed at the correct tilt or in the correct position

본 발명의 실시예에 따르면, 제2삽입홀(310)은 상부가 개방될 수 있고 코핑(300)의 상면의 높이가 제2삽입홀(310)에 삽입된 캡(210)의 상면의 높이에 대응될 수 있다. 이에 따라, 제2삽입홀(310)에 캡(210)이 올바르게 삽입되었는지 여부를 용이하게 확인할 수 있고, 코핑(300)의 상면 및 캡(210)의 상면이 슬래브(400)를 함께 지지할 수 있으므로 잔교의 지지력 및 안정성이 향상될 수 있다.According to an embodiment of the present invention, the upper side of the second insertion hole 310 may be opened, and the height of the upper surface of the coping 300 is equal to the height of the upper surface of the cap 210 inserted into the second insertion hole 310. Can correspond. Accordingly, it can be easily checked whether the cap 210 is correctly inserted into the second insertion hole 310, and the upper surface of the coping 300 and the upper surface of the cap 210 can support the slab 400 together. Therefore, the support and stability of the pier can be improved.

본 발명의 실시예에 따르면, 제2삽입홀(310)은 단면적이 일정한 크기로 유지되는 상부영역(312) 및 상부영역(312)보다 단면적이 크고 상부로 갈수록 단면적이 작아지는 하부영역(314)을 포함하여 구성될 수 있다. 이에 따라, 캡(210)이 단면적이 큰 하부영역(314)에 의해 가이드되어 제2삽입홀(310)의 하부에서 상부로 삽입되므로 코핑(300)을 코핑브라켓(200)에 용이하게 설치할 수 있다.According to an exemplary embodiment of the present invention, the second insertion hole 310 has a larger cross-sectional area than the upper area 312 and the upper area 312 in which the cross-sectional area is maintained at a constant size, and the lower area 314 has a smaller cross-sectional area toward the top It can be configured to include. Accordingly, since the cap 210 is guided by the lower region 314 with a large cross-sectional area and is inserted from the lower portion of the second insertion hole 310 to the upper portion, the coping 300 can be easily installed on the coping bracket 200. .

본 발명의 실시예에 따르면, 코핑(300)에는 각각 복수 개의 제2삽입홀(310)이 형성될 수 있고 복수 개의 제2삽입홀(310) 중에서 적어도 일부의 제2삽입홀(310)은 상부가 개방될 수 있으며 각각의 코핑(300)에 형성된 적어도 한 개의 제2삽입홀(310)은 다른 코핑(300)에 형성된 제2삽입홀(310)과 상하방향으로 연통되게 배치될 수 있고 복수 개의 캡(210) 중에서 적어도 일부는 각각 연통되게 배치된 복수 개의 제2삽입홀(310)에 한꺼번에 관통삽입될 수 있다. 이에 따라, 별도의 결합부재 없이 최소한의 단순한 구성으로 코핑(300)이 캡(210)에 조립결합되면서 용이하게 연장될 수 있고, 코핑(300)이 서로 결속되어 슬래브(400)를 지지하므로 잔교의 안정성, 내구력이 향상될 수 있다.According to an embodiment of the present invention, a plurality of second insertion holes 310 may be formed in the coping 300, respectively, and at least a portion of the second insertion holes 310 among the plurality of second insertion holes 310 are upper May be opened, and at least one second insertion hole 310 formed in each coping 300 may be disposed to be in vertical communication with the second insertion hole 310 formed in the other coping 300, and a plurality of At least some of the caps 210 may be inserted through the plurality of second insertion holes 310 respectively disposed to communicate with each other at one time. Accordingly, the coping 300 can be easily extended while being assembled and coupled to the cap 210 in a minimal and simple configuration without a separate coupling member, and since the coping 300 is bound to each other to support the slab 400, Stability and durability can be improved.

본 발명의 실시예에 따르면, 적층배치된 코핑(300)의 일단부 및 다른 코핑(300)의 타단부는 코핑(300) 및 다른 코핑(300)에서 내측상방 또는 내측하방으로 단차지게 형성되어 서로 맞물릴 수 있고, 적층배치된 일단부 및 타단부의 두께를 합산한 값이 상기 코핑(300)의 두께와 대응될 수 있다. 이에 따라, 코핑(300)이 다른 코핑(300)과 단부에서 적층되더라도 코핑(300) 표면이 매끄럽게 연결될 수 있으므로 코핑(300)이 손상되는 것을 방지할 수 있다.According to an embodiment of the present invention, one end of the coping 300 and the other end of the other coping 300 are formed to be stepped from the coping 300 and other copings 300 inwardly A value obtained by summing the thicknesses of one end portion and the other end portion that may be interlocked and disposed in a stack may correspond to the thickness of the coping 300. Accordingly, even if the coping 300 is stacked at the end of the coping 300 and the other coping 300, the surface of the coping 300 may be smoothly connected, so that damage to the coping 300 may be prevented.

본 발명의 실시예에 따르면, 조립식 프리캐스트 잔교의 시공방법이 파일(100)을 지면에 설치하는 파일설치단계(S610); 파일(100)의 상단부를 제1삽입홀(212)에 삽입하는 코핑브라켓설치단계(S620); 제1삽입홀(212)에 제1충진재를 타설하는 코핑브라켓고정단계(S630); 코핑브라켓(200)의 캡(210)을 제2삽입홀(310)에 삽입하는 코핑설치단계(S640); 제2삽입홀(310)에 제2충진재를 타설하는 코핑고정단계(S650); 및 슬래브(400)를 코핑(300)의 상면에 설치하는 슬래브설치단계(S660)를 포함할 수 있다. 따라서, 별도의 연결부재 또는 결합부재를 설치하는 등의 공정을 포함하지 않고 최소한의 단순한 공정으로 잔교를 만들 수 있으므로, 잔교의 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있다.According to an embodiment of the present invention, the method of constructing a precast pier is a pile installation step of installing the pile 100 on the ground (S610); Coping bracket installation step of inserting the upper end of the pile 100 into the first insertion hole 212 (S620); Coping bracket fixing step of pouring the first filler into the first insertion hole 212 (S630); A coping installation step of inserting the cap 210 of the coping bracket 200 into the second insertion hole 310 (S640); Coping fixing step (S650) of pouring a second filler into the second insertion hole 310; And it may include a slab installation step (S660) of installing the slab 400 on the upper surface of the coping (300). Therefore, since the pier can be made with a minimal simple process without including a process such as installing a separate connecting member or a connecting member, the manufacturing cost and construction cost of the pier can be reduced, and the construction period can be shortened.

본 발명의 실시예에 따르면, 코핑브라켓고정단계(S650)에서는 캡(210)의 양쪽 측면을 관통하여 대향설치되는 볼트(270)를 조작하여 코핑브라켓(200)의 위치 또는 기울기를 조절한 후에 제1충진재를 타설할 수 있다. 이에 따라, 제조 또는 시공상의 오차에도 불구하고 코핑브라켓(200)을 신속하고 용이하게 올바른 기울기로 고정하거나 올바른 위치에 고정할 수 있다.According to an embodiment of the present invention, in the coping bracket fixing step (S650), the position or inclination of the coping bracket 200 is adjusted by manipulating the bolts 270 installed opposite to each other through both sides of the cap 210. 1 Filling material can be poured. Accordingly, in spite of manufacturing or construction errors, the coping bracket 200 can be quickly and easily fixed to the correct inclination or fixed to the correct position.

상술한 효과와 더불어 본 발명의 구체적인 효과는 이하 발명을 실시하기 위한 구체적인 사항을 설명하면서 함께 기술한다.In addition to the above-described effects, specific effects of the present invention will be described together while describing specific details for carrying out the present invention.

도 1, 도 2 및 도 3은 본 발명의 일 실시예에 따른 조립식 프리캐스트 교량을 나타낸 사시도, 정면도 및 우측면도이고, 도 4 및 도 5는 도 1 내지 도 3의 조립식 프리캐스트 교량의 일부 구성을 나타낸 사시도 및 단면도이며, 도 6은 도 1 내지 도 3의 조립식 프리캐스트 교량의 우측단 부분의 일부 구성을 확대한 확대도이다.
도 1은 본 발명의 일 실시예에 따른 조립식 프리캐스트 교량을 나타낸 사시도이다.
도 2는 본 발명의 일 실시예에 따른 파일을 나타낸 사시도이고 도 3은 도 2의 파일 내부에 설치 가능한 채움마감판을 나타낸 사시도이며 도 4는 도 2의 파일 내부에 도 3의 채움마감판이 설치된 상태를 나타낸 단면도이다.
도 5 및 도 6은 본 발명의 일 실시예에 따른 코핑브라켓의 사시도이고 도 7 내지 도 9는 각각 도 5 및 도 6의 코핑브라켓의 평면도, 저면도 및 정면도이며, 도 10은 도 5 내지 도 9의 코핑브라켓이 도 4의 파일에 설치된 상태를 나타낸 단면도이다.
도 11 및 도 12는 그레이팅이 형성된 코핑브라켓의 일 실시예를 나타낸 사시도 및 평면도이다.
도 13 내지 도 15는 제2보강리브를 포함하여 구성되는 코핑브라켓의 일 실시예를 나타낸 사시도, 평면도 및 정면도이다.
도 16 내지 도 18은 볼트를 구비하는 코핑브라켓의 일 실시예를 나타낸 사시도, 평면도 및 정면도이다.
도 19 내지 도 22는 본 발명의 일 실시예에 따른 코핑을 나타낸 사시도, 평면도, 저면도 및 정면투시도이고, 도 23 및 도 24는 파일, 코핑브라켓 및 코핑이 결합된 상태를 나타낸 사시도 및 정면투시도이다.
도 25 내지 도 27은 본 발명의 일 실시예에 따른 슬래브를 나타낸 사시도, 평면도 및 정면도이고, 도 28 및 도 29는 슬래브가 이웃하는 슬래브와 조립결합되는 과정을 나타낸 상태도이다.
도 30은 본 발명의 다른 일 실시예에 따른 조립식 프리캐스트 교량을 나타낸 사시도이고 도 31 내지 도 42는 도 30의 조립식 프리캐스트 교량에 설치되는 세가지 형태의 코핑을 나타낸 사시도, 평면도, 저면도 및 정면투시도이다.
도 43은 본 발명의 다른 일 실시예에 따른 조립식 프리캐스트 교량을 나타낸 사시도이고 도 44는 도 43의 코핑을 나타낸 사시도이며 도 45 및 도 46은 도 43의 코핑이 코핑브라켓에 안착되기 전후의 상태를 나타낸 사시도이다.
도 47은 본 발명의 일 실시예에 따른 조립식 프리캐스트 교량의 시공방법을 나타낸 순서도이다.
1, 2 and 3 are a perspective view, a front view and a right side view showing a prefabricated precast bridge according to an embodiment of the present invention, and Figs. 4 and 5 are part of the prefabricated precast bridge of Figs. 1 to 3 It is a perspective view and a cross-sectional view showing the configuration, and FIG. 6 is an enlarged view of an enlarged partial configuration of a right end portion of the prefabricated precast bridge of FIGS. 1 to 3.
1 is a perspective view showing an assembled precast bridge according to an embodiment of the present invention.
FIG. 2 is a perspective view showing a pile according to an embodiment of the present invention, and FIG. 3 is a perspective view showing a filling finish plate that can be installed inside the pile of FIG. 2, and FIG. 4 is a filling finish plate of FIG. 3 installed inside the pile of FIG. It is a cross-sectional view showing the state.
5 and 6 are perspective views of a coping bracket according to an embodiment of the present invention, and FIGS. 7 to 9 are plan, bottom and front views of the coping bracket of FIGS. 5 and 6, respectively, and FIG. 10 is a view of FIGS. A cross-sectional view showing a state in which the coping bracket of 9 is installed on the pile of FIG. 4.
11 and 12 are perspective views and plan views illustrating an embodiment of a coping bracket having a grating formed thereon.
13 to 15 are perspective views, plan views, and front views illustrating an embodiment of a coping bracket including a second reinforcing rib.
16 to 18 are perspective views, plan views, and front views illustrating an embodiment of a coping bracket having a bolt.
19 to 22 are a perspective view, a plan view, a bottom view and a front perspective view showing a coping according to an embodiment of the present invention, and FIGS. 23 and 24 are a perspective view and a front perspective view showing a state in which a pile, a coping bracket, and a coping are combined to be.
25 to 27 are perspective views, plan views, and front views showing a slab according to an embodiment of the present invention, and FIGS. 28 and 29 are state diagrams showing a process in which the slab is assembled and coupled with an adjacent slab.
FIG. 30 is a perspective view showing a prefabricated precast bridge according to another embodiment of the present invention, and FIGS. 31 to 42 are a perspective view, a plan view, a bottom view, and a front view showing three types of coping installed in the precast bridge of FIG. 30 It is a perspective view.
43 is a perspective view showing an assembly-type precast bridge according to another embodiment of the present invention, and FIG. 44 is a perspective view showing the coping of FIG. 43, and FIGS. 45 and 46 are states before and after the coping of FIG. 43 is seated on the coping bracket Is a perspective view showing.
47 is a flow chart showing the construction method of the precast bridge assembly according to an embodiment of the present invention.

본 발명은 이하에서 개시되는 실시 예에 한정되는 것이 아니라 다양한 변경을 가할 수 있고 서로 다른 다양한 형태로 구현될 수 있다. 단지 본 실시 예는 본 발명의 개시가 완전하도록 하며 통상의 지식을 가진 자에게 발명의 범주를 완전하게 알려주기 위하여 제공되는 것이다. 따라서 본 발명은 이하에서 개시되는 실시예에 한정되는 것이 아니라, 어느 하나의 실시예의 구성과 다른 실시예의 구성을 서로 치환하거나 부가하는 것은 물론 본 발명의 기술적 사상과 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다.The present invention is not limited to the embodiments disclosed below, and various modifications may be made and may be implemented in various different forms. However, this embodiment is provided to complete the disclosure of the present invention and to fully inform a person of ordinary skill in the scope of the invention. Therefore, the present invention is not limited to the embodiments disclosed below, and all changes and equivalents included in the technical spirit and scope of the present invention as well as substituting or adding to each other the configuration of any one embodiment and the configuration of another embodiment. To include substitutes.

첨부된 도면은 본 명세서에 개시된 실시 예를 쉽게 이해할 수 있도록 하기 위한 것일 뿐, 첨부된 도면에 의해 본 명세서에 개시된 기술적 사상이 제한되지 않으며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다. 도면에서 구성요소들은 이해의 편의 등을 고려하여 크기나 두께가 과장되게 크거나 작게 표현될 수 있으나, 이로 인해 본 발명의 보호범위가 제한적으로 해석되어서는 아니 될 것이다.The accompanying drawings are only for making it easier to understand the embodiments disclosed in the present specification, and the technical idea disclosed in the present specification is not limited by the accompanying drawings, and all changes and equivalents included in the spirit and scope of the present invention It should be understood to include water or substitutes. In the drawings, components may be exaggeratedly large or small in size or thickness in consideration of convenience of understanding, and thus, the scope of protection of the present invention should not be limitedly interpreted.

본 명세서에서 사용한 용어는 단지 특정한 구현예나 실시예를 설명하기 위해 사용되는 것으로, 본 발명을 한정하려는 의도가 아니다. 그리고 단수의 표현은, 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 명세서에서 ~포함하다, ~이루어진다 등의 용어는 명세서 상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부품 또는 이들을 조합한 것이 존재함을 지정하려는 것이다. 즉 명세서에서 ~포함하다, ~이루어진다 등의 용어는. 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부품 또는 이들이 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.The terms used in the present specification are only used to describe specific embodiments or examples, and are not intended to limit the present invention. And singular expressions include plural expressions, unless the context clearly indicates otherwise. In the specification, terms such as to include, to consist of, etc. are intended to designate the presence of features, numbers, steps, actions, components, parts, or combinations thereof described in the specification. In other words, in the specification, terms such as to include, to consist of. It is to be understood that it does not preclude the possibility of the presence or addition of one or more other features or numbers, steps, actions, components, parts, or combinations thereof.

제1, 제2 등과 같이 서수를 포함하는 용어는 다양한 구성요소들을 설명하는데 사용될 수 있지만, 상기 구성요소들은 상기 용어들에 의해 한정되지는 않는다. 상기 용어들은 하나의 구성요소를 다른 구성요소로부터 구별하는 목적으로만 사용된다.Terms including ordinal numbers, such as first and second, may be used to describe various elements, but the elements are not limited by the terms. These terms are used only for the purpose of distinguishing one component from another component.

어떤 구성요소가 다른 구성요소에 "연결되어" 있다거나 "접속되어" 있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결되어 있거나 또는 접속되어 있을 수도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에, 어떤 구성요소가 다른 구성요소에 "직접 연결되어" 있다거나 "직접 접속되어" 있다고 언급된 때에는, 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다.When a component is referred to as being "connected" or "connected" to another component, it is understood that it may be directly connected or connected to the other component, but other components may exist in the middle. Should be. On the other hand, when a component is referred to as being "directly connected" or "directly connected" to another component, it should be understood that there is no other component in the middle.

어떤 구성요소가 다른 구성요소의 "상부에 있다"거나 "하부에 있다"고 언급된 때에는, 그 다른 구성요소의 바로 위에 배치되어 있는 것뿐만 아니라 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다.When a component is referred to as being "above" or "below" another component, it should be understood that other components may exist in the middle as well as those disposed directly above the other component. .

다르게 정의되지 않는 한, 기술적이거나 과학적인 용어를 포함해서 여기서 사용되는 모든 용어들은 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가지고 있다. 일반적으로 사용되는 사전에 정의되어 있는 것과 같은 용어들은 관련 기술의 문맥 상 가지는 의미와 일치하는 의미를 가지는 것으로 해석되어야 하며, 본 출원에서 명백하게 정의하지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다.Unless otherwise defined, all terms used herein, including technical or scientific terms, have the same meaning as commonly understood by one of ordinary skill in the art to which the present invention belongs. Terms as defined in a commonly used dictionary should be interpreted as having a meaning consistent with the meaning in the context of the related technology, and should not be interpreted as an ideal or excessively formal meaning unless explicitly defined in this application. Does not.

설명의 편의 상, 교량이 길게 연장되는 방향을 길이방향, 교량을 가로지르는 방향을 폭방향이라 한다. 또한, 슬래브가 다른 슬래브와 조립결합되면서 연장되는 방향을 제1방향, 슬래브를 가로지르는 방향을 제2방향이라 한다.For convenience of explanation, the direction in which the bridge extends long is called the length direction, and the direction across the bridge is called the width direction. In addition, a direction in which a slab extends while being assembled and coupled with another slab is referred to as a first direction, and a direction crossing the slab is referred to as a second direction.

또한, 반경방향이라 함은 물체의 회전축 또는 중심축과 수직한 평면 상에서 상기 회전축 또는 중심축을 지나는 직선을 따라 상기 회전축 또는 중심축에 가까워지는 방향 또는 상기 회전축 또는 중심축으로부터 멀어지는 방향을 의미한다.In addition, the radial direction means a direction closer to or away from the rotation axis or central axis along a straight line passing through the rotation axis or central axis on a plane perpendicular to the rotation axis or central axis of an object.

둘레방향 또는 원주방향이라 함은 상기 회전축 또는 중심축의 주위를 둘러싸는 방향을 의미한다. 외주라 함은 외측 둘레, 내주라 함은 내측 둘레를 의미한다. 따라서 외주면은 상기 회전축 또는 중심축을 등지는 방향의 면이고, 내주면은 상기 회전축 또는 중심축을 바라보는 방향의 면을 의미한다.The circumferential direction or the circumferential direction means a direction surrounding the rotation axis or the central axis. The outer circumference means the outer circumference, and the inner circumference means the inner circumference. Accordingly, the outer circumferential surface is a surface facing the rotational axis or the central axis, and the inner circumferential surface is a surface facing the rotational axis or the central axis.

이하의 실시예들에서 개시되는 조립식 프리캐스트 잔교 및 그 시공방법에 대해 각 도면을 참조하여 보다 구체적으로 살펴보기로 한다. 본 발명의 기술적 사상이 반드시 잔교에 한정되어야 하는 것은 아니므로, 이하 설명의 편의상 잔교를 포함하는 상위의 개념인 '교량'이라는 용어를 사용하여 설명한다.The prefabricated precast pier and its construction method disclosed in the following embodiments will be described in more detail with reference to each drawing. Since the technical idea of the present invention is not necessarily limited to the pier, it will be described using the term “bridge”, which is an upper concept including the pier, for convenience of description.

도 1은 본 발명의 일 실시예에 따른 조립식 프리캐스트 교량을 나타낸 사시도이다.1 is a perspective view showing an assembled precast bridge according to an embodiment of the present invention.

도 1을 참조하면, 일 실시예에 따른 조립식 프리캐스트 교량(10)은 파일(100), 코핑브라켓(200), 코핑(300) 및 슬래브(400)를 포함하여 구성될 수 있다. 각 구성에 대해 구체적으로 살펴본다.Referring to FIG. 1, the prefabricated precast bridge 10 according to an embodiment may include a pile 100, a coping bracket 200, a coping 300 and a slab 400. We look at each configuration in detail.

[파일][file]

도 2는 본 발명의 일 실시예에 따른 파일을 나타낸 사시도이고 도 3은 도 2의 파일 내부에 설치 가능한 채움마감판을 나타낸 사시도이며 도 4는 도 2의 파일 내부에 도 3의 채움마감판이 설치된 상태를 나타낸 단면도이다.FIG. 2 is a perspective view showing a pile according to an embodiment of the present invention, and FIG. 3 is a perspective view showing a filling finish plate that can be installed inside the pile of FIG. 2, and FIG. 4 is a filling finish plate of FIG. It is a cross-sectional view showing the state.

도 2를 참조하면, 파일(100)은 상부가 개방된 중공부(110)를 가질 수 있고 원기둥 형상에 해당할 수 있다. 파일(100)은 강재 또는 콘크리트로 구성될 수 있다. 또한, 파일(100)의 상단부는 코핑브라켓(200)에 삽입될 수 있다.Referring to FIG. 2, the pile 100 may have a hollow portion 110 with an open top and may correspond to a cylindrical shape. The pile 100 may be made of steel or concrete. In addition, the upper end of the pile 100 may be inserted into the coping bracket 200.

도 3을 참조하면, 파일(100) 내부에 설치 가능한 채움마감판(120)의 상면에는 상방으로 돌출되는 결합봉(122)이 형성될 수 있다. 이에 따라, 중공부(110)에 충진된 제1충진재가 결합봉(122)과 결합될 수 있으므로 결합봉(122)은 제1충진재와 파일(100)을 강하게 결속시킬 수 있다. 나아가, 제1충진재는 코핑브라켓(100)과도 결속되므로, 결합봉(122)은 파일(100)과 코핑브라켓(200)을 강하게 결속시킬 수 있다. 실시예에 있어서 상기 결합봉(122)은 이형 철근일 수 있다.Referring to FIG. 3, a coupling rod 122 protruding upward may be formed on an upper surface of the filling finish plate 120 that can be installed inside the pile 100. Accordingly, since the first filler filled in the hollow part 110 can be combined with the coupling rod 122, the coupling rod 122 can strongly bind the first filler and the file 100. Furthermore, since the first filler is also bound to the coping bracket 100, the coupling rod 122 can strongly bind the pile 100 and the coping bracket 200. In an embodiment, the coupling rod 122 may be a deformed reinforcement.

도 4를 참조하면, 중공부(110)에는 중공부(110)의 상단으로부터 소정의 높이를 두고 아래에 중공부(110)를 가로막는 채움마감판(120)이 설치될 수 있다. 이에 따라, 제1충진재가 아래로 흐르는 것을 방지할 수 있다.Referring to FIG. 4, a filling finish plate 120 may be installed in the hollow portion 110 to block the hollow portion 110 under a predetermined height from the top of the hollow portion 110. Accordingly, it is possible to prevent the first filler from flowing downward.

[코핑브라켓][Coping Bracket]

도 5 및 도 6은 본 발명의 일 실시예에 따른 코핑브라켓의 사시도이고 도 7 내지 도 9는 각각 도 5 및 도 6의 코핑브라켓의 평면도, 저면도 및 정면도이며, 도 10은 도 5 내지 도 9의 코핑브라켓이 도 4의 파일에 설치된 상태를 나타낸 단면도이다.5 and 6 are perspective views of a coping bracket according to an embodiment of the present invention, and FIGS. 7 to 9 are plan, bottom and front views of the coping bracket of FIGS. 5 and 6, respectively, and FIG. 10 is a view of FIGS. A cross-sectional view showing a state in which the coping bracket of 9 is installed on the pile of FIG. 4.

도 5 내지 도 9를 참조하면, 일 실시예에 따른 코핑브라켓(200)은 캡(210), 지지판(220), 연장부(230) 및 제1보강리브(240)를 포함하여 구성될 수 있다. 코핑브라켓(200)은 강재로 구성될 수 있다.5 to 9, the coping bracket 200 according to an embodiment may include a cap 210, a support plate 220, an extension part 230, and a first reinforcing rib 240. . The coping bracket 200 may be made of steel.

캡(210)에는 하부가 개방된 중공의 제1삽입홀(212)이 형성될 수 있다. 제1삽입홀(212)에는 파일(100)의 상단부가 삽입될 수 있다.A hollow first insertion hole 212 with an open lower portion may be formed in the cap 210. The upper end of the pile 100 may be inserted into the first insertion hole 212.

캡(210)의 상단의 하면은 파일(100)의 상단면과 결합될 수 있다. 이에 따라, 코핑브라켓(200)이 코핑(300)을 안정적으로 지지할 수 있다.The lower surface of the upper end of the cap 210 may be combined with the upper surface of the pile 100. Accordingly, the coping bracket 200 may stably support the coping 300.

또한, 캡(210)의 상면 또는 측면에는 관통공(214)이 형성될 수 있다. 관통공(214)을 통해 제1삽입홀(212) 또는 중공부(110, 도 2)에 제1충진재가 타설될 수 있다. 제1충진재는 몰탈, 시멘트 또는 에폭시수지 등에 해당할 수 있다.In addition, a through hole 214 may be formed on the top or side of the cap 210. The first filler may be poured into the first insertion hole 212 or the hollow portion 110 (FIG. 2) through the through hole 214. The first filler may correspond to mortar, cement, or epoxy resin.

이에 따라, 캡(210)에 파일(100)을 삽입한 후에 캡(210) 및 파일(100) 사이에 빈 공간이 발생하더라도 제1충진재가 빈 공간을 채울 수 있으므로, 코핑브라켓(200)이 파일(100)과 강하게 결속될 수 있다.Accordingly, even if an empty space occurs between the cap 210 and the pile 100 after inserting the pile 100 into the cap 210, the first filler can fill the empty space, so that the coping bracket 200 Can be strongly bound with (100).

나아가, 제1충진재로 빈 공간을 채울 수 있어서 제1삽입홀(212)의 단면적 크기를 파일(100)의 단면적 크기보다 크게 형성할 수 있으므로, 제조 또는 시공상의 오차에도 불구하고 코핑브라켓(200)을 파일(100) 상단에 올바른 기울기로 설치하거나 올바른 위치에 설치할 수 있다.Further, since the empty space can be filled with the first filler, the size of the cross-sectional area of the first insertion hole 212 can be formed larger than the size of the cross-sectional area of the pile 100, so that the coping bracket 200 is made despite errors in manufacturing or construction. Can be installed on the top of the pile 100 at a correct slope or at a correct position.

지지판(220)은 캡(210)의 하단에 캡(210)의 외주를 따라 반경방향 외측으로 돌출형성될 수 있다. 지지판(220)에는 코핑(300)의 하면이 안착될 수 있다.The support plate 220 may be formed to protrude radially outward along the outer periphery of the cap 210 at the lower end of the cap 210. The lower surface of the coping 300 may be seated on the support plate 220.

연장부(230)는 캡(210)의 하단으로부터 하방으로 연장되어 형성될 수 있다. 따라서, 파일(100)은 연장부(230)를 관통할 수 있다.The extension part 230 may be formed to extend downward from the lower end of the cap 210. Accordingly, the pile 100 may penetrate the extension 230.

제1보강리브(240)는 지지판(220)의 하면에 반경방향으로 설치되는 제1수평면부(242), 연장부(230)의 외주면에 상하방향으로 설치되는 제1수직면부(244) 및 제1수평면부(242)와 제1수직면부(244)를 연결하는 제1연결부(246)를 포함하여 구성될 수 있다.The first reinforcing rib 240 includes a first horizontal surface portion 242 installed in a radial direction on the lower surface of the support plate 220, a first vertical surface portion 244 installed in the vertical direction on the outer peripheral surface of the extension portion 230, and It may be configured to include a first connecting portion 246 connecting the first horizontal surface portion 242 and the first vertical surface portion 244.

또한, 제1보강리브(240)는 연장부(230)의 중심축을 중심으로 하여 둘레방향을 따라 복수 개가 배치될 수 있다.In addition, a plurality of first reinforcing ribs 240 may be disposed along the circumferential direction with the center axis of the extension part 230 as the center.

이에 따라, 코핑(300)을 지지하는 지지판(220)의 지지력이 강화될 수 있다.Accordingly, the support force of the support plate 220 supporting the coping 300 may be strengthened.

도 10을 참조하면, 일 실시예에 따른 코핑브라켓(200) 하단에는 패킹부재(260)가 구비될 수 있다. 패킹부재(260)는 오링(o-ring) 형상에 해당할 수 있다. 이에 따라, 제1충진재가 아래로 흐르는 것을 방지할 수 있다.Referring to FIG. 10, a packing member 260 may be provided below the coping bracket 200 according to an embodiment. The packing member 260 may correspond to an O-ring shape. Accordingly, it is possible to prevent the first filler from flowing downward.

도 11 및 도 12는 그레이팅이 형성된 코핑브라켓의 일 실시예를 나타낸 사시도 및 평면도이다.11 and 12 are perspective views and plan views illustrating an embodiment of a coping bracket having a grating formed thereon.

도 11 및 도 12를 참조하면, 캡(210)의 상면에는, 도 5 내지 도 10의 관통공(214) 대신에, 그레이팅(216)이 형성될 수 있다. 그레이팅(216)을 통해 제1삽입홀(212) 또는 중공부(110, 도 2)에 제1충진재가 타설될 수 있다.11 and 12, a grating 216 may be formed on the upper surface of the cap 210, instead of the through hole 214 of FIGS. 5 to 10. The first filler may be poured into the first insertion hole 212 or the hollow portion 110 (FIG. 2) through the grating 216.

이에 따라, 캡(210)에 파일(100)을 삽입한 후에 캡(210) 및 파일(100) 사이에 빈 공간이 발생하더라도 제1충진재가 빈 공간을 채울 수 있으므로, 코핑브라켓(200)이 파일(100)과 강하게 결속될 수 있다.Accordingly, even if an empty space occurs between the cap 210 and the pile 100 after inserting the pile 100 into the cap 210, the first filler can fill the empty space, so that the coping bracket 200 Can be strongly bound with (100).

나아가, 제1충진재로 빈 공간을 채울 수 있어서 제1삽입홀(212)의 단면적 크기를 파일(100)의 단면적 크기보다 크게 형성할 수 있으므로, 제조 또는 시공상의 오차에도 불구하고 코핑브라켓(200)을 파일(100) 상단에 올바른 기울기로 설치하거나 올바른 위치에 설치할 수 있다.Further, since the empty space can be filled with the first filler, the size of the cross-sectional area of the first insertion hole 212 can be formed larger than the size of the cross-sectional area of the pile 100, so that the coping bracket 200 is made despite errors in manufacturing or construction. Can be installed on the top of the pile 100 at a correct slope or at a correct position.

예를 들면, 파일(100)이 기울어지게 설치되더라도, 제1삽입홀(212)의 여유공간을 통해 파일(100) 상단에 설치되는 코핑브라켓(200)의 기울기를 조절할 수 있다. 이에, 코핑(300)이 코핑브라켓(200)에 수평으로 설치될 수 있다.For example, even if the pile 100 is installed to be inclined, the inclination of the coping bracket 200 installed on the top of the pile 100 may be adjusted through the free space of the first insertion hole 212. Accordingly, the coping 300 may be horizontally installed on the coping bracket 200.

도 13 내지 도 15는 제2보강리브를 포함하여 구성되는 코핑브라켓의 일 실시예를 나타낸 사시도, 평면도 및 정면도이다.13 to 15 are perspective views, plan views, and front views illustrating an embodiment of a coping bracket including a second reinforcing rib.

도 13 내지 도 15를 참조하면, 제2보강리브(250)는 지지판(220)의 상면에 반경방향으로 설치되는 제2수평면부(252), 상기 캡(210)의 외주면에 상하방향으로 설치되는 제2수직면부(254) 및 상기 제2수평면부(252)와 제2수직면부(254)를 연결하는 제2연결부(256)를 포함하여 구성될 수 있다.13 to 15, the second reinforcing rib 250 includes a second horizontal surface portion 252 installed radially on the upper surface of the support plate 220, and vertically installed on the outer peripheral surface of the cap 210. It may be configured to include a second vertical surface portion 254 and a second connection portion 256 connecting the second horizontal surface portion 252 and the second vertical surface portion 254.

또한, 제2보강리브(250)는 캡(210)의 중심축을 중심으로 하여 둘레방향을 따라 복수 개가 배치될 수 있다.In addition, a plurality of second reinforcing ribs 250 may be disposed along the circumferential direction with the center axis of the cap 210 as the center.

이에 따라, 코핑(300)을 지지하는 지지판(220)의 지지력이 강화될 수 있다.Accordingly, the support force of the support plate 220 supporting the coping 300 may be strengthened.

이 때에, 캡(210)의 중심축으로부터 제2수평면부(252)의 반경방향 외측 단부까지의 거리(d3)가 캡(210)의 중심축으로부터 지지판(220)의 측단면까지의 거리(d1)보다 작을 수 있다.At this time, the distance d3 from the central axis of the cap 210 to the radially outer end of the second horizontal surface portion 252 is the distance d1 from the central axis of the cap 210 to the side end surface of the support plate 220 Can be smaller than ).

이에 따라, 지지판(220)에 제2보강리브(250)가 구비되더라도 코핑(300)의 하면이 지지판(220)에 안정적으로 안착될 수 있다.Accordingly, even if the second reinforcing rib 250 is provided on the support plate 220, the lower surface of the coping 300 may be stably seated on the support plate 220.

또한, 캡(210)의 중심축으로부터 제2수평면부(252)의 반경방향 외측 단부까지의 거리(d3)가 연장부(230)의 중심축으로부터 제1수평면부(242)의 반경방향 외측 단부까지의 거리(d2)보다 작을 수 있다.In addition, the distance d3 from the central axis of the cap 210 to the radially outer end of the second horizontal surface portion 252 is the radially outer end of the first horizontal surface portion 242 from the central axis of the extension 230 It may be less than the distance to (d2).

이에 따라, 코핑(300)의 하면이 안착된 지지판(220) 부분이 제1보강리브(240)에 의해 지지될 수 있으므로, 코핑(300)을 지지하는 지지판(220)의 지지력이 강화될 수 있다.Accordingly, since the portion of the support plate 220 on which the lower surface of the coping 300 is seated may be supported by the first reinforcing rib 240, the support force of the support plate 220 supporting the coping 300 may be strengthened. .

도 16 내지 도 18은 볼트를 구비하는 코핑브라켓의 일 실시예를 나타낸 사시도, 평면도 및 정면도이다.16 to 18 are perspective views, plan views, and front views illustrating an embodiment of a coping bracket having a bolt.

도 16 내지 도 18을 참조하면, 캡(210)은 양쪽 측면을 관통하여 대향설치되는 볼트(270) 쌍을 구비할 수 있다. 파일(100)의 외경은 캡(210)의 내경보다 작고, 볼트(270)의 일단부는 제1삽입홀(212)에 삽입된 상기 파일(100)과 접촉할 수 있다. 대향하는 볼트의 어느 하나를 조이고 다른 하나를 푸는 방식으로, 파일(100)에 대한 캡(210)의 위치를 정교하게 조정할 수 있다.Referring to FIGS. 16 to 18, the cap 210 may include a pair of bolts 270 that pass through both sides and are oppositely installed. The outer diameter of the pile 100 is smaller than the inner diameter of the cap 210, and one end of the bolt 270 may contact the pile 100 inserted into the first insertion hole 212. By tightening one of the opposing bolts and releasing the other, the position of the cap 210 relative to the pile 100 can be precisely adjusted.

이에 따라, 제조 또는 시공상의 오차에도 불구하고 코핑브라켓(200)을 올바른 기울기로 설치하거나 올바른 위치에 설치할 수 있다.Accordingly, in spite of manufacturing or construction errors, the coping bracket 200 may be installed at a correct inclination or may be installed at a correct position.

볼트(270)는 캡(210)의 전후 및 좌우 측면에 대향설치될 수 있다. 이에 따라, 코핑브라켓(200)의 위치 또는 기울기를 빠르고 정확하게 조절할 수 있다.Bolts 270 may be installed opposite to the front and rear and left and right sides of the cap 210. Accordingly, the position or slope of the coping bracket 200 can be quickly and accurately adjusted.

[코핑][Coping]

도 19 내지 도 22는 본 발명의 일 실시예에 따른 코핑을 나타낸 사시도, 평면도, 저면도 및 정면투시도이고, 도 23 및 도 24는 파일, 코핑브라켓 및 코핑이 결합된 상태를 나타낸 사시도 및 정면투시도이다.19 to 22 are a perspective view, a plan view, a bottom view and a front perspective view showing a coping according to an embodiment of the present invention, and FIGS. 23 and 24 are a perspective view and a front perspective view showing a state in which a pile, a coping bracket, and a coping are combined to be.

도 19 내지 도 24를 참조하면, 일 실시예에 따른 코핑(300)에는 하부가 개방된 중공의 제2삽입홀(310)이 형성될 수 있다. 구체적으로 예를 들면, 코핑(300)은 일단부 및 타단부에 각각 상기 제2삽입홀(310a, 310b)이 형성될 수 있다. 제2삽입홀(310)에는 캡(210)이 삽입될 수 있다.19 to 24, a hollow second insertion hole 310 with an open lower portion may be formed in the coping 300 according to an exemplary embodiment. Specifically, for example, in the coping 300, the second insertion holes 310a and 310b may be formed at one end and the other end, respectively. The cap 210 may be inserted into the second insertion hole 310.

이 때에, 도 24와 같이, 캡(210)에 형성된 제1삽입홀(212)에 삽입된 파일(100)의 상단부는 코핑(300)에 형성된 제2삽입홀(310)의 내측에 삽입되어 위치할 수 있다. 또한, 코핑(300)의 하면은 지지판(220)에 안착될 수 있다.At this time, as shown in FIG. 24, the upper end of the pile 100 inserted into the first insertion hole 212 formed in the cap 210 is inserted into the inside of the second insertion hole 310 formed in the coping 300. can do. In addition, the lower surface of the coping 300 may be seated on the support plate 220.

이에 따라, 최소한의 단순한 구성으로 코핑(300)이 안정적으로 지지되므로 각 구성의 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있다.Accordingly, since the coping 300 is stably supported with a minimal and simple configuration, the manufacturing cost and construction cost of each component can be reduced, and the construction period can be shortened.

또한, 제2삽입홀(310)의 상부가 개방될 수 있고 개방된 상부를 통해 제2삽입홀(310)에 제2충진재가 타설될 수 있다. 제2충진재는 몰탈, 시멘트 또는 에폭시수지 등에 해당할 수 있다.In addition, an upper portion of the second insertion hole 310 may be opened, and a second filler may be poured into the second insertion hole 310 through the open upper portion. The second filler may correspond to mortar, cement, or epoxy resin.

이에 따라, 코핑(300)에 캡(210)을 삽입한 후에 코핑(300) 및 캡(210) 사이에 빈 공간이 발생하더라도 제2충진재가 빈 공간을 채울 수 있으므로, 코핑(300)이 코핑브라켓(200)과 강하게 결속될 수 있다.Accordingly, even if an empty space occurs between the coping 300 and the cap 210 after inserting the cap 210 into the coping 300, the second filler can fill the empty space, so that the coping 300 It can be strongly bound with (200).

나아가, 제2충진재로 빈 공간을 채울 수 있어서 제2삽입홀(310)의 단면적 크기를 캡(210)의 단면적 크기보다 크게 형성할 수 있으므로, 제조 또는 시공상의 오차에도 불구하고 코핑(300)을 올바른 기울기로 설치하거나 올바른 위치에 설치할 수 있다.Furthermore, since the empty space can be filled with the second filler, the size of the cross-sectional area of the second insertion hole 310 can be formed larger than the size of the cross-sectional area of the cap 210, so that the coping 300 is It can be installed at the correct slope or in the correct position.

예를 들면, 캡(210)이 기울어지게 설치되더라도, 제2삽입홀(310)의 여유공간을 통해 캡(210)에 설치되는 코핑(300)의 기울기를 조절할 수 있다. 이에, 슬래브(400)가 코핑(300)에 수평으로 설치될 수 있다.For example, even if the cap 210 is installed to be inclined, the inclination of the coping 300 installed in the cap 210 may be adjusted through the free space of the second insertion hole 310. Accordingly, the slab 400 may be installed horizontally on the coping 300.

제2삽입홀(310)은 상부가 개방될 수 있고 코핑(300)의 상면의 높이가 제2삽입홀(310)에 삽입된 캡(210)의 상면의 높이에 대응될 수 있다.The top of the second insertion hole 310 may be open, and the height of the upper surface of the coping 300 may correspond to the height of the upper surface of the cap 210 inserted into the second insertion hole 310.

이에 따라, 제2삽입홀(310)에 캡(210)이 올바르게 삽입되었는지 여부를 용이하게 확인할 수 있고, 코핑(300)의 상면 및 캡(210)의 상면이 슬래브(400)를 함께 지지할 수 있으므로 교량의 지지력 및 안정성이 향상될 수 있다.Accordingly, it can be easily checked whether the cap 210 is correctly inserted into the second insertion hole 310, and the upper surface of the coping 300 and the upper surface of the cap 210 can support the slab 400 together. Therefore, the support and stability of the bridge can be improved.

또한, 제2삽입홀(310)은 단면적이 일정한 크기로 유지되는 상부영역(312) 및 상부영역(312)보다 단면적이 크고 상부로 갈수록 단면적이 작아지는 하부영역(314)을 포함하여 구성될 수 있다.In addition, the second insertion hole 310 may include an upper region 312 having a constant cross-sectional area and a lower region 314 having a larger cross-sectional area than the upper region 312 and smaller toward the upper portion. have.

이에 따라, 캡(210)이 단면적이 큰 하부영역(314)에 의해 가이드되어 제2삽입홀(310)의 하부에서 상부로 삽입되므로 코핑(300)을 코핑브라켓(200)에 용이하게 설치할 수 있다.Accordingly, since the cap 210 is guided by the lower region 314 with a large cross-sectional area and is inserted from the lower portion of the second insertion hole 310 to the upper portion, the coping 300 can be easily installed on the coping bracket 200. .

한편, 제2삽입홀(310)의 하부영역(314) 중에서 캡(210)이 삽입된 공간을 제외한 나머지 공간에는, 도 24와 같이 전술한 제2보강리브(250)가 구비되고(구비되거나), 앞서 도 16 내지 도 18을 참조하여 설명한 볼트(270)가 구비될 수 있다. 그 외의 빈 공간에는 제2충진재가 충진될 수 있다.Meanwhile, the second reinforcing rib 250 described above as shown in FIG. 24 is provided (or provided) in the space other than the space in which the cap 210 is inserted among the lower region 314 of the second insertion hole 310 , The bolt 270 described above with reference to FIGS. 16 to 18 may be provided. Other empty spaces may be filled with a second filler.

또한, 코핑(300)의 상면에는, 도 1과 같이, 슬래브(400)가 거치될 수 있고, 도 19 내지 도 24와 같이, 위치고정홈(320)이 형성될 수 있다. 위치고정홈(320)은 후술한다.In addition, a slab 400 may be mounted on the upper surface of the coping 300 as shown in FIG. 1, and a position fixing groove 320 may be formed as shown in FIGS. 19 to 24. Position fixing groove 320 will be described later.

[슬래브][Slab]

도 25 내지 도 27은 본 발명의 일 실시예에 따른 슬래브를 나타낸 사시도, 평면도 및 정면도이고, 도 28 및 도 29는 슬래브가 이웃하는 슬래브와 조립결합되는 과정을 나타낸 상태도이다.25 to 27 are perspective views, plan views, and front views showing a slab according to an embodiment of the present invention, and FIGS. 28 and 29 are state diagrams showing a process in which the slab is assembled and coupled with an adjacent slab.

도 25 내지 도 27을 참조하면, 슬래브(400)의 제1방향의 일단부에는 제1홈부(410); 및 상기 제1홈부(410)로부터 제1방향의 타측방향으로 더 연장되고 제1방향과 교차하는 제2방향으로 확대된 폭을 가지는(즉, w2>w1) 제2홈부(420)가 형성될 수 있다.25 to 27, a first groove portion 410 at one end portion of the slab 400 in the first direction; And a second groove 420 further extending from the first groove 410 in the other direction in the first direction and having an enlarged width in a second direction crossing the first direction (that is, w2>w1). I can.

또한, 슬래브(400)의 제1방향의 타단부에는 타측방향으로 돌출되는 제1돌출부(430) 및 상기 제1돌출부(430)로부터 제1방향의 타측방향으로 더 연장되고 제2방향으로 확대된 폭을 가지는(즉, w4>w3) 제2돌출부(440)가 형성될 수 있다.In addition, at the other end of the slab 400 in the first direction, the first protrusion 430 protruding in the other direction and the first protrusion 430 further extend in the other direction in the first direction and enlarged in the second direction. A second protrusion 440 having a width (ie, w4>w3) may be formed.

제1돌출부(430) 및 제2돌출부(440)의 폭(w3, w4)은 각각 제1홈부(410) 및 제2홈부(420)의 폭(w1, w2)과 대응될 수 있다.The widths w3 and w4 of the first protrusion 430 and the second protrusion 440 may correspond to the widths w1 and w2 of the first groove 410 and the second groove 420, respectively.

이에 따라, 슬래브(400)는 제1방향의 이웃하는 슬래브(400)와 조립결합되면서 용이하게 연장될 수 있고 슬래브(400)가 제1방향 또는 제2방향으로 이탈하지 않고 서로 결속될 수 있다. 따라서, 별도의 연결부재 없이 단순한 구성으로 슬래브(400)가 안정적으로 용이하게 결속되면서 연결될 수 있으므로 교량의 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있다.Accordingly, the slab 400 may be easily extended while being assembled and coupled with the adjacent slab 400 in the first direction, and the slab 400 may be bonded to each other without deviating from the first direction or the second direction. Therefore, since the slab 400 can be connected while being stably and easily bound with a simple configuration without a separate connecting member, the manufacturing cost and construction cost of the bridge can be reduced, and the construction period can be shortened.

한편, 도면에서 슬래브(400)는 제1방향 양단에 홈부(410, 420) 및 돌출부(430, 440)가 각각 형성되지만 이러한 구성에 한정되지 않는다. 예를 들면, 복수 개의 슬래브(400) 중에서 일부의 슬래브(400)는 제1방향 양단에 모두 홈부(410, 420)가 형성될 수도 있고 다른 일부의 슬래브(400)는 제1방향 양단에 모두 돌출부(430, 440)가 형성될 수도 있다. 이하, 동일하다.Meanwhile, in the drawing, the slab 400 has grooves 410 and 420 and protrusions 430 and 440 at both ends in the first direction, but is not limited to this configuration. For example, among the plurality of slabs 400, some of the slabs 400 may have grooves 410 and 420 at both ends in the first direction, and the other part of the slabs 400 may have protrusions at both ends of the first direction. (430, 440) may be formed. It is the same below.

슬래브(400)의 일단부에는 상부가 개방되고 상부가 하부보다 홈의 제1방향 폭이 작은(즉, w6<w5) 제1홈영역(422)을 가지는 제2홈부(420)가 형성될 수 있고, 슬래브(400)의 타단부에는 제1홈영역(422)에 수용되는 제1돌출영역(442)을 가지는 제2돌출부(440)가 형성될 수 있다.At one end of the slab 400, a second groove portion 420 having a first groove region 422 having an upper portion open and a first groove width smaller than the lower portion in the first direction (ie, w6<w5) may be formed. In addition, a second protrusion 440 having a first protrusion region 442 accommodated in the first groove region 422 may be formed at the other end of the slab 400.

이에 따라, 슬래브(400)가 제1방향의 이웃하는 슬래브(400)와 조립결합되면 상방으로 이탈하지 못하고 결속될 수 있다. 따라서, 별도의 연결부재 없이 단순한 구성으로 슬래브(400)가 안정적으로 용이하게 결속되면서 연결될 수 있으므로 교량의 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있다.Accordingly, when the slab 400 is assembled and coupled with the neighboring slab 400 in the first direction, it may not be separated upward and be bound. Therefore, since the slab 400 can be connected while being stably and easily bound with a simple configuration without a separate connecting member, the manufacturing cost and construction cost of the bridge can be reduced, and the construction period can be shortened.

제2돌출부(440)는 제1방향으로 절단한 단면 상에서 장폭(w8) 및 장폭(w8)으로부터 슬래브(400)를 소정의 각도(a)로 기울인 상태에서 측정되는 단폭(w9)을 가질 수 있고, 제1홈영역(422)의 상부의 제1방향 폭(w6)은 단폭(w9)보다 크거나 같고 장폭(w8)보다 작을 수 있다.The second protrusion 440 may have a short width w9 measured in a state in which the slab 400 is inclined at a predetermined angle a from a long width w8 and a long width w8 on a cross section cut in the first direction, and , The first width w6 of the upper portion of the first groove region 422 may be greater than or equal to the short width w9 and less than the long width w8.

이에 따라, 슬래브(400b)를 예를 들면, 소정의 각도(a)로 기울이면 제2돌출부(440b)를 제1홈영역(422b)에 삽입할 수 있고(도 28) 제2돌출부(440b)가 삽입된 상태에서 슬래브(400b)를 소정의 각도(a)만큼 회전시키면 제2돌출부(440b)가 제1홈영역(422b)을 상방으로 이탈하지 못하게 되어 슬래브(400b)가 이웃하는 슬래브(400a)에 결속될 수 있다(도 29). 따라서, 별도의 연결부재 없이 단순한 구성으로 슬래브(400)가 안정적으로 용이하게 결속되면서 연결될 수 있으므로 교량의 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있다.Accordingly, when the slab 400b is tilted at, for example, a predetermined angle (a), the second protrusion 440b can be inserted into the first groove region 422b (Fig. 28), and the second protrusion 440b When the slab 400b is rotated by a predetermined angle (a) while the slab 400b is inserted, the second protrusion 440b does not deviate upward from the first groove area 422b, so that the slab 400b is adjacent to the slab 400a. ) Can be bound to (Fig. 29). Therefore, since the slab 400 can be connected while being stably and easily bound with a simple configuration without a separate connecting member, the manufacturing cost and construction cost of the bridge can be reduced, and the construction period can be shortened.

또한, 제2돌출부(440)가 제2홈부(420)에 삽입된 상태에서 슬래브(400)가 회전할 수 있으므로 일부 지역의 지면의 높이가 변경되더라도 슬래브(400)가 회전하면서 결속이 끊어지지 않고 유지될 수 있어서 교량의 내구성이 향상될 수 있다.In addition, since the slab 400 can rotate while the second protrusion 440 is inserted into the second groove 420, even if the height of the ground in some areas is changed, the bond is not broken while the slab 400 rotates. Can be maintained, so the durability of the bridge can be improved.

한편, 슬래브(400)의 제1방향의 양쪽 단부는 도 1과 같이, 이격되어 배치된 두 개의 코핑(300)의 상면에 거치될 수 있다.Meanwhile, both ends of the slab 400 in the first direction may be mounted on the upper surface of the two copings 300 spaced apart, as shown in FIG. 1.

이 때에, 제2돌출부(440)의 장폭(w8)은 슬래브(400)의 양쪽 단부가 코핑(300)에 거치된 상태에서의 제2돌출부(440)의 제1방향 폭에 해당할 수 있고 상기 소정의 각도(a)는 90도보다 작을 수 있다. 예를 들면, 도 27에서 소정의 각도(a)는 45도에 해당할 수 있다.At this time, the long width w8 of the second protrusion 440 may correspond to the width in the first direction of the second protrusion 440 in a state in which both ends of the slab 400 are mounted on the coping 300, and the The predetermined angle (a) may be less than 90 degrees. For example, in FIG. 27, the predetermined angle a may correspond to 45 degrees.

이에 따라, 90도보다 작은 각도로 슬래브(400)를 기울여서 제2돌출부(440)를 제1홈영역(422)에 삽입할 수 있고 제2돌출부(440)가 삽입된 상태에서 90도보다 작은 각도로 슬래브(400)를 회전시켜서 슬래브(400)를 이웃하는 슬래브(400)에 결속시킬 수 있다. 따라서, 슬래브(400)를 기울이거나 회전시키는 데에 소요되는 시간을 절감하여 공사시간이 단축될 수 있고 슬래브(400)의 회전량을 줄여서 회전 시에 제2돌출부(440) 또는 제2홈부(420)가 파손 또는 마모되는 정도를 감소시키거나 방지할 수 있다.Accordingly, by tilting the slab 400 at an angle less than 90 degrees, the second protrusion 440 can be inserted into the first groove area 422, and an angle less than 90 degrees in the state in which the second protrusion 440 is inserted. The slab 400 may be rotated to bind the slab 400 to the neighboring slab 400. Therefore, the construction time can be shortened by reducing the time required to tilt or rotate the slab 400, and the second protrusion 440 or the second groove 420 during rotation by reducing the amount of rotation of the slab 400 ) Can reduce or prevent damage or wear.

제1홈영역(422)은 하부에서 상부로 갈수록 제1방향 폭이 점차 작아질 수 있고 폭이 작아지는 정도가 상부로 갈수록 점차 커질 수 있다. 이에 따라, 제1홈영역(422)을 형성하는 슬래브(400)의 일측 내면 또는 타측 내면은 곡면을 이룰 수 있고 이 때의 곡면의 곡률 중심(center of curvature)은 제2홈부(420)의 내측에 위치할 수 있다.The first groove region 422 may gradually decrease in width in the first direction as it goes from the bottom to the top, and the degree of decrease in the width may be gradually increased as it goes upward. Accordingly, one inner surface or the other inner surface of the slab 400 forming the first groove region 422 may form a curved surface, and the center of curvature of the curved surface at this time is the inner side of the second groove portion 420 Can be located in

따라서, 슬래브(400)의 제2돌출부(440)가 이웃하는 슬래브(400)의 제2홈부(420)에 삽입된 상태에서 슬래브(400)를 용이하게 회전시켜 이웃하는 슬래브(400)에 용이하게 결속시키면서 설치할 수 있고, 설치과정에서 제2돌출부(440) 또는 제1홈영역(422)이 파손 또는 마모되는 것을 방지할 수 있다. 또한, 일부 지역의 지면의 높이가 변경되는 경우에 슬래브(400)가 용이하게 회전하면서 결속이 유지될 수 있으므로 교량의 내구성이 향상될 수 있다.Therefore, the slab 400 is easily rotated while the second protrusion 440 of the slab 400 is inserted into the second groove 420 of the neighboring slab 400 so that it can be easily moved to the neighboring slab 400. It can be installed while binding, and it is possible to prevent the second protrusion 440 or the first groove region 422 from being damaged or worn during the installation process. In addition, when the height of the ground in some areas is changed, the slab 400 can easily rotate and the bond can be maintained, so that the durability of the bridge can be improved.

또한, 제1홈영역(422)을 형성하는 슬래브(400)의 제1방향의 일측 내면(s1)이 전술한 곡면을 이루고 있는 경우에, 제1방향의 일측 내면(s1)과 마주하는 제2돌출부(440)의 제1방향의 일측 외주면(s1')은 대응하는 형태의 곡면을 이룰 수 있다.In addition, when one inner surface s1 in the first direction of the slab 400 forming the first groove region 422 forms the above-described curved surface, a second inner surface s1 facing one inner surface s1 in the first direction One outer peripheral surface s1 ′ of the protrusion 440 in the first direction may form a curved surface having a corresponding shape.

이에 따라, 슬래브(400)의 제2돌출부(440)가 이웃하는 슬래브(400)의 제2홈부(420)에 삽입된 상태에서 슬래브(400)를 용이하게 회전시켜 이웃하는 슬래브(400)에 용이하게 결속시키면서 설치할 수 있고, 설치과정에서 제2돌출부(440) 또는 제1홈영역(422)이 파손 또는 마모되는 것을 방지할 수 있다. 또한, 일부 지역의 지면의 높이가 변경되는 경우에 슬래브(400)가 용이하게 회전하면서 결속이 유지될 수 있으므로 교량의 내구성이 향상될 수 있다.Accordingly, the slab 400 is easily rotated while the second protrusion 440 of the slab 400 is inserted into the second groove 420 of the neighboring slab 400 to facilitate the neighboring slab 400 The second protrusion 440 or the first groove area 422 may be prevented from being damaged or worn during the installation process. In addition, when the height of the ground in some areas is changed, the slab 400 can easily rotate and the bond can be maintained, thereby improving the durability of the bridge.

또한, 슬래브(400)의 양쪽 단부가 코핑(300)에 거치된 상태에서의 제2돌출부(440)의 상면(s2)은 슬래브(400)의 상면과 평행하고 동일한 높이를 이룰 수 있다.In addition, the upper surface s2 of the second protrusion 440 in a state in which both ends of the slab 400 are mounted on the coping 300 may be parallel to and at the same height as the upper surface of the slab 400.

이에 따라, 슬래브(400) 및 제2돌출부(440)의 표면이 매끄럽게 연결되므로 제2돌출부(440) 또는 제2홈부(420)가 손상되는 것을 방지할 수 있다.Accordingly, since the surfaces of the slab 400 and the second protrusion 440 are smoothly connected, damage to the second protrusion 440 or the second groove 420 can be prevented.

또한, 슬래브(400)의 양쪽 단부가 코핑(300)에 거치된 상태에서의 제2돌출부(440)의 하면(s3)은 평평할 수 있다.In addition, the lower surface s3 of the second protrusion 440 in a state in which both ends of the slab 400 are mounted on the coping 300 may be flat.

이에 따라, 제2돌출부(440) 상부에 가해진 하중이 평평한 하면(s3)을 통해 코핑(300)에 안정적으로 전달되므로 제2돌출부(440) 하면(s3)의 특정지점에 하중이 집중되는 것을 방지하여 제2돌출부(440)가 손상되는 것을 방지할 수 있다.Accordingly, since the load applied to the upper portion of the second protrusion 440 is stably transmitted to the coping 300 through the flat lower surface s3, the load is prevented from being concentrated at a specific point on the lower surface s3 of the second protrusion 440 Thus, it is possible to prevent the second protrusion 440 from being damaged.

슬래브(400)의 일단부에는 하부가 개방되고 하부가 상부보다 홈의 제1방향 폭이 작은(즉, w7<w5) 제2홈영역(424)을 가지는 제2홈부(420)가 형성될 수 있고, 슬래브(400)의 타단부에는 제2홈영역(424)에 수용되는 제2돌출영역(444)을 가지는 제2돌출부(440)가 형성될 수 있다.At one end of the slab 400, a second groove portion 420 having a second groove region 424 having a lower opening and a lower width in the first direction than the upper portion (ie, w7<w5) may be formed. In addition, a second protruding portion 440 having a second protruding region 444 accommodated in the second groove region 424 may be formed at the other end of the slab 400.

이에 따라, 슬래브(400)가 제1방향의 이웃하는 슬래브(400)와 조립결합되면 하방으로 이탈하지 못하고 결속될 수 있다. 따라서, 별도의 연결부재 없이 단순한 구성으로 슬래브(400)가 안정적으로 용이하게 결속되면서 연결될 수 있으므로 교량의 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있다.Accordingly, when the slab 400 is assembled and coupled with the neighboring slab 400 in the first direction, the slab 400 may not be separated and may be bound downward. Therefore, since the slab 400 can be connected while being stably and easily bound with a simple configuration without a separate connecting member, the manufacturing cost and construction cost of the bridge can be reduced, and the construction period can be shortened.

제2돌출부(440)는 전술한 바와 같이, 제1방향으로 절단한 단면 상에서 장폭(w8) 및 장폭(w8)으로부터 슬래브(400)를 소정의 각도(a)로 기울인 상태에서 측정되는 단폭(w9)을 가질 수 있고, 제2홈영역(424)의 하부의 제1방향 폭(w7)은 단폭(w9)보다 크거나 같고 장폭(w8)보다 작을 수 있다.As described above, the second protrusion 440 has a short width w9 measured in a state in which the slab 400 is inclined at a predetermined angle a from the long width w8 and the long width w8 on the cross section cut in the first direction. ), and the first width w7 of the lower portion of the second groove region 424 may be greater than or equal to the short width w9 and less than the long width w8.

이에 따라, 슬래브(400)를 예를 들면, 소정의 각도(a)로 기울이면 제2돌출부(440)를 제1홈영역(422)에 삽입할 수 있고 제2돌출부(440)가 삽입된 상태에서 슬래브(400)를 소정의 각도(a)만큼 회전시키면 제2돌출부(440)가 제1홈영역(422)을 하방으로 이탈하지 못하게 되어 슬래브(400)가 이웃하는 슬래브(400)에 결속될 수 있다. 따라서, 별도의 연결부재 없이 단순한 구성으로 슬래브(400)가 안정적으로 용이하게 결속되면서 연결될 수 있으므로 교량의 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있다.Accordingly, when the slab 400 is tilted at, for example, a predetermined angle (a), the second protrusion 440 can be inserted into the first groove area 422 and the second protrusion 440 is inserted. If the slab 400 is rotated by a predetermined angle (a), the second protrusion 440 does not deviate downward from the first groove area 422 so that the slab 400 will be bound to the neighboring slab 400. I can. Therefore, since the slab 400 can be connected while being stably and easily bound with a simple configuration without a separate connecting member, the manufacturing cost and construction cost of the bridge can be reduced, and the construction period can be shortened.

또한, 제2돌출부(440)가 제2홈부(420)에 삽입된 상태에서 슬래브(400)가 회전할 수 있으므로 일부 지역의 지면의 높이가 변경되더라도 슬래브(400)가 회전하면서 결속이 끊어지지 않고 유지될 수 있어서 교량의 내구성이 향상될 수 있다.In addition, since the slab 400 can rotate while the second protrusion 440 is inserted into the second groove 420, even if the height of the ground in some areas is changed, the bond is not broken while the slab 400 rotates. Can be maintained, so the durability of the bridge can be improved.

슬래브(400)의 제2돌출부(440)가 이웃하는 슬래브(400)의 제2홈부(420)에 관통삽입되고 슬래브(400) 및 이웃하는 슬래브(400)의 양쪽 단부가 코핑(300)에 거치된 상태에서, 제2돌출부(440)는 제2홈부(420)의 하부로 돌출되는 돌출부분(450, 도 27)을 포함할 수 있다. 이에 대응하여, 코핑(300)의 상면에는 상기 돌출부분(450)이 삽입되는 위치고정홈(320)이 형성될 수 있다.The second protrusion 440 of the slab 400 is inserted through the second groove 420 of the neighboring slab 400, and both ends of the slab 400 and the neighboring slab 400 are mounted on the coping 300 In this state, the second protrusion 440 may include a protrusion 450 (FIG. 27) protruding below the second groove 420. Correspondingly, a position fixing groove 320 into which the protruding portion 450 is inserted may be formed on the upper surface of the coping 300.

이에 따라, 코핑(300) 상면에 거치된 슬래브(400)가 별도의 연결부재 없이 안정적으로 고정될 수 있으므로 교량의 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있다.Accordingly, since the slab 400 mounted on the upper surface of the coping 300 can be stably fixed without a separate connecting member, the manufacturing cost and construction cost of the bridge can be reduced, and the construction period can be shortened.

여기에서, 별도의 연결부재는 코핑(300)과 슬래브(400)를 고정시키는 볼트 등의 결합부재 또는 코핑(300) 및 슬래브(400) 사이에 설치되어 슬래브(400)를 지지하는 종래의 거더(girder) 등을 의미할 수 있다.Here, the separate connecting member is a coupling member such as a bolt for fixing the coping 300 and the slab 400, or a conventional girder installed between the coping 300 and the slab 400 to support the slab 400 ( girder), etc.

이 때에, 위치고정홈(320)의 제1방향 폭(w11, 도 19)은 돌출부분(450)의 제1방향 폭(w10, 도 27)보다 클 수 있다. 이에 따라, 코핑(300) 또는 돌출부분(450)이 수축하거나 팽창하더라도 돌출부분(450)이 위치고정홈(320)을 이탈하는 것을 방지할 수 있다.In this case, the width w11 in the first direction of the position fixing groove 320 (FIG. 19) may be larger than the width in the first direction w10 (FIG. 27) of the protruding portion 450. Accordingly, even if the coping 300 or the protruding part 450 contracts or expands, the protruding part 450 can be prevented from leaving the position fixing groove 320.

이상과 같이, 슬래브(400)의 제1방향의 양쪽 단부가 이격되어 배치된 두 개의 코핑(300)의 상면에 거치되고 슬래브(400)의 제1방향의 양쪽 단부 중에서 타단부는 이와 이웃하는 슬래브(400)의 일단부와 조립결합됨으로써, 별도의 연결부재 또는 지지부재 없이 최소한의 단순한 구성으로 교량을 만들 수 있으므로, 교량의 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있다. 여기에서, 별도의 연결부재 또는 지지부재는 코핑(300) 및 슬래브(400) 사이에 설치되어 슬래브(400)를 지지하는 종래의 거더(girder) 등을 의미할 수 있다.As described above, both ends of the slab 400 in the first direction are mounted on the upper surface of the two copings 300 spaced apart from each other, and the other end of both ends of the slab 400 in the first direction is a slab adjacent thereto. By assembling and combining with one end of the 400, a bridge can be made with a minimal and simple configuration without a separate connecting member or support member, thus reducing the manufacturing cost and construction cost of the bridge and shortening the construction period. Here, a separate connecting member or support member may refer to a conventional girder or the like installed between the coping 300 and the slab 400 to support the slab 400.

한편, 도면에서 슬래브(400)에는 제1홈부(410)와 제2홈부(420)가 함께 형성되고 제1돌출부(430)와 제2돌출부(440)가 함께 형성되지만 이러한 구성에 한정되지 않는다. 예를 들면, 슬래브(400)에는 제1홈부(410), 및 제1돌출부(430)가 형성되지 않고 제2홈부(420) 및 제2돌출부(440)만 형성될 수도 있다. 이하, 동일하다.Meanwhile, in the drawing, the first groove portion 410 and the second groove portion 420 are formed together in the slab 400, and the first protruding portion 430 and the second protruding portion 440 are formed together, but the configuration is not limited thereto. For example, the first groove 410 and the first protrusion 430 are not formed in the slab 400, but only the second groove 420 and the second protrusion 440 may be formed. It is the same below.

도 30은 본 발명의 다른 일 실시예에 따른 조립식 프리캐스트 교량을 나타낸 사시도이고 도 31 내지 도 42는 도 30의 조립식 프리캐스트 교량에 설치되는 세가지 형태의 코핑을 나타낸 사시도, 평면도, 저면도 및 정면투시도이다.FIG. 30 is a perspective view showing a prefabricated precast bridge according to another embodiment of the present invention, and FIGS. 31 to 42 are a perspective view, a plan view, a bottom view, and a front view showing three types of coping installed in the precast bridge of FIG. 30 It is a perspective view.

도 30을 참조하면, 다른 일 실시예에 따른 조립식 프리캐스트 교량(20)은 파일(100), 코핑브라켓(200), 코핑(300) 및 슬래브(400)를 포함하여 구성될 수 있다. 코핑(300)에 대해서 살펴본다. 나머지 구성은 전술한 바와 같다.Referring to FIG. 30, the prefabricated precast bridge 20 according to another embodiment may include a pile 100, a coping bracket 200, a coping 300 and a slab 400. It looks at the coping 300. The rest of the configuration is as described above.

코핑(300)에는 각각 복수 개(도면에서는 2개)의 제2삽입홀(310)이 형성될 수 있고 복수 개의 제2삽입홀(310) 중에서 적어도 일부(도면에서는 2개)의 제2삽입홀(310)은 상부가 개방될 수 있다.A plurality of second insertion holes 310 (two in the drawing) may be formed in the coping 300, respectively, and at least a portion (two in the drawing) of the second insertion holes 310 among the plurality of second insertion holes 310 The upper part 310 may be open.

각각의 코핑(300)에 형성된 적어도 한 개의 제2삽입홀(310)은 다른 코핑(300)에 형성된 제2삽입홀(310)과 상하방향으로 연통되게 배치될 수 있다.At least one second insertion hole 310 formed in each coping 300 may be disposed to be in vertical communication with the second insertion hole 310 formed in another coping 300.

구체적으로 예를 들면, 코핑(300)은 일단부 및 타단부에 각각 제2삽입홀(310)이 형성될 수 있고 코핑(300)의 일단부 또는 타단부는 다른 코핑(300)의 타단부 또는 일단부와 상하방향으로 적층배치되어 두 개의 코핑(300)에 형성된 제2삽입홀(310)이 서로 연통될 수 있다.Specifically, for example, the coping 300 may have a second insertion hole 310 formed at one end and the other end, respectively, and one end or the other end of the coping 300 is the other end of the other coping 300 or The second insertion holes 310 formed in the two copings 300 by being stacked and disposed at one end in the vertical direction may communicate with each other.

이 때에, 복수 개의 캡(210) 중에서 적어도 일부는 각각 연통되게 배치된 복수 개의 제2삽입홀(310)에 한꺼번에 관통삽입될 수 있다.At this time, at least a portion of the plurality of caps 210 may be inserted through the plurality of second insertion holes 310 respectively disposed to communicate with each other at a time.

이에 따라, 별도의 결합부재 없이 최소한의 단순한 구성으로 코핑(300)이 캡(210)에 조립결합되면서 용이하게 연장될 수 있고, 코핑(300)이 서로 결속되어 슬래브(400)를 지지하므로 교량의 안정성, 내구력이 향상될 수 있다.Accordingly, the coping 300 can be easily extended while being assembled and coupled to the cap 210 in a minimal and simple configuration without a separate coupling member, and the coping 300 is bound to each other to support the slab 400. Stability and durability can be improved.

적층배치된 코핑(300)의 일단부 및 다른 코핑(300)의 타단부는 코핑(300) 및 다른 코핑(300)에서 내측상방 또는 내측하방으로 단차지게 형성되어 서로 맞물릴 수 있다(도 30의 300a와 300b, 300b와 300c). 또한, 적층배치된 일단부 및 타단부의 두께를 합산한 값이 상기 코핑(300)의 두께와 대응될 수 있다. 이러한 구성과 관련하여 도 31 내지 도 42를 살펴본다.One end of the stacked coping 300 and the other end of the other coping 300 are formed to be stepped from the coping 300 and the other coping 300 to the inner upper side or the inner side to be engaged with each other (Fig. 30). 300a and 300b, 300b and 300c). In addition, a value obtained by summing the thicknesses of one end portion and the other end portion arranged in a stack may correspond to the thickness of the coping 300. In connection with this configuration, FIGS. 31 to 42 will be described.

도 31 내지 도 34는 타단부가 내측하방으로 단차지게 형성된 제1코핑(300a)을 나타낸 사시도, 평면도, 저면도 및 정면투시도이고, 도 35 내지 도 38은 일단부가 내측상방으로 단차지게 형성되고 타단부가 내측하방으로 단차지게 형성되는 제2코핑(300b)을 나타낸 사시도, 평면도, 저면도 및 정면투시도이며, 도 39 내지 도 42는 일단부가 내측상방으로 단차지게 형성된 제3코핑(300c)을 나타낸 사시도, 평면도, 저면도 및 정면투시도이다.31 to 34 are a perspective view, a plan view, a bottom view, and a front perspective view showing a first coping 300a in which the other end is stepped inwardly and downward, and FIGS. 35 to 38 are It is a perspective view, a top view, a bottom view, and a front perspective view showing a second coping 300b having an end stepped inwardly and downward, and FIGS. 39 to 42 show a third coping 300c having one end stepped inwardly and upwardly. It is a perspective view, a plan view, a bottom view, and a front perspective view.

제1/제2/제3코핑(300a, 300b, 300c)의 일단부 및 타단부에는 각각 제2삽입홀(310a, 310b)이 형성될 수 있다.Second insertion holes 310a and 310b may be formed at one end and the other end of the first/second/third copings 300a, 300b, and 300c, respectively.

이 때에, 코핑(300)에 형성된 제2삽입홀(310)은 전술한 바와 같이, 단면적이 일정한 크기로 유지되는 상부영역(312) 및 상부영역(312)보다 단면적이 크고 상부로 갈수록 단면적이 작아지는 하부영역(314)으로 구분될 수 있다.At this time, the second insertion hole 310 formed in the coping 300 has a larger cross-sectional area than the upper area 312 and the upper area 312, which are maintained at a constant cross-sectional area, as described above, and the cross-sectional area is smaller toward the top. The paper may be divided into a lower area 314.

제1코핑(300a) 및 제2코핑(300b)의 타단부와 같이 내측하방으로 단차지게 형성된 단부에는 하부영역(314)만으로 구성된 제2삽입홀(310)이 형성될 수 있고, 제2코핑(300b) 및 제3코핑(300c)의 일단부와 같이 내측상방으로 단차지게 형성된 단부에는 상부영역(312)만으로 구성된 제2삽입홀(310)이 형성될 수 있다.A second insertion hole 310 composed of only the lower region 314 may be formed at an end portion formed to be stepped inwardly and downward, such as the other end of the first coping 300a and the second coping 300b, and the second coping ( A second insertion hole 310 composed of only the upper region 312 may be formed at an end stepped inwardly and upward, such as at one end of 300b) and the third coping 300c.

제1코핑(300a)의 타단부와 제2코핑(300b)의 일단부 또는 제2코핑(300b)의 타단부와 제3코핑(300c)의 일단부가 맞물려서 적층배치되면 적측배치된 단부에 형성된 상부영역(312) 및 하부영역(314)이 연통될 수 있다.When the other end of the first coping 300a and one end of the second coping 300b or the other end of the second coping 300b and one end of the third coping 300c are interlocked and stacked, the upper portion formed at the right-sided end The region 312 and the lower region 314 may communicate with each other.

또한, 적층배치된 제1코핑(300a)의 타단부와 제2코핑(300b)의 일단부 또는 제2코핑(300b)의 타단부와 제3코핑(300c)의 일단부의 두께를 합산한 값이 코핑(300)의 두께와 대응될 수 있다.In addition, the sum of the thickness of the other end of the stacked first coping 300a and one end of the second coping 300b or the other end of the second coping 300b and the one end of the third coping 300c is It may correspond to the thickness of the coping 300.

이에 따라, 코핑(300)이 다른 코핑(300)과 단부에서 적층되더라도 코핑(300) 표면이 매끄럽게 연결될 수 있으므로 코핑(300)이 손상되는 것을 방지할 수 있다.Accordingly, even if the coping 300 is stacked at the end of the coping 300 and the other coping 300, the surface of the coping 300 may be smoothly connected, so that damage to the coping 300 may be prevented.

도 43은 본 발명의 다른 일 실시예에 따른 조립식 프리캐스트 교량을 나타낸 사시도이고 도 44는 도 43의 코핑을 나타낸 사시도이며 도 45 및 도 46은 도 43의 코핑이 코핑브라켓에 안착되기 전후의 상태를 나타낸 사시도이다.43 is a perspective view showing an assembly-type precast bridge according to another embodiment of the present invention, and FIG. 44 is a perspective view showing the coping of FIG. 43, and FIGS. 45 and 46 are states before and after the coping of FIG. 43 is seated on the coping bracket Is a perspective view showing.

도 43을 참조하면, 다른 일 실시예에 따른 조립식 프리캐스트 교량(20)은 파일(100), 코핑브라켓(200), 코핑(500) 및 슬래브(400)를 포함하여 구성될 수 있다. 코핑(500)에 대해서 살펴본다. 나머지 구성은 전술한 바와 같다.Referring to FIG. 43, the precast bridge 20 according to another embodiment may include a pile 100, a coping bracket 200, a coping 500, and a slab 400. It looks at the coping 500. The rest of the configuration is as described above.

도 44 내지 도 46을 더 참조하면, 적어도 하나의 코핑(500)의 측단면에는 하부가 개방된 연결홈(510)이 형성될 수 있다. 또한, 코핑(500)의 측단부의 하면은 지지판(220)에 안착될 수 있다.With further reference to FIGS. 44 to 46, a connection groove 510 with an open lower portion may be formed in a side cross-section of at least one coping 500. In addition, the lower surface of the side end portion of the coping 500 may be seated on the support plate 220.

또한, 연결홈(510a)이 형성된 코핑(500a)의 측단면은 연결홈(510b)이 형성된 다른 코핑(500b)의 측단면과 마주하여 배치될 수 있다(도 45, 도 46). 이에 따라, 마주하여 배치된 두 개의 코핑(500a, 500b)에 각각 형성된 연결홈(510a 510b)이 연통될 수 있고, 연통된 연결홈(510a, 510b)에 캡(210)이 위치할 수 있다(도 46).In addition, the side cross-section of the coping 500a in which the connection groove 510a is formed may be disposed to face the side cross-section of the other coping 500b in which the connection groove 510b is formed (FIGS. 45 and 46). Accordingly, the connection grooves 510a 510b formed respectively in the two copings 500a and 500b disposed to face each other may be communicated, and the cap 210 may be located in the connected connection grooves 510a and 510b ( Figure 46).

연통된 연결홈(510a, 510b)에는 제2충진재가 충진될 수 있다. 제2충진재가 충진되면 연결홈(510a)이 형성된 코핑(500a)의 측단면과 연결홈(510b)이 형성된 다른 코핑(500b)의 측단면이 결합될 수 있다. 따라서, 복수 개의 코핑(500)은 교량의 길이방향으로 나란히 연장되면서 배치될 수 있다(도 43).A second filler may be filled in the connected connection grooves 510a and 510b. When the second filler is filled, the side end surface of the coping 500a in which the connection groove 510a is formed and the side end surface of the other coping 500b in which the connection groove 510b is formed may be combined. Accordingly, a plurality of copings 500 may be disposed while extending side by side in the longitudinal direction of the bridge (FIG. 43).

이격되어 나란히 배치된 두 개의 코핑(500)의 상면에는 슬래브(400)의 양쪽 단부가 거치될 수 있다. 슬래브(400)는 전술한 바와 같이 제1방향의 양쪽 단부 중에서 타단부가 이와 이웃하는 슬래브(400)의 일단부와 조립결합될 수 있다.Both ends of the slab 400 may be mounted on the upper surfaces of the two copings 500 that are spaced apart and arranged side by side. As described above, the other end of the slab 400 may be assembled with one end of the slab 400 adjacent thereto.

이에 따라, 코핑(300)이 교량의 길이방향으로 설치되어 슬래브(400)를 지지하는 종래의 거더(girder) 기능을 수행할 수 있다. 따라서, 종래의 거더 등과 같은 별도의 연결부재 또는 지지부재 없이 최소한의 단순한 구성으로 교량을 만들 수 있으므로, 교량의 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있다.Accordingly, the coping 300 may be installed in the longitudinal direction of the bridge to perform a conventional girder function for supporting the slab 400. Therefore, since the bridge can be made with a simple minimum configuration without a separate connecting member or support member such as a conventional girder, it is possible to reduce the manufacturing cost and construction cost of the bridge, and to shorten the construction period.

코핑(500)의 상면에는 전술한 슬래브(400)의 돌출부분(450)이 삽입되는 위치고정홈(520)이 형성될 수 있다.A position fixing groove 520 into which the protruding portion 450 of the slab 400 is inserted may be formed on the upper surface of the coping 500.

도 47은 본 발명의 일 실시예에 따른 조립식 프리캐스트 교량의 시공방법을 나타낸 순서도이다.47 is a flow chart showing the construction method of the precast bridge assembly according to an embodiment of the present invention.

도 47을 참조하면, 일 실시예에 따른 조립식 프리캐스트 교량의 시공방법은 파일설치단계(S610), 코핑브라켓설치단계(S620), 코핑브라켓고정단계(S630), 코핑설치단계(S640), 코핑고정단계(S650) 및 슬래브설치단계(S660)를 포함하여 구성될 수 있다.Referring to Figure 47, the construction method of the precast bridge according to an embodiment is a pile installation step (S610), coping bracket installation step (S620), coping bracket fixing step (S630), coping installation step (S640), coping It may be configured including a fixing step (S650) and a slab installation step (S660).

파일설치단계(S610)에서는, 파일(100)을 지면에 설치할 수 있다.In the file installation step S610, the file 100 may be installed on the ground.

코핑브라켓설치단계(S620)에서는, 파일(100)의 상단부를 캡(210)의 제1삽입홀(212)에 삽입할 수 있다.In the coping bracket installation step (S620), the upper end of the pile 100 may be inserted into the first insertion hole 212 of the cap 210.

코핑브라켓고정단계(S630)에서는, 캡(210)의 제1삽입홀(212) 또는 파일(100)의 중공부(110)에 제1충진재를 타설할 수 있다.In the coping bracket fixing step (S630), the first filler may be poured into the first insertion hole 212 of the cap 210 or the hollow part 110 of the pile 100.

이 때에, 캡(210)의 양쪽 측면을 관통하여 대향설치되는 볼트(270)를 조작하여 코핑브라켓(200)의 위치 또는 기울기를 조절한 후에 제1충진재를 타설할 수 있다.At this time, the first filler may be poured after adjusting the position or inclination of the coping bracket 200 by manipulating the bolts 270 installed opposite to each other through both sides of the cap 210.

이에 따라, 제조 또는 시공상의 오차에도 불구하고 코핑브라켓(200)을 신속하고 용이하게 올바른 기울기로 고정하거나 올바른 위치에 고정할 수 있다.Accordingly, in spite of manufacturing or construction errors, the coping bracket 200 can be quickly and easily fixed to the correct inclination or fixed to the correct position.

한편, 코핑브라켓(200)이 사용되지 않는 경우에는 코핑브라켓설치단계(S620) 및 코핑브라켓고정단계(S630)가 생략될 수 있다. 코핑브라켓(200)이 사용되는 경우에도 코핑브라켓고정단계(S630)는 생략될 수 있다.Meanwhile, when the coping bracket 200 is not used, the coping bracket installation step (S620) and the coping bracket fixing step (S630) may be omitted. Even when the coping bracket 200 is used, the step of fixing the coping bracket (S630) may be omitted.

코핑설치단계(S640)에서는, 코핑(300)을 파일(100)의 상단부와 결합시킬 수 있다. 구체적으로, 코핑브라켓(200)이 파일(100)의 상단에 설치된 경우에는 코핑브라켓(200)의 캡(210)을 코핑(300)의 제2삽입홀(310)에 삽입할 수 있다. 이 때에, 도 30과 같이, 코핑(300)에 형성된 적어도 한 개의 제2삽입홀(310)은 다른 코핑(300)에 형성된 제2삽입홀(310)과 상하방향으로 연통되게 배치되는 경우에는, 캡(210)을 상방에 연통되게 배치되는 제2삽입홀(310) 보다 하방에 연통되게 배치되는 제2삽입홀(310)에 먼저 삽입해야 할 수 있다.In the coping installation step (S640), the coping 300 may be combined with the upper end of the pile 100. Specifically, when the coping bracket 200 is installed on the top of the pile 100, the cap 210 of the coping bracket 200 may be inserted into the second insertion hole 310 of the coping 300. At this time, as shown in FIG. 30, when at least one second insertion hole 310 formed in the coping 300 is disposed to be in vertical communication with the second insertion hole 310 formed in the other coping 300, The cap 210 may have to be first inserted into the second insertion hole 310 disposed below the second insertion hole 310 disposed in communication with the upper side.

반면에, 도 43의 다른 일 실시예에 따른 조립식 프리캐스트 교량의 시공방법의 경우에는, 코핑(500)의 측단부의 하면을 지지판(220)에 안착시키고 연결홈(510)이 형성된 코핑(500)의 측단면을 연결홈(510)이 형성된 다른 코핑(500)의 측단면과 마주하여 배치시킬 수 있다.On the other hand, in the case of the construction method of the prefabricated precast bridge according to another embodiment of FIG. 43, the lower surface of the side end portion of the coping 500 is seated on the support plate 220 and the connection groove 510 is formed. ) May be disposed to face the side end surface of the other coping 500 in which the connection groove 510 is formed.

한편, 코핑브라켓(200)이 사용되지 않는 경우에는 코핑(300)을 직접 파일(100)의 상단부와 결합시킬 수 있다.Meanwhile, when the coping bracket 200 is not used, the coping 300 may be directly coupled to the upper end of the pile 100.

코핑고정단계(S650)에서는, 제2삽입홀(310)에 제2충진재를 타설할 수 있다.In the coping fixing step (S650), a second filler may be poured into the second insertion hole 310.

반면에, 도 43의 다른 일 실시예에 따른 조립식 프리캐스트 교량의 시공방법의 경우에는, 연통된 연결홈(510)에 제2충진재를 타설할 수 있다.On the other hand, in the case of the construction method of the prefabricated precast bridge according to another embodiment of FIG. 43, a second filler may be poured into the connected connection groove 510.

코핑고정단계(S650)는 생략될 수 있다.The coping fixing step (S650) may be omitted.

슬래브설치단계(S660)에서는, 슬래브(400)를 이웃하는 슬래브(400)와 조립결합시키면서 상기 코핑(300, 500)의 상면에 설치할 수 있다.In the slab installation step (S660), the slab 400 may be installed on the upper surfaces of the copings 300 and 500 while assembling and combining the slab 400 with the neighboring slab 400.

구체적으로 예를 들면, 슬래브(400)의 타단부에 형성된 제2돌출부(440)를 코핑(300, 500)에 기설치된 이웃하는 슬래브(400)의 제2홈부(420)에 관통삽입시켜서 코핑(300, 500)에 먼저 거치시키고 거치된 제2돌출부(440)를 회전축으로 하여 슬래브(400)를 회전시켜서 코핑(300, 500)에 설치할 수 있다.Specifically, for example, the second protrusion 440 formed on the other end of the slab 400 is inserted through the second groove 420 of the neighboring slab 400 already installed in the copings 300 and 500 to be coping ( It may be installed on the copings 300 and 500 by first being mounted on the 300 and 500 and rotating the slab 400 using the mounted second protrusion 440 as a rotation axis.

제2돌출부(440)가 제1방향으로 절단한 단면 상에서 장폭(w8) 및 장폭(w8)으로부터 슬래브(400)를 소정의 각도(a)로 기울인 상태에서 측정되는 단폭(w9)을 가지고 있는 경우에는, 소정의 각도(a)로 슬래브(400)를 기울여서 제2돌출부(440)를 이웃하는 슬래브(400)의 제2홈부(220)에 관통삽입시킬 수 있다.When the second protrusion 440 has a short width w9 measured in a state in which the slab 400 is inclined at a predetermined angle a from the long width w8 and the long width w8 on the cross section cut in the first direction Here, by tilting the slab 400 at a predetermined angle (a), the second protrusion 440 may be inserted through the second groove 220 of the adjacent slab 400.

이에 따라, 슬래브(400)를 기울이거나 회전시키는 단순한 시공방법으로 슬래브(400)를 이웃하는 슬래브(400)에 결속시키면서 신속하고 용이하게 설치할 수 있다.Accordingly, it is possible to install the slab 400 quickly and easily while binding the slab 400 to the neighboring slab 400 by a simple construction method of tilting or rotating the slab 400.

이와 같이, 조립식 프리캐스트 교량의 시공방법이 파일(100)을 지면에 설치하는 파일설치단계(S610); 파일(100)의 상단부를 제1삽입홀(212)에 삽입하는 코핑브라켓설치단계(S620); 제1삽입홀(212)에 제1충진재를 타설하는 코핑브라켓고정단계(S630); 코핑브라켓(200)의 캡(210)을 제2삽입홀(310)에 삽입하는 코핑설치단계(S640); 제2삽입홀(310)에 제2충진재를 타설하는 코핑고정단계(S650); 및 슬래브(400)를 코핑(300)의 상면에 설치하는 슬래브설치단계(S660)를 포함함으로써, 별도의 연결부재 또는 결합부재를 설치하는 등의 공정을 포함하지 않고 최소한의 단순한 공정으로 교량을 만들 수 있으므로, 교량의 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있다.In this way, the construction method of the precast bridge is a pile installation step of installing the pile 100 on the ground (S610); Coping bracket installation step of inserting the upper end of the pile 100 into the first insertion hole 212 (S620); Coping bracket fixing step of pouring the first filler into the first insertion hole 212 (S630); A coping installation step of inserting the cap 210 of the coping bracket 200 into the second insertion hole 310 (S640); Coping fixing step (S650) of pouring a second filler into the second insertion hole 310; And by including a slab installation step (S660) of installing the slab 400 on the upper surface of the coping 300, a bridge is made with a minimal simple process without including a process such as installing a separate connecting member or a coupling member. As a result, it is possible to reduce the manufacturing cost and construction cost of the bridge and shorten the construction period.

또한, 조립식 프리캐스트 교량의 시공방법이 파일(100)을 지면에 설치하는 파일설치단계(S610); 코핑(300)을 파일(100)의 상단부와 결합시키는 코핑설치단계(S640); 슬래브(400)를 이웃하는 슬래브(400)와 조립결합시키면서 코핑(300)의 상면에 설치하는 슬래브설치단계(S660)를 포함함으로써, 별도의 연결부재 또는 지지부재를 설치하는 등의 추가 공정을 포함하지 않고 최소한의 단순한 공정으로 교량을 만들 수 있으므로, 교량의 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있다. 여기에서, 별도의 연결부재 또는 지지부재는 코핑(300) 및 슬래브(400) 사이에 설치되어 슬래브(400)를 지지하는 종래의 거더(girder) 등을 의미할 수 있다.In addition, the construction method of the precast bridge is a pile installation step of installing the pile 100 on the ground (S610); Coping installation step (S640) of coupling the coping 300 to the upper end of the pile 100; By including the slab installation step (S660) of installing the slab 400 on the upper surface of the coping 300 while assembling and combining the slab 400 with the neighboring slab 400, it includes an additional process such as installing a separate connecting member or support member Since the bridge can be made with a minimal and simple process, the manufacturing cost and construction cost of the bridge can be reduced, and the construction period can be shortened. Here, a separate connecting member or support member may refer to a conventional girder or the like installed between the coping 300 and the slab 400 to support the slab 400.

또한, 조립식 프리캐스트 교량의 시공방법이 파일(100)을 지면에 설치하는 파일설치단계(S610); 파일(100)의 상단부를 제1삽입홀(212)에 삽입하는 코핑브라켓설치단계(S620); 코핑(500)의 측단부의 하면을 지지판(220)에 안착시키고 연결홈(510)이 형성된 코핑(500)의 측단면을 연결홈(510)이 형성된 다른 코핑(500)의 측단면과 마주하여 배치시키는 코핑설치단계(S640); 연통된 연결홈(510)에 제2충진재를 타설하는 코핑고정단계(S650); 슬래브(400)를 이웃하는 슬래브(400)와 조립결합시키면서 코핑(500)의 상면에 설치하는 슬래브설치단계(S660)를 포함함으로써, 종래의 거더 등과 같은 별도의 연결부재 또는 지지부재를 설치하는 등의 추가공정 없이 최소한의 단순한 공정으로 교량을 만들 수 있으므로, 교량의 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있다.In addition, the construction method of the precast bridge is a pile installation step of installing the pile 100 on the ground (S610); Coping bracket installation step of inserting the upper end of the pile 100 into the first insertion hole 212 (S620); The lower surface of the side end portion of the coping 500 is seated on the support plate 220 and the side end surface of the coping 500 in which the connection groove 510 is formed faces the side end surface of the other coping 500 in which the connection groove 510 is formed. Coping installation step of placing (S640); Coping fixing step (S650) of pouring a second filler into the connected connection groove 510; By including the slab installation step (S660) of installing the slab 400 on the upper surface of the coping 500 while assembling the slab 400 with the neighboring slab 400, installing a separate connecting member or support member such as a conventional girder, etc. Since the bridge can be made with a minimal and simple process without the additional process of, it is possible to reduce the manufacturing cost and construction cost of the bridge and shorten the construction period.

이상과 같이 본 발명에 대해서 예시한 도면을 참조로 하여 설명하였으나, 본 명세서에 개시된 실시예와 도면에 의해 본 발명이 한정되는 것은 아니며, 본 발명의 기술사상의 범위 내에서 통상의 기술자에 의해 다양한 변형이 이루어질 수 있음은 자명하다. 아울러 앞서 본 발명의 실시예를 설명하면서 본 발명의 구성에 따른 작용 효과를 명시적으로 기재하여 설명하지 않았을 지라도, 해당 구성에 의해 예측 가능한 효과 또한 인정되어야 함은 당연하다.As described above with reference to the drawings illustrated for the present invention, the present invention is not limited by the embodiments and drawings disclosed in the present specification, and various by a person skilled in the art within the scope of the technical idea of the present invention. It is obvious that transformation can be made. In addition, even if not explicitly described and described the effects of the configuration of the present invention while describing the embodiments of the present invention, it is natural that the predictable effects of the configuration should also be recognized.

10: 조립식 프리캐스트 교량
100: 파일 110: 중공부
120: 충진마감판 122: 결합봉
200: 코핑브라켓 210: 캡
212: 제1삽입홀 214: 관통공
216: 그레이팅 220: 지지판
230: 연장부
240: 제1보강리브 242: 제1수평면부
244: 제1수직면부 246: 제1연결부
250: 제2보강리브 252: 제2수평면부
254: 제2수직면부 256: 제2연결부
260: 패킹부재 270: 볼트
300: 코핑 310: 제2삽입홀
312: 상부영역 314: 하부영역
320: 위치고정홈
400: 슬래브 410: 제1홈부
420: 제2홈부 422: 제1홈영역
424: 제2홈영역 430: 제1돌출부
440: 제2돌출부 442: 제1돌출영역
444: 제2돌출영역 450: 돌출부분
10: precast bridge
100: file 110: hollow part
120: filling finish plate 122: bonding rod
200: coping bracket 210: cap
212: first insertion hole 214: through hole
216: grating 220: support plate
230: extension
240: first reinforcing rib 242: first horizontal surface portion
244: first vertical surface portion 246: first connection portion
250: second reinforcing rib 252: second horizontal surface portion
254: second vertical surface portion 256: second connection portion
260: packing member 270: bolt
300: coping 310: second insertion hole
312: upper region 314: lower region
320: position fixing groove
400: slab 410: first groove
420: second groove 422: first groove area
424: second groove area 430: first protrusion
440: second protrusion 442: first protrusion region
444: second protruding region 450: protruding portion

Claims (17)

상하방향으로 연장되도록 설치되는 파일(100);
하방으로 개방된 제1삽입홀(212)을 구비하는 중공의 캡(210) 및 상기 캡(210)의 하단부의 외측 둘레로부터 반경방향 외측으로 돌출 연장되는 플랜지 형태의 지지판(220)을 포함하는 강재 코핑브라켓(200); 및
하방으로 개방된 중공의 제2삽입홀(310)을 구비하는 코핑(300);을 포함하는 잔교로서,
상기 코핑브라켓(200)의 캡(210)은 상기 제1삽입홀(212)을 통해 상기 파일(100)의 상단에 외삽되고, 이에 따라 상기 코핑브라켓(200)의 캡(210)의 상면은 상기 캡(210)의 제1삽입홀(212)에 대한 상기 파일(100)의 삽입 깊이를 규제하고,
상기 코핑(300)이 상기 제2삽입홀(310)을 통해 상기 코핑브라켓(200)의 캡(210)에 외삽됨에 따라 상기 코핑(300)의 하면은 상기 코핑브라켓(200)의 지지판(220)에 안착되고, 이에 따라 상기 코핑브라켓(200)의 지지판(220)은 상기 코핑(300)의 제2삽입홀(310)에 대한 상기 코핑브라켓(200)의 캡(210)의 삽입 깊이를 규제하고,
상기 캡(210)의 측면은, 반경방향으로 상기 파일(100)의 상단 외주와 상기 코핑(300)의 제2삽입홀(310)의 내주 사이에 배치되어서 상기 코핑(300)의 측방향 이동을 규제하고,
상기 캡(210)의 측면은 상하방향으로 연장되되, 그 상부는 상기 캡(210)의 상면과 연결되고 그 하부는 상기 지지판(220)에 연결되어서, 상기 지지판(220)에 안착된 상기 코핑브라켓(200)의 하중을 지지하며,
상기 캡(210)의 상면에 그레이팅(216)이 마련되거나, 상기 캡(210)의 상면 또는 측면에 관통공(214)이 마련되고,
상기 그레이팅(216) 또는 관통공(214)을 통해 상기 제1삽입홀(212)에 제1충진재를 타설하여 상기 캡(210)의 중공부에 상기 파일(100)의 상단이 삽입된 상태에서 상기 중공부를 충진한, 조립식 프리캐스트 잔교.
A pile 100 installed to extend in the vertical direction;
A steel material including a hollow cap 210 having a first insertion hole 212 open downward and a flange-shaped support plate 220 extending radially outward from the outer circumference of the lower end of the cap 210 Coping bracket 200; And
As a pier comprising; a coping 300 having a hollow second insertion hole 310 opened downward,
The cap 210 of the coping bracket 200 is extrapolated to the upper end of the pile 100 through the first insertion hole 212, and accordingly, the upper surface of the cap 210 of the coping bracket 200 is Regulating the insertion depth of the pile 100 with respect to the first insertion hole 212 of the cap 210,
As the coping 300 is extrapolated to the cap 210 of the coping bracket 200 through the second insertion hole 310, the lower surface of the coping 300 is the support plate 220 of the coping bracket 200 And, accordingly, the support plate 220 of the coping bracket 200 regulates the insertion depth of the cap 210 of the coping bracket 200 with respect to the second insertion hole 310 of the coping 300 ,
The side surface of the cap 210 is disposed between the outer circumference of the upper end of the pile 100 and the inner circumference of the second insertion hole 310 of the coping 300 in the radial direction to prevent the lateral movement of the coping 300. Regulate,
The side of the cap 210 is extended in the vertical direction, the upper part of which is connected to the upper surface of the cap 210 and the lower part of the cap 210 is connected to the support plate 220, so that the coping bracket seated on the support plate 220 It supports a load of (200),
A grating 216 is provided on the upper surface of the cap 210, or a through hole 214 is provided on the upper surface or side surface of the cap 210,
The first filler is poured into the first insertion hole 212 through the grating 216 or the through hole 214 so that the upper end of the pile 100 is inserted into the hollow portion of the cap 210. Prefabricated precast piers filled with hollows.
청구항 1에 있어서,
상기 파일(100)은 상부가 개방된 중공부(110)를 가지고,
상기 중공부(110)에는 중공부(110)의 상단으로부터 소정의 높이를 두고 아래에 중공부(110)를 가로막는 채움마감판(120)이 설치되는, 조립식 프리캐스트 잔교.
The method according to claim 1,
The pile 100 has a hollow portion 110 with an open top,
The hollow part 110 has a predetermined height from the upper end of the hollow part 110 and a filling finish plate 120 intercepting the hollow part 110 is installed under the prefabricated precast pier.
청구항 2에 있어서,
상기 채움마감판(120)의 상면에는 상방으로 돌출되는 결합봉(122)이 형성되는, 조립식 프리캐스트 잔교.
The method according to claim 2,
An assembly-type precast pier having a coupling rod 122 protruding upward on the upper surface of the filling finish plate 120.
청구항 1에 있어서,
상기 캡(210)은 양쪽 측면을 관통하여 대향설치되는 볼트(270) 쌍을 구비하고,
상기 볼트(270)의 일단부는 상기 제1삽입홀(212)에 삽입된 상기 파일(100)과 접촉하는, 조립식 프리캐스트 잔교.
The method according to claim 1,
The cap 210 has a pair of bolts 270 installed opposite to each other through both sides,
One end of the bolt (270) is in contact with the pile (100) inserted into the first insertion hole (212), a precast precast pier.
청구항 4에 있어서,
상기 볼트(270)는 상기 캡(210)의 전후 및 좌우 측면에 대향설치되는, 조립식 프리캐스트 잔교.
The method of claim 4,
The bolt 270 is installed opposite to the front and rear and left and right sides of the cap 210, the precast precast pier.
청구항 1에 있어서,
상기 코핑브라켓(200)은,
상기 캡(210)의 하단으로부터 하방으로 연장되는 연장부(230); 및
상기 지지판(220)의 하면에 반경방향으로 설치되는 제1수평면부(242), 상기 연장부(230)의 외주면에 상하방향으로 설치되는 제1수직면부(244) 및 상기 제1수평면부(242)와 제1수직면부(244)를 연결하는 제1연결부(246)를 포함하여 구성되는 제1보강리브(240)를 더 포함하고,
상기 제1보강리브(240)는 상기 연장부(230)의 중심축을 중심으로 하여 둘레방향을 따라 복수 개가 배치되는, 조립식 프리캐스트 잔교.
The method according to claim 1,
The coping bracket 200,
An extension part 230 extending downward from the lower end of the cap 210; And
A first horizontal surface portion 242 installed in a radial direction on a lower surface of the support plate 220, a first vertical surface portion 244 installed in a vertical direction on an outer peripheral surface of the extension portion 230, and the first horizontal surface portion 242 ) And a first reinforcing rib 240 configured to include a first connecting portion 246 connecting the first vertical surface portion 244,
A plurality of the first reinforcing ribs 240 are disposed along the circumferential direction with respect to the central axis of the extension part 230.
청구항 1에 있어서,
상기 코핑브라켓(200)은,
상기 지지판(220)의 상면에 반경방향으로 설치되는 제2수평면부(252), 상기 캡(210)의 외주면에 상하방향으로 설치되는 제2수직면부(254) 및 상기 제2수평면부(252)와 제2수직면부(254)를 연결하는 제2연결부(256)를 포함하여 구성되는 제2보강리브(250)를 더 포함하고,
상기 제2보강리브(250)는 상기 캡(210)의 중심축을 중심으로 하여 둘레방향을 따라 복수 개가 배치되는, 조립식 프리캐스트 잔교.
The method according to claim 1,
The coping bracket 200,
A second horizontal surface portion 252 installed in the radial direction on the upper surface of the support plate 220, a second vertical surface portion 254 installed in the vertical direction on the outer peripheral surface of the cap 210, and the second horizontal surface portion 252 Further comprising a second reinforcing rib 250 configured to include a second connecting portion 256 connecting the second vertical surface portion 254,
A plurality of second reinforcing ribs 250 are arranged along a circumferential direction with respect to a central axis of the cap 210, a precast pier.
청구항 7에 있어서,
상기 캡(210)의 중심축으로부터 상기 제2수평면부(252)의 반경방향 외측 단부까지의 거리(d3)가 상기 캡(210)의 중심축으로부터 상기 지지판(220)의 측단면까지의 거리(d1)보다 작은, 조립식 프리캐스트 잔교.
The method of claim 7,
The distance d3 from the central axis of the cap 210 to the radially outer end of the second horizontal surface portion 252 is the distance from the central axis of the cap 210 to the side end surface of the support plate 220 ( d1) smaller, precast piers.
청구항 6에 있어서,
상기 코핑브라켓(200)은,
상기 지지판(220)의 상면에 반경방향으로 설치되는 제2수평면부(252), 상기 캡(210)의 외주면에 상하방향으로 설치되는 제2수직면부(254) 및 상기 제2수평면부(252)와 제2수직면부(254)를 연결하는 제2연결부(256)를 포함하여 구성되는 제2보강리브(250)를 더 포함하고,
상기 제2보강리브(250)는 상기 캡(210)의 중심축을 중심으로 하여 둘레방향을 따라 복수 개가 배치되고,
상기 캡(210)의 중심축으로부터 상기 제2수평면부(252)의 반경방향 외측 단부까지의 거리(d3)가 상기 연장부(230)의 중심축으로부터 상기 제1수평면부(242)의 반경방향 외측 단부까지의 거리(d2)보다 작은, 조립식 프리캐스트 잔교.
The method of claim 6,
The coping bracket 200,
A second horizontal surface portion 252 installed in the radial direction on the upper surface of the support plate 220, a second vertical surface portion 254 installed in the vertical direction on the outer peripheral surface of the cap 210, and the second horizontal surface portion 252 Further comprising a second reinforcing rib 250 configured to include a second connecting portion 256 connecting the second vertical surface portion 254,
A plurality of the second reinforcing ribs 250 are disposed along the circumferential direction around the central axis of the cap 210,
The distance d3 from the central axis of the cap 210 to the radially outer end of the second horizontal surface portion 252 is in the radial direction of the first horizontal surface portion 242 from the central axis of the extension portion 230 Prefabricated precast pier, less than the distance to the outer end (d2).
청구항 1에 있어서,
상기 제2삽입홀(310)은 상부가 개방되고,
상기 개방된 상부를 통해 상기 제2삽입홀(310)에 제2충진재가 타설되는, 조립식 프리캐스트 잔교.
The method according to claim 1,
The second insertion hole 310 has an open top,
A second filler material is poured into the second insertion hole 310 through the open upper part of the precast pier.
청구항 1에 있어서,
상기 제2삽입홀(310)은 상부가 개방되고,
상기 코핑(300)의 상면의 높이는 상기 제2삽입홀(310)에 삽입된 상기 캡(210)의 상면의 높이에 대응되는, 조립식 프리캐스트 잔교.
The method according to claim 1,
The second insertion hole 310 has an open top,
The height of the upper surface of the coping 300 corresponds to the height of the upper surface of the cap 210 inserted into the second insertion hole 310, a precast pier.
청구항 1에 있어서,
상기 제2삽입홀(310)은 단면적이 일정한 크기로 유지되는 상부영역(312) 및 상기 상부영역(312)보다 단면적이 크고 상부로 갈수록 단면적이 작아지는 하부영역(314)을 포함하여 구성되는, 조립식 프리캐스트 잔교.
The method according to claim 1,
The second insertion hole 310 is configured to include an upper region 312 having a cross-sectional area maintained at a constant size, and a lower region 314 having a larger cross-sectional area than the upper region 312 and decreasing upwardly, Prefabricated precast pier.
청구항 1에 있어서,
상기 조립식 프리캐스트 잔교는 상기 파일(100), 상기 코핑브라켓(200) 및 상기 코핑(300)을 각각 복수 개 포함하고,
상기 복수 개의 파일(100)은 상기 복수 개의 코핑브라켓(200)의 캡(210)에 각각 삽입되고,
상기 복수 개의 코핑(300)에는 각각 복수 개의 상기 제2삽입홀(310)이 형성되고,
복수 개의 상기 제2삽입홀(310) 중에서 적어도 일부의 제2삽입홀(310)은 상부가 개방되고,
각각의 상기 코핑(300)에 형성된 적어도 한 개의 상기 제2삽입홀(310)은 다른 코핑(300)에 형성된 제2삽입홀(310)과 상하방향으로 연통되게 배치되고,
상기 복수 개의 캡(210) 중에서 적어도 일부는 각각 상기 연통되게 배치된 복수 개의 제2삽입홀(310)에 한꺼번에 관통삽입되는, 조립식 프리캐스트 잔교.
The method according to claim 1,
The prefabricated precast pier includes a plurality of the pile 100, the coping bracket 200, and the coping 300, respectively,
The plurality of piles 100 are respectively inserted into the caps 210 of the plurality of coping brackets 200,
Each of the plurality of copings 300 is formed with a plurality of the second insertion holes 310,
At least a portion of the second insertion hole 310 of the plurality of second insertion holes 310 has an open upper portion,
At least one of the second insertion holes 310 formed in each of the copings 300 is arranged to be in vertical communication with the second insertion holes 310 formed in the other copings 300,
At least some of the plurality of caps 210 are inserted through the plurality of second insertion holes 310 respectively disposed to communicate with each other at a time.
청구항 13에 있어서,
상기 코핑(300)은 일단부 및 타단부에 각각 상기 제2삽입홀(310)이 형성되고,
상기 코핑(300)의 일단부 또는 타단부는 상기 다른 코핑(300)의 타단부 또는 일단부와 상하방향으로 적층배치되어 두 개의 코핑(300)에 형성된 상기 제2삽입홀(310)이 서로 연통되고,
상기 적층배치된 일단부 및 타단부는 상기 코핑(300) 및 상기 다른 코핑(300)에서 내측상방 또는 내측하방으로 단차지게 형성되어 서로 맞물리고,
상기 적층배치된 일단부 및 타단부의 두께를 합산한 값이 상기 코핑(300)의 두께와 대응되는, 조립식 프리캐스트 잔교.
The method of claim 13,
The coping 300 has the second insertion hole 310 formed at one end and the other end, respectively,
One end or the other end of the coping 300 is stacked and disposed in a vertical direction with the other end or one end of the other coping 300 so that the second insertion holes 310 formed in the two copings 300 communicate with each other. Become,
The stacked one end and the other end are formed to be stepped inwardly upward or downwardly in the coping 300 and the other coping 300 so as to mesh with each other,
The prefabricated precast pier, wherein a value obtained by summing the thicknesses of the one end portion and the other end portion arranged in the stack corresponds to the thickness of the coping (300).
청구항 1에 있어서,
상기 코핑브라켓(200)의 하단부에는 패킹부재(260)가 구비되는, 조립식 프리캐스트 잔교.
The method according to claim 1,
A packing member 260 is provided at the lower end of the coping bracket 200, an assembly-type precast pier.
청구항 1 내지 청구항 15 중 어느 하나의 조립식 프리캐스트 잔교의 시공방법으로서,
상기 파일(100)을 지면에 설치하는 파일설치단계(S610);
상기 파일(100)의 상단부를 상기 제1삽입홀(212)에 삽입하는 코핑브라켓설치단계(S620);
상기 제1삽입홀(212)에 제1충진재를 타설하는 코핑브라켓고정단계(S630);
상기 코핑브라켓(200)의 캡(210)을 상기 제2삽입홀(310)에 삽입하는 코핑설치단계(S640);
상기 제2삽입홀(310)에 제2충진재를 타설하는 코핑고정단계(S650); 및
슬래브(400)를 상기 코핑(300)의 상면에 설치하는 슬래브설치단계(S660)를 포함하는, 조립식 프리캐스트 잔교의 시공방법.
As the construction method of the precast pier of any one of claims 1 to 15,
A file installation step (S610) of installing the file 100 on the ground;
Coping bracket installation step (S620) of inserting the upper end of the pile 100 into the first insertion hole 212;
Coping bracket fixing step (S630) of pouring a first filler into the first insertion hole 212;
A coping installation step (S640) of inserting the cap 210 of the coping bracket 200 into the second insertion hole 310;
Coping fixing step (S650) of pouring a second filler into the second insertion hole 310; And
Including a slab installation step (S660) of installing the slab 400 on the upper surface of the coping 300, the construction method of the precast pier.
청구항 4 또는 청구항 5의 조립식 프리캐스트 잔교의 시공방법으로서,
상기 파일(100)을 지면에 설치하는 파일설치단계(S610);
상기 파일(100)의 상단부를 상기 제1삽입홀(212)에 삽입하는 코핑브라켓설치단계(S620);
상기 볼트(270)를 조작하여 상기 코핑브라켓(200)의 위치 또는 기울기를 조절한 후에 상기 제1삽입홀(212)에 제1충진재를 타설하는 코핑브라켓고정단계(S630);
상기 코핑브라켓(200)의 캡(210)을 상기 제2삽입홀(310)에 삽입하는 코핑설치단계(S640);
상기 제2삽입홀(310)에 제2충진재를 타설하는 코핑고정단계(S650); 및
슬래브(400)를 상기 코핑(300)의 상면에 설치하는 슬래브설치단계(S660)를 포함하는, 조립식 프리캐스트 잔교의 시공방법.
As the construction method of the prefabricated precast pier of claim 4 or 5,
A file installation step (S610) of installing the file 100 on the ground;
Coping bracket installation step (S620) of inserting the upper end of the pile 100 into the first insertion hole 212;
A coping bracket fixing step (S630) of placing a first filler in the first insertion hole 212 after adjusting the position or inclination of the coping bracket 200 by manipulating the bolt 270;
A coping installation step (S640) of inserting the cap 210 of the coping bracket 200 into the second insertion hole 310;
Coping fixing step (S650) of pouring a second filler into the second insertion hole 310; And
Including a slab installation step (S660) of installing the slab 400 on the upper surface of the coping 300, the construction method of the precast pier.
KR1020200122265A 2020-09-22 2020-09-22 Prefabricated precast pier and construction method thereof KR20200116874A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200122265A KR20200116874A (en) 2020-09-22 2020-09-22 Prefabricated precast pier and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200122265A KR20200116874A (en) 2020-09-22 2020-09-22 Prefabricated precast pier and construction method thereof

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020200036384A Division KR102160679B1 (en) 2020-03-25 2020-03-25 Prefabricated precast bridge and construction method thereof

Publications (1)

Publication Number Publication Date
KR20200116874A true KR20200116874A (en) 2020-10-13

Family

ID=72885000

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200122265A KR20200116874A (en) 2020-09-22 2020-09-22 Prefabricated precast pier and construction method thereof

Country Status (1)

Country Link
KR (1) KR20200116874A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102414847B1 (en) * 2021-08-02 2022-06-30 주식회사 빌드윈 Pier girder joint structure and construction method of the same
KR20230050045A (en) * 2021-10-07 2023-04-14 한국해양과학기술원 Modular pier capable of realizing high girder height and long column spans

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101939132B1 (en) 2018-04-16 2019-01-16 한녹희 Girder, modular rahmen structure and construction method thereof

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101939132B1 (en) 2018-04-16 2019-01-16 한녹희 Girder, modular rahmen structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102414847B1 (en) * 2021-08-02 2022-06-30 주식회사 빌드윈 Pier girder joint structure and construction method of the same
KR20230050045A (en) * 2021-10-07 2023-04-14 한국해양과학기술원 Modular pier capable of realizing high girder height and long column spans

Similar Documents

Publication Publication Date Title
KR102160679B1 (en) Prefabricated precast bridge and construction method thereof
CA2626096C (en) Tower construction
EP1246972B1 (en) Pre-stressed modular retaining wall system and method
US4564313A (en) Rectilinear culvert structure
KR102160684B1 (en) Prefabricated precast bridge and construction method thereof
KR20200116874A (en) Prefabricated precast pier and construction method thereof
KR100969586B1 (en) Rhamen bridge and construction method there of
CN112469864A (en) Base for wind turbine
KR20210094617A (en) Foundation for wind turbine towers
KR20110126866A (en) Method for constructing united joint of tube filled concrete block
JP7490128B2 (en) Road Structure
KR102517707B1 (en) Construction method of pier and its structure system
KR20200116875A (en) Prefabricated precast pier and construction method thereof
CA3162517A1 (en) Foundation for a wind turbine
KR102308731B1 (en) Combined Structure of Column and Coping and Girders
EP1495191B1 (en) Arch systems
JP4413064B2 (en) Side wall structure of precast PC tank
KR102274358B1 (en) Precast Deck for Bridge Structure Cantilever
KR102580530B1 (en) Bridge lower structure of assembly type having elastic duct coupler of socket type, and construction method for the same
KR102327700B1 (en) Girder structure and construction method for continuity of supporting portion of girder using the same
CN211200023U (en) Prefabricated bridge construction of full assembled
KR102254229B1 (en) Assembly bridge structure and method with improved coupling force
KR20060028828A (en) Precast concrete girder having integrated slab
KR101971267B1 (en) Precast mountain type rahmen structure and method for constructing this same
JP7250406B2 (en) Bridge piers and pier construction methods

Legal Events

Date Code Title Description
A107 Divisional application of patent