JP4802111B2 - Long structure and steel rebar members - Google Patents

Long structure and steel rebar members Download PDF

Info

Publication number
JP4802111B2
JP4802111B2 JP2007026383A JP2007026383A JP4802111B2 JP 4802111 B2 JP4802111 B2 JP 4802111B2 JP 2007026383 A JP2007026383 A JP 2007026383A JP 2007026383 A JP2007026383 A JP 2007026383A JP 4802111 B2 JP4802111 B2 JP 4802111B2
Authority
JP
Japan
Prior art keywords
steel
rebar
reinforcing bar
interlocking
protruding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007026383A
Other languages
Japanese (ja)
Other versions
JP2008190233A (en
Inventor
伊藤  誠
重彦 渋沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP2007026383A priority Critical patent/JP4802111B2/en
Publication of JP2008190233A publication Critical patent/JP2008190233A/en
Application granted granted Critical
Publication of JP4802111B2 publication Critical patent/JP4802111B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、橋脚、煙突、杭、ケーソン、地下タンクなどの軸力補強材とコンクリートとによって構築される一方向に長い長尺構造物、及びその長尺構造物の構築に使用する鉄骨鉄筋部材に関するものである。   The present invention relates to a long structure in one direction constructed by an axial force reinforcing material such as a pier, a chimney, a pile, a caisson, and an underground tank, and concrete, and a steel rebar member used for the construction of the long structure. It is about.

従来、特許文献1に開示されているように、橋脚等の塔構造物を構築するに際して、H形鋼などの鉛直鋼材とその周囲を包囲する包囲鉄筋とから構成される複合補強材を、間隔を置いて複数配置し、その周囲にコンクリートを打設することで中空の塔構造物を構築する方法が知られている。   Conventionally, as disclosed in Patent Document 1, when a tower structure such as a pier is constructed, a composite reinforcing material composed of a vertical steel material such as an H-shaped steel and a surrounding reinforcing bar surrounding the periphery thereof, A method of constructing a hollow tower structure by placing a plurality of and placing concrete around it is known.

この包囲鉄筋は、四隅に立設された縦鉄筋を角にしてその外側に螺旋状に巻き付けられることで形成されている。   The surrounding reinforcing bars are formed by winding the vertical reinforcing bars standing at the four corners around the corners in a spiral manner.

また、特許文献2には、2つの環状帯筋を平面視で重ねた環状帯筋群間に、コ字形のリンク筋を架け渡すことでインターロッキング配筋をおこなう方法が開示されている。
特開平11−152899号公報 特開2004−316180号公報
Further, Patent Document 2 discloses a method of performing interlocking bar arrangement by bridging a U-shaped link bar between a group of ring band obtained by overlapping two ring bands in a plan view.
JP-A-11-152899 JP 2004-316180 A

しかしながら、特許文献1に開示された複合補強材は、間隔を置いて配置することを前提にして構成されており、包囲鉄筋部分をインターロッキング配筋のように重ね合わせようとしても、四隅に配置された縦鉄筋同士が接触してしまうため平面視で重ね合わせることが難しい。   However, the composite reinforcing material disclosed in Patent Document 1 is configured on the assumption that the reinforcing bars are arranged at intervals, and even if the surrounding reinforcing bars are overlapped like interlocking bars, they are arranged at the four corners. It is difficult to superimpose them in a plan view because the vertical bars that have been made come into contact with each other.

また、特許文献2には、主筋の周りを囲むために配置する帯鉄筋をインターロッキング配筋とした構造が開示されているが、軸力に対して大きな耐力を確保できる鉄骨を使用する鉄骨鉄筋コンクリート構造物を開示するものではない。   Further, Patent Document 2 discloses a structure in which a band reinforcing bar arranged to surround the main bar is an interlocking reinforcing bar, but a steel reinforced concrete using a steel frame that can secure a large proof strength against an axial force. It does not disclose the structure.

そこで、本発明は、長尺方向に作用する軸力に対して大きな耐力を確保できる長尺構造物、及びその構築に使用する鉄骨鉄筋部材を提供することを目的としている。   Therefore, an object of the present invention is to provide a long structure capable of securing a large proof strength against an axial force acting in the long direction, and a steel rebar member used for the construction.

前記目的を達成するために、本発明の長尺構造物は、鉄骨の周囲に螺旋状鉄筋が配設された鉄骨鉄筋部材を長尺方向に向けて配置し、その周囲にコンクリートを打ち込んで構築する長尺構造物であって、前記鉄骨鉄筋部材は、鉄骨と、その周囲に立設される複数の組立鉄筋と、それらの組立鉄筋の外側を螺旋状に囲むとともに組立鉄筋の位置では折り曲げられずに組立鉄筋が角部に係合されない箇所が発生するように外側に突出する突出部が形成される螺旋状鉄筋とを有し、隣接する前記鉄骨鉄筋部材の前記突出部同士が重なるように配置されることを特徴とする。 In order to achieve the above object, the long structure of the present invention is constructed by arranging steel rebar members in which spiral rebars are arranged around the steel frame in the long direction and driving concrete around the steel rebar members. The steel rebar member includes a steel frame, a plurality of assembly rebars erected around the steel frame, and spirally surrounds the outside of the assembly rebar , and is bent at the position of the assembly rebar. A spiral reinforcing bar formed with a protruding part protruding outward so that a portion where the assembled reinforcing bar is not engaged with the corner part is generated, and the protruding parts of the adjacent steel reinforcing bar members overlap each other. It is characterized by being arranged in.

ここで、前記組立鉄筋は、前記突出部の突出方向に対する位置が正確に規定されており、隣接して配置される前記鉄骨鉄筋部材の一方の前記突出部又は組立鉄筋を他方の前記組立鉄筋又は螺旋状鉄筋に当接させて配置することが好ましい。 Here, the position of the assembly rebar in the projecting direction of the projecting portion is precisely defined, and one projecting portion or assembly rebar of the steel rebar members arranged adjacent to each other is the other assembly rebar or It is preferable to place it in contact with the helical rebar.

また、前記突出部同士を重ねて連続して配置される前記鉄骨鉄筋部材群の両側に沿って前記突出部の突出方向に向けた帯筋を延設させることもできる。 In addition, it is also possible to extend the reinforcing bars in the projecting direction of the projecting portions along both sides of the steel rebar member group that is continuously arranged by overlapping the projecting portions .

さらに、前記螺旋状鉄筋は、前記鉄骨を挟んで前記突出部が突出している側とは反対側が前記組立鉄筋に係合されているものであってもよい。 Furthermore, the helical reinforcing bar may be of the opposite side is engaged in the assembly rebar to the side where the protrusion across the steel is projected.

また、前記螺旋状鉄筋は、前記鉄骨を交差点にして二方向に突出する突出部によって平面視屈曲形状に形成されるものであってもよい。   Further, the spiral reinforcing bar may be formed in a bent shape in plan view by a protruding portion protruding in two directions with the steel frame as an intersection.

また、本発明の鉄骨鉄筋部材は、上記のいずれかの長尺構造物に配置されるものである。   Moreover, the steel-frame reinforcing bar member of this invention is arrange | positioned at said long structure.

このように構成された本発明の長尺構造物は、鉄骨鉄筋部材に螺旋状鉄筋を装着するための組立鉄筋よりも外側に突出する突出部を螺旋状鉄筋に設けることで、隣接する鉄骨鉄筋部材の突出部同士を重ね合わせることができる。   The long structure of the present invention configured as described above is provided with a protruding portion that protrudes outward from the assembled reinforcing bar for mounting the helical reinforcing bar on the steel reinforcing bar member, so that the adjacent reinforcing steel bar is provided. The protrusions of the members can be overlapped.

このため、長尺方向の耐力を増加させるために配置される鉄骨の座屈が螺旋状鉄筋の拘束力によって防止できるとともに、螺旋状鉄筋を重ねることでインターロッキング配筋となってさらに高耐力の長尺構造物とすることができる。   For this reason, buckling of the steel frame that is arranged to increase the yield strength in the longitudinal direction can be prevented by the restraining force of the helical rebar, and it becomes an interlocking reinforcement by overlapping the helical rebar and has a higher yield strength. It can be a long structure.

また、インターロッキング配筋となれば、帯鉄筋がなくとも躯体の連続性が確保されてせん断力に対抗することが可能になり、帯鉄筋を省略することもできる。   Moreover, if interlocking reinforcement is used, the continuity of the frame can be ensured even if there is no band reinforcement, and it is possible to counter the shearing force, and the band reinforcement can be omitted.

さらに、このような鉄骨鉄筋部材の構成では、隣接する鉄骨鉄筋部材の一方の突出部又は組立鉄筋が他方の組立鉄筋に当接すると、双方の鉄骨鉄筋部材はそれより近づかなくなる。   Furthermore, in the structure of such a steel rebar member, when one protrusion part or assembly rebar of an adjacent steel rebar member contacts the other assembly rebar, both steel rebar members become closer than that.

このため、組立鉄筋の位置を、突出部の突出方向に対して正確に規定しておくことで、突出部同士が重なる長さを所定の長さに容易に設定することができる。また、鉄骨の間隔も一定の間隔に合わせることが容易にできる。 Therefore, the position of the assembly rebar, by leaving precisely defined for the projecting direction of the projecting portion, it is possible to easily set the length of the projecting portions overlap each other to a predetermined length. Also, the interval between the steel frames can be easily adjusted to a constant interval.

さらに、鉄骨鉄筋部材群の内側及び外側を帯筋で囲むことで、鉄骨鉄筋部材群の拘束力を高めるとともにせん断耐力を増加させることができる。   Furthermore, by enclosing the inner side and the outer side of the steel rebar member group with a band, the binding force of the steel rebar member group can be increased and the shear strength can be increased.

また、螺旋状鉄筋の突出部の反対側を組立鉄筋に係合させることで、鉄骨の近傍を囲む鉄筋量が増加し、鉄骨の拘束力を高めることができる。   In addition, by engaging the opposite side of the protruding portion of the spiral reinforcing bar with the assembled reinforcing bar, the amount of reinforcing bar surrounding the vicinity of the steel frame is increased, and the binding force of the steel frame can be increased.

以下、本発明の最良の実施の形態について図面を参照して説明する。   The best mode for carrying out the present invention will be described below with reference to the drawings.

図1は、本実施の形態の長尺構造物としての塔構造物1の概略構成を示した切断斜視図である。ここで、塔構造物1とは、橋脚、煙突などの地上に構築される鉛直方向に長い構造物をいう。   FIG. 1 is a cut perspective view showing a schematic configuration of a tower structure 1 as a long structure according to the present embodiment. Here, the tower structure 1 refers to a vertically long structure constructed on the ground, such as a pier or a chimney.

まず、構成から説明すると、この塔構造物1は、平面視長方形の鉛直方向に延設される長尺構造物で、四角柱状の中空部12の四辺が壁部11,・・・に囲まれた中空構造物である。   First, in terms of configuration, the tower structure 1 is a long structure extending in the vertical direction of a rectangular shape in plan view, and the four sides of a square columnar hollow portion 12 are surrounded by wall portions 11. It is a hollow structure.

この壁部11は、横方向に間隔を置いて複数立設される鉄骨鉄筋部材としてのインターロッキングカラム2,・・・と、そのインターロッキングカラム2,・・・群の外側と内側に配置される帯鉄筋3,・・・(図4,6参照)と、それらの周囲に打設されるコンクリート4とによって主に構成される。   The wall portion 11 is arranged on the outer side and the inner side of the interlocking columns 2,. (See FIGS. 4 and 6) and the concrete 4 placed around them.

このインターロッキングカラム2は、図2の斜視図を示すように、中心部に鉄骨として配置されるH形鋼21と、その四隅付近にH形鋼21から少し離れて略平行に立設される組立鉄筋23,・・・と、その組立鉄筋23,・・・の外周を螺旋状に囲む螺旋状鉄筋22とから主に構成される。   As shown in the perspective view of FIG. 2, the interlocking column 2 is erected substantially parallel to the H-section steel 21 arranged as a steel frame in the center and a little apart from the H-section steel 21 near its four corners. The assembly rebars 23,... And the helical rebars 22 that surround the outer periphery of the assembly rebars 23,.

このH形鋼21は、塔構造物1の長尺方向である鉛直方向の荷重を主に負担させる部材であって、H形鋼21に代えて鉄骨として鋼管などを使用することもできる。   The H-section steel 21 is a member that mainly bears a load in the vertical direction that is the longitudinal direction of the tower structure 1, and a steel pipe or the like can be used as a steel frame instead of the H-section steel 21.

また、このH形鋼21の側面には、長尺方向に間隔を置いて複数のスペーサ(図示せず)を取り付け、そのスペーサを介して組立鉄筋23,・・・を取り付ける。   A plurality of spacers (not shown) are attached to the side surface of the H-shaped steel 21 at intervals in the longitudinal direction, and the assembly reinforcing bars 23,... Are attached via the spacers.

この組立鉄筋23は、螺旋状鉄筋22を装着するために配置されるものであるが、構造鉄筋として使用できる太さの鉄筋を使用して構造部材とすることもできる。   The assembled reinforcing bar 23 is arranged for mounting the helical reinforcing bar 22, but it can also be used as a structural member by using a reinforcing bar having a thickness that can be used as a structural reinforcing bar.

そして、この組立鉄筋23,・・・の外周には、例えば細径異形PC鋼棒を平面視略長方形の螺旋状に巻き付けて螺旋状鉄筋22として配置する。この螺旋状鉄筋22は、組立鉄筋23,・・・がH形鋼21から横方向に離れた位置に配置されているので、H形鋼21に接することなく配置される。   And, on the outer periphery of the assembled reinforcing bars 23,..., For example, a small-diameter deformed PC steel bar is wound around a spiral having a substantially rectangular shape in plan view and arranged as a helical reinforcing bar 22. The helical rebars 22 are arranged without contacting the H-section steel 21 because the assembly rebars 23,... Are arranged at positions away from the H-section steel 21 in the lateral direction.

また、この螺旋状鉄筋22は、H形鋼21の両フランジ側にあたる両側が、組立鉄筋23,・・・より外側に突出して突出部22a,22aが形成されている。すなわち、この螺旋状鉄筋22は、平面視略長方形に成形されるが、組立鉄筋23,・・・の位置では折り曲げられず、組立鉄筋23,・・・より外側に突出した位置で折り曲げられる。   Moreover, as for this helical rebar 22, both sides which correspond to the both flanges side of the H-section steel 21 protrude outside the assembly rebar 23, ..., and the protrusion parts 22a and 22a are formed. That is, the helical reinforcing bar 22 is formed in a substantially rectangular shape in plan view, but is not bent at the position of the assembled reinforcing bars 23,... But is bent at a position protruding outward from the assembled reinforcing bars 23,.

ここで、螺旋状鉄筋22とは、H形鋼21を囲む包囲体が長尺方向に間隔をおいて複数配置されて螺旋のように形成されるものをいい、H形鋼21との間に充填されるコンクリートを拘束する機能を有し、それによってH形鋼21の座屈が防止される。   Here, the helical rebar 22 refers to a structure in which a plurality of enclosures surrounding the H-shaped steel 21 are arranged in the longitudinal direction at intervals and formed like a spiral. It has a function of restraining the concrete to be filled, whereby buckling of the H-section steel 21 is prevented.

この螺旋状鉄筋22は、一本のH形鋼21に対して上から下まで連続している必要はなく、例えば螺旋バネ状に成形された部材を、H形鋼21の長尺方向に間隔を置いて複数配置し、それぞれ長尺方向に伸ばして端部同士を接続することで図2に示すような形態に仕上げることができる。   The helical rebar 22 does not need to be continuous from top to bottom with respect to one H-section steel 21. For example, the members formed in a spiral spring shape are spaced apart in the longitudinal direction of the H-section steel 21. A plurality of arrangements can be placed, and each can be finished in the form shown in FIG. 2 by extending in the longitudinal direction and connecting the ends.

このようにして製作されたインターロッキングカラム2(2A,2B)は、図3に示すように、隣接するインターロッキングカラム2A,2Bの突出部22a,22a同士が平面視で重なり合うように配置する。   As shown in FIG. 3, the interlocking columns 2 (2A, 2B) manufactured in this way are arranged so that the protrusions 22a, 22a of the adjacent interlocking columns 2A, 2B overlap in plan view.

このインターロッキングカラム2A,2Bの突出部22a,22a同士を重ね合わせるには、例えば図3(a)に示すように、一方のインターロッキングカラム2Aを所定の位置に立設した後に、他方のインターロッキングカラム2Bを同じ高さまで吊り降ろして横方向に移動させ、一方のインターロッキングカラム2Aの突出部22aに他方のインターロッキングカラム2Bの突出部22aを挿し込むことによっておこなう。   In order to overlap the protrusions 22a and 22a of the interlocking columns 2A and 2B, for example, as shown in FIG. 3A, after one interlocking column 2A is erected at a predetermined position, This is done by hanging the locking column 2B to the same height and moving it in the lateral direction, and inserting the protruding portion 22a of the other interlocking column 2B into the protruding portion 22a of the one interlocking column 2A.

すなわち、螺旋状鉄筋22に組立鉄筋23,・・・の外側に突出させた突出部22aを形成することで、組立鉄筋23,・・・に干渉されることなく容易にインターロッキングカラム2A,2B同士を重ね合わせることが可能になる。   That is, by forming the protruding portion 22a that protrudes outside the assembled reinforcing bars 23,... On the helical reinforcing bars 22, the interlocking columns 2A, 2B can be easily made without being interfered by the assembled reinforcing bars 23,. It becomes possible to overlap each other.

しかしながら、一方の突出部22aを他方の突出部22aに挿し込み続けると、他方の組立鉄筋23,・・・に一方の突出部22aが当接してそれより奥には挿し込めなくなる。   However, if one protrusion 22a continues to be inserted into the other protrusion 22a, one protrusion 22a abuts against the other rebar 23,.

そこで、螺旋状鉄筋22の突出部22aの突出方向に対して、組立鉄筋23の位置を正確に規定して取り付けておくことで、隣接するインターロッキングカラム2A,2Bの突出部22a,22a同士が重なる長さを一定の値に設定することができる。   Therefore, the protrusions 22a and 22a of the adjacent interlocking columns 2A and 2B can be connected to each other by accurately defining and attaching the position of the assembly rebar 23 with respect to the protrusion direction of the protrusion 22a of the helical rebar 22. The overlapping length can be set to a constant value.

また、H形鋼21と組立鉄筋23の位置関係についても、突出部22aの突出方向に正確に規定しておくことで、隣接するインターロッキングカラム2A,2BのH形鋼21,21の間隔を一定にすることができる。   In addition, the positional relationship between the H-section steel 21 and the assembly rebar 23 is also accurately defined in the projecting direction of the projecting portion 22a, so that the interval between the H-section steels 21 and 21 of the adjacent interlocking columns 2A and 2B can be increased. Can be constant.

さらに、突出部22a,22a同士を重ねた重複部22bには、図3(b)に示すように重ねた後から挿筋5,5を挿入し、インターロッキングカラム2A,2Bの重なりが解除されないようにすることができる。   Further, in the overlapping portion 22b in which the protruding portions 22a and 22a are overlapped with each other, the insertion bars 5 and 5 are inserted after the overlapping as shown in FIG. 3B, and the overlapping of the interlocking columns 2A and 2B is not released. Can be.

また、この挿筋5によって、インターロッキングカラム2A,2B間の連結強度を高めたり、長尺方向の補強鉄筋としたりすることができる。   Further, the insertion bar 5 can increase the connection strength between the interlocking columns 2A and 2B, or can be a reinforcing bar in the longitudinal direction.

図4には、インターロッキングカラム2,・・・を、突出部22a,22a同士が重なり合った重複部22b,・・・が形成されるように、横方向に間隔を置いて複数配置した壁部11の断面図を示す。   In FIG. 4, wall portions in which a plurality of interlocking columns 2,... Are arranged at intervals in the lateral direction so that overlapping portions 22 b,. 11 is a cross-sectional view.

この図4に示すように、インターロッキングカラム2,・・・は、壁部11の厚さ方向の略中央に配置され、外側と内側とには帯鉄筋3,3がそれぞれ配置される。この帯鉄筋3は、鉛直方向に間隔を置いて複数段配置される。   As shown in FIG. 4, the interlocking columns 2,. The strip reinforcing bars 3 are arranged in a plurality of stages at intervals in the vertical direction.

そして、図4の断面図に示すように、H形鋼21と螺旋状鉄筋22との間に充填されたコンクリート4は螺旋状鉄筋22によって拘束され、インターロッキングカラム2,2間の重複部22bに充填されたコンクリート4は、螺旋状鉄筋22の突出部22a,22aによって拘束される。   Then, as shown in the cross-sectional view of FIG. 4, the concrete 4 filled between the H-section steel 21 and the helical rebar 22 is constrained by the helical rebar 22, and an overlapping portion 22 b between the interlocking columns 2 and 2. The concrete 4 filled in is constrained by the protrusions 22 a and 22 a of the spiral reinforcing bar 22.

また、帯鉄筋3,3とインターロッキングカラム2,・・・群との間に充填されたコンクリート4は、帯鉄筋3,3によって壁部11の厚さ方向が拘束されるので、鉛直方向に大きな軸力が作用しても座屈が生じ難い。   In addition, the concrete 4 filled between the steel bars 3 and 3 and the interlocking columns 2,... Is constrained in the thickness direction of the wall 11 by the steel bars 3 and 3. Even if a large axial force is applied, buckling is unlikely to occur.

一方、図5には、平面視長方形の塔構造物1のコーナー部13(図6参照)に配置される鉄骨鉄筋部材としてのコーナーカラム6の構成を示した。   On the other hand, in FIG. 5, the structure of the corner column 6 as a steel frame reinforcing member arranged in the corner part 13 (refer FIG. 6) of the tower structure 1 of planar view rectangle was shown.

このコーナーカラム6は、図5(a)の斜視図を示すように、中心部に鉄骨として配置されるH形鋼61と、その四隅付近にH形鋼61から少し離れて略平行に立設される組立鉄筋63,・・・と、その組立鉄筋63,・・・の外周を螺旋状に囲む螺旋状鉄筋62とから主に構成される。   As shown in the perspective view of FIG. 5 (a), this corner column 6 is erected in a substantially parallel manner with an H-section steel 61 arranged as a steel frame in the center and a little distance from the H-section steel 61 near its four corners. .. Of the assembled reinforcing bars 63,... And the helical reinforcing bars 62 that spirally surround the outer periphery of the assembled reinforcing bars 63,.

この螺旋状鉄筋62は、H形鋼61を交差点にして、平面視略直交する二方向に突出部62a,62bが突出されて平面視屈曲形状に成形される。すなわち、一本の細径異形PC鋼棒を使用し、二方向に延びる平面視長方形を鉛直方向に交互に形成していくことで突出部62aと突出部62bを成形する。   The helical rebar 62 is formed into a bent shape in plan view with protrusions 62a and 62b protruding in two directions substantially perpendicular to the plan view with the H-shaped steel 61 as an intersection. That is, the protrusion 62a and the protrusion 62b are formed by using one small-diameter deformed PC steel bar and alternately forming a rectangular in plan view extending in two directions in the vertical direction.

このようにして製作されるコーナーカラム6は、図5(b)の平面図に示すように、一方の突出部62aのH形鋼61を挟んだ反対側の角部62c,62cが組立鉄筋63,63に係合しており、他方の突出部62bのH形鋼61を挟んだ反対側の角部62c,62cも組立鉄筋63,63に係合している。   In the corner column 6 manufactured in this way, as shown in the plan view of FIG. 5B, the corners 62c and 62c on the opposite side across the H-shaped steel 61 of one projecting portion 62a are assembled rebar 63. 63, and the opposite corners 62c, 62c of the other protrusion 62b across the H-shaped steel 61 are also engaged with the rebars 63, 63.

このコーナーカラム6を配置した塔構造物1のコーナー部13周辺の断面図を図6に示す。   A sectional view around the corner portion 13 of the tower structure 1 in which the corner column 6 is arranged is shown in FIG.

このコーナーカラム6は、コーナー部13の略中央に配置され、二方向に延設される壁部11,11のインターロッキングカラム2,2にそれぞれ接続される。   The corner column 6 is disposed substantially at the center of the corner portion 13 and connected to the interlocking columns 2 and 2 of the wall portions 11 and 11 extending in two directions.

そして、このコーナーカラム6の突出部62a,62bも、それぞれ隣接するインターロッキングカラム2,2の突出部22a,22aと平面視で重なり合うように配置されている。   The protrusions 62a and 62b of the corner column 6 are also arranged so as to overlap with the protrusions 22a and 22a of the adjacent interlocking columns 2 and 2 in plan view.

また、図6に示すように、コーナー部13においても、コーナーカラム6の外周側と内周側には略直角に折り曲げられた帯鉄筋3,3が配置され、壁部11に配置された帯鉄筋3,3と継手部31,31を介してそれぞれ接合されている。   Further, as shown in FIG. 6, also in the corner portion 13, the strip reinforcing bars 3 and 3 bent at substantially right angles are arranged on the outer peripheral side and the inner peripheral side of the corner column 6, and The reinforcing bars 3 and 3 are joined to the joints 31 and 31, respectively.

次に、本実施の形態の塔構造物1の構築方法について説明する。   Next, the construction method of the tower structure 1 of the present embodiment will be described.

まず、工場や地上の製作ヤードにおいて、インターロッキングカラム2及びコーナーカラム6を製作する。   First, the interlocking column 2 and the corner column 6 are manufactured in a factory or a production yard on the ground.

例えば、インターロッキングカラム2を製作するには、横にして作業架台上に架け渡したH形鋼21に、図示しないスペーサを介してH形鋼21の四隅から少し離れた所定の位置に組立鉄筋23,・・・を取り付ける。   For example, in order to manufacture the interlocking column 2, the assembled rebar is placed at a predetermined position slightly apart from the four corners of the H-shaped steel 21 via a spacer (not shown) on the H-shaped steel 21 that is laid horizontally on the work platform. 23, ... are attached.

そして、別途、細径異形PC鋼棒を平面視長方形の螺旋状に成形することで螺旋状鉄筋22を製作し、H形鋼21及び組立鉄筋23,・・・にその螺旋状鉄筋22を通して装着する。この取り付ける際に、螺旋状鉄筋22は縮んだ弦巻バネのような状態になっており、装着後にH形鋼21の長尺方向に引き伸ばして所定の長さに成形する。   Then, separately, a helical rebar 22 is manufactured by forming a small-diameter deformed PC steel rod into a rectangular spiral shape in plan view, and is attached to the H-shaped steel 21 and the assembled rebar 23 through the helical rebar 22. To do. At the time of attachment, the helical rebar 22 is in a state like a contracted string spring, and is stretched in the longitudinal direction of the H-shaped steel 21 after being mounted and formed into a predetermined length.

このようにして製作されたインターロッキングカラム2は、塔構造物1を構築する現地に設けた架台(図示せず)上に、長尺方向を鉛直方向に向けた状態で設置する。   The interlocking column 2 manufactured in this way is installed on a gantry (not shown) provided on the site where the tower structure 1 is constructed in a state where the longitudinal direction is directed to the vertical direction.

このインターロッキングカラム2は、先に立設したものの突出部22aに、横から別のインターロッキングカラム2の突出部22aを挿し込むことによって、突出部22a,22a同士が平面視で重なり合うようにして配置していく。   The interlocking column 2 is configured such that the protrusions 22a and 22a overlap each other in a plan view by inserting the protrusion 22a of another interlocking column 2 from the side into the protrusion 22a of the first standing column. Place it.

この挿し込む際に、突出部22aが組立鉄筋23に当接して挿し込む深さが制限されるので、正確な位置に次々とインターロッキングカラム2,・・・を設置していくことができる。   When this is inserted, the depth at which the projecting portion 22a abuts against the rebar 23 is inserted, so that the interlocking columns 2,... Can be installed one after another at an accurate position.

なお、挿し込む方向は、図3(a)に図示した矢印の方向に限定されるものではなく、間隔をおいて配置したインターロッキングカラム2A,2B間に、矢印の直交方向から第三のインターロッキングカラム2を挿し込む方法によっても重ね合わせることができる。   The insertion direction is not limited to the direction of the arrow shown in FIG. 3 (a), and a third interface is inserted from the orthogonal direction of the arrow between the interlocking columns 2A and 2B arranged at intervals. Superposition can also be achieved by a method of inserting the locking column 2.

このようにインターロッキングカラム2,・・・とコーナーカラム6,・・・が連続して平面視長方形になるようにした後に、インターロッキングカラム群の内側と外側に平面視長方形となるように帯鉄筋3を配置する。   After the interlocking columns 2,... And the corner columns 6,... Are continuously formed into a rectangular shape in a plan view, a band is formed so as to have a rectangular shape in a plan view inside and outside the interlocking column group. Reinforcing bar 3 is arranged.

この帯鉄筋3の配置は、インターロッキングカラム2の全長が囲まれるように、鉛直方向に間隔を置いて複数段おこなわれる。このようなインターロッキングカラム群に沿って延設させる帯鉄筋3であれば、鉄筋の延設方向が交錯しないので容易に組み立てることができる。   The band reinforcing bars 3 are arranged in a plurality of stages at intervals in the vertical direction so that the entire length of the interlocking column 2 is surrounded. If the rebar 3 extends along such an interlocking column group, the extending direction of the rebar does not cross, so that it can be easily assembled.

そして、中空の塔構造物1の内側面と外側面を成形するための内側面型枠と外側面型枠を、それぞれ設置する。   And the inner surface formwork and outer surface formwork for shape | molding the inner surface and outer surface of a hollow tower structure 1 are each installed.

なお、塔構造物1の内側面と外側面を形成するプレキャスト型枠に予め帯鉄筋3を埋設しておき、帯鉄筋3の配置と型枠の設置が同時におこなえるようにしてもよい。   In addition, the band reinforcement 3 may be previously embedded in the precast formwork which forms the inner surface and the outer surface of the tower structure 1, and the arrangement of the band reinforcement 3 and the installation of the formwork may be performed simultaneously.

続いて、内側面型枠と外側面型枠との間にコンクリート4を打設することによって、図1に示すような断面の塔構造物1の壁部11,・・・が構築される。   Subsequently, by placing concrete 4 between the inner surface formwork and the outer surface formwork, the wall portions 11,... Of the tower structure 1 having a cross section as shown in FIG.

また、塔構造物1の高さを延ばしていく際には、インターロッキングカラム2,・・・の上端が突出する位置でコンクリート4の打設を一旦停止し、突出したH形鋼21の上に新たなインターロッキングカラム2のH形鋼21の下端を当接させ、両者をボルトや溶接などの接合手段によって接合することでインターロッキングカラム2を上方に延伸していく。   Moreover, when extending the height of the tower structure 1, the placement of the concrete 4 is temporarily stopped at the position where the upper ends of the interlocking columns 2,. The lower end of the H-shaped steel 21 of the new interlocking column 2 is brought into contact with each other, and both are joined by a joining means such as a bolt or welding, whereby the interlocking column 2 is extended upward.

そして、延伸されたインターロッキングカラム2の周囲には、上記と同様の手順でコンクリート4の打設をおこない、このような作業の繰り返しによって、所望する高さの塔構造物1を構築する。   The concrete 4 is placed around the extended interlocking column 2 in the same manner as described above, and the tower structure 1 having a desired height is constructed by repeating such operations.

このように工場などで製作されたインターロッキングカラム2,・・・を立設して、その周囲にコンクリート4を打設して塔構造物1の壁部11を構築するようにすれば、現地での鉄筋の組立作業を大幅に削減することができるので効率的である。   If the interlocking columns 2,... Manufactured in a factory or the like are erected and concrete 4 is placed around them to construct the wall portion 11 of the tower structure 1, It is efficient because the assembling work of reinforcing bars can be greatly reduced.

また、鉛直方向の必要鋼材を鉄筋ではなく鉄骨で負担させることで、過密配筋を避けることができて施工性が向上するうえに、コンクリートの充填不足などを防ぐことができる。   In addition, by placing the necessary steel material in the vertical direction with a steel frame instead of a reinforcing bar, it is possible to avoid overcrowding and improve workability and to prevent insufficient filling of concrete.

さらに、このように構成された本実施の形態の塔構造物1は、インターロッキングカラム2に螺旋状鉄筋22を取り付けるための組立鉄筋23よりも外側に突出する突出部22aを螺旋状鉄筋22に設けることで、隣接するインターロッキングカラム2,2の突出部22a,22a同士を平面視で重ね合わせることができる。   Further, the tower structure 1 of the present embodiment configured as described above has a protruding portion 22 a protruding outward from the assembly reinforcing bar 23 for attaching the helical reinforcing bar 22 to the interlocking column 2. By providing, protrusion part 22a, 22a of the adjacent interlocking columns 2 and 2 can be piled up by planar view.

このため、H形鋼21によって軸方向耐力が増加されるうえに螺旋状鉄筋22の拘束力によってH形鋼21の座屈が防止できるとともに、螺旋状鉄筋22を平面視で重ねることでインターロッキング配筋となってさらに高耐力の長尺構造物とすることができる。   For this reason, the axial strength is increased by the H-section steel 21 and the buckling of the H-section steel 21 can be prevented by the restraining force of the spiral rebar 22, and the interlocking is achieved by overlapping the spiral rebar 22 in plan view. It is possible to make a long structure with higher proof stress by arranging the bars.

また、本実施の形態では帯鉄筋3を配置したが、インターロッキング配筋となれば、帯鉄筋がなくとも躯体の連続性が確保されてせん断力に対抗することが可能になり、帯鉄筋を省略することができる。   Further, in the present embodiment, the band reinforcement 3 is arranged. However, if interlocking reinforcement is provided, the continuity of the frame can be ensured without the band reinforcement and the shearing force can be counteracted. Can be omitted.

また、隣接するインターロッキングカラム2の一方の突出部22aが他方のインターロッキングカラム2の組立鉄筋23に当接すると、双方のインターロッキングカラム2,2はそれより近づかなくなる。   Moreover, if one protrusion part 22a of the adjacent interlocking column 2 contact | abuts to the assembly reinforcement 23 of the other interlocking column 2, both interlocking columns 2 and 2 will become closer than it.

このため、組立鉄筋23の位置を、突出部22aの突出方向に正確に規定しておくことで、突出部22a,22a同士が重なる重複部22bの長さを所定の長さに容易に設定することができる。   For this reason, the length of the overlapping portion 22b where the protruding portions 22a and 22a overlap is easily set to a predetermined length by accurately defining the position of the assembled reinforcing bar 23 in the protruding direction of the protruding portion 22a. be able to.

また、H形鋼21,21の間隔も一定の間隔に合わせることが容易にできる。   Further, the interval between the H-section steels 21 and 21 can be easily adjusted to a constant interval.

さらに、インターロッキングカラム群の内側及び外側を帯筋3で囲むことで、インターロッキングカラム群の拘束力を高めるとともにせん断耐力を増加させることができる。   Furthermore, by enclosing the inner side and the outer side of the interlocking column group with the band 3, it is possible to increase the binding force of the interlocking column group and increase the shear strength.

また、インターロッキングカラム2は、鉄骨を使用した高軸力部材であるため、鉄筋コンクリートによって塔構造物を構築する場合に比べて小さな断面のであっても大きな耐力を確保することができる。   Moreover, since the interlocking column 2 is a high axial force member using a steel frame, a large proof stress can be ensured even if it has a small cross section as compared with the case where a tower structure is constructed of reinforced concrete.

以下、前記した実施の形態とは別の形態の実施例について説明する。なお、前記実施の形態で説明した内容と同一乃至均等な部分の説明については同一符号を付して説明する。   Hereinafter, an example of a mode different from the above-described embodiment will be described. The description of the same or equivalent parts as those described in the above embodiment will be given the same reference numerals.

この実施例では、前記実施の形態で説明したインターロッキングカラム2に代えて、図7に示すような二重スパイラルカラム7を鉄骨鉄筋部材として使用する。   In this example, a double spiral column 7 as shown in FIG. 7 is used as a steel rebar member instead of the interlocking column 2 described in the above embodiment.

この二重スパイラルカラム7は、前記実施の形態で説明したコーナーカラム6と突出方向が異なるが同様の方法によって製作できる。   The double spiral column 7 can be manufactured by the same method as the corner column 6 described in the above embodiment, although the protruding direction is different.

すなわち、この二重スパイラルカラム7は、図7(a)の斜視図に示すように、中心部に鉄骨として配置されるH形鋼71と、その四隅付近にH形鋼71から少し離れて略平行に立設される組立鉄筋73,・・・と、その組立鉄筋73,・・・の外周を螺旋状に囲む螺旋状鉄筋72とから主に構成される。   That is, as shown in the perspective view of FIG. 7 (a), this double spiral column 7 has an H-section steel 71 arranged as a steel frame in the center and a little apart from the H-section steel 71 near its four corners. It is mainly comprised from the assembly reinforcing bars 73 and ... which stand in parallel, and the helical reinforcement 72 which spirally surrounds the outer periphery of the assembly reinforcement 73, ....

この螺旋状鉄筋72は、H形鋼71を挟んで両側に突出部72a,72bが突出されて平面視長方形状に成形される。この突出部62aと突出部62bは、鉛直方向に交互に形成される。   The helical rebar 72 is formed in a rectangular shape in plan view with protrusions 72a and 72b protruding on both sides with the H-shaped steel 71 interposed therebetween. The protrusions 62a and the protrusions 62b are alternately formed in the vertical direction.

このようにして製作される二重スパイラルカラム7は、図7(b)の平面図に示すように、一方の突出部72aのH形鋼71を挟んだ反対側の角部72c,72cが組立鉄筋73,73に係合して係合部721aが形成され、他方の突出部72bのH形鋼71を挟んだ反対側の角部72c,72cも組立鉄筋73,73に係合して係合部721bが形成される。   In the double spiral column 7 manufactured in this way, as shown in the plan view of FIG. 7B, the opposite corners 72c and 72c sandwiching the H-shaped steel 71 of one protrusion 72a are assembled. An engaging portion 721a is formed by engaging with the reinforcing bars 73, 73, and the opposite corners 72c, 72c across the H-section steel 71 of the other protruding portion 72b are also engaged with the assembled reinforcing bars 73, 73. A joining portion 721b is formed.

このため、組立鉄筋73,・・・を包囲するように鉄筋が配置されることになり、H形鋼21の近傍を囲む鉄筋量が増加するので、H形鋼21の拘束力を高めることができる。   Therefore, the reinforcing bars are arranged so as to surround the assembled reinforcing bars 73,... And the amount of reinforcing bars surrounding the vicinity of the H-shaped steel 21 increases, so that the binding force of the H-shaped steel 21 can be increased. it can.

また、図7(b)に示すように、二重スパイラルカラム7,7を重ね合わせると、略同じ高さの一方の突出部72a(72b)に他方の係合部721a(721b)又は組立鉄筋73が当接して両者の距離がそれより近づかなくなる。   Further, as shown in FIG. 7B, when the double spiral columns 7 and 7 are overlapped, the one engaging portion 721a (721b) or the assembled reinforcing bar is placed on one projecting portion 72a (72b) having substantially the same height. 73 abuts so that the distance between the two becomes closer than that.

このように突出部72a(72b)と係合部721a(721b)又は組立鉄筋73との接触によって二重スパイラルカラム7,7間の距離が一定になるように規制する構成であれば、当接させた際に平面視で傾き難く、正確な位置に容易に二重スパイラルカラム7を配置することができる。   Thus, if it is the structure which controls so that the distance between double spiral columns 7 and 7 may become fixed by contact with projection part 72a (72b), engagement part 721a (721b), or assembly reinforcing bar 73, it will contact The double spiral column 7 can be easily arranged at an accurate position, which is difficult to tilt in plan view.

なお、他の構成及び作用効果については、前記実施の形態と略同様であるので説明を省略する。   Other configurations and functions and effects are substantially the same as those in the above-described embodiment, and thus description thereof is omitted.

以上、図面を参照して、本発明の最良の実施の形態を詳述してきたが、具体的な構成は、この実施の形態及び実施例に限らず、本発明の要旨を逸脱しない程度の設計的変更は、本発明に含まれる。   The best embodiment of the present invention has been described in detail with reference to the drawings, but the specific configuration is not limited to this embodiment and example, and the design does not depart from the gist of the present invention. Such modifications are included in the present invention.

例えば、前記実施の形態では、長尺構造物として地上に構築される塔構造物1について説明したが、これに限定されるものではなく、杭、ケーソン、地下タンクなどの一方向に長い地中構造物であってもよい。   For example, in the said embodiment, although the tower structure 1 constructed | assembled on the ground as a long structure was demonstrated, it is not limited to this, It is underground in one direction, such as a pile, a caisson, and an underground tank It may be a structure.

また、前記実施の形態では、平面視長方形の塔構造物1について説明したが、これに限定されるものではなく、平面視円形、六角形や八角形などの平面視多角形、平面視楕円形、平面視長円形など任意の形状に構築することができる。   Moreover, in the said embodiment, although the tower structure 1 of the planar view rectangle was demonstrated, it is not limited to this, Plane view circular, planar view polygons, such as a hexagon and an octagon, planar view ellipse In addition, it can be constructed in an arbitrary shape such as an oval in plan view.

また、前記実施の形態及び実施例では、連続した螺旋となる螺旋状鉄筋22,72を配置した鉄骨鉄筋部材について説明したが、これに限定されるものではなく、略長方形に折り曲げた複数の環状鉄筋を、組立鉄筋23,・・・の長尺方向に間隔を置いて取り付けることで螺旋状鉄筋を形成してもよい。なお、この際は、個々の環状鉄筋の拘束力を高めるために、機械式継手によって長方形を閉合したり、鉄筋の端部にフックを設けて組立鉄筋23,・・・に係合させたりするなどしてもよい。   Moreover, in the said embodiment and Example, although the steel rebar member which has arrange | positioned the helical rebars 22 and 72 used as a continuous spiral was demonstrated, it is not limited to this, The some cyclic | annular shape bent into the substantially rectangular shape Spiral reinforcing bars may be formed by attaching reinforcing bars at intervals in the longitudinal direction of the assembled reinforcing bars 23. In this case, in order to increase the restraining force of each annular reinforcing bar, the rectangular shape is closed by a mechanical joint, or a hook is provided at the end of the reinforcing bar to be engaged with the assembled reinforcing bars 23. Etc.

さらに、前記実施の形態及び実施例では、平面視略長方形の螺旋状鉄筋22,72を配置した鉄骨鉄筋部材について説明したが、これに限定されるものではなく、平面視略円形、略正方形、略菱形など様々な形状の螺旋状鉄筋を配置することができる。   Furthermore, in the said embodiment and Example, although the steel frame reinforcement member which has arrange | positioned the helical reinforcement 22 and 72 of planar view substantially rectangular shape was demonstrated, it is not limited to this, Plane view substantially circular, substantially square, Various shapes of helical reinforcing bars such as a diamond shape can be arranged.

但し、平面視略円形や略菱形に螺旋状鉄筋をした場合、組立鉄筋より外側に突出する部分が円弧形や三角形になるので、隣接する鉄骨鉄筋部材の組立鉄筋に突出部が当接しなくなる。このような場合は、組立鉄筋同士を当接させることで、突出部同士が重なり合う長さを一定の長さに設定することができる。   However, when a spiral reinforcing bar is formed in a substantially circular shape or a diamond shape in a plan view, the protruding portion does not come into contact with the assembled reinforcing bar of the adjacent steel reinforcing bar member because the portion protruding outward from the assembled reinforcing bar becomes an arc shape or a triangle. . In such a case, the length at which the protruding portions overlap can be set to a certain length by bringing the assembled reinforcing bars into contact with each other.

また、前記実施の形態では、平面視略L字形の螺旋状鉄筋62を平面視屈曲形状として説明したが、これに限定されるものではなく、平面視略ヘの字形の螺旋状鉄筋を備えた鉄骨鉄筋部材を配置することで、平面視円形や平面視六角形などの塔構造物を構築することができる。   Further, in the above-described embodiment, the helical rebar 62 having a substantially L shape in plan view has been described as a bent shape in plan view. By arranging the steel rebar members, a tower structure such as a circular shape in plan view or a hexagonal shape in plan view can be constructed.

さらに、前記実施の形態では帯鉄筋3をインターロッキングカラム群の内側及び外側に配置した場合について説明したが、これに限定されるものではなく、インターロッキング配筋のみでせん断耐力が確保できる場合は帯鉄筋3を配置しなくてもよい。   Furthermore, in the above-described embodiment, the case where the band reinforcing bars 3 are arranged inside and outside the interlocking column group has been described. However, the present invention is not limited to this, and when the shear strength can be ensured only by the interlocking reinforcing bars. The band reinforcement 3 does not need to be arranged.

また、前記実施の形態では、塔構造物1の全周をインターロッキングカラム2,・・・及びコーナーカラム6,・・・で連続させる場合について説明したが、これに限定されるものではなく、部分的に平面視コ字形のリンク筋によってインターロッキングカラム2,2間を連結してもよい。   Moreover, in the said embodiment, although demonstrated about the case where the perimeter of the tower structure 1 was made continuous by the interlocking columns 2, ... and the corner columns 6, ..., it is not limited to this, The interlocking columns 2 and 2 may be connected by a link bar that is partially U-shaped in plan view.

本発明の最良の実施の形態の塔構造物の概略構成を示した切断斜視図である。It is the cutting perspective view showing the schematic structure of the tower structure of the best embodiment of the present invention. インターロッキングカラムの構成を説明する斜視図である。It is a perspective view explaining the structure of an interlocking column. インターロッキングカラムの重ね合わせ方法について説明する図であって、(a)は重ね合わせる前の状態を示した平面図、(b)は重ね合わせた状態を示した平面図である。It is a figure explaining the overlaying method of an interlocking column, Comprising: (a) is the top view which showed the state before superimposing, (b) is the top view which showed the superimposed state. 本発明の最良の実施の形態の塔構造物の壁部の構成を示した断面図である。It is sectional drawing which showed the structure of the wall part of the tower structure of the best embodiment of this invention. (a)はコーナーカラムの構成を説明する斜視図、(b)はコーナーカラムの構成を説明する平面図である。(A) is a perspective view explaining the structure of a corner column, (b) is a top view explaining the structure of a corner column. 本発明の最良の実施の形態の塔構造物のコーナー部周辺の構成を示した断面図である。It is sectional drawing which showed the structure of the corner part periphery of the tower structure of the best embodiment of this invention. (a)は実施例の二重スパイラルカラムの構成を説明する斜視図、(b)は二重スパイラルカラムを重ね合わせた状態を示した平面図である。(A) is the perspective view explaining the structure of the double spiral column of an Example, (b) is the top view which showed the state which piled up the double spiral column.

符号の説明Explanation of symbols

1 塔構造物(長尺構造物)
11 壁部
2 インターロッキングカラム(鉄骨鉄筋部材)
21 H形鋼(鉄骨)
22 螺旋状鉄筋
22a 突出部
23 組立鉄筋
3 帯鉄筋
4 コンクリート
6 コーナーカラム(鉄骨鉄筋部材)
61 H形鋼(鉄骨)
62 螺旋状鉄筋
62a,62b 突出部
63 組立鉄筋
7 二重スパイラルカラム(鉄骨鉄筋部材)
71 H形鋼(鉄骨)
72 螺旋状鉄筋
72a,72b 突出部
721a,721b 係合部
73 組立鉄筋
1 tower structure (long structure)
11 Wall part 2 Interlocking column (steel rebar member)
21 H-section steel (steel frame)
22 Spiral rebar 22a Protruding part 23 Assembling rebar 3 Band rebar 4 Concrete 6 Corner column (steel rebar member)
61 H-section steel (steel frame)
62 Spiral Rebar 62a, 62b Protrusion 63 Assembled Rebar 7 Double Spiral Column (Steel Rebar Member)
71 H-section steel (steel frame)
72 Spiral rebars 72a, 72b Protruding portions 721a, 721b Engaging portions 73 Assembly rebar

Claims (6)

鉄骨の周囲に螺旋状鉄筋が配設された鉄骨鉄筋部材を長尺方向に向けて配置し、その周囲にコンクリートを打ち込んで構築する長尺構造物であって、
前記鉄骨鉄筋部材は、鉄骨と、その周囲に立設される複数の組立鉄筋と、それらの組立鉄筋の外側を螺旋状に囲むとともに組立鉄筋の位置では折り曲げられずに組立鉄筋が角部に係合されない箇所が発生するように外側に突出する突出部が形成される螺旋状鉄筋とを有し、隣接する前記鉄骨鉄筋部材の前記突出部同士が重なるように配置されることを特徴とする長尺構造物。
It is a long structure that is constructed by placing a steel rebar member in which spiral rebars are arranged around the steel frame in the long direction and driving concrete around it.
The steel rebar member comprises a steel, a plurality of assembly rebar erected around it, surrounds the outer their assembled reinforcing steel helically, to assemble reinforcement corner portion without being bent at the position of the assembly rebar It has a spiral reinforcing bar formed with a protruding part that protrudes outward so that a part that is not engaged is generated, and is arranged so that the protruding parts of the adjacent steel rebar members overlap each other. Long structure.
前記組立鉄筋は、前記突出部の突出方向に対する位置が正確に規定されており、隣接して配置される前記鉄骨鉄筋部材の一方の前記突出部又は組立鉄筋を他方の前記組立鉄筋又は螺旋状鉄筋に当接させることを特徴とする請求項1に記載の長尺構造物。 The position of the assembling reinforcing bar in the protruding direction of the projecting portion is precisely defined, and one of the projecting portions or the assembling reinforcing bars of the steel rebar members arranged adjacent to each other is replaced with the other assembling reinforcing bar or the helical reinforcing bar. The elongate structure according to claim 1, wherein the elongate structure is brought into contact with the elongate structure. 前記突出部同士を重ねて連続して配置される前記鉄骨鉄筋部材群の両側に沿って前記突出部の突出方向に向けた帯筋を延設させることを特徴とする請求項1又は2に記載の長尺構造物。 The band reinforcement which extended in the protrusion direction of the said protrusion part is extended along the both sides of the said steel-frame reinforcing-bar member group arrange | positioned continuously with the protrusion part overlapping. Long structure. 前記螺旋状鉄筋は、前記鉄骨を挟んで前記突出部が突出している側とは反対側が前記組立鉄筋に係合されていることを特徴とする請求項1乃至3のいずれか一項に記載の長尺構造物。 It said helical reinforcing bars, according to any one of claims 1 to 3 to the side where the protrusion across the steel is projected, characterized in that the other side is engaged in the assembly rebar Long structure. 前記螺旋状鉄筋は、前記鉄骨を交差点にして二方向に突出する突出部によって平面視屈曲形状に形成されることを特徴とする請求項4に記載の長尺構造物。   5. The long structure according to claim 4, wherein the spiral reinforcing bar is formed in a bent shape in plan view by a protruding portion protruding in two directions with the steel frame as an intersection. 請求項1乃至5のいずれか一項に記載の長尺構造物に配置されることを特徴とする鉄骨鉄筋部材。   A steel rebar member, which is disposed on the long structure according to any one of claims 1 to 5.
JP2007026383A 2007-02-06 2007-02-06 Long structure and steel rebar members Active JP4802111B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007026383A JP4802111B2 (en) 2007-02-06 2007-02-06 Long structure and steel rebar members

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007026383A JP4802111B2 (en) 2007-02-06 2007-02-06 Long structure and steel rebar members

Publications (2)

Publication Number Publication Date
JP2008190233A JP2008190233A (en) 2008-08-21
JP4802111B2 true JP4802111B2 (en) 2011-10-26

Family

ID=39750574

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007026383A Active JP4802111B2 (en) 2007-02-06 2007-02-06 Long structure and steel rebar members

Country Status (1)

Country Link
JP (1) JP4802111B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505233A (en) * 2018-11-05 2019-03-22 安徽省交通规划设计研究总院股份有限公司 A kind of assembled steel reinforced concrete combined hollow bridge pier

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6585144B2 (en) * 2017-11-16 2019-10-02 一般財団法人先端建設技術センター Corner structure of concrete structure
JP6585142B2 (en) * 2017-11-16 2019-10-02 一般財団法人先端建設技術センター Tower structure structure, composite reinforcing material, and method of manufacturing composite reinforcing material
JP6585143B2 (en) * 2017-11-16 2019-10-02 一般財団法人先端建設技術センター Corner structure of concrete structure

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63241252A (en) * 1987-03-30 1988-10-06 株式会社竹中工務店 Steel reinforced concrete pillar
JPH0721697Y2 (en) * 1991-01-16 1995-05-17 矢作建設工業株式会社 Steel plate concrete member of structure
JPH07119304A (en) * 1993-10-25 1995-05-09 Nippon Steel Corp Reinforcing bar, reinforced cage, and reinforced concrete structure
JP3463074B2 (en) * 1997-11-21 2003-11-05 独立行政法人土木研究所 Construction method of tower structure and structure of tower structure
JP2001090193A (en) * 1999-09-22 2001-04-03 Kawasaki Steel Corp Steel concrete structure and steel framed reinforced concrete structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505233A (en) * 2018-11-05 2019-03-22 安徽省交通规划设计研究总院股份有限公司 A kind of assembled steel reinforced concrete combined hollow bridge pier

Also Published As

Publication number Publication date
JP2008190233A (en) 2008-08-21

Similar Documents

Publication Publication Date Title
KR100971736B1 (en) Shear reinforcement with dual anchorage function each up and down
JP6424075B2 (en) REINFORCED CONCRETE COLUMN STEEL BEAM JOINTING MEMBER, ITS MANUFACTURING METHOD, AND BUILDING CONSTRUCTION METHOD
KR20200048596A (en) Precast concrete double wall for constructing shear wall, method for manufacturing the same and method for constructing shear wall using the same
KR102357050B1 (en) Column form system using deckplate form
JP4802111B2 (en) Long structure and steel rebar members
JP5640768B2 (en) Pile construction method, pile construction method, and member for positioning and fixing reinforcing bars
KR101672991B1 (en) Pre-assembled structure for reinforced concrete column
JP2018096071A (en) Composite building
JP2017095986A (en) Iron concrete structure reinforcement structure
JP2010261270A (en) Composite structure and method for constructing composite structure building
JP2005220699A (en) Reinforcement structure of existing column and reinforcing method for the same
JP6836835B2 (en) Column-beam joint structure
JP2006283287A (en) Cage body, reinforcement arrangement method of slab-like member, and slab-like member
JP6704801B2 (en) Rebuilding building with existing underground outer wall
JP6567368B2 (en) Reinforcement structure and reinforcement method for existing columns
JP2016205051A (en) Construction method for structure
JP6353647B2 (en) Seismic isolation device joint structure
JP2007023712A (en) Columnar structure using shape steel, pier or foundation pile and its manufacturing method
JP4890217B2 (en) Construction method of underground structure and underground structure
JP6585142B2 (en) Tower structure structure, composite reinforcing material, and method of manufacturing composite reinforcing material
JP3131259U (en) Frame structure of a column structure using helical muscles
JP2017082548A (en) Concrete foundation joint member and pile structure
JP6585144B2 (en) Corner structure of concrete structure
JP6585143B2 (en) Corner structure of concrete structure
JP2013234518A (en) Structure and method for joining cast-in-place concrete pile and reinforced concrete footing beam

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100203

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110519

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110524

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110712

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110802

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110808

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140812

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4802111

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250