KR20200048596A - Precast concrete double wall for constructing shear wall, method for manufacturing the same and method for constructing shear wall using the same - Google Patents

Precast concrete double wall for constructing shear wall, method for manufacturing the same and method for constructing shear wall using the same Download PDF

Info

Publication number
KR20200048596A
KR20200048596A KR1020180130819A KR20180130819A KR20200048596A KR 20200048596 A KR20200048596 A KR 20200048596A KR 1020180130819 A KR1020180130819 A KR 1020180130819A KR 20180130819 A KR20180130819 A KR 20180130819A KR 20200048596 A KR20200048596 A KR 20200048596A
Authority
KR
South Korea
Prior art keywords
reinforcing bar
panel
reinforcing
shear wall
double wall
Prior art date
Application number
KR1020180130819A
Other languages
Korean (ko)
Other versions
KR102177360B1 (en
Inventor
이강철
신상훈
김재건
이제훈
문정호
Original Assignee
삼표피앤씨 주식회사
현대건설주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼표피앤씨 주식회사, 현대건설주식회사 filed Critical 삼표피앤씨 주식회사
Priority to KR1020180130819A priority Critical patent/KR102177360B1/en
Publication of KR20200048596A publication Critical patent/KR20200048596A/en
Application granted granted Critical
Publication of KR102177360B1 publication Critical patent/KR102177360B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The present invention relates to shear wall construction technology. According to the present invention, provided is a PC double-wall for the construction of a shear wall. The PC double-wall includes: a first PC panel; a second PC panel spaced from the first PC panel; and a reinforcement bar structure including a first reinforcement bar mesh buried in the first PC panel, a second reinforcement bar mesh buried in the second PC panel, and two reinforcement bar units located between the first and second reinforcement bar meshes and connecting the two reinforcement bar meshes. Each of the two reinforcement bar units is extended in a vertical direction and spaced from each other in a horizontal direction. The reinforcement bar units include: a plurality of tie hoop members placed in order in a vertical direction; and a plurality of connection bars extended in a vertical direction and placed side by side to connect the tie hoop members. The tie hoop members include a hoop-shaped flange part connected with the connection bars.

Description

전단벽 시공용 피씨 더블월, 이의 제조방법 및 이를 이용한 전단벽 시공방법 {PRECAST CONCRETE DOUBLE WALL FOR CONSTRUCTING SHEAR WALL, METHOD FOR MANUFACTURING THE SAME AND METHOD FOR CONSTRUCTING SHEAR WALL USING THE SAME}PC double wall for shear wall construction, manufacturing method thereof and shear wall construction method using the same {PRECAST CONCRETE DOUBLE WALL FOR CONSTRUCTING SHEAR WALL, METHOD FOR MANUFACTURING THE SAME AND METHOD FOR CONSTRUCTING SHEAR WALL USING THE SAME}

본 발명은 전단벽 시공 기술에 관한 것으로서, 더욱 상세하게는 전단벽 시공용 피씨 더블월 및 이를 이용한 전단벽 시공방법에 관한 것이다.The present invention relates to a shear wall construction technology, and more particularly, to a PC double wall for shear wall construction and a shear wall construction method using the same.

전단벽은 지진 등과 같은 수평력에 저항하도록 구성된 벽으로서, 수평방향으로도 강한 전단력을 부담할 수 있도록 많은 양의 수평철근을 배근한다. 특수 전단벽은 기존의 내력벽 또는 보통 전단벽에 비해 벽체 단면적에 대해 철근 물량이 40 내지 60% 증가된 특수경계요소가 벽체의 단부에 형성되어서 보강된 것이다.The shear wall is a wall configured to resist horizontal forces such as earthquakes, and a large amount of horizontal rebar is reinforced to bear a strong shear force in the horizontal direction. The special shear wall is reinforced by forming a special boundary element at the end of the wall with an increase of 40 to 60% of the reinforcing bar volume relative to the cross-sectional area of the wall compared to a conventional shear wall or a normal shear wall.

일반적으로 전단벽은 현장에서 철근 배근과 콘크리트 타설 작업이 모두 이루져서 시공되는데, 복잡한 배근 구조 등으로 인해 작업성이 매우 낮다. 특히, 보통 전단벽에 비해 증가된 철근 물량을 갖는 특수 전단벽의 경우 작업성이 더욱 낮아지며, 매우 복잡하게 얽힌 철근 구조가 형성된 특수경계요소에서는 콘크리트가 미충전되는 부분이 발생하여 문제가 되고 있다.In general, the shear wall is constructed with both reinforcement and concrete placement work in the field, but the workability is very low due to the complex reinforcement structure. Particularly, in the case of a special shear wall having an increased amount of reinforcing bar compared to a normal shear wall, the workability is further lowered, and a special boundary element having a very complicated entangled reinforcing bar structure has a problem that unfilled concrete occurs.

대한민국 등록특허공보 등록번호 제10-0547225호 (2006.01.26.)Republic of Korea Registered Patent Publication No. 10-0547225 (2006.01.26.)

본 발명의 목적은 전단벽 시공의 작업성을 향상시키면서 종래의 콘크리트 미충전 문제를 해소할 수 있는 전단벽 시공용 피씨 더블월, 이의 제조방법 및 이를 이용한 전단벽 시공방법을 제공하는 것이다.An object of the present invention is to provide a PC double wall for shear wall construction, a manufacturing method thereof, and a shear wall construction method using the same, which can solve the conventional unfilled concrete problem while improving the workability of shear wall construction.

상기한 본 발명의 목적을 달성하기 위하여, 본 발명의 일 측면에 따르면, 제1 피씨 패널; 상기 제1 피씨 패널과 이격되어서 위치하는 제2 피씨 패널; 및 상기 제1 피씨 패널에 매설되는 제1 철근망과, 상기 제2 피씨 패널에 매설되는 제2 철근망과, 상기 제1 철근망과 상기 제2 철근망의 사이에 위치하고 상기 두 철근망들을 연결하는 두 보강 철근 유닛들을 구비하는 철근 구조물을 포함하며, 상기 두 보강 철근 유닛들 각각은 세로방향을 따라 연장되고 가로방향을 따라서 서로 이격되어 배치되며, 상기 보강 철근 유닛은 세로방향을 따라 차례대로 배치되는 복수개의 띠철근 부재들과, 세로방향을 따라서 연장되고 나란하게 배치되어서 상기 복수개의 띠철근 부재들을 연결하는 복수개의 연결 철근들을 구비하며, 상기 띠철근 부재는 상기 복수개의 연결 철근들과 연결되는 띠 형상의 테두리부를 구비하는 전단벽 시공용 피씨 더블월이 제공된다.In order to achieve the above object of the present invention, according to an aspect of the present invention, a first PC panel; A second PC panel spaced apart from the first PC panel; And a first rebar network embedded in the first PC panel, a second rebar network embedded in the second PC panel, and positioned between the first rebar network and the second rebar network to connect the two rebar networks. It includes a reinforcing bar structure having two reinforcing bar units, each of the two reinforcing bar units extending along the longitudinal direction and spaced apart from each other along the horizontal direction, the reinforcing bar units are arranged in sequence along the longitudinal direction A plurality of reinforcing bar members, and a plurality of reinforcing bars extending along a longitudinal direction and arranged side by side to connect the plurality of reinforcing bar members, wherein the reinforcing bar member is connected to the plurality of reinforcing bars There is provided a PC double wall for shear wall construction having a strip-shaped rim.

상기한 본 발명의 목적을 달성하기 위하여, 본 발명의 다른 측면에 따르면, 상기피씨 더블월을 이용하여 전단벽을 시공하는 방법으로서, 상기 두 보강 철근 유닛이 양측에 배치되도록 상기 피씨 더블월을 현장에 세워서 설치되는 단계; 및 상기 제1 피씨 패널과 상기 제2 피씨 패널 사이의 공간으로 콘크리트를 타설하는 단계를 포함하는 전단벽 시공방법이 제공된다.In order to achieve the above object of the present invention, according to another aspect of the present invention, as a method of constructing a shear wall using the PC double wall, the PC double wall is placed on the site so that the two reinforcing bar units are disposed on both sides. Erected and installed; And pouring concrete into a space between the first PC panel and the second PC panel.

상기한 본 발명의 목적을 달성하기 위하여, 본 발명의 또 다른 측면에 따르면, 나란하게 배치되는 복수개의 연결 철근들과, 상기 복수개의 연결 철근들에 연결되는 띠 형상의 테두리부를 구비하고 상기 연결 철근의 연장방향을 따라서 차례대로 배치되는 복수개의 띠철근 부재를 포함하는 보강 철근 유닛을 이용하여 전단벽 시공용 피씨 더블월을 제조하는 방법으로서, 제1 철근망의 일면에 상기 보강 철근 유닛 두 개를 평행하게 배치하여 결속시키는 제1 철근망 결속 단계; 상기 제1 철근망을 거푸집 내에 설치하고 상기 거푸집에 콘크리트를 타설하여 상기 제1 철근망이 매설되는 제1 피씨 패널을 형성하는 제1 패널 형성 단계; 상기 두 보강 철근 유닛들에 상기 제1 피씨 패널과 대향하는 제2 철근망을 결속시키는 제2 철근망 결속 단계; 및 상기 제2 철근망을 거푸집 내에 설치하고 상기 거푸집에 콘크리트를 타설하여 상기 제2 철근망이 매설되는 제2 피씨 패널을 형성하는 제2 패널 형성 단계를 포함하는 전단벽 시공용 피씨 더블월의 제조방법이 제공된다.In order to achieve the above object of the present invention, according to another aspect of the present invention, a plurality of connecting rebars arranged side by side, and having a band-shaped rim portion connected to the plurality of connecting reinforcing bars and the connecting rebar A method of manufacturing a PC double wall for shear wall construction using a reinforcing rebar unit including a plurality of strip reinforcing members arranged in sequence along the extending direction of the two reinforcing bar units on one surface of the first rebar network in parallel A first reinforcing bar binding step of arranging and binding; A first panel forming step of installing the first reinforcing bar in the formwork and pouring concrete into the formwork to form a first PC panel in which the first reinforcing bar is buried; A second reinforcing bar binding step of binding a second reinforcing bar network facing the first PC panel to the two reinforcing bar units; And a second panel forming step of installing the second reinforcing bar in the formwork and pouring concrete into the formwork to form a second panel in which the second reinforcing bar is buried. Is provided.

본 발명에 의하면 앞서서 기재한 본 발명의 목적을 모두 달성할 수 있다. 구체적으로는, 제1 패널 피씨에 매설되는 제1 철근망과 제2 패널 피씨에 매설되는 제2 철근망을 연결하고 복수개의 띠철근 부재들과 복수개의 띠철근 부재들을 연결하는 복수개의 연결 철근을 구비하는 두 보강 철근 유닛들을 구비하는 피씨 더블월을 이용하므로, 현장에서의 특수 전단벽 시공의 작업성이 현저하게 향상되며, 패널의 선제작에 의해 종래의 콘크리트 미충전의 문제가 해소될 수 있다.According to the present invention, it is possible to achieve all the objects of the present invention described above. Specifically, the first reinforcing bar embedded in the first panel PC and the second reinforcing bar embedded in the second panel PC, a plurality of reinforcing bar members and a plurality of reinforcing bar members connecting a plurality of reinforcing bar members Since the use of a PC double wall having two reinforcing rebar units is provided, the workability of special shear wall construction in the field is significantly improved, and the problem of unfilled concrete can be solved by pre-production of the panel.

도 1은 본 발명의 일 실시예에 따른 전단벽 시공용 피씨 더블월의 사시도이다.
도 2는 도 1에 도시된 전단벽 시공용 피씨 더블월의 철근 구조물에 대한 사시도이다.
도 3은 도 2에 도시된 철근 구조물의 분해 사시도이다.
도 4는 도 2에 도시된 철근 구조물을 상부에서 바라본 형태를 보여주는 평면도이다.
도 5는 도 3에 도시된 철근 구조물에서 보강 철근 유닛에 대한 사시도이다.
도 6은 도 5에 도시된 보강 철근 유닛에서 띠철근 부재를 도시한 사시도이다.
도 7은 도 1에 도시된 전단벽 시공용 피씨 더블월의 제조방법의 일 실시예를 설명하는 순서도이다.
도 8은 도 7의 제1 철근망 결속 단계에 의해 제1 철근망과 보강 철근 유닛이 결속된 상태를 도시한 사시도이다.
도 9는 도 7의 제1 패널 형성 단계에 의해 제1 패널이 형성된 상태를 도시한 사시도이다.
도 10은 도 7의 제2 철근망 결속 단계에 의해 제2 철근망과 보강 철근 유닛이 결속된 상태를 도시한 사시도이다.
도 11은 도 7의 제2 패널 형성 단계에 의해 제2 패널이 형성된 상태를 도시한 사시도이다.
도 12는 도 1에 도시된 전단벽 시공용 피씨 더블월을 이용한 시공방법의 일 실시예를 설명하는 순서도이다.
도 13은 도 12의 시공방법에서 추가 수직 철근 설치 단계가 수행된 상태를 도시한 사시도이다.
도 14는 도 12의 시공방법에서 콘크리트 타설 단계가 수행된 상태를 도시한 사시도이다.
1 is a perspective view of a PC double wall for shear wall construction according to an embodiment of the present invention.
FIG. 2 is a perspective view of a reinforced structure of a PC double wall for shear wall construction illustrated in FIG. 1.
3 is an exploded perspective view of the reinforcing bar structure shown in FIG. 2.
FIG. 4 is a plan view showing a shape of the rebar structure shown in FIG. 2 when viewed from the top.
5 is a perspective view of a reinforcing bar unit in the reinforcing bar structure shown in FIG. 3.
FIG. 6 is a perspective view showing a reinforcing bar member in the reinforcing bar unit shown in FIG. 5.
7 is a flowchart illustrating an embodiment of a method of manufacturing a PC double wall for shear wall construction illustrated in FIG. 1.
8 is a perspective view illustrating a state in which the first reinforcing bar and the reinforcing bar unit are bound by the first reinforcing bar binding step of FIG. 7.
9 is a perspective view showing a state in which the first panel is formed by the first panel forming step of FIG. 7.
10 is a perspective view showing a state in which the second reinforcing bar and the reinforcing bar unit are bound by the second reinforcing bar binding step of FIG. 7.
11 is a perspective view showing a state in which the second panel is formed by the second panel forming step of FIG. 7.
12 is a flowchart illustrating an embodiment of a construction method using a PC double wall for shear wall construction illustrated in FIG. 1.
FIG. 13 is a perspective view showing a state in which an additional vertical rebar installation step is performed in the construction method of FIG. 12.
14 is a perspective view showing a state in which a concrete pouring step is performed in the construction method of FIG. 12.

이하, 도면을 참조하여 본 발명의 실시예의 구성 및 작용을 상세하게 설명한다.Hereinafter, the configuration and operation of the embodiment of the present invention will be described in detail with reference to the drawings.

도 1에는 본 발명의 일 실시예에 따른 전단벽 시공용 피씨 더블월(preacast concrete double wall)이 사시도로서 도시되어 있다. 도 1을 참조하면, 본 발명의 일 실시예에 따른 전단벽 시공용 피씨 더블월(100)은 제1 피씨 패널(110)과, 제1 피씨 패널(110)과 일정간격 이격되어서 위치하는 제2 피씨 패널(120)과, 이격되어서 위치하는 두 피씨 패널(110, 120)을 연결되는 철근 구조물(130)을 포함한다.Figure 1 is a perspective view of a concrete double wall (preacast concrete double wall) for shear wall construction according to an embodiment of the present invention. Referring to FIG. 1, a PC double wall 100 for shear wall construction according to an embodiment of the present invention includes a first PC panel 110 and a second PC positioned at a predetermined distance from the first PC panel 110. And a reinforcing bar structure 130 connecting the panel 120 and two PC panels 110 and 120 spaced apart.

제1 피씨 패널(110)은 시멘트 콘크리트 재질로서 평평한 벽 형태이며, 제1 피씨 패널(110)에 철근 구조물(130)의 일부가 고정된다.The first PC panel 110 is a cement concrete material and has a flat wall shape, and a part of the reinforcing bar structure 130 is fixed to the first PC panel 110.

제2 피씨 패널(120)은 시멘트 콘크리트 재질로서 평평한 벽 형태이며, 제1 피씨 패널(110)과 일정 간격 이격되어서 평행하게 배치된다. 제2 피씨 패널(110)에 철근 구조물(130)의 일부가 고정된다.The second PC panel 120 is a cement concrete material, and has a flat wall shape, and is spaced apart from the first PC panel 110 by a predetermined distance and disposed in parallel. A part of the reinforcing bar structure 130 is fixed to the second PC panel 110.

도 2 내지 도 4는 철근 구조물(130)에 대한 도면이다. 도 2 내지 도 3을 참조하면, 철근 구조물(130)은 제1 피씨 패널(110)에 매설되는 제1 철근망(140)과, 제2 피씨 패널(120)에 매설되는 제2 철근망(150)과, 두 철근망(140, 150)의 사이에 결합되는 두 보강 철근 유닛(160)을 구비한다.2 to 4 are views of the reinforcing bar structure 130. 2 to 3, the reinforcing bar structure 130 includes a first reinforcing bar network 140 buried in the first PC panel 110 and a second reinforcing bar network 150 buried in the second PC panel 120. ) And two reinforcing bar units 160 coupled between the two reinforcing bar networks 140 and 150.

제1 철근망(140)은 제1 피씨 패널(110)에 대응한 평평한 형태로서, 복수개의 제1 수평 철근(141)들과, 복수개의 제1 수평 철근(141)들과 연결되는 복수개의 제1 수직 철근(146)들을 구비한다. 제1 철근망(140)은 제1 피씨 패널(110) 내에 매설된다. 제1 철근망(140)의 일면에는 두 보강 철근 유닛(160)이 양측에 배치되도록 결합된다.The first reinforcing bar 140 is a flat shape corresponding to the first PC panel 110, and a plurality of first horizontal reinforcing bars 141 and a plurality of first horizontal reinforcing bars 141 connected to each other. 1 vertical rebar (146) is provided. The first reinforcing bar 140 is buried in the first PC panel 110. On one surface of the first reinforcing bar network 140, two reinforcing bar units 160 are combined to be disposed on both sides.

복수개의 제1 수평 철근(141)들 각각은 가로방향(폭방향)으로 연장되며, 복수개의 제1 수평 철근(141)들은 세로방향(높이방향)을 따라서 차례대로 이격되어서 배치된다. 복수개의 제1 수평 철근(141)들은 복수개의 제1 수직 철근(146)들과 연결된다.Each of the plurality of first horizontal reinforcing bars 141 extends in the horizontal direction (width direction), and the plurality of first horizontal reinforcing bars 141 are spaced apart in sequence along the vertical direction (height direction). The plurality of first horizontal reinforcing bars 141 are connected to the plurality of first vertical reinforcing bars 146.

복수개의 제1 수직 철근(146)들 각각은 세로방향(높이방향)으로 연장되며, 복수개의 제1 수직 철근(146)들은 가로방향(폭방향)을 따라서 차례대로 이격되어서 배치된다. 복수개의 제1 수직 철근(146)들은 복수개의 제1 수평 철근(141)들을 교차하면서 연결한다. 제1 수직 철근(146)은 두 보강 철근 유닛(160)이 위치하는 제1 철근망(140)의 양측에는 구비되지 않는 것으로 설명한다. 즉, 두 보강 철근 유닛(160)이 제1 수직 철근(146) 대신에 위치하는 것으로 설명될 수 있다.Each of the plurality of first vertical reinforcing bars 146 extends in the vertical direction (height direction), and the plurality of first vertical reinforcing bars 146 are spaced one after the other in the horizontal direction (width direction). The plurality of first vertical reinforcing bars 146 cross and connect the plurality of first horizontal reinforcing bars 141. The first vertical reinforcing bar 146 will be described as not provided on both sides of the first reinforcing bar 140 where the two reinforcing bar units 160 are located. That is, it can be described that the two reinforcing bar units 160 are located in place of the first vertical reinforcing bar 146.

제2 철근망(150)은 제2 피씨 패널(120)에 대응한 평평한 형태로서, 복수개의 제2 수평 철근(151)들과, 복수개의 제2 수평 철근(151)들과 연결되는 복수개의 제2 수직 철근(156)들을 구비한다. 제2 철근망(150)은 제1 철근망(140)과 마주보도록 배치되며, 제2 피씨 패널(120) 내에 매설된다. 제2 철근망(150)의 일면에는 두 보강 철근 유닛(160)이 양측에 배치되도록 결합된다. 제2 철근망(150)의 구체적인 구성은 제1 철근망(140)의 구성과 대체로 동일하므로 이에 대한 상세한 설명은 생략한다.The second reinforcing bar network 150 is a flat shape corresponding to the second PC panel 120, and includes a plurality of second horizontal reinforcing bars 151 and a plurality of second horizontal reinforcing bars 151. 2 It is provided with vertical rebar (156). The second reinforcing bar network 150 is disposed to face the first reinforcing bar network 140 and is buried in the second PC panel 120. On one surface of the second reinforcing bar network 150, two reinforcing bar units 160 are coupled to be arranged on both sides. Since the specific configuration of the second reinforcing bar network 150 is substantially the same as that of the first reinforcing bar network 140, detailed description thereof will be omitted.

두 보강 철근 유닛(160)은 이격된 제1 철근망(140)과 제2 철근망(150)의 사이에 위치하며 두 철근망(140, 150)을 연결한다. 두 보강 철근 유닛(160)은 두 철근망(140, 150)과 와이어에 의해 결합된다. 두 보강 철근 유닛(160)은 두 철근망(140, 150)의 사이에서 양측 단부에 서로 이격되어서 위치한다. 두 보강 철근 유닛(160) 각각은 세로방향(높이방향)을 따라서 연장되는 기둥 형태로서, 보강 철근 유닛(160)이 사시도로서 도시된 도 5를 함께 참조하면, 세로방향(높이방향)을 따라서 차례대로 배치되는 복수개 띠철근 부재(161)들과, 복수개의 띠 철근 부재(161)들을 연결하는 복수개의 연결 철근(166)들을 구비한다.The two reinforcing bar units 160 are positioned between the spaced first reinforcing bar 140 and the second reinforcing bar network 150 and connect the two reinforcing bar networks 140 and 150. The two reinforcing bar units 160 are coupled by two reinforcing bar networks 140 and 150 and wires. The two reinforcing bar units 160 are positioned to be spaced apart from each other at both ends between the two reinforcing bars 140 and 150. Each of the two reinforcing bar units 160 is in the form of a column extending along the longitudinal direction (height direction), and referring to FIG. 5, where the reinforcing rebar unit 160 is shown as a perspective view, turn along the longitudinal direction (height direction). It is provided with a plurality of strip reinforcing member 161 disposed as is, and a plurality of connecting reinforcing bars 166 connecting the plurality of strip reinforcing member 161.

복수개의 띠철근 부재(161)들은 세로방향(높이방향)을 따라서 차례대로 일정 간격 이격되어서 배치되며, 복수개의 연결 철근(166)들에 의해 연결된다. 도 6에는 띠철근 부재(161)가 사시도로서 도시되어 있다. 도 6을 함께 참조하면, 띠철근 부재(161)는 띠 형상의 테두리부(162)와, 테두리부(162)를 가로지르는 연결부(163)를 구비한다. 테두리부(162)는 대체로 직사각형의 띠 형상으로서, 대향하는 두 장변부(1621)와, 대향하는 두 단변부(1622)를 구비한다. 테두리부(162)는 철근을 대응하는 형태로 절곡하고 겹치는 양끝단부를 용접하여 제조된다. 테두리부(162)의 대향하는 두 장변부(1621)는 연결부(163)에 의해 연결되어서 구조적으로 보강된다. 연결부(163)는 테두리부(162)의 두 장변부(1621)를 가로지르며 연결하여 띠철근 부재(161)를 구조적으로 보강한다. 연결부(163)는 절곡된 양끝단을 갖는 철근의 절곡된 양끝단이 두 장변부(1621)에 각각 용접되어서 형성된다. 띠철근 부재(161)는 두 장변부(1621)들이 가로방향을 따라서 연장되도록 배치되어서 제1 철근망(140)의 제1 수평 철근(141)들 및 제2 철근망(140)의 제2 수평 철근(151)들과 평행하다. 띠철근 부재(161)의 두 장변부(1621) 중 하나는 제1 철근망(140)과 접하며 다른 하나는 제2 철근망(150)과 접한다. The plurality of strip reinforcing members 161 are arranged at regular intervals in order along the longitudinal direction (height direction), and are connected by a plurality of connecting reinforcing bars 166. 6, the stiffener member 161 is shown as a perspective view. Referring to FIG. 6 together, the strip reinforcing member 161 includes a strip-shaped rim portion 162 and a connecting portion 163 traversing the rim portion 162. The edge portion 162 has a substantially rectangular band shape, and includes two opposing long sides 1621 and two opposing short sides 1622. The edge portion 162 is manufactured by bending and overlapping both ends of the reinforcing bar in a corresponding shape. The two opposing long sides 1621 of the edge portion 162 are connected by a connection portion 163 to be structurally reinforced. The connecting portion 163 structurally reinforces the strip reinforcing member 161 by crossing and connecting two long sides 1621 of the edge portion 162. The connecting portion 163 is formed by welding both bent ends of the reinforcing bars having both bent ends to the two long sides 1621, respectively. The reinforcing bar member 161 is disposed such that the two long sides 1621 extend along the horizontal direction, so that the first horizontal reinforcing bars 141 of the first reinforcing bar 140 and the second horizontal of the second reinforcing bar 140 It is parallel to the reinforcing bars 151. One of the two long sides 1621 of the stiffener member 161 is in contact with the first reinforcing bar network 140 and the other is in contact with the second rebar network 150.

복수개의 연결 철근(166)들 각각은 세로방향(높이방향)을 따라서 길게 직선으로 연장되며, 복수개의 띠철근 부재(161)들과 연결된다. 연결 철근(166)은 6개로서, 각각이 복수개의 띠철근 부재(161)들 각각에서 테두리부(162)의 네 모서리 지점과, 테두리부(162)의 두 장변부(1621)와 연결부(163)가 만나는 두 지점에서 연결된다. 복수개의 연결 철근(166)들은 복수개의 띠철근 부재(161)들과 결속 와이어를 통해 견고하게 결합되어서 고정된다.Each of the plurality of connecting reinforcing bars 166 extends in a straight line along the longitudinal direction (height direction), and is connected to the plurality of strip reinforcing members 161. There are six connecting reinforcing bars 166, four corner points of the edge portion 162 in each of the plurality of strip reinforcing member members 161, and two long sides 1621 of the edge portion 162 and the connecting portion 163. ) Are connected at the two points where they meet. The plurality of connecting reinforcing bars 166 are fixed by being firmly coupled to the plurality of strip reinforcing members 161 through a binding wire.

도 7에는 도 1에 도시된 전단벽 시공용 피씨 더블월(100)의 제조방법의 일 실시예가 순서도로서 도시되어 있다. 도 7을 참조하면, 본 발명의 일 실시예에 따른 전단벽 시공용 피씨 더블월의 제조방법은, 보강 철근 유닛 제작 단계(S5)와, 제1 철근망 결속 단계(S10)와, 제1 패널 형성 단계(S20)와, 제2 철근망 결속 단계(S30)와, 제2 패널 형성 단계(S40)를 포함한다.In FIG. 7, an embodiment of a method of manufacturing the PC double wall 100 for shear wall construction illustrated in FIG. 1 is illustrated as a flowchart. Referring to FIG. 7, a method for manufacturing a PC double wall for shear wall construction according to an embodiment of the present invention includes a step of manufacturing a reinforcing bar unit (S5), a step of binding a first rebar network (S10), and forming a first panel. It includes a step (S20), a second rebar network binding step (S30), and a second panel forming step (S40).

보강 철근 유닛 제작 단계(S5)에서는 도 3에 도시된 보강 철근 유닛(S5)이 사전 제작된다. 보강 철근 유닛 제작 단계(S5)에서 복수개의 띠철근 부재(161)들이 차례대로 일정 간격 이격되어서 배치되고, 복수개의 연결 철근(166)들에 의해 연결된다. 띠철근 부재(161)는 앞서 상세히 설명된 바와 같이 철근을 직사각형의 띠 형태로 절곡하고 겹치는 양끝단을 용접하여 제작된 테두리부(162)의 두 장변부(1621)에 철근의 절곡된 양끝단를 용접하여 연결부(163)를 형성함으로써 제조된다. In step S5 of manufacturing the reinforcing bar unit, the reinforcing bar unit S5 shown in FIG. 3 is pre-manufactured. In the manufacturing step (S5) of the reinforcing rebar unit, a plurality of strip reinforcing members 161 are sequentially arranged at regular intervals, and are connected by a plurality of connecting reinforcing bars 166. The reinforcing bar member 161 welds the bent both ends of the reinforcing bar to the two long sides 1621 of the rim portion 162, which is manufactured by bending the reinforcing bar in the form of a rectangular strip and welding overlapping both ends as described in detail above. It is manufactured by forming the connecting portion 163.

제1 철근망 결속 단계(S10)에서는 제1 철근망(도 3의 140)과 두 보강 철근 유닛(도 3의 160)들이 결속된다. 이를 더욱 구체적으로 설명하면, 제1 철근망(도 3의 140)의 일면에 두 보강 철근 유닛(도 3의 160)들이 양측 단부(제1 수평 철근(도 3의 141)의 양끝 단부)에 복수개의 연결 철근(도 3의 166)들이 제1 수직 철근(146)들과 평행하도록 각각 배치된 상태에서, 와이어에 의해 제1 철근망(140)과 두 보강 철근 유닛(160)들이 결속된다. 도 8에는 제1 철근망(140)의 일측에 두 보강 철근 유닛(160) 중 하나가 결속된 상태가 도시되어 있다. 제1 철근망 결속 단계(S10)가 완료되어서 제1 철근망(140)에 두 보강 철근 유닛(160)이 결속된 후에는 제1 패널 형성 단계(S20)가 수행된다.In the first rebar network binding step (S10), the first rebar network (140 in FIG. 3) and the two reinforcing bar units (160 in FIG. 3) are bound. More specifically, two reinforcing bar units (160 in FIG. 3) on one side of the first reinforcing bar network (140 in FIG. 3) are provided at both ends (both ends of the first horizontal rebar (141 in FIG. 3)). In the state where the connecting reinforcing bars (166 in FIG. 3) are respectively arranged to be parallel to the first vertical reinforcing bars 146, the first reinforcing bar 140 and the two reinforcing bar units 160 are bound by the wire. 8 shows a state in which one of the two reinforcing bar units 160 is bound to one side of the first reinforcing bar network 140. After the first reinforcing bar binding step S10 is completed and the two reinforcing bar units 160 are bound to the first reinforcing bar network 140, the first panel forming step S20 is performed.

제1 패널 형성 단계(S20)에서는 도 1에 도시된 제1 피씨 패널(110)이 형성된다. 제1 패널 형성 단계(S20)는 제1 철근망 결속 단계(S10)를 통해 준비된 두 보강 철근 유닛(160)이 결속된 제1 철근망(140)을 제1 피씨 패널(110)을 형성하기 위한 거푸집(미도시)에 설치하고 콘크리트를 타설 후 양생함으로써 수행된다. 이때, 제1 철근망(140)이 아래에 수평으로 배치된 상태로 타설이 이루어짐으로써, 철근이 밀집된 부분에도 콘크리트가 고르게 충전될 수 있다. 도 9에는 제1 패널 형성 단계(S20)를 통해 제1 피씨 패널(110)이 형성된 상태가 도시되어 있다. 제1 패널 형성 단계(S20)가 완료된 후에는 제2 철근망 결속 단계(S30)가 수행된다.In the first panel forming step (S20), the first PC panel 110 illustrated in FIG. 1 is formed. The first panel forming step (S20) is for forming the first PC panel 110 in the first reinforcing bar network 140 in which the two reinforcing bar units 160 prepared through the first reinforcing bar network binding step S10 are bound. It is performed by installing it in a formwork (not shown) and curing it after pouring concrete. At this time, by pouring the first reinforcing bar 140 in a horizontally arranged state, the concrete can be evenly filled in the part where the reinforcing bar is dense. 9 illustrates a state in which the first PC panel 110 is formed through the first panel forming step (S20). After the first panel forming step S20 is completed, a second reinforcing bar network binding step S30 is performed.

제2 철근망 결속 단계(S30)에서는 제1 패널 형성 단계(S20)를 통해 제1 피씨 패널(110)이 형성된 후에 제2 철근망(150)이 제1 피씨 패널(110)에 대향하여 두 보강 철근 유닛(160)들에 결속된다. 이 때, 제2 철근망(150)은 제1 철근망(140)과 동일한 방향으로 배치되며, 제2 철근망(150)과 두 보강 철근 유닛(160)들에 와이어에 의해 견고하게 결속된다. 도 10에는 제2 철근망(150)이 보강 철근 유닛(160)에 결속된 상태가 도시되어 있다. 제2 철근망 결속 단계(S30)가 완료되어서 두 보강 철근 유닛(160)에 제2 철근망(140)이 결속된 후에는 제2 패널 형성 단계(S40)가 수행된다. In the second reinforcement network binding step (S30), after the first PC panel 110 is formed through the first panel forming step (S20), the second reinforcement network 150 faces the first PC panel 110 and reinforces the two. It is bound to the reinforcing bar units 160. At this time, the second reinforcing bar network 150 is disposed in the same direction as the first reinforcing bar network 140, and is firmly bound by a wire to the second reinforcing bar network 150 and the two reinforcing bar units 160. FIG. 10 shows a state in which the second reinforcing bar network 150 is bound to the reinforcing bar unit 160. After the second reinforcing bar network binding step S30 is completed and the second reinforcing bar networks 140 are bound to the two reinforcing bar units 160, the second panel forming step S40 is performed.

제2 패널 형성 단계(S40)에서는 도 1에 도시된 제2 피씨 패널(120)이 형성된다. 제2 패널 형성 단계(S40)는 제2 철근망 결속 단계(S30)를 통해 준비된 두 보강 철근 유닛(160)에 결속된 제2 철근망(150)을 제2 피씨 패널(120)을 형성하기 위한 거푸집(미도시)에 설치하고 콘크리트를 타설 후 양생함으로써 수행된다. 이때, 제2 철근망(150)이 아래에 수평으로 배치된 상태로 타설이 이루어짐으로써, 철근이 밀집된 부분에도 콘크리트가 고르게 충전될 수 있다. 도 11에는 제2 패널 형성 단계(S40)를 통해 제2 피씨 패널(120)이 형성된 상태가 도시되어 있다.In the second panel forming step (S40), the second PC panel 120 illustrated in FIG. 1 is formed. The second panel forming step (S40) is for forming the second PC panel 120 of the second reinforcing bar network 150 bound to the two reinforcing bar units 160 prepared through the second reinforcing bar network binding step (S30). It is performed by installing it in a formwork (not shown) and curing it after pouring concrete. At this time, by pouring the second reinforcing bar 150 in a horizontally arranged state, the concrete can be evenly filled in the part where the reinforcing bar is dense. 11 shows a state in which the second PC panel 120 is formed through the second panel forming step (S40).

도 12는 도 1에 도시된 전단벽 시공용 피씨 더블월을 이용한 전단벽 시공방법의 일 실시예를 설명하는 순서도이다. 도 12를 참조하면, 본 발명의 일 실시예에 따른 피씨 더블월을 이용한 전단벽 시공방법은 피씨 더블월 설치 단계(S50)와, 수직 철근 설치 단계(S60)와, 콘크리트 타설 단계(S70)와, 상층 피씨 더블월 설치 단계(S80)와, 상층 수직 철근 설치 단계(S90)와, 상층 콘크리트 타설 단계(S100)를 포함한다.12 is a flowchart illustrating an embodiment of a shear wall construction method using a PC double wall for shear wall construction illustrated in FIG. 1. Referring to FIG. 12, a method of constructing a shear wall using a PC double wall according to an embodiment of the present invention includes a PC double wall installation step (S50), a vertical rebar installation step (S60), and a concrete pouring step (S70), It includes an upper PC double wall installation step (S80), an upper vertical rebar installation step (S90), and an upper concrete pouring step (S100).

피씨 더블월 설치 단계(S50)에서는 도 1에 도시된 전단벽 시공용 피씨 더블월(100)이 현장에 벽 형태로 세워져서 고정된다. 이때, 피씨 더블월(100)은 두 보강 철근 유닛(160)이 기둥 형태로 양측에 배치되도록 설치된다. 피씨 더블월 설치 단계(S50)를 통해 피씨 더블월(100)이 현장에 설치된 후에는 추가 수직 철근 설치 단계(S60)가 수행된다.In the PC double wall installation step (S50), the PC double wall 100 for shear wall construction shown in FIG. 1 is erected and fixed in the form of a wall on the site. At this time, the PC double wall 100 is installed so that the two reinforcing bar units 160 are arranged on both sides in the form of pillars. After the PC double wall 100 is installed on the site through the PC double wall installation step (S50), an additional vertical rebar installation step (S60) is performed.

추가 수직 철근 설치 단계(S60)에서는 피씨 더블월 설치 단계(S50)를 통해 현장에 설치된 피씨 더블월(100)의 두 피씨 패널(110, 120)의 사이에 형성된 공간으로 도 13에 도시된 바와 같이 복수개 추가 수직 철근(180)들이 설치된다. 추가 수직 철근 설치 단계(S60)가 완료된 후에는 콘크리트 타설 단계(S70)가 수행된다.In the additional vertical rebar installation step (S60), a space formed between two PC panels 110 and 120 of the PC double wall 100 installed in the field through the PC double wall installation step (S50), as shown in FIG. 13. A plurality of additional vertical reinforcing bars 180 are installed. After the additional vertical rebar installation step (S60) is completed, the concrete pouring step (S70) is performed.

콘크리트 타설 단계(S70)에서는 추가 수직 철근(도 13의 180)이 설치된 피씨 더블월(100)의 두 피씨 패널(110, 120) 사이의 공간으로 도 14에 도시된 바와 같이 콘크리트(190)가 타설된 후 양생되어서 특수전단벽이 완성된다. 피씨 더블월 설치 단계(S50), 추가 수직 철근 설치 단계(S60) 및 콘크리트 타설 단계(S70)를 통해 N층 특수전단벽이 시공된다.In the concrete pouring step (S70), concrete 190 is poured as shown in FIG. 14 as a space between two PC panels 110 and 120 of the PC double wall 100 in which additional vertical rebars (180 of FIG. 13) are installed. After curing, the special shear wall is completed. The N-layer special shear wall is constructed through the PC double wall installation step (S50), the additional vertical rebar installation step (S60), and the concrete pouring step (S70).

상층 피씨 더블월 설치 단계(S80)에서는 콘크리트 타설 단계(S70) 후 형성된 N층 전단벽의 위에 N+1층 전단벽에 대응하는 피씨 더블월(100)이 피씨 더블월 설치 단계(S50)에서와 동일한 방식으로 세워져서 고정된다.In the installation step (S80) of the upper layer PC, the PC double wall (100) corresponding to the N + 1 layer shear wall is formed on the N-layer shear wall formed after the concrete pouring step (S70), and the same method as in the PC double wall installation step (S50). It is erected and fixed.

상층 추가 철근 설치 단계(S90)에서는 상층 피씨 더블월 설치 단계(S80)를 통해 설치된 N+1층 전단벽에 대응하는 피씨 더블월(100)의 두 피씨 패널(110, 120)의 사이에 형성된 공간으로 추가 철근 설치 단계(S60)에서와 동일한 방식으로 N+1층에 대한 복수개의 추가 수직 철근(180)들이 설치된다. In the additional step of installing the upper rebar (S90), it is a space formed between two PC panels 110 and 120 of the PC double wall 100 corresponding to the N + 1 layer shear wall installed through the upper PC double wall installation step (S80). A plurality of additional vertical reinforcing bars 180 for the N + 1 floor are installed in the same manner as in the additional reinforcing bar installation step (S60).

상층 콘크리트 타설 단계(S100)에서는 상층 수직 철근 단계(S90)를 통해 설치된 N+1층에 대한 추가 철근이 설치된 N+1층 피씨 더블월(100)의 두 피씨 패널(110, 120)의 사이의 공간으로 콘크리트가 타설된 후 양생되어서 N+1층에 대한 특수전단벽이 N층에 대한 특수전단벽 위에 완성된다.In the upper concrete pouring step (S100), between the two PC panels 110 and 120 of the N + 1 layer PC double wall 100 with additional reinforcing bars installed on the N + 1 floor installed through the upper vertical rebar step (S90). After concrete is poured into the space and cured, a special shear wall for the N + 1 floor is completed on the special shear wall for the N floor.

앞서 설명된 더블월 피씨 설치 단계, 추가 수직 철근 설치, 콘크리트 타설 단계를 반복하여 수행함으로써, 고층의 특수전단벽이 시공될 수 있다.By repeatedly performing the above-described double wall PC installation step, additional vertical rebar installation, and concrete pouring step, a high-rise special shear wall can be constructed.

이상 실시예를 통해 본 발명을 설명하였으나, 본 발명은 이에 제한되는 것은 아니다. 상기 실시예는 본 발명의 취지 및 범위를 벗어나지 않고 수정되거나 변경될 수 있으며, 본 기술분야의 통상의 기술자는 이러한 수정과 변경도 본 발명에 속하는 것임을 알 수 있을 것이다.The present invention has been described through the above embodiments, but the present invention is not limited thereto. The above embodiments can be modified or changed without departing from the spirit and scope of the present invention, and those skilled in the art will recognize that such modifications and changes also belong to the present invention.

100 : 피씨 더블월 110 : 제1 피씨 패널
120 : 제2 피씨 패널 130 : 철근 구조물
140 : 제1 철근망 150 : 제2 철근망
160 : 보강 철근 유닛 161 : 띠철근 부재
166 : 연결 철근
100: PC double wall 110: the first PC panel
120: second PC panel 130: reinforced structure
140: first rebar network 150: second rebar network
160: reinforcing bar unit 161: strip reinforcing member
166: connecting rebar

Claims (13)

제1 피씨 패널;
상기 제1 피씨 패널과 이격되어서 위치하는 제2 피씨 패널; 및
상기 제1 피씨 패널에 매설되는 제1 철근망과, 상기 제2 피씨 패널에 매설되는 제2 철근망과, 상기 제1 철근망과 상기 제2 철근망의 사이에 위치하고 상기 두 철근망들을 연결하는 두 보강 철근 유닛들을 구비하는 철근 구조물을 포함하며,
상기 두 보강 철근 유닛들 각각은 세로방향을 따라 연장되고 가로방향을 따라서 서로 이격되어 배치되며,
상기 보강 철근 유닛은 세로방향을 따라 차례대로 배치되는 복수개의 띠철근 부재들과, 세로방향을 따라서 연장되고 나란하게 배치되어서 상기 복수개의 띠철근 부재들을 연결하는 복수개의 연결 철근들을 구비하며,
상기 띠철근 부재는 상기 복수개의 연결 철근들과 연결되는 띠 형상의 테두리부를 구비하는 전단벽 시공용 피씨 더블월.
A first PC panel;
A second PC panel spaced apart from the first PC panel; And
A first rebar network embedded in the first PC panel, a second rebar network embedded in the second PC panel, and positioned between the first rebar network and the second rebar network to connect the two rebar networks A reinforcing bar structure comprising two reinforcing bar units,
Each of the two reinforcing bar units is extended along the longitudinal direction and spaced apart from each other along the horizontal direction,
The reinforcing bar unit includes a plurality of strip reinforcing members arranged in sequence along the vertical direction, and a plurality of connecting reinforcing bars extending in parallel and arranged in parallel to connect the plurality of strip reinforcing members,
The strip reinforcing member is a PC double wall for shear wall construction having a strip-shaped rim portion connected to the plurality of connecting reinforcing bars.
청구항 1에 있어서,
상기 띠철근 부재는 상기 테두리부의 내부 영역을 가로지르는 연결부를 더 구비하는 전단벽 시공용 피씨 더블월.
The method according to claim 1,
The sash reinforcing member is a PC double wall for shear wall construction further comprising a connection portion crossing the inner region of the rim.
청구항 2에 있어서,
상기 테두리부는 직사각형 형상이며, 상기 연결부는 상기 테두리부의 대향하는 두 변부 사이에 연장되는 전단벽 시공용 피씨 더블월.
The method according to claim 2,
The edge portion has a rectangular shape, and the connecting portion is a PC double wall for shear wall construction extending between two opposite sides of the edge portion.
청구항 3에 있어서,
상기 복수개의 연결 철근들 각각은 상기 테두리부의 네 모서리 부분과 상기 연결부가 상기 두 변부와 만나는 두 부분에서 연결되는 전단벽 시공용 피씨 더블월.
The method according to claim 3,
Each of the plurality of connecting rebars is a PC double wall for shear wall construction in which the four corners of the rim and the connecting portions are connected at two parts where the two sides meet.
청구항 3에 있어서,
상기 테두리부에서 상기 연결부가 연결되는 대향하는 두 변부가 각각 상기 제1 철근망과 상기 제2 철근망에 연결되는 전단벽 시공용 피씨 더블월.
The method according to claim 3,
A double wall for shear wall construction in which two opposing sides at which the connecting portion is connected to the rim portion are respectively connected to the first and second rebar networks.
청구항 3에 있어서,
상기 테두리부는 대향하는 두 장변부와, 대향하는 두 단변부를 구비하며, 상기 연결부는 상기 테두리부의 두 장변부를 연결하는 전단벽 시공용 피씨 더블월.
The method according to claim 3,
The edge portion has two opposite sides and two short sides facing each other, and the connecting portion is a PC double wall for shear wall construction connecting the two long sides of the edge portion.
청구항 1에 있어서,
상기 두 보강 철근 유닛들은 가로방향 양 끝단에 각각 위치하는 전단벽 시공용 피씨 더블월.
The method according to claim 1,
The two reinforcing bar units are PC double walls for shear wall construction respectively located at both ends in the horizontal direction.
청구항 7에 있어서,
상기 제1 철근망은 가로방향을 따라 연장되고 세로방향을 따라서 차례대로 배치되는 복수개의 제1 수평 철근들과, 세로방향을 따라 연장되고 가로방향을 따라서 차례대로 배치되는 복수개의 제1 수직 철근들을 구비하며,
상기 제2 철근망은 가로방향을 따라 연장되고 세로방향을 따라서 차례대로 배치되는 복수개의 제2 수평 철근들과, 세로방향을 따라 연장되고 가로방향을 따라서 차례대로 배치되는 복수개의 제2 수직 철근들을 구비하며,
상기 복수개의 제1 수직 철근들과 상기 복수개의 제2 수직 철근들은 상기 두 보강 철근 유닛들과 겹치지 않은 가로방향 구간에 배치되는 전단벽 시공용 피씨 더블월.
The method according to claim 7,
The first reinforcing bar network includes a plurality of first horizontal reinforcing bars extending along the horizontal direction and sequentially arranged along the vertical direction, and a plurality of first vertical reinforcing bars extending along the vertical direction and sequentially arranged along the horizontal direction. Equipped,
The second reinforcing bar network includes a plurality of second horizontal reinforcing bars extending along the horizontal direction and sequentially arranged along the vertical direction, and a plurality of second vertical reinforcing bars extending along the vertical direction and sequentially arranged along the horizontal direction. Equipped,
The plurality of first vertical rebars and the plurality of second vertical rebars are PC double walls for shear wall construction that are disposed in a horizontal section not overlapping the two reinforcing bar units.
나란하게 배치되는 복수개의 연결 철근들과, 상기 복수개의 연결 철근들에 연결되는 띠 형상의 테두리부를 구비하고 상기 연결 철근의 연장방향을 따라서 차례대로 배치되는 복수개의 띠철근 부재를 포함하는 보강 철근 유닛을 제작하는 보강 철근 유닛 제작 단계;
제1 철근망의 일면에 상기 보강 철근 유닛 두 개를 평행하게 배치하여 결속시키는 제1 철근망 결속 단계;
상기 제1 철근망을 거푸집 내에 설치하고 상기 거푸집에 콘크리트를 타설하여 상기 제1 철근망이 매설되는 제1 피씨 패널을 형성하는 제1 패널 형성 단계;
상기 두 보강 철근 유닛들에 상기 제1 피씨 패널과 대향하는 제2 철근망을 결속시키는 제2 철근망 결속 단계; 및
상기 제2 철근망을 거푸집 내에 설치하고 상기 거푸집에 콘크리트를 타설하여 상기 제2 철근망이 매설되는 제2 피씨 패널을 형성하는 제2 패널 형성 단계를 포함하는 전단벽 시공용 피씨 더블월의 제조방법.
A reinforcing rebar unit including a plurality of connecting rebars arranged side by side, and a plurality of strip reinforcing members having a belt-shaped rim portion connected to the plurality of connecting rebars and sequentially arranged along the extending direction of the connecting reinforcing bar. Manufacturing reinforcement unit manufacturing step;
A first reinforcing bar binding step of binding the two reinforcing rebar units in parallel on one surface of the first reinforcing bar network;
A first panel forming step of installing the first reinforcing bar in the formwork and pouring concrete into the formwork to form a first PC panel in which the first reinforcing bar is buried;
A second reinforcing bar binding step of binding a second reinforcing bar network facing the first PC panel to the two reinforcing bar units; And
A second panel forming step of forming a second PC panel in which the second reinforcement network is buried by installing the second reinforcement network in the formwork and pouring concrete into the formwork.
청구항 9에 있어서,
상기 제1 패널 형성 단계에서는 상기 제1 철근망이 상기 두 보강 철근 유닛들에 비해 아래에 위치하도록 상기 거푸집 내에 설치된 상태에서 상기 콘크리트가 타설되며,
상기 제2 패널 형성 단계에서는 상기 제2 철근망이 상기 제1 피씨 패널에 비해 아래에 위치하도록 상기 거푸집 내에 설치된 상태에서 상기 콘크리트가 타설되는 전단벽 시공용 피씨 더블월의 제조방법.
The method according to claim 9,
In the step of forming the first panel, the concrete is poured in a state where the first reinforcing bar is installed in the formwork so that it is located below the two reinforcing bar units.
In the step of forming the second panel, a method of manufacturing a PC double wall for shear wall construction in which the concrete is poured while the second reinforcing bar is installed in the formwork so that the second reinforcing bar is located below the first PC panel.
청구항 1 내지 청구항 8 중 어느 하나의 청구항에 기재된 피씨 더블월을 이용하여 전단벽을 시공하는 방법으로서,
상기 두 보강 철근 유닛이 양측에 배치되도록 상기 피씨 더블월을 현장에 세워서 설치되는 단계; 및
상기 제1 피씨 패널과 상기 제2 피씨 패널 사이의 공간으로 콘크리트를 타설하는 단계를 포함하는 전단벽 시공방법.
A method for constructing a shear wall using the PC double wall according to any one of claims 1 to 8,
A step in which the PC double wall is installed on the site so that the two reinforcing bar units are disposed on both sides; And
Shear wall construction method comprising the step of pouring concrete into the space between the first PC panel and the second PC panel.
청구항 11에 있어서,
상기 콘크리트가 타설되기 전에 상기 현장에 설치된 상기 피씨 더블월의 상기 제1 피씨 패널과 상기 제2 피씨 패널 사이의 공간으로 복수개의 추가 수직 철근들이 설치되는 단계를 더 포함하는 전단벽 시공방법.
The method according to claim 11,
A method of constructing a shear wall further comprising installing a plurality of additional vertical rebars into a space between the first PC panel and the second PC panel of the PC double wall installed at the site before the concrete is poured.
청구항 12에 있어서,
상기 콘크리트가 타설된 후에 상기 피씨 더블월 위에 피씨 더블월을 추가로 설치하는 상층 더블월 피씨 설치 단계;
상기 상층 더블월 피씨 설치 단계에서 설치된 피씨 더블월의 두 피씨 패널 사이의 공간으로 복수개의 추가 수직 철근을 설치하는 상층 추가 수직 철근 설치 단계; 및
상기 상층 더블월 피씨 설치 단계에서 설치된 피씨 더블월의 두 피씨 패널 사이의 공간으로 콘크리트를 타설하는 상층 콘크리트 타설 단계를 더 포함하는 전단벽 시공방법.
The method according to claim 12,
An upper layer double wall PC installation step of additionally installing a PC double wall on the PC double wall after the concrete is poured;
An upper vertical rebar installation step of installing a plurality of additional vertical rebars into a space between two PC panels of the PC double wall installed in the upper double wall PC installation step; And
Shear wall construction method further comprising the step of placing the concrete in the upper layer to place concrete into the space between the two PC panels of the installed double wall PC double wall installation step.
KR1020180130819A 2018-10-30 2018-10-30 Precast concrete double wall for constructing shear wall, method for manufacturing the same and method for constructing shear wall using the same KR102177360B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180130819A KR102177360B1 (en) 2018-10-30 2018-10-30 Precast concrete double wall for constructing shear wall, method for manufacturing the same and method for constructing shear wall using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180130819A KR102177360B1 (en) 2018-10-30 2018-10-30 Precast concrete double wall for constructing shear wall, method for manufacturing the same and method for constructing shear wall using the same

Publications (2)

Publication Number Publication Date
KR20200048596A true KR20200048596A (en) 2020-05-08
KR102177360B1 KR102177360B1 (en) 2020-11-11

Family

ID=70676955

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180130819A KR102177360B1 (en) 2018-10-30 2018-10-30 Precast concrete double wall for constructing shear wall, method for manufacturing the same and method for constructing shear wall using the same

Country Status (1)

Country Link
KR (1) KR102177360B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220060663A (en) * 2020-11-05 2022-05-12 (주)티에이치엘네트웍스 the central reinforcement type bearing wall structure
CN114737699A (en) * 2022-06-14 2022-07-12 中冶建筑研究总院有限公司 Assembled reinforced concrete shear wall structure and prefabricated shear wall unit
CN115012786A (en) * 2022-06-22 2022-09-06 杭州钱江人防设备有限公司 Lightweight reinforced concrete sealing door and manufacturing method thereof
KR20220145443A (en) * 2021-04-21 2022-10-31 아이에스동서 주식회사 PC double pannel using hoop shaped member
KR20220145444A (en) * 2021-04-21 2022-10-31 아이에스동서 주식회사 PC double pannel using concrete block
CN115450371A (en) * 2022-09-16 2022-12-09 金鹏装配式建筑有限公司 Novel prefabricated external wallboard without ribs and connecting piece thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111794445A (en) * 2020-07-13 2020-10-20 沈阳建筑大学 Ring-type FRP connecting piece and using method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0557131U (en) * 1991-12-27 1993-07-30 株式会社大林組 PC wall formwork
KR100547225B1 (en) 2003-10-31 2006-01-26 (주)나인아키텍 Construction method of shear wall type structure using for plural direction deck plate
KR20120116063A (en) * 2011-04-12 2012-10-22 (주)건설자재산업 Rebar cage and constructing method using the same
KR101193895B1 (en) * 2012-08-01 2012-10-29 대한이.이엔.씨(주) Structure of sandwich pannel with precast concrete and cast in place concrete
KR20180094673A (en) * 2017-02-16 2018-08-24 주식회사 청진이엔씨 Double plate walls and manufacturing method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0557131U (en) * 1991-12-27 1993-07-30 株式会社大林組 PC wall formwork
KR100547225B1 (en) 2003-10-31 2006-01-26 (주)나인아키텍 Construction method of shear wall type structure using for plural direction deck plate
KR20120116063A (en) * 2011-04-12 2012-10-22 (주)건설자재산업 Rebar cage and constructing method using the same
KR101193895B1 (en) * 2012-08-01 2012-10-29 대한이.이엔.씨(주) Structure of sandwich pannel with precast concrete and cast in place concrete
KR20180094673A (en) * 2017-02-16 2018-08-24 주식회사 청진이엔씨 Double plate walls and manufacturing method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220060663A (en) * 2020-11-05 2022-05-12 (주)티에이치엘네트웍스 the central reinforcement type bearing wall structure
KR20220145443A (en) * 2021-04-21 2022-10-31 아이에스동서 주식회사 PC double pannel using hoop shaped member
KR20220145444A (en) * 2021-04-21 2022-10-31 아이에스동서 주식회사 PC double pannel using concrete block
CN114737699A (en) * 2022-06-14 2022-07-12 中冶建筑研究总院有限公司 Assembled reinforced concrete shear wall structure and prefabricated shear wall unit
CN115012786A (en) * 2022-06-22 2022-09-06 杭州钱江人防设备有限公司 Lightweight reinforced concrete sealing door and manufacturing method thereof
CN115012786B (en) * 2022-06-22 2023-10-03 杭州钱江人防设备有限公司 Light reinforced concrete airtight door and manufacturing method thereof
CN115450371A (en) * 2022-09-16 2022-12-09 金鹏装配式建筑有限公司 Novel prefabricated external wallboard without ribs and connecting piece thereof
CN115450371B (en) * 2022-09-16 2023-12-22 金鹏装配式建筑有限公司 Prefabricated external wall panel without ribs and connecting piece thereof

Also Published As

Publication number Publication date
KR102177360B1 (en) 2020-11-11

Similar Documents

Publication Publication Date Title
KR102177360B1 (en) Precast concrete double wall for constructing shear wall, method for manufacturing the same and method for constructing shear wall using the same
KR101809687B1 (en) Joining Members of Steel Concrete Column and Steel Beam and Construction Method Thereof
KR20140119465A (en) The building PC slab structure and the constructing method thereof
KR101456391B1 (en) Formed steel beam with holes and structure of composite floor
CN109024699B (en) Integral water stop system and manufacturing method thereof
KR200414349Y1 (en) Connection structure of precast concrete structure
JP6032606B2 (en) Slab reinforcement assembly structure of waffle slab in building and its assembly method
JP4802111B2 (en) Long structure and steel rebar members
JP5382872B2 (en) building
JP4657993B2 (en) Beam-column joint structure and construction method thereof
JP2009046829A (en) Aseismatic reinforcing wall
JP5750246B2 (en) Composite beam, building, and composite beam construction method
KR102467631B1 (en) PC double pannel using hoop shaped member
JPH0519384Y2 (en)
JP7264690B2 (en) METHOD FOR MANUFACTURING CONCRETE WALL STRUCTURE AND BUILDING STRUCTURE
KR100456192B1 (en) Composition of precast concrete wall and precast concrete column for outdoor to sustain external force
KR101895803B1 (en) Housing construction method
CN214614741U (en) Prefabricated wall body connected node
KR101708274B1 (en) Integrated hollow bodies for void slab, void slim-floor and flat slab structure using the same
KR102182537B1 (en) Connecting structure and connecting method of PC wall members using welded wire mesh
CN211313027U (en) Prefabricated plate and use its coincide floor
KR101019739B1 (en) Building assembly, building and construction method
KR102175474B1 (en) Rebar assembly
JP7229836B2 (en) Hollow slab structure
JP4933847B2 (en) Manufacturing method for solid foundation corner corner unit rebar

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant