KR20200115038A - System for enterprise resource planning - Google Patents
System for enterprise resource planning Download PDFInfo
- Publication number
- KR20200115038A KR20200115038A KR1020190172778A KR20190172778A KR20200115038A KR 20200115038 A KR20200115038 A KR 20200115038A KR 1020190172778 A KR1020190172778 A KR 1020190172778A KR 20190172778 A KR20190172778 A KR 20190172778A KR 20200115038 A KR20200115038 A KR 20200115038A
- Authority
- KR
- South Korea
- Prior art keywords
- management
- information
- cost
- construction site
- worker
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/105—Human resources
- G06Q10/1053—Employment or hiring
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/08—Insurance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
Description
본 발명은 컴퓨터로 구현되는 비용계산서의 관리 기능, 근로자별 보험금 자동조정 기능 및 컴퓨터로 구현되는 캘린더를 이용한 공사현장 관리기능을 구비한 전사적 자원 관리 시스템에 관한 것이다.The present invention relates to a company-wide resource management system having a computer-implemented cost invoice management function, an automatic adjustment function for each worker's insurance payment, and a construction site management function using a computer-implemented calendar.
전사적 자원 관리(Enterprise resource planning, ERP)는 경영 정보 시스템(MIS)의 한 종류로서, 기업의 제반 요소를 통합하고 기업 활동을 위해 사용되는 기업 내의 모든 인적, 물적 자원을 효율적으로 관리하여 궁극적으로 기업의 경쟁력을 강화시켜 주는 역할을 하는 통합정보시스템을 의미한다.Enterprise resource planning (ERP) is a type of management information system (MIS). It integrates all elements of a company and efficiently manages all human and material resources used for business activities. It refers to an integrated information system that plays a role in enhancing the competitiveness of the company.
회계, 원가, 영업, 구매, 자재, 생산, 품질, 설비, 자금, 투자, 프로젝트 관리 부분 등 다양한 산업 분야에서 전사적 자원 관리 시스템이 적용되고 있으며, 이를 통해 관리 및 재무 효율의 확연한 상승을 보임은 물론이고, 업무 결과 및 경영 성과의 개선 수준에 까지도 영향을 주고 있다.The company-wide resource management system is being applied in various industries such as accounting, cost, sales, purchasing, materials, production, quality, facilities, funds, investment, and project management, and through this, management and financial efficiency have not only improved significantly. It also affects the level of improvement in work results and management performance.
최근에는 계정원장관리, 채권관리, 채무관리, 고정자산관리, 연결회계 등의 재무 회계 또는 간접관리 부분(원가중심 간접비, ABC 등), 제품원가관리부분(표준원가계산, 실제원가계산), 수익성 분석 등의 관리 회계에 관한 관리 영역에 전사적 자원 관리 시스템을 구축하여 자금 수지 및 운용 관리를 넘어 자금 유동성 예측에 이르기까지 다양한 회계 관리 기능을 제공하기 위한 기술의 개발이 진행되고 있다.Recently, financial accounting or indirect management such as account ledger management, debt management, debt management, fixed asset management, consolidated accounting, etc. (cost-oriented overhead expenses, ABC, etc.), product cost management (standard cost calculation, actual cost calculation), profitability analysis The development of technology to provide various accounting management functions from fund balance and operation management to fund liquidity prediction by establishing a company-wide resource management system in the management area related to management accounting, such as, etc. is in progress.
이와 관련하여 회계 관리 관련한 전사적 자원관리 시스템을 구축하기 위해 마련된 종래기술에 대한 선행문헌에는 대한민국 등록특허공보 제10-0817602호의 "전사적 자원관리 시스템"(이하, '종래기술'이라고 함)이 있다.In this regard, as a prior document on the prior art prepared to establish an enterprise resource management system related to accounting management, there is a "company-wide resource management system" (hereinafter referred to as "conventional technology") of Korean Patent Publication No. 10-0817602.
하지만, 종래기술을 비롯한 회계 관리 기능을 구비한 전사적 자원 관리 시스템의 경우, 회계 관리와 관련된 각종 기능의 제공 형태는 물론이고, 해당 기능의 제공을 통해 마련되는 각종 회계 관리와 관련된 정보의 출력 혹은 인쇄 형태가 최초 설정된 형태로부터 고정되거나 설정된 형태의 일부만을 조절할 수 있어 적용되는 시스템의 다양한 분야 혹은 범위에 따라 대응되는 다변성에 큰 제한이 존재하는 문제점이 있었다.However, in the case of an enterprise resource management system equipped with accounting management functions including the prior art, not only the form of providing various functions related to accounting management, but also printing or printing information related to various accounting management provided through the provision of the corresponding functions. Since the shape is fixed from the initially set shape or only a part of the set shape can be adjusted, there is a problem that there is a large limitation in the variability corresponding to various fields or ranges of the applied system.
아울러, 종래기술을 비롯한 회계 관리 기능을 구비한 전사적 자원 관리 시스템의 경우, 회계 관리와 관련된 비용 산정 방식에 있어서도 실직적인 시스템 적용 환경에 대응되지 못해 충분한 이용가능성 및 실효성을 갖추지 못하는 문제점이 있었다.In addition, in the case of an enterprise resource management system equipped with an accounting management function including the prior art, there is a problem in that the cost calculation method related to accounting management does not respond to the practical system application environment, and thus does not have sufficient usability and effectiveness.
본 발명은 상기 문제점을 해결하기 위해 창작된 것으로써, 본 발명의 목적은 전사적 자원 관리 시스템을 통해 공사현장의 회계 관리와 관련한 각종 비용계산서 관리에 있어 시스템 적용 환경 및 범위에 대응되어 관리자 선택에 의해 다양하게 변화되는 기능의 이용이 가능하도록 하는 기술을 제공하는데 있다.The present invention was created to solve the above problem, and an object of the present invention is to respond to the system application environment and scope in managing various cost invoices related to accounting management of a construction site through an enterprise resource management system. It is to provide a technology that enables the use of variously changed functions.
아울러, 본 발명의 또 다른 목적은 전사적 자원 관리 시스템을 통해 공사현장의 근로자들의 보험금 산정에 있어 실무 및 법리적으로 실효성을 갖춘 방식을 통해 보험금 공제 금액의 자동 조정을 수행하는 기능의 이용이 가능하도록 하는 기술을 제공하는데 있다.In addition, another object of the present invention is to enable the use of the function of automatically adjusting the insurance deduction amount through a method that is practically and legally effective in calculating the insurance payments of workers at the construction site through the enterprise resource management system. It is to provide the technology to do.
또한, 본 발명의 또 다른 목적은 공사현장 관리기능을 통한 전사적 자원 관리에 있어서 컴퓨터로 구현되는 캘린더를 이용해 해당 기능의 제공을 통한 정보의 파악이 더욱 용이하고 정보의 활용 및 접근 효율이 우수한 근로자 근태 및 업무 관리기능을 구비할 수 있는 기술을 제공하는데 있다.In addition, another object of the present invention is to use a computer-implemented calendar in enterprise-wide resource management through a construction site management function to make it easier to grasp information by providing the corresponding function, and to use and access information more efficiently. And it is to provide a technology capable of having a business management function.
상기 목적을 달성하기 위하여 본 발명에 따른 전사적 자원 관리 시스템은, 관리자가 입력하는 비용계산서 관리용 신호들 및 근로자별 보험금 자동조정용 신호들을 생성하며, 관리자가 입력하는 공사현장의 근로자, 환경, 일정, 사건 및 비용 관리 위한 내용을 반영한 공사현장 관리정보를 생성하는 관리 단말기와 연동되며, 컴퓨터로 구현되는 비용계산서 관리 및 근로자별 보험금 자동조정 기능과 컴퓨터로 구현되는 캘린더를 이용한 공사현장 관리기능을 구비한 전사적 자원 관리 시스템에 있어서, 상기 관리 단말기로부터 수신된 비용계산서 관리용 신호들을 기반으로 상기 컴퓨터로 구현되는 비용계산서의 포맷설정, 생성, 저장 출력이 이루어지도록 함으로써, 비용계산서 관리 기능을 수행하며, 상기 관리 단말기로부터 수신된 근로자별 보험금 자동조정용 신호들을 기반으로 근로자별 보험금 자동조정 기능을 수행하는 제1프로세서; 상기 관리 단말기로부터 수신된 공사현장 관리정보가 상기 컴퓨터로 구현되는 캘린더에 반영되도록 함으로써, 공사현장 관리기능을 수행하는 제2프로세서; 및 상기 제1프로세서 및 제2프로세서에 의해 액세스 가능한 비-일시적 유형으로, 컴퓨터로 구현되는 비용계산서 관리 및 근로자별 보험금 자동조정 기능과 컴퓨터로 구현되는 캘린더를 이용한 공사현장 관리기능을 수행하게 하는 지시들의 세트를 포함한 컴퓨터 코드들이 저장된 메모리;를 포함하며, 상기 제1프로세서는, 상기 관리 단말기로부터 수신된 비용계산서 관리용 신호들을 통해 공사현장 관리를 위한 비용계산서의 템플릿 포맷을 설정하고, 템플릿 포맷이 설정된 비용계산서를 생성, 저장 및 출력시키는 비용계산서 관리부; 및 상기 관리 단말기로부터 수신된 보험금 자동조정용 신호들을 통해 근로자 각각의 보험금을 기 설정된 최소 하한액에서 최대 상한액까지의 기준 금액 범위 내로 조정 후 공사현장별 노무비율에 따라 자동 분할하여 조정금액 정보를 생성하고, 생성된 조정금액 정보를 저장, 출력시키는 보험금 자동조정 관리부;을 포함하며, 상기 제2프로세서는, 상기 관리 단말기로부터 수신되는 공사현장 관리정보 중 알림형 정보의 건수 및 내역을 캘린더 내 각각의 날짜별로 정보 생성날짜 혹은 정보 내 기 설정된 날짜와 대응되게 표시하는 캘린더를 제공하는 제1공사현장 관리용 캘린더 제공부;를 포함한다.In order to achieve the above object, the enterprise-wide resource management system according to the present invention generates signals for cost invoice management input by the manager and signals for automatic adjustment of insurance payments for each worker, and the workers, environment, schedule, and It is interlocked with a management terminal that generates construction site management information that reflects the contents for event and cost management, and has a function of managing cost invoices implemented by a computer, automatic adjustment of insurance payments for each worker, and a construction site management function using a computer-implemented calendar. In the enterprise-wide resource management system, the cost invoice management function is performed by making the format setting, generation, and storage output of the cost invoice implemented by the computer based on the cost invoice management signals received from the management terminal, and the A first processor that performs an automatic adjustment function for each worker based on signals for automatic adjustment of insurance benefits for each worker received from the management terminal; A second processor that performs a construction site management function by reflecting the construction site management information received from the management terminal on a calendar implemented by the computer; And a non-temporary type accessible by the first processor and the second processor, instructing to perform a computer-implemented cost invoice management and an automatic adjustment function for each worker's insurance payment, and a construction site management function using a computer-implemented calendar. And a memory storing computer codes including a set of them, wherein the first processor sets a template format of a cost invoice for construction site management through signals for cost invoice management received from the management terminal, and the template format is A cost invoice management unit generating, storing and outputting the set cost invoice; And Through signals for automatic adjustment of insurance benefits received from the management terminal, each worker's insurance premium is adjusted within the range of the standard amount from the preset minimum lower limit to the maximum upper limit, and then automatically divided according to the labor ratio for each construction site to generate adjustment amount information, And an automatic insurance adjustment management unit for storing and outputting the generated adjustment amount information, wherein the second processor stores the number and details of notification type information among the construction site management information received from the management terminal for each date in the calendar. It includes; a first construction site management calendar providing unit for providing a calendar that displays corresponding to the information creation date or a preset date in the information.
여기서, 상기 비용계산서의 템플릿은 특정 금액값과 매칭된 다수의 제1컨트롤 항목과 상기 제1컨트롤 항목 복수개 각각에 매칭된 금액값이 기 설정된 계산식에 대입되어 산정된 계산값과 매칭된 다수의 제2컨트롤 항목 중 각각 적어도 하나 이상으로 구성된 포맷으로 마련된다.Here, in the template of the cost invoice, a plurality of first control items matched with a specific amount of money and a plurality of first control items matched with a plurality of first control items are substituted into a preset calculation formula and matched with the calculated calculation values. It is provided in a format consisting of at least one or more of each of the 2 control items.
또한, 상기 비용계산서 관리부는, 상기 관리 단말기를 통해 입력되는 항목 설정 신호에 의해, 상기 제1컨트롤 항목의 내용 및 상기 제1컨트롤 항목과 매칭된 금액값을 설정하거나 상기 제2컨트롤 항목의 내용 및 상기 제2컨트롤 항목과 매칭된 상기 계산값의 산정을 위한 상기 계산식을 설정하여 상기 제1컨트롤 항목 또는 상기 제2컨트롤 항목을 생성하는 항목 설정부분; 상기 항목 설정부분을 통해 설정 완료 후 생성된 다수의 상기 제1컨트롤 항목과 다수의 상기 제2컨트롤 항목을 저장하는 항목 저장부분; 상기 관리 단말기를 통해 입력되는 포맷 설정 신호에 의해, 상기 항목 저장부분에 저장된 다수의 상기 제1컨트롤 항목과 다수의 상기 제2컨트롤 항목 중 각각 적어도 하나 이상으로 구성된 상기 비용계산서의 템플릿의 포맷을 설정하는 포맷 설정부분; 및 상기 포맷 설정부분을 통해 포맷 설정이 완료된 비용계산서의 템플릿을 구성하는 적어도 하나 이상의 제1컨트롤 항목과 제2컨트롤 항목과 함께 상기 포맷 설정부분을 통해 포맷 설정이 완료된 비용계산서의 템플릿을 구성하는 적어도 하나 이상의 제1컨트롤 항목과 제2컨트롤 항목 각각에 매칭된 금액값 및 계산값이 표시된 비용계산서를 생성하는 비용계산서 생성부분;을 포함한다.In addition, the cost invoice management unit may set the content of the first control item and an amount of money matched with the first control item according to the item setting signal input through the management terminal, or the content of the second control item and An item setting part for generating the first control item or the second control item by setting the calculation formula for calculating the calculated value matched with the second control item; An item storage section for storing a plurality of the first control items and a plurality of the second control items generated after setting is completed through the item setting section; According to the format setting signal input through the management terminal, the format of the template of the cost invoice is composed of at least one of each of the plurality of first control items and the plurality of second control items stored in the item storage part. Format setting part; And at least constituting a template of a cost invoice for which format setting has been completed through the format setting portion together with at least one or more first control items and second control items constituting a template of the cost invoice for which format setting has been completed through the format setting portion. And a cost invoice generation unit for generating a cost invoice in which the price value and calculated value matched to each of the one or more first control items and the second control item are displayed.
또한, 상기 비용계산서 관리부는, 상기 비용계산서 생성부분을 통해 생성된 비용계산서를 저장하는 비용계산서 저장부분; 및 상기 관리 단말기를 통해 입력되는 출력 신호에 의해, 상기 비용계산서 생성부분을 통해 생성된 비용계산서 또는 상기 비용계산서 저장부분에 저장된 비용계산서 중 출력 신호에 대응되는 비용계산서를 상기 관리 단말기로 출력하는 비용계산서 출력부분;을 더 포함한다.In addition, the cost invoice management unit may include a cost invoice storage section for storing a cost invoice generated through the cost invoice generation section; And a cost of outputting a cost invoice corresponding to an output signal from among the cost invoice generated through the cost invoice generation portion or the cost invoice stored in the cost invoice storage portion by an output signal input through the management terminal to the management terminal. It further includes a bill output part.
아울러, 상기 보험금 자동조정 관리부는, 상기 관리 단말기를 통해 입력되는 한도 설정 신호에 의해, 근로자의 보험금에 대한 최소 하한액 및 최대 상한액에 대한 한도정보를 설정하여 저장하는 한도 설정부분; 상기 관리 단말기를 통해 입력되는 근로자별 노무정보 입력 신호에 의해, 근로자별 노무정보 입력 신호와 대응되어 근로자의 공사현장별 노무비용에 대한 정보를 포함하는 노무정보를 근로자별로 생성하여 저장 관리하는 노무정보 관리부분; 상기 관리 단말기를 통해 입력되는 보험금 공제기준 설정 신호에 의해, 근로자의 공사현장별 노무비용 대비 보험금 공제금액의 산정기준을 설정하여 저장하는 산정기준 설정부분; 상기 산정기준 설정부분을 통해 설정된 보험금 공제금액의 산정기준 및 상기 노무정보 관리부분에 저장된 근로자별 노무정보를 기반으로 근로자의 공사현장별 보험금 공제금액에 대한 공제정보를 근로자별로 생성하여 저장 관리하는 공제정보 관리부분; 및 기 설정된 조정기준에 따라 상기 공제정보 관리부분에 저장된 공제정보에 따른 근로자의 공사현장별 보험금 공제금액의 총합을 보험금 조정금액의 총합으로 근로자별 변환을 수행하고, 변환된 근로자별 보험금 조정금액의 총합을 상기 노무정보 관리부분에 저장된 근로자별 노무정보에 따른 근로자의 공사현장별 노무비용의 상호 비율에 대응되도록 자동 분할하여 근로자의 공사현장별 보험금 조정금액에 대한 조정정보를 근로자별로 생성하여 저장 관리하는 조정정보 관리부분;을 포함하며, 상기 기 설정된 조정기준은 상기 공제정보 관리부분에 저장된 공제정보 및 상기 한도 설정부분을 통해 설정된 한도정보를 기반으로 근로자의 공사현장별 보험금 공제금액의 총합이 최소 하한액 미만이면 최소 하한액을 보험금 조정금액의 총합으로 변환하고, 근로자의 공사현장별 보험금 공제금액의 총합이 최대 상한액을 초과하면 최대 상한액을 보험금 조정금액의 총합으로 변환하고, 근로자의 공사현장별 보험금 공제금액의 총합이 최소 하한액 이상에서 최대 상한액 이하이면 보험금 공제금액을 보험금 조정금액의 총합으로 변환하는 기준에 해당한다.In addition, the insurance payment automatic adjustment management unit may include a limit setting part for setting and storing limit information on the minimum lower limit and the maximum upper limit of the insurance amount of the worker according to the limit setting signal input through the management terminal; Labor information that generates and manages labor information for each worker, including information on the labor cost of each construction site, corresponding to the labor information input signal for each worker by the labor information input signal for each worker input through the management terminal. Management part; A calculation standard setting part for setting and storing a calculation standard of an insurance premium deduction amount relative to the labor cost of each construction site of the worker according to the insurance premium deduction standard setting signal input through the management terminal; Based on the calculation standard of the insurance deduction amount set through the calculation criteria setting part and the labor information for each worker stored in the labor information management part, deduction information for the insurance deduction amount for each construction site of the worker is created and stored for each worker. Information management part; And the total amount of insurance premiums deducted for each construction site of workers according to the deduction information stored in the deduction information management part according to the preset adjustment criteria, converted to the total amount of insurance premiums adjusted for each worker, and The total is automatically divided to correspond to the reciprocal ratio of the labor cost of each construction site according to the labor information for each worker stored in the labor information management section, and the adjustment information for the adjustment amount of the insurance premium for each construction site is generated for each worker and stored and managed. And the preset adjustment standard is based on the deduction information stored in the deduction information management portion and the limit information set through the limit setting portion, the total sum of the insurance deduction amount for each construction site of the worker. If the amount is less than the lower limit, the minimum lower limit is converted to the total amount of the insurance premium adjustment amount.If the total amount of the insurance premium deducted amount for each construction site of the worker exceeds the maximum maximum amount, the maximum upper limit is converted into the total amount of the insurance premium adjustment amount. If the sum of the insurance deduction amount is more than the minimum lower limit and less than the maximum upper limit, it is the standard for converting the insurance deduction amount into the total amount of the insurance premium adjustment amount.
또한, 상기 보험금 자동조정 관리부는, 상기 관리 단말기를 통해 입력되는 정보 출력 신호에 의해, 노무정보 관리부분에 저장된 노무정보, 공제정보 관리부분에 저장된 공제정보, 조정정보 관리부분에 저장된 조정정보를 근로자별로 매칭시켜 동시에 상기 관리 단말기로 출력하는 정보 출력부분;을 더 포함한다.In addition, the insurance payment automatic adjustment management unit, by the information output signal input through the management terminal, the labor information stored in the labor information management portion, deduction information stored in the deduction information management portion, and the adjustment information stored in the adjustment information management portion It further includes an information output part that matches each and simultaneously outputs the information to the management terminal.
그리고 상기 제2프로세서는, 상기 관리 단말기로부터 수신되는 공사현장 관리정보 내 비용관리형 정보의 비용관리 대상 수 및 비용관리 대상의 비용현황을 캘린더 내 각각의 날짜별로 정보 생성날짜가 대응되게 표시하는 캘린더를 제공하는 제2공사현장 관리용 캘린더 제공부; 및 상기 관리 단말기로부터 수신되는 공사현장 관리정보 내 공사현장의 날씨정보를 캘린더 내 각각의 날짜별로 정보 생성날짜 대응되게 표시하는 캘린더를 제공하는 날씨 관리용 캘린더 제공부;를 더 포함한다.In addition, the second processor is a calendar that displays the number of cost management targets of cost management information in the construction site management information received from the management terminal and the cost status of the cost management target in correspondence with the information creation date for each date in the calendar. A second construction site management calendar providing unit to provide a; And a weather management calendar providing unit that provides a calendar displaying the weather information of the construction site in the construction site management information received from the management terminal in correspondence with the information creation date for each date in the calendar.
여기서, 상기 알림형 정보는 공사현장 관련 공사일보, 공지사항, 공사휴무, 작업사건 현황, 사건 마감현황 및 사건 결제현황에 관한 정보 중 하나에 해당한다.Here, the notification type information corresponds to one of information on a construction site-related construction daily report, announcements, construction holidays, work event status, event closing status, and event settlement status.
아울러, 상기 제1공사현장 관리용 캘린더 제공부는, 날짜 표시 공간과 알림형 정보 표시 공간을 구비한 다수의 제1날짜 칸 및 알림형 정보에 대한 월별 합계정보를 표시하기 위한 제1합계 칸을 포함하는 캘린더를 생성하는 제1공사현장 관리용 캘린더 생성부분; 상기 제1날짜 칸의 알림형 정보 표시 공간에 상기 관리 단말기로부터 수신되는 공사현장 관리정보를 기반으로 알림형 정보의 건수 및 내역에 대한 정보를 상기 제1날짜 칸의 날짜 표시 공간에 표시된 날짜별로 대응되게 표시하는 알림형 정보 표시부분; 및 상기 제1합계 칸에 상기 관리 단말기로부터 수신되는 공사현장 관리정보를 기반으로 알림형 정보 건수에 대한 정보의 월별 합계정보를 표시하는 제1합계정보 표시부분;을 포함한다.In addition, the first construction site management calendar providing unit includes a plurality of first date columns having a date display space and a reminder-type information display space, and a first total column for displaying monthly total information on the reminder type information. A first construction site management calendar generating portion for generating a calendar to be used; Based on the construction site management information received from the management terminal in the notification type information display space of the first date column, information on the number and details of notification type information is matched by date displayed in the date display space of the first date column A notification type information display portion that is displayed to be displayed; And a first total information display portion for displaying monthly total information on the number of notification type information based on the construction site management information received from the management terminal in the first total column.
그리고 상기 비용관리형 정보는 근로자 수당, 근로자 노무비, 장비 공급비, 장비 유류비, 현장 수리비, 자재 관련 비용, 현장 운반비, 공사 기성 관련 비용, 현장 경비, 공사 투입 원가, 공제 관련 비용 중 하나에 관한 정보에 해당한다.In addition, the above cost management type information includes information on one of worker's allowance, worker labor cost, equipment supply cost, equipment fuel cost, field repair cost, material-related cost, on-site transportation cost, construction completion-related cost, on-site cost, construction input cost, and deduction-related cost. Corresponds to.
아울러, 상기 제2공사현장 관리용 캘린더 제공부는, 날짜 표시 공간과 비용관리형 정보 표시 공간을 구비한 다수의 제2날짜 칸 및 비용관리형 정보에 대한 월별 합계정보를 표시하기 위한 제2합계 칸을 포함하는 캘린더를 생성하는 제2공사현장 관리용 캘린더 생성부분; 상기 제2날짜 칸의 비용관리형 정보 표시 공간에 상기 관리 단말기로부터 수신되는 공사현장 관리정보를 기반으로 비용관리형 정보의 비용관리 대상 수 및 비용관리 대상의 비용현황 각각에 대한 정보를 상기 제2날짜 칸의 날짜 표시 공간에 표시된 날짜별로 대응되게 표시하는 비용관리형 정보 표시부분; 및 상기 제2합계 칸에 상기 관리 단말기로부터 수신되는 공사현장 관리정보를 기반으로 비용관리형 정보의 비용관리 대상 수 및 비용관리 대상의 비용현황 각각의 월별 합계정보를 표시하는 제2합계정보 표시부분;을 포함한다.In addition, the second construction site management calendar providing unit includes a plurality of second date columns having a date display space and a cost management type information display space, and a second total space for displaying monthly total information about cost management type information. A second construction site management calendar generating portion for generating a calendar including a; Based on the construction site management information received from the management terminal in the cost management information display space of the second date column, information on each of the number of cost management targets and the cost status of the cost management target is displayed in the second A cost management type information display portion corresponding to each date displayed in the date display space of the date column; And a second total information display section that displays monthly total information of the number of cost management targets of cost management type information and cost status of cost management targets based on the construction site management information received from the management terminal in the second total column. Includes;
또한, 상기 날씨 관리용 캘린더 제공부는, 날짜 표시 공간과 날씨정보 표시 공간을 구비한 다수의 제3날짜 칸을 포함하는 캘린더를 생성하는 날씨 관리용 캘린더 생성부분; 및 상기 제3날짜 칸의 날씨정보 표시 공간에 상기 관리 단말기로부터 수신되는 공사현장 관리정보를 기반으로 날씨 상태, 최저 기온, 최고 기온 및 강수량에 대한 날씨정보를 상기 제3날짜 칸의 날짜 표시 공간에 표시된 날짜별로 대응되게 표시하는 날씨정보 표시부분;을 포함한다.In addition, the weather management calendar providing unit may include: a weather management calendar generation unit for generating a calendar including a plurality of third date columns having a date display space and a weather information display space; And weather information on the weather condition, minimum temperature, maximum temperature, and precipitation in the weather information display space of the third date field based on the construction site management information received from the management terminal in the date display space of the third date field. And a weather information display portion correspondingly displayed for each displayed date.
본 발명에 의하면 다음과 같은 효과가 있다.According to the present invention, there are the following effects.
첫째, 전사적 자원 관리 시스템을 통해 공사현장의 회계 관리와 관련한 각종 비용계산서 관리에 있어 시스템 적용 환경 및 범위에 대응되어 관리자 선택에 의해 다양하게 변화 가능한 기능을 제공할 수 있다.First, through the company-wide resource management system, in managing various cost invoices related to the accounting management of the construction site, it is possible to provide functions that can be changed in various ways by selecting the manager in response to the system application environment and scope.
둘째, 전사적 자원 관리 시스템을 통해 공사현장의 근로자들의 보험금 산정에 있어 실무 및 법리적으로 실효성을 갖춘 방식을 통해 공제 금액의 자동 조정이 가능한 기능을 제공할 수 있다.Second, through the company-wide resource management system, it is possible to provide a function that enables automatic adjustment of the amount of deduction through a method that is practically and legally effective in calculating insurance payments for workers at construction sites.
셋째, 전사적 자원 관리 시스템을 통해 공사현장의 근로자들의 보험금 산정과 관련한 노무정보, 공제정보 및 조정정보의 파악이 한 눈에 쉽게 가능하다.Third, through the company-wide resource management system, it is possible to easily grasp labor information, deduction information, and adjustment information related to the calculation of insurance payments of workers at construction sites at a glance.
넷째, 전사적 자원 관리 시스템을 통해 공사현장 관리 기능을 캘린더를 이용해 제공할 수 있다.Fourth, through the enterprise resource management system, the construction site management function can be provided using a calendar.
다섯째, 전사적 자원 관리에 있어 캘린더를 이용하여 공사현장 관리 기능을 제공함에 따라 이와 연계된 각종 공사현장 관련 알림형 정보 및 비용관리형 정보의 파악이 한 눈에 쉽게 가능하다.Fifth, in the company-wide resource management, as the construction site management function is provided using a calendar, it is possible to easily grasp notification type information related to various construction sites and cost management type information related thereto.
여섯째, 전사적 자원 관리에 있어 캘린더를 이용하여 공사현장 관리 기능을 제공함에 있어 날짜별로 표시되는 각종 공사현장 관련 알림형 정보 및 비용관리형 정보들이 팝업 링크를 통해 세부 정보 제공이 가능한 인터페이스와 연결되어 있어 정보의 가공 및 출력 등의 활용에 작업 용이성 및 효율이 높아진다.Sixth, in providing a construction site management function using a calendar for enterprise resource management, notification type information and cost management type information related to various construction sites displayed by date are connected to an interface that provides detailed information through a pop-up link. Ease of work and efficiency increase in the use of information processing and printing.
도1은 본 발명에 따른 전사적 자원 관리 시스템의 세부구성을 도시한 블록도이다.
도2는 본 발명에 따른 전사적 자원 관리 시스템 내 제1프로세서의 세부구성을 도시한 블록도이다.
도3은 본 발명에 따른 전사적 자원 관리 시스템 내 제2프로세서의 세부구성을 도시한 블록도이다.
도4는 본 발명에 따른 전사적 자원 관리 시스템이 제공하는 비용계산서 관리 기능에 따라 비용계산서의 템플릿 포맷을 설정하는 실시예를 도시하고 있다.
도5은 본 발명에 따른 전사적 자원 관리 시스템이 제공하는 비용계산서 관리 기능에 따라 생성되는 비용계산서의 실시예를 도시하고 있다.
도6 및 도7는 본 발명에 따른 전사적 자원 관리 시스템이 제공하는 보험금 자동조정 기능에 따라 생성되는 노무정보, 공제정보 및 조정정보를 출력하는 실시예를 도시하고 있다.
도8은 본 발명에 따른 전사적 자원 관리 시스템이 제공하는 제1공사현장 관리용 캘리더의 실시예를 도시하고 있다.
도9 내지 도10은 본 발명에 따른 전사적 자원 관리 시스템이 제공하는 제1공사현장 관리용 캘리더의 또 다른 실시예들을 도시하고 있다.
도11은 본 발명에 따른 전사적 자원 관리 시스템이 제공하는 제2공사현장 관리용 캘리더의 실시예를 도시하고 있다.
도12 내지 도15는 본 발명에 따른 전사적 자원 관리 시스템이 제공하는 제2공사현장 관리용 캘리더의 또 다른 실시예들을 도시하고 있다.
도16은 본 발명에 따른 전사적 자원 관리 시스템이 제공하는 날씨 관리용 캘리더의 실시예를 도시하고 있다.1 is a block diagram showing a detailed configuration of an enterprise resource management system according to the present invention.
2 is a block diagram showing a detailed configuration of a first processor in the enterprise resource management system according to the present invention.
3 is a block diagram showing a detailed configuration of a second processor in the enterprise resource management system according to the present invention.
Fig. 4 shows an embodiment of setting a template format of a cost invoice according to a cost invoice management function provided by the enterprise resource management system according to the present invention.
5 shows an embodiment of a cost invoice generated according to a cost invoice management function provided by the enterprise resource management system according to the present invention.
6 and 7 show an embodiment of outputting labor information, deduction information, and adjustment information generated according to an automatic insurance payment adjustment function provided by the enterprise resource management system according to the present invention.
Fig. 8 shows an embodiment of a calendar for managing a first construction site provided by the enterprise resource management system according to the present invention.
9 to 10 show still other embodiments of the first construction site management calendar provided by the enterprise resource management system according to the present invention.
Figure 11 shows an embodiment of a second construction site management calendar provided by the enterprise resource management system according to the present invention.
12 to 15 show still other embodiments of a second construction site management caliper provided by the enterprise resource management system according to the present invention.
16 shows an embodiment of a weather management calendar provided by the enterprise resource management system according to the present invention.
본 발명의 바람직한 실시예에 대하여 첨부된 도면을 참조하여 더 구체적으로 설명하되, 이미 주지된 기술적 부분에 대해서는 설명의 간결함을 위해 생략하거나 압축하기로 한다.Preferred embodiments of the present invention will be described in more detail with reference to the accompanying drawings, but technical parts that are already well known will be omitted or compressed for conciseness of description.
<전사적 자원 관리 시스템에 관한 설명><Explanation of enterprise resource management system>
먼저, 본 발명의 컴퓨터로 구현되는 비용계산서 관리 및 근로자별 보험금 자동조정 기능과 컴퓨터로 구현되는 캘린더를 이용한 공사현장 관리기능을 구비한 전사적 자원 관리 시스템(10)에 대해 이하에서 도1 내지 도3의 블록도를 참조하여 상세하게 설명한다.First, for the company-wide
여기서, 전사적 자원 관리 시스템(10)은 실체적 하드웨어 구성간의 결합 및 연결을 통해 구축되는 시스템에 해당될 수도 있지만, 가장 바람직하게는 컴퓨터와 같은 단말에 설치되는 프로그램에 의해 구현되는 소프트웨어 구성간의 결합 및 연결을 통해 구축되는 시스템에 해당된다.Here, the enterprise
따라서 전사적 자원 관리 시스템(10)을 구성하는 세부 구성은 특정 구성부로서의 의미와 함께, 방법적 단계, 프로그램적 기능으로서의 해석 또한 가능하기 때문에, 본 발명의 전사적 자원 관리 시스템(10)은 전사적 자원 관리 방법 및 전사적 자원 관리 프로그램이 기록된 컴퓨터로 읽은 수 있는 기록매체로 실시 가능하며 상호 세부 구성의 특징은 대응됨이 바람직하다.Therefore, since the detailed configuration constituting the enterprise
우선, 본 발명의 컴퓨터로 구현되는 비용계산서 관리 및 근로자별 보험금 자동조정 기능과 컴퓨터로 구현되는 캘린더를 이용한 공사현장 관리기능을 구비한 전사적 자원 관리 시스템(10)은 관리 단말기(WC)와 연동된다.First, the company-wide
여기서, 관리 단말기(WC)는 비용계산서 관리용 신호들 및 근로자별 보험금 자동조정용 신호들을 생성하는 컴퓨터 혹은 노트북과 같은 단말에 해당한다.Here, the management terminal (WC) corresponds to a terminal such as a computer or laptop that generates signals for managing cost invoices and signals for automatic adjustment of insurance payments for each worker.
다시 말해, 관리자 혹은 사용자는 자신이 비용계산서의 포맷설정, 생성, 저장 출력을 비롯해 근로자별 보험금 자동조정의 기능을 제공받기 위해 관리 단말기(WC)를 이용해 정보 및 신호를 입력한다.In other words, the manager or the user inputs information and signals using the management terminal (WC) in order to receive the function of automatically adjusting the insurance payment for each worker, including the format setting, generation, and storage output of the expense invoice.
또한, 관리 단말기(WC)는 관리자가 입력하는 공사현장의 근로자, 환경, 일정, 사건 및 비용 관리 위한 내용을 반영한 공사현장 관리정보를 생성하는 컴퓨터 혹은 노트북과 같은 단말에 해당한다.In addition, the management terminal (WC) corresponds to a terminal such as a computer or laptop that generates construction site management information that reflects the contents of the construction site workers, environment, schedule, event and cost management input by the manager.
다시 말해, 관리자 혹은 사용자는 자신이 보고 및 정리하고자 하는 공사현장의 근로자, 환경, 일정, 사건 및 비용 관리 위한 정보가 있으면 관리 단말기(WC)를 이용해 정보를 입력한다.In other words, the manager or user enters the information using the management terminal (WC) if there is information for managing workers, environment, schedule, events and expenses at the construction site that they want to report and organize.
다음으로, 본 발명의 전사적 자원 관리 시스템(10)은 도1에 도시된 바와 같이 컴퓨터(C)와 같은 단말에 구축되고, 이와 같이 전사적 자원 관리 시스템(10)이 구축된 컴퓨터(C)와 같은 단말은 관리 단말기(WC)와 정보 데이터의 송수신을 통한 실시한 신호 교환 및 대응이 가능하도록 연결된다.Next, the company-wide
여기서, 전사적 자원 관리 시스템(10)이 구축된 컴퓨터(C)와 같은 단말과 관리 단말기(WC)간의 연결은 직접적으로 상호 유선 환경 혹은 무선 환경을 통해 연결될 수도 있고, 별도의 관리 서버를 통해 중계되어 유선 환경 혹은 무선 환경을 통해 연결될 수도 있다.Here, the connection between the terminal such as the computer C on which the enterprise
또한, 전사적 자원 관리 시스템(10)이 구축된 컴퓨터(C)와 같은 단말은 관리 단말기(WC)와 동일한 단말로 마련될 수 도 있다. 다시 말해 하나의 컴퓨터와 같은 단말 내에 비용계산서 관리 시스템, 근로자별 보험금 자동조정 시스템 및 공사현장 관리 시스템과 전사적 자원 관리 시스템이 모두 구축되어 비용계산서 관리, 근로자별 보험금 자동조정, 공사현장 관리정보의 생성 및 제공, 이를 통한 전사적 자원 관리 모두 하나의 단말을 통해서도 가능하다.Further, a terminal such as the computer C on which the enterprise
이를 위해, 본 발명의 컴퓨터로 구현되는 캘린더를 이용한 공사현장 관리기능을 구비한 전사적 자원 관리 시스템(10)은 도1에 도시된 바와 같이 제1프로세서(100), 제2프로세서(200); 및 메모리(300);을 포함한다.To this end, the enterprise
제1프로세서(100)는 관리 단말기로부터 수신된 비용계산서 관리용 신호들을 기반으로 상기 컴퓨터로 구현되는 비용계산서의 포맷설정, 생성, 저장 출력이 이루어지도록 함으로써, 비용계산서 관리 기능을 수행하며, 상기 관리 단말기로부터 수신된 근로자별 보험금 자동조정용 신호들을 기반으로 근로자별 보험금 자동조정 기능을 수행하며, 이를 위해 도1에 도시된 바와 같이 비용계산서 관리부(110) 및 보험금 자동조정 관리부(120)을 포함한다.The
우선, 비용계산서 관리부(110)는 공사현장 관리를 위한 비용계산서의 템플릿(PT) 포맷을 설정하고, 템플릿 포맷이 설정된 비용계산서(P)를 관리 단말기(WC)를 통해 생성, 저장 및 출력시킨다.First, the cost invoice management unit 110 sets the template (PT) format of the cost invoice for construction site management, and generates, stores and outputs the cost invoice (P) in which the template format is set through the management terminal (WC).
여기서, 비용계산서(P)의 템플릿(PT)은 도4 및 도5에 도시된 바와 같이 다수의 제1컨트롤 항목(C1)과 다수의 제2컨트롤 항목(C2) 중 각각 적어도 하나 이상으로 구성된 포맷으로 마련된다.Here, the template PT of the cost invoice P is a format composed of at least one of a plurality of first control items C1 and a plurality of second control items C2, respectively, as shown in FIGS. 4 and 5 It is provided with.
구체적으로, 제1컨트롤 항목(C1)은 도4에 도시된 바와 같이 특정 금액값(V1)과 매칭된 컨트롤 항목을 의미하며, 제2컨트롤 항목(C2)은 도4에 도시된 바와 같이 제1컨트롤 항목(C1) 복수개 각각에 매칭된 금액값(V1)이 기 설정된 계산식(T)에 대입되어 산정된 계산값(V2)과 매칭된 컨트롤 항목을 의미한다.Specifically, the first control item C1 refers to a control item matched with a specific value V1 as shown in FIG. 4, and the second control item C2 is the first control item C2 as shown in FIG. The control item C1 refers to a control item matched with the calculated value V2 calculated by substituting the value V1 matched to each of the plurality of control items C1 into a preset calculation formula T.
다시 말해, 제1컨트롤 항목(C1)은 도4에 공종명으로 표기된 내용을 갖춘 컨트롤 항목으로 특정 금액값(V1)이 페어링되어 있어 이를 템플릿에 반영할 경우 도5에 도시된 바와 같이 해당 비용계산서(P) 내 제1컨트롤 항목(C1)에는 내용과 함께 금액값(V1)이 표시된다.In other words, the first control item (C1) is a control item with the contents indicated by the public type name in FIG. 4, and when a specific amount of money (V1) is paired and reflected in the template, the corresponding cost invoice as shown in FIG. (P) In the first control item (C1) in (P), the amount value (V1) is displayed along with the contents.
여기서, 제1컨트롤 항목(C1)에 매칭된 금액값(V1)은 관리 단말기(WC)의 입력장치를 통해 관리자가 직접적으로 입력하는 신호에 대응되는 금액정보 자체일 수도 있고, 실시에 따라서는 관리 단말기(WC)의 입력장치(20)을 통해 관리자가 직접적으로 입력하는 신호에 대응되는 복수의 금액정보가 기 설정된 별도의 연산 과정을 거쳐 산정되는 금액합산정보일 수도 있다.Here, the amount value V1 matched with the first control item C1 may be the amount information itself corresponding to a signal directly input by the administrator through the input device of the management terminal WC, or depending on implementation. A plurality of amount information corresponding to a signal directly input by the administrator through the
또한, 제2컨트롤 항목(C2)은 복수의 제1컨트롤 항목(C1)이 기 설정된 계산식(T)에 대응되어 도출되는 정보로서, 복수의 제1컨트롤 항목(C1) 각각이 매칭된 복수의 금액값(V1)이 기 설정된 계산식(T)을 통해 계산값(V2)으로 산정되어 이에 대한 정보값을 페어링하게 된다. In addition, the second control item (C2) is information derived from a plurality of first control items (C1) corresponding to a preset calculation formula (T), and a plurality of amounts in which each of the plurality of first control items (C1) is matched. The value V1 is calculated as a calculated value V2 through a preset calculation formula T, and information values thereof are paired.
따라서 제1컨트롤 항목(C1)에 매칭된 금액값(V1)은 관리 단말기(WC)의 입력장치를 통해 관리자가 직접적으로 입력하는 신호에 대응되어 변환되는 반면, 제2컨트롤 항목(C2)은 제1컨트롤 항목(C1)에 매칭된 금액값(V1)이 변환됨에 대응되어 변환 처리된다.Therefore, the amount value V1 matched with the first control item C1 is converted in response to a signal directly input by the administrator through the input device of the management terminal WC, while the second control item C2 In response to the conversion of the amount value V1 matched with the 1 control item C1, the conversion process is performed.
이를 위해, 비용계산서 관리부(110)는 도2에 도시된 바와 같이 항목 설정부분(111), 항목 저장부분(112), 포맷 설정부분(113), 비용계산서 생성부분(114), 비용계산서 저장부분(115), 비용계산서 출력부분(116)을 포함한다.To this end, the cost invoice management unit 110 includes an item setting portion 111, an item storage portion 112, a format setting portion 113, a cost invoice generation portion 114, and a cost invoice storage portion, as shown in FIG. (115), including the cost statement output section (116).
여기서, 항목 설정부분(111)은 관리 단말기(WC)를 통해 입력되는 항목 설정 신호에 의해, 제1컨트롤 항목(C1)의 내용(도4, 도5의 공종명) 및 제1컨트롤 항목(C1)과 매칭된 금액값(V1)을 설정하거나 제2컨트롤 항목(C2)의 내용(도4, 도5의 공종명) 및 제2컨트롤 항목(C2)과 매칭된 계산값(V2)의 산정을 위한 계산식(T)을 설정하여 제1컨트롤 항목(C1) 또는 제2컨트롤 항목(C2)을 생성한다. Here, the item setting part 111 is based on the item setting signal input through the management terminal (WC), the content of the first control item (C1) (public type name in Figs. 4 and 5) and the first control item (C1). ) Or the calculation of the calculated value V2 matched with the second control item (C2) and the second control item (C2) and the content of the second control item (C2) A first control item (C1) or a second control item (C2) is created by setting the calculation formula (T) for.
또한, 항목 저장부분(112)은 항목 설정부분(111)를 통해 설정 완료 후 생성된 다수의 제1컨트롤 항목(C1)과 다수의 제2컨트롤 항목(C2)을 저장하는 데이터 베이스이다.In addition, the item storage part 112 is a database that stores a plurality of first control items C1 and a plurality of second control items C2 generated after setting is completed through the item setting part 111.
아울러, 포맷 설정부분(113)은 관리 단말기(WC)의 입력장치를 통해 입력되는 포맷 설정 신호에 의해, 상기 항목 저장부분에 저장된 다수의 상기 제1컨트롤 항목(C1)과 다수의 상기 제2컨트롤 항목(C2) 중 각각 적어도 하나 이상으로 구성된 비용계산서의 템플릿(PT)의 포맷을 설정한다.In addition, the format setting part 113 includes a plurality of first control items C1 and a plurality of the second control items stored in the item storage part by a format setting signal input through the input device of the management terminal WC. The format of the template PT of the cost invoice, each consisting of at least one of the items C2, is set.
또한, 비용계산서 생성부분(114)은 포맷 설정부분(113)를 통해 포맷 설정이 완료된 비용계산서의 템플릿(PT)을 구성하는 적어도 하나 이상의 제1컨트롤 항목(C1)과 제2컨트롤 항목(C2)과 함께 포맷 설정부분(113)를 통해 포맷 설정이 완료된 비용계산서의 템플릿(PT)을 구성하는 적어도 하나 이상의 제1컨트롤 항목(C1)과 제2컨트롤 항목(C2) 각각에 매칭된 금액값(V1) 및 계산값(V2)이 표시된 비용계산서(P)를 도5에 도시된 바와 같이 생성한다.In addition, the cost invoice generation portion 114 includes at least one first control item (C1) and a second control item (C2) constituting the template PT of the cost invoice for which the format setting is completed through the format setting portion 113. Together with the at least one first control item (C1) and at least one second control item (C2) constituting the template PT of the cost invoice for which the format setting has been completed through the format setting part 113 ) And the calculated value V2 are displayed as shown in FIG. 5.
또한, 비용계산서 저장부분(115)은 비용계산서 생성부분(114)을 통해 생성된 비용계산서(P)를 저장하는 데이터 베이스이다.In addition, the cost invoice storage portion 115 is a database for storing the cost invoice P generated through the cost invoice generation portion 114.
마지막으로, 비용계산서 출력부분(116)은 관리 단말기(WC)의 입력장치(20)을 통해 입력되는 출력 신호에 의해, 비용계산서 생성부분(114)을 통해 생성된 비용계산서 또는 비용계산서 저장부분(115)에 저장된 비용계산서(P) 중 출력 신호에 대응되는 비용계산서(P)를 관리 단말기(WC)의 출력장치(30)로 출력하여 관리자가 비용계산서(P)을 확인 가능하도록 한다.Finally, the cost invoice output section 116 is a cost invoice or cost invoice storage section generated through the cost invoice generation section 114 by an output signal input through the
다음으로, 보험금 자동조정 관리부(120)는 근로자(W) 각각의 보험금을 기 설정된 최소 하한액(L)에서 최대 상한액(H)까지의 기준 금액 범위 내로 조정 후 공사현장(WP)별 노무비율에 따라 자동 분할하여 조정금액 정보를 생성하고, 생성된 조정금액 정보를 관리 단말기(WC)를 통해 저장 및 출력시킬 수 있다.Next, the insurance payment automatic adjustment management unit 120 adjusts the insurance amount for each worker (W) within the range of the standard amount from the preset minimum lower limit (L) to the maximum upper limit (H), and then adjusts the labor ratio for each construction site (WP). Accordingly, the adjustment amount information may be automatically divided to be generated, and the generated adjustment amount information may be stored and output through the management terminal (WC).
여기서, 보험금 자동조정 관리부(120)는 보험금 자동조정 기능 수행 시, 근로자의 국민연금, 건강보험, 요양보험 등의 보험금을 자동 분할 및 조정하여 조정금액을 국민연금, 건강보험, 요양보험 등의 보험금 확정금액으로 이용하기 위해 실시됨이 가장 바람직하기 때문에, 추후 설명되는 보험금의 개념은 국민연금, 건강보험, 요양보험 등을 예로 함이 바람직하다.Here, the automatic insurance adjustment management unit 120 automatically divides and adjusts insurance payments such as the national pension, health insurance, and nursing care insurance of the worker when performing the automatic adjustment of the insurance payment, and adjusts the adjusted amount to the insurance payments such as national pension, health insurance, and nursing care insurance. Since it is most preferable to use it as a fixed amount, it is preferable to use the national pension, health insurance, nursing insurance, etc. as an example of the insurance payment to be described later.
이를 위해, 보험금 자동조정 관리부(120)는 도2에 도시된 바와 같이 한도 설정부분(121), 노무정보 관리부분(122), 산정기준 설정부분(123), 공제정보 관리부분(124), 조정정보 관리부분(125) 및 정보 출력부분(126)을 포함한다.To this end, the insurance payment automatic adjustment management unit 120 includes a limit setting part 121, a labor information management part 122, a calculation standard setting part 123, a deduction information management part 124, as shown in FIG. It includes an information management part 125 and an information output part 126.
여기서, 한도 설정부분(121)은 관리 단말기(WC)의 입력장치(20)을 통해 입력되는 한도 설정 신호에 의해, 근로자(W)의 보험금에 대한 최소 하한액(L) 및 최대 상한액(H)에 대한 한도정보를 설정하여 저장한다.Here, the limit setting part 121 is a minimum lower limit (L) and a maximum upper limit (H) for the insurance amount of the worker (W) by a limit setting signal input through the
또한, 노무정보 관리부분(122)은 관리 단말기(WC)의 입력장치(20)을 통해 입력되는 근로자별 노무정보 입력 신호에 의해, 근로자별 노무정보 입력 신호와 대응되어 근로자(W)의 공사현장(WP)별 노무비용에 대한 정보를 포함하는 노무정보(WI)를 근로자(W)별로 생성하여 저장 관리한다.In addition, the labor information management part 122 corresponds to the labor information input signal for each worker by the labor information input signal for each worker input through the
다음으로, 산정기준 설정부분(123)은 관리 단말기(WC)의 입력장치(20)을 통해 입력되는 보험금 공제기준 설정 신호에 의해, 근로자(W)의 공사현장(WP)별 노무비용 대비 보험금 공제금액의 산정기준을 설정하여 저장한다.Next, the calculation criterion setting part 123 is a deduction of insurance money against the labor cost of each construction site (WP) of the worker (W) by a signal that is input through the
여기서, 산정기준 설정부분(123)을 통해 설정 저장되는 보험금 공제금액의 산정기준은 해당 국가가 법리적으로 결정한 보험금 공제금액의 산정기준에 따름이 바람직하다.Here, it is preferable that the calculation standard of the insurance deduction amount set and stored through the calculation standard setting part 123 is in accordance with the calculation standard of the insurance deduction amount legally determined by the country.
다음으로, 공제정보 관리부분(124)은 산정기준 설정부분(123)를 통해 설정된 보험금 공제금액의 산정기준 및 노무정보 관리부분(122)에 저장된 근로자(W)별 노무정보(WI)을 기반으로 근로자(W)의 공사현장(WP)별 보험금 공제금액에 대한 공제정보(DI)를 근로자(W)별로 생성하여 저장 관리한다.Next, the deduction information management part 124 is based on the calculation standard of the insurance deduction amount set through the calculation standard setting part 123 and the labor information (WI) for each worker (W) stored in the labor information management part 122. Deduction information (DI) for the insurance deduction amount for each worker (W) construction site (WP) is created and stored for each worker (W).
또한, 조정정보 관리부분(125)은 우선, 기 설정된 조정기준에 따라 공제정보 관리부분(124)에 저장된 공제정보(DI)에 따른 근로자(W)의 공사현장(WP)별 보험금 공제금액의 총합을 보험금 조정금액의 총합으로 근로자별로 변환을 수행한다.In addition, the adjustment information management part 125 is, first, the sum of the amount of insurance deductions for each construction site (WP) of the worker (W) according to the deduction information (DI) stored in the deduction information management part 124 according to a preset adjustment standard. Is converted to the sum of the insurance premium adjustment amount for each worker.
여기서, 기 설정된 조정기준은 공제정보 관리부분(124)에 저장된 공제정보 및 한도 설정부분(121)을 통해 설정된 한도정보(L, H)를 기반으로 근로자(W)의 공사현장(WP)별 보험금 공제금액의 총합이 최소 하한액 미만이면 최소 하한액을 보험금 조정금액의 총합으로 변환하고, 근로자의 공사현장별 보험금 공제금액의 총합이 최대 상한액을 초과하면 최대 상한액을 보험금 조정금액의 총합으로 변환하고, 근로자의 공사현장별 보험금 공제금액의 총합이 최소 하한액 이상에서 최대 상한액 이하이면 보험금 공제금액을 보험금 조정금액의 총합으로 변환하는 기준에 해당한다.Here, the preset adjustment criterion is based on the deduction information stored in the deduction information management part 124 and the limit information (L, H) set through the limit setting part 121, the insurance premium for each construction site (WP) of the worker (W). If the total deduction amount is less than the minimum lower limit, the minimum lower limit is converted into the total amount of the insurance premium adjustment amount.If the total sum of the insurance premium deduction amount for each construction site of the worker exceeds the maximum upper limit, the maximum upper limit is converted into the total amount of the insurance premium adjustment amount. If the total amount of insurance deductions for each construction site of workers is not less than the minimum lower limit and less than the maximum upper limit, it is a standard for converting the insurance deduction amount into the total amount of the insurance premium adjustment amount.
예를 들어, 도6에 도시된 바와 같이 근로자(W)의 국민연금에 대한 최소 하한액(L)이 13,500원이고, 근로자(W)의 국민연금에 대한 최대 상한액(H)이 210,600원으로 한도 설정부분(121)를 통해 설정된 경우, 공제정보 관리부분(124)에 의해 생성되어 저장된 공제정보(DI)가 나타내는 근로자(W)의 공사현장(WP)별 국민연금 공제금액의 총합이 312,070원으로 산정되면, 조정정보 관리부분(125)는 우선 근로자(W)의 국민연금에 대한 최대 상한액(H)을 초과한 근로자(W)의 공사현장(WP)별 국민연금 공제금액의 총합을 근로자(W)의 국민연금에 대한 최대 상한액(H)에 해당하는 210,600원으로 자동 조정하여 근로자(W)의 공사현장(WP)별 국민연금 조정금액의 총합으로 변환 수행한다.For example, as shown in Fig. 6, the minimum lower limit (L) for the national pension for the worker (W) is 13,500 won, and the maximum upper limit (H) for the national pension for the worker (W) is limited to 210,600 won. When set through the setting part 121, the total sum of the national pension deduction amount for each construction site (WP) of the worker (W) represented by the deduction information (DI) created and stored by the deduction information management part 124 is 312,070 won. Once calculated, the adjustment information management part 125 first calculates the total amount of the national pension deductions for each construction site (WP) of workers (W) who exceeded the maximum upper limit (H) for the national pension of workers (W). It is automatically adjusted to 210,600 won, which is the maximum upper limit (H) for the national pension in W), and converted into the total amount of the adjusted amount of the national pension for each construction site (WP) of the worker (W).
또 다른 예로, 도7에 도시된 바와 같이 근로자(W)의 건강보험에 대한 최소 하한액(L)이 8,730원이고, 근로자(W)의 건강보험에 대한 최대 상한액(H)이 2,436,720원으로 한도 설정부분(121)를 통해 설정된 경우, 공제정보 관리부분(124)에 의해 생성되어 저장된 공제정보(DI)가 나타내는 근로자(W)의 공사현장(WP)별 건강보험 공제금액의 총합이 2,538,270원으로 산정되면, 조정정보 관리부분(125)는 우선 근로자(W)의 건강보험에 대한 최대 상한액(H)을 초과한 근로자(W)의 공사현장(WP)별 건강보험 공제금액의 총합을 근로자(W)의 건강보험에 대한 최대 상한액(H)에 해당하는 2,436,720원으로 자동 조정하여 근로자(W)의 공사현장(WP)별 건강보험 조정금액의 총합으로 변환 수행한다.As another example, as shown in Fig. 7, the minimum lower limit (L) for the health insurance of the worker (W) is 8,730 won, and the maximum upper limit (H) for the health insurance of the worker (W) is limited to 2,436,720 won. When set through the setting part 121, the total amount of health insurance deductions for each construction site (WP) of the worker (W) represented by the deduction information (DI) created and stored by the deduction information management part 124 is 2,538,270 won. Once calculated, the adjustment information management part 125 first calculates the total amount of health insurance deductions for each construction site (WP) of workers (W) who exceeded the maximum maximum (H) for the health insurance of workers (W). It is automatically adjusted to KRW 2,436,720, which is the maximum maximum (H) for health insurance of W), and converted into the total amount of the adjusted amount of health insurance for each construction site (WP) of the worker (W).
아울러, 조정정보 관리부분(125)은 근로자(W)의 공사현장(WP)별 보험금 공제금액의 총합에 대한 자동 조정이 완료되고 나면, 변환된 근로자별 보험금 조정금액의 총합을 노무정보 관리부분(122)에 저장된 근로자별 노무정보(WI)에 따른 근로자(W)의 공사현장(WP)별 노무비용의 상호 비율에 대응되도록 자동 분할하여 근로자(W)의 공사현장(WP)별 보험금 조정금액에 대한 조정정보(AI)를 근로자(W)별로 생성하여 저장 관리한다.In addition, after the automatic adjustment of the total amount of insurance deductions for each construction site (WP) of the worker (W) is completed, the adjustment information management part 125 converts the total amount of the adjusted insurance amount for each worker into the labor information management part ( 122), according to the labor information for each worker (WI), it is automatically divided to correspond to the reciprocal ratio of the labor cost of each construction site (WP) of the worker (W) to the adjusted amount of the insurance premium for each construction site (WP) of the worker (W). Coordination information (AI) for each worker (W) is created and stored and managed.
구체적으로, 도6에 도시된 바와 같이, 근로자(W)의 공사현장(WP)별 국민연금 공제금액의 총합에 대한 자동 조정이 완료되어 근로자(W)의 공사현장(WP)별 국민연금 조정금액의 총합이 근로자(W)의 국민연금 총합 금액에 대한 최대 상한액(H)에 해당하는 210,600원과 같이 변환된 후, 조정정보 관리부분(125)는 노무정보(WI)에 따른 근로자(W)의 공사현장(WP)별 노무비용의 상호 비율(1,260,000원 : 1,875,000원 : 3,800,000원)과 동일하게 210,600원을 공사현장(WP)별로 자동 분할시킨다.Specifically, as shown in Fig. 6, the automatic adjustment of the total amount of the national pension deduction for each construction site (WP) of the worker (W) is completed, and the adjusted amount of the national pension for each construction site (WP) of the worker (W) is completed. After converting the total sum to 210,600 won, which is the maximum upper limit (H) for the total amount of the employee (W), the adjustment information management part (125) is the worker (W) according to the labor information (WI). In the same way as the mutual ratio of labor costs by construction site (WP) (1,260,000 won: 1,875,000 won: 3,800,000 won), 210,600 won is automatically divided by construction site (WP).
또한, 도7에 도시된 바와 같이, 근로자(W)의 공사현장(WP)별 건강보험 공제금액의 총합에 대한 자동 조정이 완료되어 근로자(W)의 공사현장(WP)별 건강보험 조정금액의 총합이 근로자(W)의 건강보험 총합 금액에 대한 최대 상한액(H)에 해당하는 2,436,720원과 같이 변환된 후, 조정정보 관리부분(125)는 노무정보(WI)에 따른 근로자(W)의 공사현장(WP)별 노무비용의 상호 비율(1,260,000원 : 1,995,000원 : 10,000,000원)과 동일하게2,436,720원을 공사현장(WP)별로 자동 분할시킨다.In addition, as shown in Fig. 7, the automatic adjustment of the total amount of health insurance deductions for each construction site (WP) of the worker (W) is completed, so that the adjusted amount of health insurance for each construction site (WP) of the worker (W) is After the total is converted to 2,436,720 won, which is the maximum upper limit (H) for the total amount of health insurance of the worker (W), the adjustment information management part (125) is the worker (W) according to the labor information (WI). In the same way as the mutual ratio of labor costs by construction site (WP) (1,260,000 KRW: 1,995,000 KRW: 10,000,000 KRW), KRW 2,436,720 is automatically divided by construction site (WP).
이를 통해, 도6 및 도7에 도시된 바와 같이, 근로자(W)의 공사현장(WP)별 국민연금 또는 건강보험 등의 보험금 조정금액의 상호 비율은 근로자(W)의 공사현장(WP)별 노무비용의 상호 비율과 동일하게 된다.Through this, as shown in Figs. 6 and 7, the mutual ratio of the adjusted amount of insurance money such as national pension or health insurance for each construction site (WP) of the worker (W) is determined by the construction site (WP) of the worker (W). It is equal to the reciprocal ratio of labor costs.
다음으로, 정보 출력부분(126)은 관리 단말기(WC)의 입력장치(20)을 통해 입력되는 정보 출력 신호에 의해, 노무정보 관리부분(122)에 저장된 노무정보(WI), 공제정보 관리부분(124)에 저장된 공제정보(DI), 조정정보 관리부분(125)에 저장된 조정정보(AI)를 근로자(W)별로 매칭시켜 동시에 관리 단말기(WC)의 출력장치(30)로 출력하여 관리자가 정보의 파악 및 확인이 용이하게 한 눈에 가능하도록 한다.Next, the information output part 126 is the labor information (WI) stored in the labor information management part 122, the deduction information management part by the information output signal input through the
제2프로세서(200)는 관리 단말기(WC)로부터 수신된 공사현장 관리정보가 컴퓨터(C)로 구현되는 캘린더(151, 161, 171)에 반영되도록 함으로써, 공사현장 관리기능을 실질적으로 수행하게 된다.The
메모리(300)는 제1프로세서(100) 및 제2프로세서(200)에 의해 액세스 가능한 비-일시적 유형으로, 컴퓨터(C)로 구현되는 캘린더(151, 161, 171)을 이용한 근로자 근태 및 업무 관리기능을 수행하게 하는 지시들의 세트를 포함한 컴퓨터 코드들이 저장된 데이터 베이스 공간이다.The
이와 같은 제2프로세서(200)는 도3에 도시된 바와 같이 제1공사현장 관리용 캘린더 제공부(210), 제2공사현장 관리용 캘린더 제공부(220) 및 날씨 관리용 캘린더 제공부(230)를 포함한다.As shown in FIG. 3, the
우선, 제1공사현장 관리용 캘린더 제공부(210)은 관리 단말기(WC)로부터 수신되는 공사현장 관리정보 중 알림형 정보의 건수 및 내역을 캘린더 내 각각의 날짜별로 정보 생성날짜 혹은 정보 내 기 설정된 날짜와 대응되게 표시하는 캘린더(151)를 제공한다.First, the first construction site management calendar providing unit 210 includes the number and details of notification-type information among the construction site management information received from the management terminal (WC). It provides a
여기서, 정보 내 기 설정된 날짜라 함은 알림형 정보의 유형에 따라 정보의 생성날짜와 달리 구분되는 사건의 마감기일 혹은 결제기일 등을 의미한다.Here, the preset date in the information means a deadline or settlement date of an event that is different from the creation date of the information according to the type of notification type information.
또한, 알림형 정보는 공사현장 관련 공사일보, 공지사항, 공사휴무, 작업사건 현황, 사건 마감현황 및 사건 결제현황에 관한 정보 중 하나에 해당하며, 근로자 혹은 관리자에게 공사현장 관리를 위해 알림이 필요한 정보들에 관한 것이다.In addition, the notification type information corresponds to one of the information on the construction site-related construction daily report, notice, construction holiday, work event status, event closing status, and event settlement status, and workers or managers need notification for construction site management. It's about information.
이를 위해, 제1공사현장 관리용 캘린더 제공부(210)는 제1공사현장 관리용 캘린더 생성부분(212), 알림형 정보 표시부분(213), 제1합계정보 표시부분(214) 및 제1팝업 설정부분(215)를 포함한다. To this end, the first construction site management calendar providing unit 210 includes a first construction site management calendar generation unit 212, a notification type information display unit 213, a first total information display unit 214 and a first It includes a pop-up setting
여기서, 제1공사현장 관리용 캘린더 생성부분(212)은 도8에 도시된 바와 같이 날짜 표시 공간(151aa)과 알림형 정보 표시 공간(151ab)을 구비한 다수의 제1날짜 칸(151a) 및 알림형 정보에 대한 월별 합계정보를 표시하기 위한 제1합계 칸(151b)을 포함하는 제1공사현장 관리용 캘린더(151)를 생성한다.Here, the first construction site management calendar generation part 212 includes a plurality of
또한, 알림형 정보 표시부분(213)은 제1날짜 칸(151a)의 알림형 정보 표시 공간(151ab)에 관리 단말기(WC)로부터 수신되는 공사현장 관리정보를 기반으로 알림형 정보의 건수 및 내역에 대한 정보를 상기 제1날짜 칸(151a)의 날짜 표시 공간(151aa)에 표시된 날짜별로 대응되게 표시한다.In addition, the notification type information display part 213 includes the number and details of notification type information based on the construction site management information received from the management terminal WC in the notification type information display space 151ab of the
이를 통해, 제1날짜 칸(151a)의 알림형 정보 표시 공간(151ab)에는 날짜 별로 등록되거나 날짜 별로 마감 또는 결제 기한을 가지는 공사일보, 공지사항, 공사휴무, 작업사건 현황, 사건 마감현황 및 사건 결제현황에 관한 알림형 정보의 건수 및 내역에 대한 정보가 표시된다.Through this, in the notification-type information display space 151ab of the
또한, 제1합계정보 표시부분(214)는 제1합계 칸(151b)에 관리 단말기(WC)로부터 수신되는 공사현장 관리정보를 기반으로 알림형 정보 건수에 대한 정보의 월별 합계정보를 표시한다.In addition, the first total information display part 214 displays monthly total information of information on the number of notification type information based on the construction site management information received from the management terminal WC in the first
예를 들어, 도8에 도시된 바와 같이 제1공사현장 관리용 캘린더(151)이 공사일보에 관한 알림형 정보를 표시하기 위해 마련될 경우, 제1날짜 칸(151a)의 알림형 정보 표시 공간(151ab)에는 날짜별로 등록된 공사일보의 건수 및 내역이 표시되고, 제1합계 칸(151b)에는 해당 월에 누적된 전체 공사일보의 건수가 표시된다.For example, as shown in Fig. 8, when the first construction
다른 예로, 도9에 도시된 바와 같이 제1공사현장 관리용 캘린더(151)이 공사현장 관련 공지사항에 관한 알림형 정보를 표시하기 위해 마련될 경우, 제1날짜 칸(151a)의 알림형 정보 표시 공간(151ab)에는 날짜별로 등록된 공사현장 관련 공지사항의 건수 및 내역이 표시되고, 제1합계 칸(151b)에는 해당 월에 누적된 전체 공지사항의 건수가 표시된다.As another example, as shown in FIG. 9, when the first construction
다른 예로, 도10에 도시된 바와 같이 제1공사현장 관리용 캘린더(151)이 공사휴무에 관한 알림형 정보를 표시하기 위해 마련될 경우, 제1날짜 칸(151a)의 알림형 정보 표시 공간(151ab)에는 날짜별로 휴무일이 대응되는 공사휴무의 건수 및 내역이 표시되고, 제1합계 칸(151b)에는 해당 월에 누적된 전체 공사휴무의 건수가 표시된다.As another example, as shown in FIG. 10, when the first construction
또한, 제1팝업 설정부분(215)는 업무 관리 단말기(WC) 또는 본 발명의 전사적 자원 관리 시스템(10)이 적용된 컴퓨터(C)와 같은 단말을 통해 제1날짜 칸(151a)의 날짜 표시 공간(151aa), 제1날짜 칸(151a)의 알림형 정보 표시 공간(151ab) 또는 제1합계 칸(151b)에 대한 팝업 연결 요청 신호가 수신되면, 제1날짜 칸(151a)의 날짜 표시 공간(151aa), 제1날짜 칸(151a)의 알림형 정보 표시 공간(151ab) 또는 제1합계 칸(151b)에 기 링크 설정된 세부정보 인터페이스 제공 창을 업무 관리 단말기(WC) 또는 본 발명의 전사적 자원 관리 시스템(10)이 적용된 컴퓨터(C)와 같은 단말의 디스플레이와 같은 출력장치에 팝업 시킨다.In addition, the first pop-up setting
다시 말해, 관리자가 키보드, 마우스 혹은 직접적인 터치를 통해 입력신호를 생성하는 형태로 제1날짜 칸(151a)의 날짜 표시 공간(151aa), 제1날짜 칸(151a)의 알림형 정보 표시 공간(151ab) 또는 제1합계 칸(151b)을 선택할 시, 각각의 칸에 링크 설정된 세부정보 인터페이스(공사일보, 공지사항 안내서, 작업현황 보고서 등의 출력, 수정, 인쇄 등 관련 인터페이스) 제공 창이 팝업을 통해 제공되어 해당 정보들의 수정 혹은 출력을 빠르고 용이하게 진행할 수 있다.In other words, the date display space 151aa of the
다음으로, 제2공사현장 관리용 캘린더 제공부(220)는 관리 단말기로부터 수신되는 공사현장 관리정보 내 비용관리형 정보의 비용관리 대상 수 및 비용관리 대상의 비용현황을 캘린더 내 각각의 날짜별로 정보 생성날짜가 대응되게 표시하는 캘린더를 제공한다.Next, the second construction site management calendar providing unit 220 includes the number of cost management targets and cost status of the cost management target of the cost management information received from the management terminal by each date in the calendar. It provides a calendar that displays the creation date correspondingly.
여기서, 비용관리형 정보는 근로자 수당, 근로자 노무비, 장비 공급비, 장비 유류비, 현장 수리비, 자재 관련 비용, 현장 운반비, 공사 기성 관련 비용, 현장 경비, 공사 투입 원가, 공제 관련 비용 중 하나에 관한 정보들에 관한 것이다.Here, the cost management type information is information on one of worker's allowance, worker labor cost, equipment supply cost, equipment fuel cost, field repair cost, material-related cost, on-site transportation cost, construction completion-related cost, site cost, construction input cost, and deduction-related cost. It is about the field.
이를 위해, 제2공사현장 관리용 캘린더 제공부(220)은 제2공사현장 관리용 캘린더 생성부분(222), 비용관리형 정보 표시부분(223), 제2합계정보 표시부분(224) 및 제2팝업 설정부분(225)을 포함한다. To this end, the second construction site management calendar providing unit 220 includes a second construction site management
여기서, 제2공사현장 관리용 캘린더 생성부분(222)는 도11에 도시된 바와 같이 날짜 표시 공간(161aa)과 비용관리형 정보 표시 공간(161ab)을 구비한 다수의 제2날짜 칸(161a) 및 비용관리형 정보에 대한 월별 합계정보를 표시하기 위한 제2합계 칸(161b)을 포함하는 제2공사현장 관리용 캘린더(161)를 생성한다.Here, the second construction site management
또한, 비용관리형 정보 표시부분(223)은 제2날짜 칸(161a)의 비용관리형 정보 표시 공간(161ab)에 관리 단말기(WC)로부터 수신되는 공사현장 관리정보를 기반으로 비용관리형 정보의 비용관리 대상 수 및 비용관리 대상의 비용현황 각각에 대한 정보를 상기 제2날짜 칸(161a)의 날짜 표시 공간(161aa)에 표시된 날짜별로 대응되게 표시한다.In addition, the cost management type information display part 223 is based on the construction site management information received from the management terminal (WC) in the cost management type information display space 161ab of the
이를 통해, 제2날짜 칸(161a)의 비용관리형 정보 표시 공간(161ab)에는 날짜 별로 등록된 근로자 수당, 근로자 노무비, 장비 공급비, 장비 유류비, 현장 수리비, 자재 관련 비용, 현장 운반비, 공사 기성 관련 비용, 현장 경비, 공사 투입 원가, 공제 관련 비용 중 하나에 관한 비용관리형 정보의 비용관리 대상 수 및 비용관리 대상의 비용현황에 대한 정보가 표시된다.Through this, in the cost management information display space (161ab) of the second date column (161a), registered worker allowance, worker labor cost, equipment supply cost, equipment fuel cost, on-site repair cost, material related cost, on-site transportation cost, construction completion Information on the number of cost management targets and the status of costs of cost management targets of cost management type information about one of related costs, site expenses, construction input costs, and deduction-related expenses is displayed.
또한, 제2합계정보 표시부분(224)은 제2합계 칸(161b)에 관리 단말기(WC)로부터 수신되는 공사현장 관리정보를 기반으로 비용관리형 정보의 비용관리 대상 수 및 비용관리 대상의 비용현황 각각에 대한 정보의 월별 합계정보를 표시한다.In addition, the second total information display portion 224 is based on the construction site management information received from the management terminal (WC) in the second total column (161b), the number of cost management targets and the cost of the cost management target Displays the monthly total information for each status.
예를 들어, 도11에 도시된 바와 같이 제2공사현장 관리용 캘린더(161)이 근로자 수당에 관한 비용관리형 정보를 표시하기 위해 마련될 경우, 제2날짜 칸(161a)의 비용관리형 정보 표시 공간(161ab)에는 날짜별로 수당 관리 대상으로 등록된 근로자의 수 및 근로자들의 수당 내역(당일 전체 수당액, 전일 전체 수당액, 누계 전체 수당액 등)이 표시되고, 제2합계 칸(161b)에는 해당 월에 누적된 근로자 수 및 근로자들의 수당액이 표시된다.For example, as shown in Fig. 11, when the second construction
다른 예로, 도12에 도시된 바와 같이 제2공사현장 관리용 캘린더(161)가 근로자 노무비에 관한 비용관리형 정보를 표시하기 위해 마련될 경우, 제2날짜 칸(161a)의 비용관리형 정보 표시 공간(161ab)에는 날짜별로 노무비 관리 대상으로 등록된 근로자의 수(혹은 노무비 관리 대상의 공수) 및 근로자들의 노무비 내역(당일 전체 노무비, 전일 전체 노무비, 누계 전체 노무비 등)이 표시되고, 제2합계 칸(161b)에는 해당 월에 누적된 노무비 관리 대상으로 등록된 근로자의 수(혹은 노무비 관리 대상의 공수) 및 근로자들의 노무비가 표시된다.As another example, as shown in Fig. 12, when the second construction
다른 예로, 도13에 도시된 바와 같이 제2공사현장 관리용 캘린더(161)가 장비유류에 관한 비용관리형 정보를 표시하기 위해 마련될 경우, 제2날짜 칸(161a)의 비용관리형 정보 표시 공간(161ab)에는 날짜별로 장비유류 관리 대상으로 등록된 장비대수 및 장비유류비 내역(당일 전체 장비유류비, 전일 전체 장비유류비, 누계 전체 장비유류비 등)이 표시되고, 제2합계 칸(161b)에는 해당 월에 누적된 장비유류비 관리 대상으로 등록된 장비대수 및 장비유류비가 표시된다.As another example, as shown in Fig. 13, when the second construction
다른 예로, 도14에 도시된 바와 같이 제2공사현장 관리용 캘린더(161)가 공사 투입 원가에 관한 비용관리형 정보를 표시하기 위해 마련될 경우, 제2날짜 칸(161a)의 비용관리형 정보 표시 공간(161ab)에는 날짜별로 등록된 공사 투입 원가 금액 및 원가 투입율 내역(당일 전체 공사 투입 원가 금액 및 원가 투입율, 전일 전체 공사 투입 원가 금액 및 원가 투입율, 누계 전체 공사 투입 원가 금액 및 원가 투입율 등)이 표시되고, 제2합계 칸(161b)에는 해당 월에 누적된 공사 투입 원가 금액 및 원가 투입율이 표시된다.As another example, as shown in Fig. 14, when the second construction
다른 예로, 도15에 도시된 바와 같이 제2공사현장 관리용 캘린더(161)이 공사 기성 관련 비용에 관한 비용관리형 정보를 표시하기 위해 마련될 경우, 제2날짜 칸(161a)의 비용관리형 정보 표시 공간(161ab)에는 날짜별로 등록된 공종별 기성 금액 및 공종별 기성 금액 투입율 내역(당일 전체 공종별 기성 금액 및 공종별 기성 금액 투입율, 공종별 기성 금액 및 공종별 기성 금액 투입율, 공종별 기성 금액 및 공종별 기성 금액 투입율 등)이 표시되고, 제2합계 칸(161b)에는 해당 월에 누적된 공종별 기성 금액 및 공종별 기성 금액 투입율이 표시된다.As another example, as shown in FIG. 15, when the second construction
또한, 제2팝업 설정부분(225)은 업무 관리 단말기(WC) 또는 본 발명의 전사적 자원 관리 시스템(10)이 적용된 컴퓨터(C)와 같은 단말을 통해 제2날짜 칸(161a)의 날짜 표시 공간(161aa), 제2날짜 칸(161a)의 비용관리형 정보 표시 공간(161ab) 또는 제2합계 칸(161b)에 대한 팝업 연결 요청 신호가 수신되면, 제2날짜 칸(161a)의 날짜 표시 공간(161aa), 제2날짜 칸(161a)의 비용관리형 정보 표시 공간(161ab) 또는 제2합계 칸(161b)에 기 링크 설정된 세부정보 인터페이스 제공 창을 업무 관리 단말기(WC) 또는 본 발명의 전사적 자원 관리 시스템(10)이 적용된 컴퓨터(C)와 같은 단말의 디스플레이와 같은 출력장치에 팝업 시킨다.In addition, the second pop-up setting part 225 is a date display space of the
다시 말해, 관리자가 키보드, 마우스 혹은 직접적인 터치를 통해 입력신호를 생성하는 형태로 제2날짜 칸(161a)의 날짜 표시 공간(161aa), 제2날짜 칸(161a)의 비용관리형 정보 표시 공간(161ab) 또는 제2합계 칸(161b)을 선택할 시, 각각의 칸에 링크 설정된 세부정보 인터페이스(직원현황 및 수당내역 보고서, 노무 생산성 현황 보고서, 노무원장 보고서, 장비현황 보고서, 장비유류 현황 보고서, 자재청구 현황 보고서, 재고현황 보고서, 현장 경비현황 보고서, 공종별기성내역서, 외주기성원장 보고서, 원가투입원장 보고서, 공제현황 보고서 등의 출력, 수정, 인쇄 등 관련 인터페이스) 제공 창이 팝업을 통해 제공되어 해당 정보들의 수정 혹은 출력을 빠르고 용이하게 진행할 수 있다.In other words, an administrator generates an input signal through a keyboard, a mouse, or a direct touch. The date display space 161aa of the
마지막으로, 날씨 관리용 캘린더 제공부(230)는 관리 단말기(WC)로부터 수신되는 공사현장 관리정보 내 공사현장의 날씨정보를 캘린더 내 각각의 날짜별로 정보 생성날짜 대응되게 표시하는 캘린더(171)를 제공한다.Finally, the weather management calendar providing unit 230 displays a
이를 위해, 날씨 관리용 캘린더 제공부(230)는 날씨 관리용 캘린더 생성부분(232), 날씨정보 표시부분(233), 날씨현황 표시부분(234), 제3팝업 설정부분(235)를 포함한다. To this end, the weather management calendar providing unit 230 includes a weather management calendar generation unit 232, a weather information display unit 233, a weather status display unit 234, and a third pop-up setting unit 235. .
여기서, 날씨 관리용 캘린더 생성부분(232)은 도16에 도시된 바와 같이 날짜 표시 공간(171aa)과 날씨정보 표시 공간(171ab)을 구비한 다수의 제3날짜 칸(171a) 및 날씨정보에 대한 월별 날씨 현황에 대한 정보를 표시하기 위한 날씨 현황 칸(171b)을 포함하는 날씨 관리용 캘린더(171)를 생성한다. Here, the weather management calendar generation part 232 includes a plurality of
날씨정보 표시부분(233)은 제3날짜 칸(171a)의 날씨정보 표시 공간(171ab)에 관리 단말기(WC)로부터 수신되는 공사현장 관리정보를 기반으로 날씨 상태, 최저 기온, 최고 기온 및 강수량에 대한 날씨정보를 상기 제3날짜 칸(171a)의 날짜 표시 공간(171aa)에 표시된 날짜별로 대응되게 표시한다. The weather information display part 233 is based on the construction site management information received from the management terminal (WC) in the weather information display space 171ab of the
날씨현황 표시부분(234)은 날씨 현황 칸(171b)에 관리 단말기(WC)로부터 수신되는 공사현장 관리정보를 기반으로 월별 최저 기온, 최고 기온 및 강수량의 평균값에 대한 날씨정보 혹은 월별 날씨 상태별 날짜 수 현황을 표시한다. Weather status display part 234 is based on the construction site management information received from the management terminal (WC) in the
제3팝업 설정부분(235)은 업무 관리 단말기(WC) 또는 본 발명의 전사적 자원 관리 시스템(10)이 적용된 컴퓨터(C)와 같은 단말을 통해 제3날짜 칸(171a)의 날짜 표시 공간(171aa), 제3날짜 칸(171a)의 날씨정보 표시 공간(171ab) 또는 날씨 현황 칸(171b)에 대한 팝업 연결 요청 신호가 수신되면, 제3날짜 칸(171a)의 날짜 표시 공간(171aa), 제3날짜 칸(171a)의 날씨정보 표시 공간(171ab) 또는 날씨 현황 칸(171b)에 기 링크 설정된 세부정보 인터페이스 제공 창을 업무 관리 단말기(WC) 또는 본 발명의 전사적 자원 관리 시스템(10)이 적용된 컴퓨터(C)와 같은 단말의 디스플레이와 같은 출력장치에 팝업 시킨다. The third pop-up setting part 235 is the date display space 171aa of the
다시 말해, 관리자가 키보드, 마우스 혹은 직접적인 터치를 통해 입력신호를 생성하는 형태로 제3날짜 칸(171a)의 날짜 표시 공간(171aa), 제3날짜 칸(171a)의 날씨정보 표시 공간(171ab) 또는 날씨 현황 칸(171b)을 선택할 시, 각각의 칸에 링크 설정된 세부정보 인터페이스(세부 날씨 상태 보고서, 월별 날씨 현황 보고서 등) 제공 창이 팝업을 통해 제공되어 해당 정보들의 수정 혹은 출력을 빠르고 용이하게 진행할 수 있다. In other words, the date display space 171aa of the
본 발명에 개시된 실시예는 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시예에 의해서 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. 보호범위는 아래 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리 범위에 포함되는 것으로 해석되어야 할 것이다.The embodiments disclosed in the present invention are not intended to limit the technical idea of the present invention, but to explain it, and the scope of the technical idea of the present invention is not limited by these embodiments. The scope of protection should be interpreted by the following claims, and all technical ideas within the scope equivalent thereto should be construed as being included in the scope of the present invention.
10 : 전사적 자원 관리 시스템
100 : 제1프로세서
110 : 비용계산서 관리부
111 : 항목 설정부분
112 : 항목 저장부분
113 : 포맷 설정부분
114 : 비용계산서 생성부분
115 : 비용계산서 저장부분
116 : 비용계산서 출력부분
120 : 보험금 자동조정 관리부
121 :
한도 설정부분
122 : 노무정보 관리부분
123 :
산정기준 설정부분
124 :
공제정보 관리부분
125 : 조정정보 관리부분
126 : 정보 출력부분
200 : 제2프로세서
210 : 제1공사현장 관리용 캘린더 제공부
151 : 제1공사현장 관리용 캘린더
151a : 제1날짜 칸
151b : 제1합계 칸
212 : 제1공사현장 관리용 캘린더 생성부분
213 : 알림형 정보 표시부분
214 : 제1합계정보 표시부분
215 : 제1팝업 설정부분
220 : 제2공사현장 관리용 캘린더 제공부
161 : 제2공사현장 관리용 캘린더
161a : 제2날짜 칸
161b : 제2합계 칸
222 : 제2공사현장 관리용 캘린더 생성부분
223 : 비용관리형 정보 표시부분
224 : 제2합계정보 표시부분
225 : 제2팝업 설정부분
230 : 날씨 관리용 캘린더 제공부
171 : 날씨 관리용 캘린더
171a : 제3날짜 칸
171b : 날씨 현황 칸
232 : 날씨 관리용 캘린더 생성부분
233 : 날씨정보 표시부분
234 : 날씨현황 표시부분
235 : 제3팝업 설정부분
300 : 메모리
WC : 관리 단말기
C : 컴퓨터
P : 비용계산서
PT : 비용계산서의 템플릿
C1 : 제1컨트롤 항목
V1 : 금액값
C2 : 제2컨트롤 항목
V2 : 계산값
T : 계산식10: Enterprise resource management system
100: first processor
110: Cost invoice management department
111: item setting part 112: item storage part
113: Format setting part
114: part of generating cost invoice
115: Saving portion of the cost statement
116: Output part of cost invoice
120: Insurance payment automatic adjustment management department
121: limit setting part 122: labor information management part
123: Calculation standard setting part 124: Deduction information management part
125: control information management part 126: information output part
200: second processor
210: Calendar providing unit for management of the first construction site
151: Calendar for management of the first construction site
151a: 1st date field
151b: first total cell
212: Calendar creation part for the first construction site management
213: Notification type information display part
214: first total information display part
215: 1st pop-up setting part
220: Calendar providing unit for management of the 2nd construction site
161: Calendar for management of the 2nd construction site
161a: 2nd date field
161b: second total cell
222: Calendar creation part for the 2nd construction site management
223: Cost management type information display part
224: second total information display part
225: second pop-up setting part
230: Calendar provision unit for weather management
171: Calendar for weather management
171a: 3rd date box
171b: Weather status box
232: Calendar generation part for weather management
233: Weather information display part
234: Weather status display part
235: 3rd popup setting part
300: memory
WC: Management terminal
C: computer
P: Cost invoice
PT: Template of expense statement
C1: 1st control item V1: Amount value
C2: second control item V2: calculated value
T: calculation formula
Claims (12)
상기 관리 단말기로부터 수신된 비용계산서 관리용 신호들을 기반으로 상기 컴퓨터로 구현되는 비용계산서의 포맷설정, 생성, 저장 출력이 이루어지도록 함으로써, 비용계산서 관리 기능을 수행하며, 상기 관리 단말기로부터 수신된 근로자별 보험금 자동조정용 신호들을 기반으로 근로자별 보험금 자동조정 기능을 수행하는 제1프로세서;
상기 관리 단말기로부터 수신된 공사현장 관리정보가 상기 컴퓨터로 구현되는 캘린더에 반영되도록 함으로써, 공사현장 관리기능을 수행하는 제2프로세서; 및
상기 제1프로세서 및 제2프로세서에 의해 액세스 가능한 비-일시적 유형으로, 컴퓨터로 구현되는 비용계산서 관리 및 근로자별 보험금 자동조정 기능과 컴퓨터로 구현되는 캘린더를 이용한 공사현장 관리기능을 수행하게 하는 지시들의 세트를 포함한 컴퓨터 코드들이 저장된 메모리;를 포함하며,
상기 제1프로세서는,
상기 관리 단말기로부터 수신된 비용계산서 관리용 신호들을 통해 공사현장 관리를 위한 비용계산서의 템플릿 포맷을 설정하고, 템플릿 포맷이 설정된 비용계산서를 생성, 저장 및 출력시키는 비용계산서 관리부; 및
상기 관리 단말기로부터 수신된 보험금 자동조정용 신호들을 통해 근로자 각각의 보험금을 기 설정된 최소 하한액에서 최대 상한액까지의 기준 금액 범위 내로 조정 후 공사현장별 노무비율에 따라 자동 분할하여 조정금액 정보를 생성하고, 생성된 조정금액 정보를 저장, 출력시키는 보험금 자동조정 관리부;을 포함하며,
상기 제2프로세서는,
상기 관리 단말기로부터 수신되는 공사현장 관리정보 중 알림형 정보의 건수 및 내역을 캘린더 내 각각의 날짜별로 정보 생성날짜 혹은 정보 내 기 설정된 날짜와 대응되게 표시하는 캘린더를 제공하는 제1공사현장 관리용 캘린더 제공부;를 포함하는 것을 특징으로 하는
전사적 자원 관리 시스템.
Management that generates signals for management of cost invoices input by the manager and signals for automatic adjustment of insurance payments for each worker, and creates construction site management information that reflects the contents for management of workers, environments, schedules, events and expenses input by the manager In a company-wide resource management system that is linked to a terminal and has a computer-implemented cost invoice management function, an automatic adjustment function for each worker's insurance payment, and a construction site management function using a computer-implemented calendar,
Based on the cost invoice management signals received from the management terminal, the format setting, generation, and storage output of the cost invoice implemented by the computer is performed, thereby performing a cost invoice management function, and for each worker received from the management terminal. A first processor that performs an automatic adjustment function for each worker based on signals for automatic adjustment of insurance benefits;
A second processor that performs a construction site management function by reflecting the construction site management information received from the management terminal on a calendar implemented by the computer; And
It is a non-temporary type accessible by the first and second processors, and includes instructions for performing a computer-implemented cost invoice management function and an automatic adjustment function for each worker's insurance payment and a construction site management function using a computer-implemented calendar. Including; a memory in which computer codes including a set are stored,
The first processor,
A cost invoice management unit for setting a template format of a cost invoice for management of a construction site through the cost invoice management signals received from the management terminal, and generating, storing, and outputting a cost invoice in which the template format is set; And
Through signals for automatic adjustment of insurance benefits received from the management terminal, each worker's insurance premium is adjusted within the range of the standard amount from the preset minimum lower limit to the maximum upper limit, and then automatically divided according to the labor ratio for each construction site to generate adjustment amount information, Includes; insurance automatic adjustment management unit for storing and outputting the generated adjustment amount information,
The second processor,
The first construction site management calendar that provides a calendar that displays the number and details of notification type information among the construction site management information received from the management terminal in correspondence with the information creation date or a preset date in the calendar for each date in the calendar It characterized in that it includes;
Enterprise resource management system.
상기 비용계산서의 템플릿은 특정 금액값과 매칭된 다수의 제1컨트롤 항목과 상기 제1컨트롤 항목 복수개 각각에 매칭된 금액값이 기 설정된 계산식에 대입되어 산정된 계산값과 매칭된 다수의 제2컨트롤 항목 중 각각 적어도 하나 이상으로 구성된 포맷으로 마련되는 것을 특징으로 하는
전사적 자원 관리 시스템.
The method of claim 1,
The template of the cost invoice includes a plurality of first control items matched with a specific amount of money and a plurality of second control items matched with the calculated value by substituting the price values matched with each of the plurality of first control items into a preset calculation formula. Characterized in that provided in a format consisting of at least one or more of each item
Enterprise resource management system.
상기 비용계산서 관리부는,
상기 관리 단말기를 통해 입력되는 항목 설정 신호에 의해, 상기 제1컨트롤 항목의 내용 및 상기 제1컨트롤 항목과 매칭된 금액값을 설정하거나 상기 제2컨트롤 항목의 내용 및 상기 제2컨트롤 항목과 매칭된 상기 계산값의 산정을 위한 상기 계산식을 설정하여 상기 제1컨트롤 항목 또는 상기 제2컨트롤 항목을 생성하는 항목 설정부분;
상기 항목 설정부분을 통해 설정 완료 후 생성된 다수의 상기 제1컨트롤 항목과 다수의 상기 제2컨트롤 항목을 저장하는 항목 저장부분;
상기 관리 단말기를 통해 입력되는 포맷 설정 신호에 의해, 상기 항목 저장부분에 저장된 다수의 상기 제1컨트롤 항목과 다수의 상기 제2컨트롤 항목 중 각각 적어도 하나 이상으로 구성된 상기 비용계산서의 템플릿의 포맷을 설정하는 포맷 설정부분; 및
상기 포맷 설정부분을 통해 포맷 설정이 완료된 비용계산서의 템플릿을 구성하는 적어도 하나 이상의 제1컨트롤 항목과 제2컨트롤 항목과 함께 상기 포맷 설정부분을 통해 포맷 설정이 완료된 비용계산서의 템플릿을 구성하는 적어도 하나 이상의 제1컨트롤 항목과 제2컨트롤 항목 각각에 매칭된 금액값 및 계산값이 표시된 비용계산서를 생성하는 비용계산서 생성부분;을 포함하는 것을 특징으로 하는
전사적 자원 관리 시스템.
The method of claim 2,
The cost invoice management unit,
According to the item setting signal input through the management terminal, the content of the first control item and the amount of money matched with the first control item are set, or the content of the second control item and the second control item are matched. An item setting part for generating the first control item or the second control item by setting the calculation formula for calculating the calculated value;
An item storage section for storing a plurality of the first control items and a plurality of the second control items generated after setting is completed through the item setting section;
According to the format setting signal input through the management terminal, the format of the template of the cost invoice is composed of at least one of each of the plurality of first control items and the plurality of second control items stored in the item storage part. Format setting part; And
At least one constituting a template of a cost invoice for which format setting has been completed through the format setting part, along with at least one first control item and a second control item constituting the template of the cost invoice for which the format setting has been completed through the format setting part. And a cost invoice generation portion for generating a cost invoice in which the price value and the calculated value matched to each of the first control item and the second control item are displayed.
Enterprise resource management system.
상기 비용계산서 관리부는,
상기 비용계산서 생성부분을 통해 생성된 비용계산서를 저장하는 비용계산서 저장부분; 및
상기 관리 단말기를 통해 입력되는 출력 신호에 의해, 상기 비용계산서 생성부분을 통해 생성된 비용계산서 또는 상기 비용계산서 저장부분에 저장된 비용계산서 중 출력 신호에 대응되는 비용계산서를 상기 관리 단말기로 출력하는 비용계산서 출력부분;을 더 포함하는 것을 특징으로 하는
전사적 자원 관리 시스템.
The method of claim 3,
The cost invoice management unit,
A cost invoice storage portion for storing a cost invoice generated through the cost invoice generation portion; And
A cost invoice for outputting a cost invoice corresponding to an output signal from among the cost invoice generated through the cost invoice generation part or the cost invoice stored in the cost invoice storage section by an output signal input through the management terminal to the management terminal Characterized in that it further comprises an output portion;
Enterprise resource management system.
상기 보험금 자동조정 관리부는,
상기 관리 단말기를 통해 입력되는 한도 설정 신호에 의해, 근로자의 보험금에 대한 최소 하한액 및 최대 상한액에 대한 한도정보를 설정하여 저장하는 한도 설정부분;
상기 관리 단말기를 통해 입력되는 근로자별 노무정보 입력 신호에 의해, 근로자별 노무정보 입력 신호와 대응되어 근로자의 공사현장별 노무비용에 대한 정보를 포함하는 노무정보를 근로자별로 생성하여 저장 관리하는 노무정보 관리부분;
상기 관리 단말기를 통해 입력되는 보험금 공제기준 설정 신호에 의해, 근로자의 공사현장별 노무비용 대비 보험금 공제금액의 산정기준을 설정하여 저장하는 산정기준 설정부분;
상기 산정기준 설정부분을 통해 설정된 보험금 공제금액의 산정기준 및 상기 노무정보 관리부분에 저장된 근로자별 노무정보를 기반으로 근로자의 공사현장별 보험금 공제금액에 대한 공제정보를 근로자별로 생성하여 저장 관리하는 공제정보 관리부분; 및
기 설정된 조정기준에 따라 상기 공제정보 관리부분에 저장된 공제정보에 따른 근로자의 공사현장별 보험금 공제금액의 총합을 보험금 조정금액의 총합으로 근로자별 변환을 수행하고, 변환된 근로자별 보험금 조정금액의 총합을 상기 노무정보 관리부분에 저장된 근로자별 노무정보에 따른 근로자의 공사현장별 노무비용의 상호 비율에 대응되도록 자동 분할하여 근로자의 공사현장별 보험금 조정금액에 대한 조정정보를 근로자별로 생성하여 저장 관리하는 조정정보 관리부분;을 포함하며,
상기 기 설정된 조정기준은 상기 공제정보 관리부분에 저장된 공제정보 및 상기 한도 설정부분을 통해 설정된 한도정보를 기반으로 근로자의 공사현장별 보험금 공제금액의 총합이 최소 하한액 미만이면 최소 하한액을 보험금 조정금액의 총합으로 변환하고, 근로자의 공사현장별 보험금 공제금액의 총합이 최대 상한액을 초과하면 최대 상한액을 보험금 조정금액의 총합으로 변환하고, 근로자의 공사현장별 보험금 공제금액의 총합이 최소 하한액 이상에서 최대 상한액 이하이면 보험금 공제금액을 보험금 조정금액의 총합으로 변환하는 기준에 해당하는 것을 특징으로 하는
전사적 자원 관리 시스템.
The method of claim 1,
The insurance payment automatic adjustment management unit,
A limit setting part for setting and storing limit information for a minimum lower limit and a maximum upper limit for the insurance premium of a worker according to a limit setting signal input through the management terminal;
Labor information that generates and manages labor information for each worker, including information on the labor cost of each construction site, corresponding to the labor information input signal for each worker by the labor information input signal for each worker input through the management terminal. Management part;
A calculation standard setting part for setting and storing a calculation standard of an insurance premium deduction amount relative to the labor cost of each construction site of the worker according to the insurance premium deduction standard setting signal input through the management terminal;
Based on the calculation standard of the insurance deduction amount set through the calculation criteria setting part and the labor information for each worker stored in the labor information management part, deduction information for the insurance deduction amount for each construction site of the worker is created and stored for each worker. Information management part; And
In accordance with the pre-set adjustment criteria, the total amount of insurance premium deductions for each construction site of workers according to the deduction information stored in the deduction information management section is converted into the total amount of insurance premium adjustments, and the total amount of the converted insurance premium adjustment amount for each worker In accordance with the labor information for each worker stored in the labor information management section, it is automatically divided to correspond to the reciprocal ratio of the labor cost of each construction site of the worker, and the adjustment information for the adjustment amount of the insurance payment for each construction site of the worker is generated and stored for each worker. Including the coordination information management part;
Based on the deduction information stored in the deduction information management part and the limit information set through the limit setting part, the preset adjustment criterion is the minimum lower limit if the total amount of the insurance premium deduction for each construction site is less than the minimum lower limit. When the total amount of insurance deductions for each construction site exceeds the maximum, the maximum upper limit is converted to the total amount of the insurance premium adjustment, and the total sum of the insurance deductions for each construction site by the worker is at least the minimum lower limit. If it is less than the maximum upper limit, it corresponds to a criterion for converting the insurance premium deduction amount into the total sum of the insurance premium adjustment amount.
Enterprise resource management system.
상기 보험금 자동조정 관리부는,
상기 관리 단말기를 통해 입력되는 정보 출력 신호에 의해, 노무정보 관리부분에 저장된 노무정보, 공제정보 관리부분에 저장된 공제정보, 조정정보 관리부분에 저장된 조정정보를 근로자별로 매칭시켜 동시에 상기 관리 단말기로 출력하는 정보 출력부분;을 더 포함하는 것을 특징으로 하는
전사적 자원 관리 시스템.
The method of claim 1,
The insurance payment automatic adjustment management unit,
According to the information output signal input through the management terminal, the labor information stored in the labor information management part, the deduction information stored in the deduction information management part, and the adjustment information stored in the adjustment information management part are matched for each worker and simultaneously output to the management terminal. It characterized in that it further comprises an information output part;
Enterprise resource management system.
상기 제2프로세서는,
상기 관리 단말기로부터 수신되는 공사현장 관리정보 내 비용관리형 정보의 비용관리 대상 수 및 비용관리 대상의 비용현황을 캘린더 내 각각의 날짜별로 정보 생성날짜가 대응되게 표시하는 캘린더를 제공하는 제2공사현장 관리용 캘린더 제공부; 및
상기 관리 단말기로부터 수신되는 공사현장 관리정보 내 공사현장의 날씨정보를 캘린더 내 각각의 날짜별로 정보 생성날짜 대응되게 표시하는 캘린더를 제공하는 날씨 관리용 캘린더 제공부;를 더 포함하는 것을 특징으로 하는
전사적 자원 관리 시스템.
The method of claim 1,
The second processor,
A second construction site that provides a calendar that displays the number of cost management targets of the cost management type information in the construction site management information received from the management terminal and the cost status of the cost management target in correspondence with each date in the calendar. A management calendar providing unit; And
A weather management calendar providing unit that provides a calendar for displaying the weather information of the construction site in the construction site management information received from the management terminal in correspondence with the information creation date for each date in the calendar;
Enterprise resource management system.
상기 알림형 정보는 공사현장 관련 공사일보, 공지사항, 공사휴무, 작업사건 현황, 사건 마감현황 및 사건 결제현황에 관한 정보 중 하나에 해당하는 것을 특징으로 하는
전사적 자원 관리 시스템.
The method of claim 7,
The notification type information corresponds to one of information on a construction site-related construction daily report, announcements, construction holidays, work event status, event closing status, and event settlement status.
Enterprise resource management system.
상기 제1공사현장 관리용 캘린더 제공부는,
날짜 표시 공간과 알림형 정보 표시 공간을 구비한 다수의 제1날짜 칸 및 알림형 정보에 대한 월별 합계정보를 표시하기 위한 제1합계 칸을 포함하는 캘린더를 생성하는 제1공사현장 관리용 캘린더 생성부분;
상기 제1날짜 칸의 알림형 정보 표시 공간에 상기 관리 단말기로부터 수신되는 공사현장 관리정보를 기반으로 알림형 정보의 건수 및 내역에 대한 정보를 상기 제1날짜 칸의 날짜 표시 공간에 표시된 날짜별로 대응되게 표시하는 알림형 정보 표시부분; 및
상기 제1합계 칸에 상기 관리 단말기로부터 수신되는 공사현장 관리정보를 기반으로 알림형 정보 건수에 대한 정보의 월별 합계정보를 표시하는 제1합계정보 표시부분;을 포함하는 것을 특징으로 하는
전사적 자원 관리 시스템.
The method of claim 8,
The first construction site management calendar providing unit,
Creation of a calendar for management of the first construction site that creates a calendar including a first total space for displaying monthly total information for the reminder-type information and a plurality of first date spaces with a date display space and a reminder-type information display space part;
Based on the construction site management information received from the management terminal in the notification type information display space of the first date column, information on the number and details of notification type information is matched by date displayed in the date display space of the first date column A notification type information display portion that is displayed to be displayed; And
And a first total information display part for displaying monthly total information on the number of notification type information based on the construction site management information received from the management terminal in the first total column;
Enterprise resource management system.
상기 비용관리형 정보는 근로자 수당, 근로자 노무비, 장비 공급비, 장비 유류비, 현장 수리비, 자재 관련 비용, 현장 운반비, 공사 기성 관련 비용, 현장 경비, 공사 투입 원가, 공제 관련 비용 중 하나에 관한 정보에 해당하는 것을 특징으로 하는
전사적 자원 관리 시스템.
The method of claim 7,
The above cost management information includes information on one of worker's allowance, worker labor cost, equipment supply cost, equipment fuel cost, on-site repair cost, material-related cost, on-site transportation cost, construction completion-related cost, on-site cost, construction input cost, and deduction-related cost. Characterized in that
Enterprise resource management system.
상기 제2공사현장 관리용 캘린더 제공부는,
날짜 표시 공간과 비용관리형 정보 표시 공간을 구비한 다수의 제2날짜 칸 및 비용관리형 정보에 대한 월별 합계정보를 표시하기 위한 제2합계 칸을 포함하는 캘린더를 생성하는 제2공사현장 관리용 캘린더 생성부분;
상기 제2날짜 칸의 비용관리형 정보 표시 공간에 상기 관리 단말기로부터 수신되는 공사현장 관리정보를 기반으로 비용관리형 정보의 비용관리 대상 수 및 비용관리 대상의 비용현황 각각에 대한 정보를 상기 제2날짜 칸의 날짜 표시 공간에 표시된 날짜별로 대응되게 표시하는 비용관리형 정보 표시부분; 및
상기 제2합계 칸에 상기 관리 단말기로부터 수신되는 공사현장 관리정보를 기반으로 비용관리형 정보의 비용관리 대상 수 및 비용관리 대상의 비용현황 각각의 월별 합계정보를 표시하는 제2합계정보 표시부분;을 포함하는 것을 특징으로 하는
전사적 자원 관리 시스템.
The method of claim 10,
The second construction site management calendar providing unit,
For the management of a second construction site that creates a calendar including a number of second date columns with a date display space and a cost management information display space and a second total column for displaying monthly total information for cost management information Calendar creation part;
Based on the construction site management information received from the management terminal in the cost management information display space of the second date column, information on each of the number of cost management targets and the cost status of the cost management target is displayed in the second A cost management type information display portion corresponding to each date displayed in the date display space of the date column; And
A second total information display portion for displaying, in the second total column, monthly total information of the number of cost management targets of the cost management type information and cost status of the cost management target based on the construction site management information received from the management terminal; Characterized in that it comprises a
Enterprise resource management system.
상기 날씨 관리용 캘린더 제공부는,
날짜 표시 공간과 날씨정보 표시 공간을 구비한 다수의 제3날짜 칸을 포함하는 캘린더를 생성하는 날씨 관리용 캘린더 생성부분; 및
상기 제3날짜 칸의 날씨정보 표시 공간에 상기 관리 단말기로부터 수신되는 공사현장 관리정보를 기반으로 날씨 상태, 최저 기온, 최고 기온 및 강수량에 대한 날씨정보를 상기 제3날짜 칸의 날짜 표시 공간에 표시된 날짜별로 대응되게 표시하는 날씨정보 표시부분;을 포함하는 것을 특징으로 하는
전사적 자원 관리 시스템.The method of claim 7,
The weather management calendar providing unit,
A weather management calendar generating part for generating a calendar including a plurality of third date columns having a date display space and a weather information display space; And
Weather information on the weather condition, minimum temperature, maximum temperature, and precipitation is displayed in the date display space of the third date field based on the construction site management information received from the management terminal in the weather information display space of the third date field. And a weather information display portion correspondingly displayed for each date.
Enterprise resource management system.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20190034413 | 2019-03-26 | ||
KR1020190034413 | 2019-03-26 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20200115038A true KR20200115038A (en) | 2020-10-07 |
KR102298860B1 KR102298860B1 (en) | 2021-09-07 |
Family
ID=72884438
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020190172778A KR102298860B1 (en) | 2019-03-26 | 2019-12-23 | System for enterprise resource planning |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102298860B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102494262B1 (en) * | 2022-06-13 | 2023-01-31 | 김재영 | Wage statement management system having automatic labor cost calculation function |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102476030B1 (en) | 2022-04-14 | 2022-12-09 | 주식회사 엠키스코어 | System for analysing present condition of business opportunity |
KR102476029B1 (en) | 2022-04-14 | 2022-12-09 | 주식회사 엠키스코어 | System for managing business opportunity |
KR102476031B1 (en) | 2022-04-14 | 2022-12-09 | 주식회사 엠키스코어 | System for monitoring deadline of business opportunity |
KR102530929B1 (en) * | 2022-08-10 | 2023-05-10 | 주식회사 언더라이터 | Method and apparatus for calculating house fire insurance using machine learning and software |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030047279A (en) * | 2001-12-10 | 2003-06-18 | 주식회사 포스코건설 | Cost estimate method for construction project using historical cost data, auto cost estimate system and medium storing a computer program for performing there |
JP2011197975A (en) * | 2010-03-19 | 2011-10-06 | Mitsubishi Heavy Ind Ltd | Method of preparing construction schedule in consideration of weather |
JP2017117046A (en) * | 2015-12-22 | 2017-06-29 | 高崎 将紘 | Insurance provision device, method and computer program |
-
2019
- 2019-12-23 KR KR1020190172778A patent/KR102298860B1/en active IP Right Grant
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030047279A (en) * | 2001-12-10 | 2003-06-18 | 주식회사 포스코건설 | Cost estimate method for construction project using historical cost data, auto cost estimate system and medium storing a computer program for performing there |
JP2011197975A (en) * | 2010-03-19 | 2011-10-06 | Mitsubishi Heavy Ind Ltd | Method of preparing construction schedule in consideration of weather |
JP2017117046A (en) * | 2015-12-22 | 2017-06-29 | 高崎 将紘 | Insurance provision device, method and computer program |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102494262B1 (en) * | 2022-06-13 | 2023-01-31 | 김재영 | Wage statement management system having automatic labor cost calculation function |
Also Published As
Publication number | Publication date |
---|---|
KR102298860B1 (en) | 2021-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102298860B1 (en) | System for enterprise resource planning | |
CN112950164B (en) | Information system engineering supervision working hour recording information system based on standardized rules | |
US8341089B2 (en) | Real estate management system and method | |
Cui et al. | Systems analysis of project cash flow management strategies | |
US5855005A (en) | System for electronically auditing exposures used for determining insurance premiums | |
US20160042470A1 (en) | System and Method for Budgeting and Cash Flow Forecasting | |
US20160210572A1 (en) | System and method for budgeting and cash flow forecasting | |
US20090138308A1 (en) | Technology benefits realization for public sector | |
AU2023203834A1 (en) | System and method for inter-company billing processing | |
WO2011008186A1 (en) | Software-based system and method for business management | |
KR102061447B1 (en) | System and method for enterprise resource planning comprising construction site managing function using computer-implemented calendar, recording medium having program thereof | |
KR102360120B1 (en) | System for enterprise resource planning comprising workers, works managing function and construction site managing function using computer-implemented calendar | |
Byers et al. | Capital investment analysis for managers | |
KR102652883B1 (en) | Computer-readable medium in which an enterprise resource planning program using computer-implemented calendar for financial managing | |
Padhi | SAP® ERP financials and FICO handbook | |
Putri et al. | Information System Design Based On Enterprise Resource Planning Using Account Payable Module Sap With ASAP Method In PT. Len Industri (Persero) | |
KR101138056B1 (en) | System and method for making real-time brief income statement | |
Dimitriou | A theoretical framework and perspective regarding the accounting and the technology issues in Greece | |
Salmon | Controlling with SAP: Practical guide | |
US20230101451A1 (en) | Automatic Refinement of Customizable Forecasts for Strategic Management | |
Harman | The extent and limitations of managerial accounting function within ERP systems | |
Patel | Discover SAP ERP Financials | |
Harikrishnan | Navigating the ERP Transformation: Unveiling the Role of Consultants and Microsoft D365 in Reshaping Post-Pandemic Business Dynamics | |
JP2004127265A (en) | Personnel management system in security agency service | |
Yu | Optimization of Accounting Information System for O Manufacturing Company |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant |