KR20200034436A - Wall structure and method for constructing the same - Google Patents

Wall structure and method for constructing the same Download PDF

Info

Publication number
KR20200034436A
KR20200034436A KR1020180114209A KR20180114209A KR20200034436A KR 20200034436 A KR20200034436 A KR 20200034436A KR 1020180114209 A KR1020180114209 A KR 1020180114209A KR 20180114209 A KR20180114209 A KR 20180114209A KR 20200034436 A KR20200034436 A KR 20200034436A
Authority
KR
South Korea
Prior art keywords
concrete
thumb
supporting
wall
piles
Prior art date
Application number
KR1020180114209A
Other languages
Korean (ko)
Other versions
KR102197094B1 (en
Inventor
이경미
Original Assignee
주식회사 티아이에스
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 티아이에스 filed Critical 주식회사 티아이에스
Priority to KR1020180114209A priority Critical patent/KR102197094B1/en
Publication of KR20200034436A publication Critical patent/KR20200034436A/en
Application granted granted Critical
Publication of KR102197094B1 publication Critical patent/KR102197094B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0283Retaining or protecting walls characterised by constructional features of mixed type
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/40Miscellaneous comprising stabilising elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention relates to a wall structure and a construction method thereof. The construction method of a wall structure comprises: a step of driving support installation H-piles on the ground at intervals; a soil retaining plate installation step of excavating the ground to form a ground cutting wall with respect to the support installation H-piles, and inserting soil retaining plates between two adjacent support installation H-piles among the support installation H-piles; an earth anchor installation step of installing an earth anchor on the ground cutting wall being in contact with the support installation H-piles; and a panel installation step of vertically placing each concrete panel and horizontally arranging the same in order to cover the support installation H-piles and the soil retaining plates, wherein the concrete panels are supported to be in contact with the support installation H-piles, and the earth anchor is tensioned after penetrating the support installation H-piles and the concrete panels in order to fix the concrete panels to the support installation H-piles. Therefore, the wall structure can have a strong structure with a reduced thickness, and the construction is simple to shorten the construction period.

Description

벽체구조물 및 그 시공방법{WALL STRUCTURE AND METHOD FOR CONSTRUCTING THE SAME}Wall structure and construction method {WALL STRUCTURE AND METHOD FOR CONSTRUCTING THE SAME}

본 발명은 벽체구조물 및 그 시공방법에 관한 것이다.The present invention relates to a wall structure and its construction method.

토지의 이용을 효율적으로 하기 위하여 도로나 단지의 성토 및 절개지, 하천제방, 해안도로, 또는 주거지역의 사면 등에는 사면 안정화를 위하여 옹벽이 시공된다.In order to make efficient use of the land, retaining walls are constructed to stabilize slopes on roads and complexes of lands and incisions, river banks, coastal roads, or residential areas.

대한민국 공개특허 제10-2014-0078395호(2014.06.25. 공개일)(이하, 선행기술이라 함)에는 합벽식 옹벽 및 그 시공방법의 일예가 개시되어 있다. 선행기술 1에는 에이치형 파일들을 설정된 간격으로 박고 에이치형 파일들을 기준으로 지반을 굴착하여 절토사면을 형성하고 서로 인접하는 두 개의 에이치형 파일들 사이에 토류판들을 수직 방향으로 적층하고 절토사면에 영구앵커들을 설치하고 에이치형 파일들에 띠장들이 간격을 두고 설치하고 띠장에 정착장치를 설치하고 그 정착장치에 영구앵커의 강선을 긴장시켜 고정한다. 그리고 띠장과 간격을 두고 중력블록들이 적층되어 벽체를 형성하되, 중력블록에 구비된 후크와 띠장에 구비된 후크를 연결하면서 중력블록들을 적층하고 벽체와 절토사면 사이에 콘크리트를 타설하여 벽체, 띠장, 정착장치, 에이치형 파일 및 토류판 등을 일체화하여 옹벽을 시공한다.Korean Patent Publication No. 10-2014-0078395 (published on June 25, 2014) (hereinafter referred to as prior art) discloses an example of a retaining wall of a plywood type and its construction method. In the prior art 1, the H-shaped piles are put at a set interval, and the ground is excavated based on the H-shaped piles to form a cut slope, and the earth plates are stacked vertically between two adjacent H-shaped piles and permanent anchors on the cut slope. They are installed, and the bands are installed on the H-shaped files at intervals, a fixing device is installed on the bands, and the steel wire of the permanent anchor is tensioned and fixed to the fixing device. Then, at a distance from the strip, the gravity blocks are stacked to form a wall, but by connecting the hook provided on the gravity block and the hook provided on the strip, the gravity blocks are stacked and concrete is poured between the wall and the cut slope to form a wall, strip, Retaining wall is constructed by integrating the fixing device, H-type pile and earth plate.

그러나 선행기술은 에이치형 파일들에 띠장들을 설치하고 그 띠장에 정착장치를 장착하고 그 정착장치에 영구앵커의 강선을 긴장시켜 고정하고 중력블록들을 적층하여 벽체를 시공한 상태에서 벽체와 절토사면 사이에 콘크리트를 타설하게 되므로 시공이 복잡하고 옹벽의 두께가 두껍게 되며 또한 띠장들이 콘크리트에 매립되어 시공 비용이 많이 발생되는 문제점이 있다.However, the prior art is to install the bands on the H-type piles, mount the fixing device on the bands, tension the steel wires of the permanent anchors on the fixing devices, and stack the gravity blocks to build the wall between the wall and the cut slope. Since concrete is poured in, the construction is complicated, the thickness of the retaining wall is thick, and there is also a problem in that construction costs are high due to the embedding of strips in the concrete.

본 발명의 목적은 두께를 감소시키면서 구조가 견고한 벽체구조물 및 그 시공방법을 제공하는 것이다.An object of the present invention is to provide a wall structure having a solid structure and a construction method thereof while reducing thickness.

본 발명의 다른 목적은 시공이 간단하여 시공 기간을 단축시키는 벽체구조물 및 그 시공방법을 제공하는 것이다.Another object of the present invention is to provide a wall structure that shortens the construction period due to the simple construction.

상기한 바와 같은 본 발명의 목적을 달성하기 위하여, 절토벽에 간격을 두고 설치되는 지보재설치겸용 엄지말뚝들; 상기 지보재설치겸용 엄지말뚝들 중 서로 인접하는 두 개의 지보재설치겸용 엄지말뚝들 사이에 수직 방향으로 삽입되어 절토벽을 막는 토류판들; 상기 지보재설치겸용 엄지말뚝들과 토류판을 커버하도록 상기 지보재설치겸용 엄지말뚝에 접촉 지지되어 콘크리트벽체를 형성하는 콘크리트패널들; 상기 콘크리트패널들을 지보재설치겸용 엄지말뚝에 고정하도록 상기 콘크리트패널과 지보재설치겸용 엄지말뚝을 관통하여 상기 절토벽 내부에 고정되는 어스앵커들;을 포함하며, 상기 지보재설치겸용 엄지말뚝은 서로 간격을 두고 나란하게 위치하는 두 개의 디귿자 형강들과, 상기 두 개의 디귿자 형강들의 길이 방향으로 서로 간격을 두고 상기 두 개의 디귿자 형강들을 연결하는 연결부재들을 포함하며, 상기 연결부재들 사이로 상기 어스앵커가 관통하는 것을 특징으로 하는 벽체구조물이 제공된다.In order to achieve the object of the present invention as described above, the support pile installed and thumb piles installed at intervals on the cut wall; Among the support piles for supporting and installing thumb pads, which are inserted in the vertical direction between two adjacent piles for supporting and supporting thumb cutting to prevent cutting walls; Concrete panels for contacting and supporting the thumb piles for supporting and installing the thumb piles to form a concrete wall; To include the concrete panels and earth anchors that are fixed to the inside of the cut wall by penetrating the concrete panel and the support pile and the support pile to fix the concrete panels to the support and installation thumb thumbs, and the support and installation support thumb piles are spaced from each other. And two connecting members, which are positioned side by side, and connecting members connecting the two connecting members, spaced apart from each other in the longitudinal direction of the two connecting members, and passing through the earth anchor between the connecting members. A wall structure characterized by this is provided.

상기 연결부재는 직선 바이며, 상기 연결부재들은 상기 두 개의 디귿자 형강들 사이에 위치하는 것이 바람직하다.The connecting member is a straight bar, and the connecting members are preferably located between the two dike-shaped steels.

또한, 지반에 지보재설치겸용 엄지말뚝들을 간격을 두고 박는 단계; 상기 지반을 굴착하여 지보재설치겸용 엄지말뚝들을 기준으로 절토벽을 형성하고 상기 지보재설치겸용 엄지말뚝들 중 서로 인접하는 두 개의 지보재설치겸용 엄지말뚝 사이에 토류판들을 삽입하는 토류판설치단계; 상기 지보재설치겸용 엄지말뚝에 접촉되는 절토벽에 어스앵커를 설치하는 어스앵커설치단계; 상기 지보재설치겸용 엄지말뚝들과 토류판들을 커버하도록 콘크리트패널들을 각각 수직으로 위치시켜 수평 방향으로 배열하되, 상기 지보재설치겸용 엄지말뚝들에 상기 콘크리트패널을 접촉 지지하고 상기 어스앵커를 상기 지보재설치겸용 엄지말뚝과 콘크리트패널을 관통하여 상기 어스앵커를 긴장시켜 상기 콘크리트패널을 상기 지보재설치겸용 엄지말뚝에 고정하는 패널설치단계;를 포함하며, 상기 지보재설치겸용 엄지말뚝은 서로 간격을 두고 나란하게 위치하는 두 개의 디귿자 형강들과, 상기 두 개의 디귿자 형강들의 길이 방향으로 서로 간격을 두고 상기 두 개의 디귿자 형강들을 연결하는 연결부재들을 포함하며, 상기 연결부재들 사이로 상기 어스앵커가 관통하는 것을 특징으로 하는 벽체구조물 시공방법이 제공된다.In addition, the step of driving the thumb piles for mounting and supporting the ground at intervals; A excavation step of excavating the ground to form a cut wall based on the thumb piles for supporting and installing the support and inserting earth plates between two thumb piles adjacent to each other of the thumb piles for the supporting and installing and supporting; An earth anchor installation step of installing an earth anchor on a cut wall that is in contact with the support pile and the thumb pile; The concrete panels are vertically positioned so as to cover the thumb piles and earth plates for the supporting plate installation and arranged in a horizontal direction, but the concrete panel is contacted and supported by the supporting pile thumb plates and the earth anchor is used for the supporting plate installation and thumb And a panel installation step of fixing the concrete panel to the thumb pile for both support and installation by tensioning the earth anchor through the pile and the concrete panel, and the thumb piles for both support and installation are spaced apart from each other. A wall structure characterized by including two di-shaped sections and connecting members connecting the two di-shaped sections at a distance from each other in the longitudinal direction of the two di-shaped sections, and the earth anchor penetrates between the connecting members. Construction methods are provided.

또한, 지반에 지보재설치겸용 엄지말뚝들을 간격을 두고 박는 단계; 상기 지반을 굴착하여 지보재설치겸용 엄지말뚝들을 기준으로 절토벽을 형성하고 상기 지보재설치겸용 엄지말뚝들 중 서로 인접하는 두 개의 지보재설치겸용 엄지말뚝 사이에 토류판들을 삽입하는 토류판설치단계; 상기 지보재설치겸용 엄지말뚝에 접촉되는 절토벽에 어스앵커를 설치하는 어스앵커설치단계; 상기 지보재설치겸용 엄지말뚝들과 토류판들을 커버하도록 콘크리트패널들을 각각 수직으로 위치시켜 수평 방향으로 배열하되, 상기 지보재설치겸용 엄지말뚝들에 상기 콘크리트패널을 접촉 지지하고 상기 어스앵커를 상기 지보재설치겸용 엄지말뚝과 콘크리트패널을 관통하여 상기 어스앵커를 긴장시켜 상기 콘크리트패널을 상기 지보재설치겸용 엄지말뚝에 고정하는 패널설치단계; 상기 지반을 설정된 깊이에 이를 때까지 상기 토류판설치단계, 어스앵커설치단계, 패널설치단계를 반복하여 내측콘크리트벽체를 시공하는 단계; 상기 내측콘크리트벽체의 하단인 지하 바닥에 버림콘크리트를 타설하는 단계; 상기 버림콘크리트에 기초콘크리트를 타설하는 단계; 상기 내측콘크리트벽체에 간격을 두고 거푸집을 설치하되, 상기 내측콘크리트벽체의 하단 콘크리트패널의 정착부 아래까지 거푸집을 설치하고 상기 거푸집에 콘크리트를 타설하여 단위외측콘크리트벽체를 시공하는 단계; 상기 단위외측콘크리트벽체의 바로 위에 위치하는 어스앵커와 콘크리트패널의 연결을 해제하고, 상기 단위외측콘크리트벽체에 이어 위로 거푸집을 설치하되, 위에 위치하는 콘크리트패널의 정착부 아래까지 거푸집을 설치하고 상기 거푸집에 콘크리트를 타설하여 단위외측콘크리트벽체를 시공하는 단계를 상기 내측콘크리트벽체에 이르기까지 반복하여 외측콘크리트벽체를 시공하는 단계;를 포함하는 벽체구조물 시공방법이 제공된다.In addition, the step of driving the thumb piles for mounting and supporting the ground at intervals; A excavation step of excavating the ground to form a cut wall based on the thumb piles for supporting and installing the support and inserting earth plates between two thumb piles adjacent to each other of the thumb piles for the supporting and installing and supporting; An earth anchor installation step of installing an earth anchor on a cut wall that is in contact with the support pile and the thumb pile; The concrete panels are vertically positioned so as to cover the thumb piles and earth plates for the supporting plate installation and arranged in a horizontal direction, but the concrete panel is contacted and supported by the supporting pile thumb plates and the earth anchor is used for the supporting plate installation and thumb A panel installation step of penetrating through the pile and the concrete panel and tensioning the earth anchor to fix the concrete panel to the thumb pile for installation and support; Repeating the earth plate installation step, the earth anchor installation step, and the panel installation step until the ground reaches a predetermined depth to construct an inner concrete wall; Pouring discarded concrete on the basement floor, which is the lower end of the inner concrete wall; Pouring foundation concrete on the discarded concrete; Installing a formwork at intervals to the inner concrete wall, installing the formwork to the bottom of the anchoring part of the lower concrete panel of the inner concrete wall, and pouring concrete into the formwork to construct a unit outer concrete wall; Release the connection of the earth anchor and the concrete panel located directly above the unit outer concrete wall, and install the formwork on top of the unit exterior concrete wall, but install the formwork below the fixing part of the concrete panel located above and install the formwork Provided is a method of constructing a wall structure, including; constructing an outer concrete wall by repeating the step of constructing concrete on the outer concrete wall to construct the outer concrete wall.

상기 외측콘크리트벽체를 시공한 다음 상기 지보재설치겸용 엄지말뚝들을 인발하여 제거하는 단계를 더 포함하는 것이 바람직하다.After constructing the outer concrete wall, it is preferable to further include the step of drawing and removing the thumb piles for both the support and installation.

상기 거푸집은 다수 개의 거푸집용 콘크리트패널들을 포함할 수 있다.The formwork may include a plurality of formwork concrete panels.

상기 내측콘크리트벽체와 외측콘크리트벽체는 한 쌍의 대칭을 이루며, 상기 내측콘크리트벽체의 상단과 외측콘크리트벽체의 상단을 슬래브로 연결하는 것이 바람직하다.The inner concrete wall and the outer concrete wall form a pair of symmetry, and it is preferable to connect the top of the inner concrete wall and the top of the outer concrete wall with a slab.

본 발명은 지보재설치겸용 엄지말뚝들과 토류판들을 콘크리트패널들이 커버하면서 콘크리트패널들이 어스앵커에 의해 지보재설치겸용 엄지말뚝에 고정되어 콘크리트벽체를 형성하게 되므로 지하에 위치하는 콘크리트벽체의 두께가 얇으면서도 구조가 견고하게 될 뿐만 아니라 구성이 간단하게 된다. 특히, 콘크리트패널이 어스앵커에 의해 지보재설치겸용 엄지말뚝에 고정되므로 콘크리트패널이 견고하게 지지되고, 지보재설치겸용 엄지말뚝이 두 개의 디귿자 형강과 그 디귿자 형강들을 연결하는 연결부재를 포함하게 되어 지보재설치겸용 엄지말뚝의 강도가 크게 되고 어스앵커를 두 개의 디귿자 형강 사이로 설치되어 설치작업이 쉽게 된다.According to the present invention, while concrete panels cover the thumb piles and earth plates for supporting and installing the supports, the concrete panels are fixed to the thumb piles for supporting and installing the supports, thereby forming a concrete wall. Not only does it become robust, it also simplifies construction. In particular, since the concrete panel is fixed to the thumb pile for both supporting and installing the support, the concrete panel is firmly supported, and the thumb pile for supporting and installing the support includes two connecting members and connecting members connecting the deforming devices. The strength of the thumb pile is increased, and the earth anchor is installed between two dike-shaped sections to facilitate installation.

또한, 본 발명은 지반에 지보재설치겸용 엄지말뚝들을 박고 지반을 굴착하면서 토류판들을 설치하고 어스앵커를 지보재설치겸용 엄지말뚝의 배면 절토벽에 설치하고 어스앵커를 지보재설치겸용 엄지말뚝에 관통시켜 콘크리트패널을 지보재설치겸용 엄지말뚝에 접촉 지지한 상태에서 어스앵커로 콘크리트패널을 고정하게 되므로 지하에 콘크리트벽체를 견고하게 시공하게 될 뿐만 아니라 지하에 콘크리트벽체를 시공하는 시공 작업이 간단하여 시공 기간을 단축시키고, 재료의 사용량을 대폭 감소시켜 시공 비용을 절감시키게 된다.In addition, the present invention is to install the earth plate while driving the ground to support the thumb piles for mounting and supporting the ground, excavating the ground, installing the earth anchor on the back cut wall of the thumb pile for mounting and supporting the earth anchor and piercing the ground anchor to the thumb pile for mounting and supporting the concrete panel As the concrete panel is fixed with an earth anchor in the state of being in contact with and supported by the thumb pile for installation and support, the construction work of constructing the concrete wall in the basement is simplified and the construction period is shortened. , It greatly reduces the amount of material used, thereby reducing construction costs.

또한, 본 발명은 지반에 지보재설치겸용 엄지말뚝들을 박고 지반을 굴착하면서 토류판들을 설치하고 어스앵커를 지보재설치겸용 엄지말뚝의 배면 절토벽에 설치하고 어스앵커를 지보재설치겸용 엄지말뚝에 관통시켜 콘크리트패널을 지보재설치겸용 엄지말뚝에 접촉 지지한 상태에서 어스앵커로 콘크리트패널을 고정하는 것을 반복하여 내측콘크리트벽체를 시공하고 그 내측콘크리트벽체에 거푸집을 설치하고 콘크리트를 타설하여 외측콘크리트벽체를 형성하여 지하에 콘크리트벽체를 시공하게 되므로 지하에 콘크리트벽체를 견고하게 시공하게 될 뿐만 아니라 지하에 콘크리트벽체를 시공하는 시공 작업이 간단하여 시공 기간을 단축시킨다. 거푸집이 다수 개의 콘크리트패널들을 포함하게 될 경우 외측콘크리트벽체의 시공이 쉽고 간단하게 된다.In addition, the present invention is to install the earth plate while driving the ground to support the thumb piles for mounting and supporting the ground, excavating the ground, installing the earth anchor on the back cut wall of the thumb pile for mounting and supporting the earth anchor and piercing the ground anchor to the thumb pile for mounting and supporting the concrete panel In the state of contact support and support to the thumb pile for installation and installation, the concrete panel is repeatedly fixed with an earth anchor to construct the inner concrete wall, the formwork is installed on the inner concrete wall, and the concrete is poured to form the outer concrete wall to form underground Since the concrete wall is constructed, not only does the concrete wall be firmly installed in the basement, but the construction work of constructing the concrete wall in the basement is simple to shorten the construction period. When the formwork includes multiple concrete panels, the construction of the outer concrete wall is easy and simple.

또한, 본 발명은 외측콘크리트벽체를 시공하기전 내측콘크리트벽체에 정착된 어스앵커를 내측콘크리트벽체와 분리한 다음 외측콘크리트벽체를 시공하게 되므로 지보재설치겸용 엄지말뚝들을 인발하여 회수할 수도 있어 비용을 절감시키게 된다.In addition, the present invention separates the ground anchor fixed to the inner concrete wall from the inner concrete wall before constructing the outer concrete wall, and then constructs the outer concrete wall. Ordered.

도 1은 본 발명에 따른 벽체구조물의 일실시예를 도시한 정면도,
도 2는 본 발명에 따른 벽체구조물의 일실시예를 도시한 평단면도,
도 3은 본 발명에 따른 벽체구조물의 일실시예를 도시한 측단면도,
도 4는 본 발명에 따른 벽체구조물의 일실시예를 구성하는 지보재설치겸용 엄지말뚝을 도시한 부분 확대도,
도 5는 본 발명에 따른 벽체구조물 시공방법의 제1 실시예를 도시한 순서도,
도 6a에서 도 6d는 본 발명에 따른 벽체구조물 시공방법의 제1 실시예를 시공 단계별로 도시한 단면도,
도 6a에서 도 6g는 본 발명에 따른 벽체구조물 시공방법의 제2 실시예를 시공 단계별로 도시한 단면도,
도 7은 본 발명에 따른 벽체구조물 시공방법의 제2 실시예를 도시한 순서도.
1 is a front view showing an embodiment of a wall structure according to the present invention,
Figure 2 is a cross-sectional plan view showing an embodiment of the wall structure according to the present invention,
Figure 3 is a side cross-sectional view showing an embodiment of a wall structure according to the present invention,
Figure 4 is a partial enlarged view showing a thumb pile for both the installation and support material constituting one embodiment of the wall structure according to the present invention,
Figure 5 is a flow chart showing a first embodiment of the construction method of a wall structure according to the present invention,
6A to 6D are cross-sectional views showing a first embodiment of a method for constructing a wall structure according to the present invention in stages of construction,
6A to 6G are cross-sectional views showing a second embodiment of a method for constructing a wall structure according to the present invention in stages of construction,
7 is a flow chart showing a second embodiment of the construction method of a wall structure according to the present invention.

이하, 본 발명에 따른 벽체구조물 및 그 시공방법의 실시예를 첨부도면을 참조하여 설명한다.Hereinafter, embodiments of the wall structure according to the present invention and its construction method will be described with reference to the accompanying drawings.

도 1은 본 발명에 따른 벽체구조물의 일실시예를 도시한 정면도이다. 도 2는 본 발명에 따른 벽체구조물의 일실시예를 도시한 평단면도이다. 도 3은 본 발명에 따른 벽체구조물의 일실시예를 도시한 측단면도이다.1 is a front view showing an embodiment of a wall structure according to the present invention. Figure 2 is a plan cross-sectional view showing an embodiment of a wall structure according to the present invention. 3 is a side cross-sectional view showing an embodiment of a wall structure according to the present invention.

도 1, 2, 3에 도시한 바와 같이, 본 발명에 따른 벽체구조물의 일실시예는, 지보재설치겸용 엄지말뚝(10)들, 토류판(20)들, 콘크리트패널(30)들, 어스앵커(40)들을 포함한다.As shown in Figures 1, 2, 3, an embodiment of the wall structure according to the present invention, the thumb piles (10), earth plates (20), concrete panels (30), earth anchor ( 40).

지보재설치겸용 엄지말뚝(10)들은 절토벽(W)에 간격을 두고 설치된다. 지보재설치겸용 엄지말뚝(10)들은 일렬로 위치하는 것이 바람직하다. 지보재설치겸용 엄지말뚝(10)의 일예로, 도 4에 도시한 바와 같이, 지보재설치겸용 엄지말뚝(10)은 서로 간격을 두고 나란하게 위치하는 두 개의 디귿자 형강(11)들과, 그 두 개의 디귿자 형강(11)들의 길이 방향으로 서로 간격을 두고 두 개의 디귿자 형강들을 연결하는 다수 개의 연결부재(12)들을 포함한다. 두 개의 디귿자 형강(11)들은 중간면이 서로 대면되도록 위치한다. 연결부재(12)는 직선 바인 것이 바람직하다. 연결부재(12)의 횡단면 형상은 니은자 형상, 디귿자 형상, 또는 균일한 두께를 갖는 직선 형상이 될 수 있다. 연결부재(12)들은 두 개의 디귿자 형강(11)들 사이에 위치하되, 연결부재(12)의 양단이 두 개의 디귿자 형강(11)의 중간면에 각각 위치하도록 용접에 의해 연결되는 것이 바람직하다.Thumb piles 10 for both supporting and installing are installed at intervals on the cutting wall W. It is preferable that the thumb piles 10 for supporting and installing the supports are positioned in a line. As an example of the thumb pile 10 for supporting and installing the support, as shown in FIG. 4, the thumb pile 10 for supporting and installing the supporting plate is provided with two dike-shaped sections 11 spaced apart from each other and two of them. It includes a plurality of connecting members (12) connecting the two Diguja-shaped steel spaced from each other in the longitudinal direction of the Diguja-shaped steel (11). The two deguza beams 11 are positioned such that the intermediate surfaces face each other. The connecting member 12 is preferably a straight bar. The cross-sectional shape of the connecting member 12 may be a needle-shaped shape, a de-shape shape, or a straight shape having a uniform thickness. The connecting members 12 are positioned between the two de-shaped beams 11, but are preferably connected by welding such that both ends of the connecting member 12 are respectively located on the intermediate surfaces of the two de-shaped beams 11.

토류판(20)들은 지보재설치겸용 엄지말뚝(10)들 중 서로 인접하는 두 개의 지보재설치겸용 엄지말뚝(10)들 사이에 수직 방향으로 삽입되어 절토벽(W)을 막는다. 토류판(20)들은 두 개의 지보재설치겸용 엄지말뚝(10)들 사이에 수직 방향으로 일렬로 배열된다. The earth plates 20 are inserted in the vertical direction between two adjacent pile piles 10, which are adjacent to each other, among the pile piles 10 for supporting and installing, thereby blocking the cut wall W. The earth plates 20 are arranged in a line in the vertical direction between the two support piles 10.

콘크리트패널(30)들은 지보재설치겸용 엄지말뚝(10)들과 토류판(20)을 커버하도록 지보재설치겸용 엄지말뚝(10)에 접촉 지지되어 콘크리트벽체를 형성한다. 콘크리트패널(30)의 가운데에 어스앵커(40)가 고정되는 정착부(41)가 구비됨이 바람직하다. 콘크리트패널(30)의 일예로, 콘크리트패널(30)은 사각판 형상으로 형성됨이 바람직하며, 그 콘크리트패널(30)의 가운데에 구비된 정착부가 지보재설치겸용 엄지말뚝(10)에 위치하며, 그 콘크리트패널(30)의 양쪽 측면이 서로 인접하는 두 개의 지보재설치겸용 엄지말뚝(10) 사이에 위치하는 것이 바람직하다. 콘크리트패널(30)의 다른 일예로, 콘크리트패널(30)은 육각판 형상으로 형성될 수 있다. 콘크리트패널(30)은 다양한 형태로 구현될 수 있다. The concrete panels 30 are contacted and supported by the thumb piles 10 for supporting and installing the support so as to cover the thumb piles 10 for supporting and installing the supporting plate and the earth plate 20 to form a concrete wall. It is preferable that the anchoring portion 41 to which the earth anchor 40 is fixed is provided in the center of the concrete panel 30. As an example of the concrete panel 30, the concrete panel 30 is preferably formed in the shape of a square plate, the fixing part provided in the center of the concrete panel 30 is located on the thumb pile 10 for supporting and installing the support, and It is preferable that both sides of the concrete panel 30 are located between two adjacent thumb piles 10 for installation and support. As another example of the concrete panel 30, the concrete panel 30 may be formed in a hexagonal plate shape. The concrete panel 30 may be implemented in various forms.

어스앵커(40)들은 콘크리트패널(30)들을 지보재설치겸용 엄지말뚝(10)에 고정하도록 상기 콘크리트패널(30)과 지보재설치겸용 엄지말뚝(10)을 관통하여 상기 절토벽(W) 내부에 고정된다. 어스앵커(40)는 지보재설치겸용 엄지말뚝(10)의 연결부재(12)들 사이로 관통되는 것이 바람직하다.Earth anchors 40 penetrate the concrete panel 30 and the thumb pile 10 for supporting and installing the support so that the concrete panels 30 are fixed to the thumb stake for the installation and fixation inside the cut wall W do. The earth anchor 40 is preferably penetrated between the connecting members 12 of the thumb pile 10 for both support and installation.

도 5는 본 발명에 따른 벽체구조물 시공방법의 제1 실시예를 도시한 순서도이다. 도 6a에서 도 6d는 본 발명에 따른 벽체구조물 시공방법의 제1 실시예를 시공 단계별로 도시한 단면도.5 is a flowchart illustrating a first embodiment of a method for constructing a wall structure according to the present invention. 6A to 6D are cross-sectional views showing a first embodiment of a method for constructing a wall structure according to the present invention in stages of construction.

도 5에 도시한 바와 같이, 본 발명에 따른 벽체구조물 시공방법의 제1 실시예는, 먼저, 지반에 지보재설치겸용 엄지말뚝(10)들을 간격을 두고 박는 단계(S1)가 진행된다(도 6a 참조). 지보재설치겸용 엄지말뚝(10)들을 일렬로 배열되도록 박는 것이 바람직하다. 지보재설치겸용 엄지말뚝(10)의 일예로, 도 4에 도시한 바와 같이, 지보재설치겸용 엄지말뚝(10)은 서로 간격을 두고 나란하게 위치하는 두 개의 디귿자 형강(11)들과, 그 두 개의 디귿자 형강(11)들의 길이 방향으로 서로 간격을 두고 두 개의 디귿자 형강(11)들을 연결하는 다수 개의 연결부재(12)들을 포함한다. 두 개의 디귿자 형강(11)들은 중간면이 서로 대면되도록 위치한다. 연결부재(12)는 직선 바인 것이 바람직하다. 연결부재(12)의 횡단면 형상은 니은자 형상, 디귿자 형상, 또는 균일한 두께를 갖는 직선 형상이 될 수 있다. 연결부재(12)들은 두 개의 디귿자 형강(11)들 사이에 위치하되, 연결부재(12)의 양단이 두 개의 디귿자 형강(11)의 중간면에 각각 위치하도록 용접에 의해 연결되는 것이 바람직하다. 지보재설치겸용 엄지말뚝(10)은 항타에 의해 지반에 박을 수 있고, 또한 오거장비로 지반을 천공한 후 그 천공된 홀에 지보재설치겸용 엄지말뚝(10)을 매입할 수도 있다. 지보재설치겸용 엄지말뚝(10)들 사이의 간격이 균일하도록 지보재설치겸용 엄지말뚝(10)들을 지반에 박는 것이 바람직하다.As shown in FIG. 5, in the first embodiment of the method for constructing a wall structure according to the present invention, first, a step S1 of driving the thumb piles 10 for supporting and installing the ground at intervals is performed (FIG. 6A). Reference). It is preferable to drive the thumb piles 10 for supporting and installing them so that they are arranged in a line. As an example of the thumb pile 10 for supporting and installing the support, as shown in FIG. 4, the thumb pile 10 for supporting and installing the supporting plate is provided with two dike-shaped sections 11 spaced apart from each other and two of them. It includes a plurality of connecting members (12) for connecting the two Diguja-shaped steel (11) spaced from each other in the longitudinal direction of the Diguja-shaped steel (11). The two deguza beams 11 are positioned such that the intermediate surfaces face each other. The connecting member 12 is preferably a straight bar. The cross-sectional shape of the connecting member 12 may be a needle-shaped shape, a de-shape shape, or a straight shape having a uniform thickness. The connecting members 12 are positioned between the two de-shaped beams 11, but are preferably connected by welding such that both ends of the connecting member 12 are respectively located on the intermediate surfaces of the two de-shaped beams 11. The thumb pile 10 for supporting and installing the support can be driven into the ground by driving, and after drilling the floor with auger equipment, the thumb pile for supporting and installing the supporting pile 10 can also be purchased. It is preferable to drive the thumb piles 10 for supporting and installing the support on the ground so that the gap between the thumb piles 10 for installing and supporting the support is uniform.

지보재설치겸용 엄지말뚝(10)들을 박은 다음 지반을 굴착하여 지보재설치겸용 엄지말뚝(10)들을 기준으로 절토벽(W)을 형성하고 지보재설치겸용 엄지말뚝(10)들 중 서로 인접하는 두 개의 지보재설치겸용 엄지말뚝(10) 사이에 토류판(20)들을 삽입하는 토류판설치단계(S2)가 진행된다(도 6b 참조). 토류판(20)의 양단은 서로 인접하는 두 개의 지보재설치겸용 엄지말뚝(10)의 디귿자 형강(11)의 내부에 삽입된다.After supporting the thumb piles 10 for supporting and installing the foundation, excavating the ground to form a cut wall (W) based on the thumb piles 10 for supporting and installing and supporting two of the thumb piles 10 adjacent to each other. The earth plate installation step (S2) in which the earth plates 20 are inserted between the thumb piles 10 for installation and installation proceeds (see FIG. 6B). Both ends of the earth plate 20 are inserted into the interior of the dike-shaped section 11 of two thumb piles 10 that are adjacent to each other.

토류판설치단계가 진행된 다음 지보재설치겸용 엄지말뚝(10)에 접촉되는 절토벽(W)에 어스앵커(40)를 설치하는 어스앵커설치단계(S3)가 진행된다(도 6c 참조). 절토벽(W)에 설치되는 어스앵커(40)는 지보재설치겸용 엄지말뚝(10)의 두 개의 디극자형 형강 사이에 위치하는 것이 바람직하다. 어스앵커(30)를 설치하는 방법은 다양하다. 그 일예로, 천공기로 절토벽(W)에 설정된 깊이로 천공한 후 그 천공된 홀(31)에 그라우팅재(32)를 압입 분사하고 강연선(33)이 연결된 앵커체(34)를 홀(31)에 삽입하여 그라우팅재(32)를 고결시킨다. 절토벽(W)을 천공시 지보재설치겸용 엄지말뚝(10)의 두 개의 디귿자 형강(11)들 사이로 절토벽(W)을 천공된다. 어스앵커는 그라우팅재(32)가 천공홀에서 고결됨에 따라 그라우팅재와 앵커체가 일체화되어 절토벽(W) 내부에 고정되고 앵커체에 연결된 강연선은 지보재설치겸용 엄지말뚝(10) 외부로 노출된다.After the earth plate installation step proceeds, the earth anchor installation step (S3) of installing the earth anchor 40 on the cut wall W contacting the support pile thumb 10 is progressed (see FIG. 6C). It is preferable that the earth anchor 40 installed on the cut wall W is positioned between two dipole-shaped sections of the thumb pile 10 for supporting and installing the support. The method of installing the earth anchor 30 is various. As an example, after drilling with a perforator to a depth set in the cutting wall W, the grouting material 32 is press-injected into the perforated hole 31 and the anchor body 34 to which the strand 33 is connected is hole 31 ) To fix the grouting material 32. When drilling the cut wall (W), the cut wall (W) is drilled between the two deguza beams (11) of the thumb pile (10) for both installation and support. As the grouting material 32 is consolidated in the drilling hole, the ground anchor is integrated into the grouting material and the anchor body to be fixed inside the cut wall W, and the stranded wire connected to the anchor body is exposed to the outside of the thumb pile 10 for supporting and installing the support.

어스앵커설치단계가 진행된 다음 지보재설치겸용 엄지말뚝(10)들과 토류판(20)들을 커버하도록 콘크리트패널(30)들을 각각 수직으로 위치시켜 수평 방향으로 배열하되, 지보재설치겸용 엄지말뚝(10)들에 콘크리트패널(30)을 접촉 지지하고 어스앵커(40)를 지보재설치겸용 엄지말뚝(10)과 콘크리트패널(30)을 관통하여 어스앵커(40)를 긴장시켜 콘크리트패널(30)을 지보재설치겸용 엄지말뚝(10)에 고정하는 패널설치단계(S4)가 진행된다(도 6d 참조). 콘크리트패널(30)들은 동일 평면을 갖는 한 개의 콘크리트벽체를 형성한다. 콘크리트패널(30)의 가운데에 어스앵커(40)가 고정되는 정착부가 구비됨이 바람직하다. 콘크리트패널(30)의 일예로, 콘크리트패널(30)은 사각판 형상으로 형성됨이 바람직하며, 그 콘크리트패널(30)의 가운데에 구비된 정착부가 지보재설치겸용 엄지말뚝(10)에 위치하며, 그 콘크리트패널(30)의 양쪽 측면이 서로 인접하는 두 개의 지보재설치겸용 엄지말뚝(10) 사이에 위치하는 것이 바람직하다. 콘크리트패널(30)은 다수 개의 지보재설치겸용 엄지말뚝(10)들을 한 개의 콘크리트패널로 커버할 수도 있다.After the earth anchor installation step is carried out, the concrete panels 30 are vertically arranged to cover the thumb piles 10 and the earth plates 20, which are used for supporting beam installation, and arranged in the horizontal direction, respectively, and the thumb stakes 10 for supporting and installing the supporting beams are installed. To support the concrete panel 30 in contact and install and support the earth anchor 40, the thumb anchor 10 and the concrete panel 30 penetrate the anchor 40 to tension the concrete panel 30 to support and install the concrete panel 30 The panel installation step (S4) for fixing to the thumb pile 10 proceeds (see FIG. 6D). The concrete panels 30 form one concrete wall having the same plane. It is preferable that the anchoring part to which the earth anchor 40 is fixed is provided in the center of the concrete panel 30. As an example of the concrete panel 30, the concrete panel 30 is preferably formed in the shape of a square plate, the fixing part provided in the center of the concrete panel 30 is located on the thumb pile 10 for supporting and installing the support, and It is preferable that both sides of the concrete panel 30 are located between two adjacent thumb piles 10 for installation and support. The concrete panel 30 may cover a plurality of supporting piles for installation and thumb piles 10 with one concrete panel.

도 7은 본 발명에 따른 벽체구조물 시공방법의 제2 실시예를 도시한 순서도이다. 도 6a에서 도 6g는 도 본 발명에 따른 벽체구조물 시공방법의 제2 실시예를 시공 단계별로 도시한 단면도.7 is a flow chart showing a second embodiment of the construction method of a wall structure according to the present invention. 6A to 6G are cross-sectional views illustrating a second embodiment of a method for constructing a wall structure according to the present invention in steps of construction.

도 7에 도시한 바와 같이, 본 발명에 따른 벽체구조물 시공방법의 제2 실시예는, 먼저, 지반에 지보재설치겸용 엄지말뚝(10)들을 간격을 두고 박는 단계(S1)가 진행된다(도 6a 참조). 이와 같은 단계는 제1 실시예에서 설명한 바와 같다.As shown in FIG. 7, in the second embodiment of the method for constructing a wall structure according to the present invention, first, a step S1 of driving the thumb piles 10 for supporting and installing the ground at intervals is performed (FIG. 6A). Reference). These steps are as described in the first embodiment.

지보재설치겸용 엄지말뚝(10)들을 박은 다음 지반을 굴착하여 지보재설치겸용 엄지말뚝(10)들을 기준으로 절토벽(W)을 형성하고 지보재설치겸용 엄지말뚝(10)들 중 서로 인접하는 두 개의 지보재설치겸용 엄지말뚝(10) 사이에 토류판(20)들을 삽입하는 토류판설치단계(S2)가 진행된다(도 6b 참조). 토류판설치단계는 제1 실시예에서 설명한 바와 같다.After supporting the thumb piles 10 for supporting and installing the foundation, excavating the ground to form a cut wall (W) based on the thumb piles 10 for supporting and installing and supporting two of the thumb piles 10 adjacent to each other. The earth plate installation step (S2) in which the earth plates 20 are inserted between the thumb piles 10 for installation and installation proceeds (see FIG. 6B). The earth plate installation step is as described in the first embodiment.

토류판설치단계가 진행된 다음 지보재설치겸용 엄지말뚝(10)에 접촉되는 절토벽(W)에 어스앵커(40)를 설치하는 어스앵커설치단계(S3)가 진행된다(도 6c 참조). 어스앵커설치단계는 제1 실시예에서 설명한 바와 같다.After the earth plate installation step proceeds, the earth anchor installation step (S3) of installing the earth anchor 40 on the cut wall W contacting the support pile thumb 10 is progressed (see FIG. 6C). The ground anchor installation step is as described in the first embodiment.

어스앵커설치단계가 진행된 다음 지보재설치겸용 엄지말뚝(10)들과 토류판(20)들을 커버하도록 콘크리트패널(30)들을 각각 수직으로 위치시켜 수평 방향으로 배열하되, 상기 지보재설치겸용 엄지말뚝(10)들에 상기 콘크리트패널(30)을 접촉 지지하고 상기 어스앵커(40)를 상기 지보재설치겸용 엄지말뚝(10)과 콘크리트패널(30)을 관통하여 상기 어스앵커(40)를 긴장시켜 상기 콘크리트패널(30)을 상기 지보재설치겸용 엄지말뚝(10)에 고정하는 패널설치단계(S4)가 진행된다(도 6d 참조). 패널설치단계는 제1 실시예에서 설명한 바와 같다.After the earth anchor installation step is carried out, the concrete panels 30 are vertically positioned to cover the thumb piles 10 and the earth plates 20, which are also used for supporting beam installation, and arranged in the horizontal direction, but the thumb piles 10 for supporting and installing the support The concrete panel 30 is brought into contact with the support, and the earth anchor 40 is penetrated through the thumb pile 10 and the concrete panel 30 for both support and installation, and the earth anchor 40 is tensioned so that the concrete panel ( 30) is a panel installation step (S4) for fixing the support pile and the thumb pile (10) in progress (see Fig. 6d). The panel installation step is as described in the first embodiment.

패널설치단계가 진행된 다음 지반을 설정된 깊이에 이를 때까지 토류판설치단계(S2), 어스앵커설치단계(S3), 패널설치단계(S4)를 반복하여 내측콘크리트벽체(50)를 시공하는 단계(S5)가 진행된다(도 6e 참조). 토류판설치단계(S2), 어스앵커설치단계(S3), 패널설치단계(S4)가 진행되면 수평 방향으로 콘크리트패널(30)들이 배열되어 1단을 이루게 되고, 토류판설치단계(S2), 어스앵커설치단계(S3), 패널설치단계(S4)가 복수 회 반복되면 복수 단의 콘크리트패널(30)들이 설치된다. 콘크리트벽체를 크게 할 경우 지반을 위에서 굴착하여 아래로 파내려 가면서 토류판설치단계(S2), 어스앵커설치단계(S3), 패널설치단계(S4)를 반복하여 다층의 콘크리트벽체를 시공한다.After the panel installation step is carried out, the earth plate installation step (S2), the earth anchor installation step (S3), and the panel installation step (S4) are repeated until the ground reaches a predetermined depth (S5). ) Proceeds (see FIG. 6E). When the earth plate installation step (S2), the earth anchor installation step (S3), and the panel installation step (S4) are performed, the concrete panels 30 are arranged in a horizontal direction to form a single stage, and the earth plate installation step (S2), earth anchor When the installation step (S3) and the panel installation step (S4) are repeated a plurality of times, a plurality of stages of the concrete panels 30 are installed. When the concrete wall is enlarged, the ground is excavated from the top and dug down to repeat the installation of the earth plate installation step (S2), the earth anchor installation step (S3), and the panel installation step (S4) to construct a multi-layer concrete wall.

내측콘크리트벽체(50)를 시공한 다음 내측콘크리트벽체(50)의 하단인 지하 바닥에 버림콘크리트(61)를 타설하는 단계(S6)가 진행된다(도 6f 참조).After the inner concrete wall 50 is constructed, the step S6 of pouring the discarded concrete 61 on the basement floor, which is the bottom of the inner concrete wall 50, is performed (see FIG. 6F).

버림콘크리트(61)를 타설한 다음 버림콘크리트(61)에 기초콘크리트(62)를 타설하는 단계(S7)가 진행된다(도 6f 참조). 기초콘크리트(62)가 타설된 상태에서 기초콘크리트(62)의 면은 맨 아래단에 위치하는 콘크리트패널(30)들의 하단 위쪽에 위치하는 것이 바람직하다. 기초콘크리트(62)를 타설하기 전 버림콘크리트(61)와 내측콘크리트벽체(50)에 방수시트(미도시)를 부착하고 기초콘크리트(62)를 타설하는 것이 바람직하다.After pouring the discarded concrete 61, the step S7 of pouring the foundation concrete 62 on the discarded concrete 61 is performed (see FIG. 6F). In the state where the foundation concrete 62 is poured, it is preferable that the surface of the foundation concrete 62 is located above the bottom of the concrete panels 30 located at the bottom end. Before pouring the foundation concrete 62, it is preferable to attach a waterproof sheet (not shown) to the discarded concrete 61 and the inner concrete wall 50 and to pour the foundation concrete 62.

기초콘크리트(62)를 타설한 다음 내측콘크리트벽체(50)에 간격을 두고 거푸집을 설치하되, 내측콘크리트벽체(50)의 하단 콘크리트패널(10)의 정착부(31) 아래까지 거푸집을 설치하고 거푸집에 콘크리트를 타설하여 단위외측콘크리트벽체를 시공하는 단계(S8)가 진행된다. 단위외측콘크리트벽체의 상면은 대략 평면이며, 단위외측콘크리트벽체의 상면은 내측콘크리트벽체(50)의 하단 콘크리트패널(30)의 정착부(31) 아래에 수평으로 위치한다.After pouring the foundation concrete 62, the formwork is installed at intervals on the inside concrete wall 50, but the formwork is installed to the bottom of the concrete 31 of the bottom concrete panel 10 of the inside concrete wall 50, and the formwork is installed. The step (S8) of constructing concrete outside the unit by pouring concrete on it is carried out. The upper surface of the unit outer concrete wall is approximately flat, and the upper surface of the unit outer concrete wall is horizontally positioned below the fixing part 31 of the lower concrete panel 30 of the inner concrete wall 50.

단위외측콘크리트벽체를 시공한 다음 단위외측콘크리트벽체의 바로 위에 위치하는 어스앵커(40)와 콘크리트패널(30)의 연결을 해제하고, 단위외측콘크리트벽체에 이어 위로 거푸집을 설치하되, 위에 위치하는 콘크리트패널(30)의 정착부(31) 아래까지 거푸집을 설치하고 그 거푸집에 콘크리트를 타설하여 단위외측콘크리트벽체를 시공하는 단계를 내측콘크리트벽체(50)에 이르기까지 반복하여 외측콘크리트벽체(70)를 시공하는 단계(S9)가 진행된다(도 6g 참조). 어스앵커(40)와 콘크리트패널(30)의 연결 해제는 콘크리트패널(30)의 정착부(31)에 위치한 어스앵커(40)의 정착구를 제거함에 의해 이루어질 수 있다.After constructing the outer concrete wall of the unit, release the connection of the earth anchor 40 and the concrete panel 30 located directly above the outer concrete wall of the unit, and install the formwork on top of the outer concrete wall of the unit. The steps of constructing the formwork up to the bottom of the fixing part 31 of the panel 30 and pouring concrete on the formwork to construct the outer concrete wall of the unit are repeated up to the inner concrete wall 50 to open the outer concrete wall 70. Construction step (S9) proceeds (see Fig. 6g). The release of the connection between the earth anchor 40 and the concrete panel 30 may be achieved by removing the anchor of the earth anchor 40 located in the fixing part 31 of the concrete panel 30.

거푸집의 일예로, 거푸집은 거푸집용 콘크리트패널(30)들을 포함하는 것이 바람직하다. 즉, 거푸집용 콘크리트패널(30)들을 내측콘크리트벽체와 간격을 두고 한 개의 벽체를 이루도록 설치한다. 이때, 내측콘크리트벽체와 콘크리트패널(30) 사이에 각격유지장치가 구비됨이 바람직하다. 간격유지장치의 일예로, 간격유지장치는 내측콘크리트벽체를 구성하는 콘크리트패널의 일측면에 돌출된 패널측 앵커볼트와, 커푸집용 콘크리트패널에 관통되며 양단에 수나사산부가 스터드볼트와, 스터드볼트와 패널측 앵커볼트를 체결하는 연결너트와, 거푸집용 콘크리트패널의 양쪽에 위치하여 스터드볼트의 한쪽 수나사산부를 체결되는 내,외측 조임너트들을 포함한다.As an example of a formwork, it is preferable that the formwork includes concrete panels 30 for formwork. That is, the concrete panels 30 for formwork are installed so as to form one wall spaced apart from the inner concrete wall. At this time, it is preferable that an angle holding device is provided between the inner concrete wall and the concrete panel 30. As an example of the space maintenance device, the space maintenance device is provided with a panel-side anchor bolt protruding from one side of a concrete panel constituting an inner concrete wall, a concrete panel for a formwork, and male thread threads at both ends with stud bolts, stud bolts, It includes a connecting nut for fastening the anchor bolt on the panel side, and inner and outer fastening nuts located on both sides of the formwork concrete panel to fasten one male thread portion of the stud bolt.

내측콘크리트벽체(50)와 외측콘크리트벽체(70)는 한 쌍의 대칭을 이루며, 내측콘크리트벽체(50)의 상단과 외측콘크리트벽체(70)의 상단에 슬래브(미도시)를 연결하는 것이 바람직하다.The inner concrete wall 50 and the outer concrete wall 70 form a pair of symmetry, and it is preferable to connect a slab (not shown) to the upper end of the inner concrete wall 50 and the upper end of the outer concrete wall 70. .

외측콘크리트벽체(70)를 시공한 다음 지보재설치겸용 엄지말뚝(10)들을 인발하여 제거하는 단계를 더 포함할 수도 있다. 내측콘크리트벽체(50)와 어스앵커(40)의 연결이 분리되므로 지보재설치겸용 엄지말뚝(10)들의 인발이 가능하게 된다.After constructing the outer concrete wall 70, it may further include the step of drawing and removing the thumb piles 10 for supporting and installing. Since the connection between the inner concrete wall 50 and the earth anchor 40 is separated, it is possible to pull out the thumb piles 10 for supporting and installing the support.

이하, 본 발명에 따른 벽체구조물 및 그 시공방법의 작용과 효과를 설명한다.Hereinafter, the operation and effects of the wall structure according to the present invention and its construction method will be described.

본 발명은 지보재설치겸용 엄지말뚝(10)들과 토류판(20)들을 콘크리트패널(30)들이 커버하면서 콘크리트패널(30)들이 어스앵커(40)에 의해 지보재설치겸용 엄지말뚝(10)에 고정되어 콘크리트벽체를 형성하게 되므로 지하에 위치하는 콘크리트벽체의 두께가 얇으면서도 구조가 견고하게 될 뿐만 아니라 구성이 간단하게 된다. 특히, 콘크리트패널(30)이 어스앵커(40)에 의해 지보재설치겸용 엄지말뚝(10)에 고정되므로 콘크리트패널(30)이 견고하게 지지되고, 지보재설치겸용 엄지말뚝(10)이 두 개의 디귿자 형강(11)과 그 디귿자 형강(11)들을 연결하는 연결부재(12)를 포함하게 되어 지보재설치겸용 엄지말뚝(10)의 강도가 크게 되고 어스앵커(40)를 두 개의 디귿자 형강(11) 사이로 설치되어 설치작업이 쉽게 된다.In the present invention, while the concrete panels 30 cover the thumb piles 10 and the earth plates 20 for supporting and installing the supports, the concrete panels 30 are fixed to the thumb piles 10 for supporting and installing the supports. Since the concrete wall is formed, the structure of the concrete wall located in the basement is thin and the structure is not only solid but also simple in construction. In particular, since the concrete panel 30 is fixed to the thumb pile 10 for supporting and installing the support by the earth anchor 40, the concrete panel 30 is firmly supported, and the thumb pile 10 for supporting and installing the support is two deguza shaped steel (11) and the connecting member (12) connecting the de-shape section steel (11) is included to increase the strength of the thumb pile (10) for both supporting and installing the earth anchor 40 is installed between the two de-shape section steel (11) This makes installation easy.

또한, 본 발명은 지반에 지보재설치겸용 엄지말뚝(10)들을 박고 지반을 굴착하면서 토류판(20)들을 설치하고 어스앵커(40)를 지보재설치겸용 엄지말뚝(10)의 배면 절토벽(W)에 설치하고 어스앵커(40)를 지보재설치겸용 엄지말뚝(10)에 관통시켜 콘크리트패널(30)을 지보재설치겸용 엄지말뚝(10)에 접촉 지지한 상태에서 어스앵커(40)로 콘크리트패널(30)을 고정하게 되므로 지하에 콘크리트벽체를 견고하게 시공하게 될 뿐만 아니라 지하에 콘크리트벽체를 시공하는 시공 작업이 간단하여 시공 기간을 단축시키고, 재료의 사용량을 대폭 감소시켜 시공 비용을 절감시키게 된다.In addition, the present invention is to install the earth support plate (20) while excavating the ground by putting the thumb piles (10) for mounting and supporting the ground on the ground and installing the earth anchor (40) on the back cut wall (W) of the thumb pile (10) After installing and piercing the earth anchor 40 through the thumb pile 10 for supporting and installing the concrete panel 30, the concrete panel 30 is used as the earth anchor 40 while the concrete panel 30 is contacted and supported by the thumb pile 10 for supporting and installing the support. Since it is fixed, not only does the concrete wall be firmly installed in the basement, but the construction work to construct the concrete wall in the basement is simple, thereby shortening the construction period and significantly reducing the amount of material used, thereby reducing construction costs.

또한, 본 발명은 지반에 지보재설치겸용 엄지말뚝(10)들을 박고 지반을 굴착하면서 토류판(20)들을 설치하고 어스앵커(40)를 지보재설치겸용 엄지말뚝(10)의 배면 절토벽(W)에 설치하고 어스앵커(40)를 지보재설치겸용 엄지말뚝(10)에 관통시켜 콘크리트패널(30)을 지보재설치겸용 엄지말뚝(10)에 접촉 지지한 상태에서 어스앵커(40)로 콘크리트패널(30)을 고정하는 것을 반복하여 내측콘크리트벽체(50)를 시공하고 그 내측콘크리트벽체(50)에 거푸집을 설치하고 콘크리트를 타설하여 외측콘크리트벽체(70)를 형성하여 지하에 콘크리트벽체를 시공하게 되므로 지하에 콘크리트벽체를 견고하게 시공하게 될 뿐만 아니라 지하에 콘크리트벽체를 시공하는 시공 작업이 간단하여 시공 기간을 단축시킨다. 거푸집이 다수 개의 콘크리트패널(30)들을 포함하게 될 경우 외측콘크리트벽체(70)의 시공이 쉽고 간단하게 된다.In addition, the present invention is to install the earth support plate (20) while excavating the ground by putting the thumb piles (10) for mounting and supporting the ground on the ground and installing the earth anchor (40) on the back cut wall (W) of the thumb pile (10) After installing and piercing the earth anchor 40 through the thumb pile 10 for supporting and installing the concrete panel 30, the concrete panel 30 is used as the earth anchor 40 while the concrete panel 30 is contacted and supported by the thumb pile 10 for supporting and installing the support. The inner concrete wall 50 is repeatedly constructed by repeating fixation, and the inner concrete wall 50 is installed with a formwork, and concrete is poured to form the outer concrete wall 70 to construct the concrete wall in the basement. Not only will the concrete wall be firmly constructed, but the construction work of constructing the concrete wall underground will be simplified to shorten the construction period. When the formwork includes a plurality of concrete panels 30, the construction of the outer concrete wall 70 becomes easy and simple.

또한, 본 발명은 외측콘크리트벽체(70)를 시공하기전 내측콘크리트벽체(50)에 정착된 어스앵커(40)를 내측콘크리트벽체(50)와 분리한 다음 외측콘크리트벽체(70)를 시공하게 되므로 지보재설치겸용 엄지말뚝(10)과 내측콘크리트벽체(50)와 절토벽(W) 사이의 프리스트레스를 제거하게 되어 지보재설치겸용 엄지말뚝(10)들을 인발하여 회수할 수도 있어 비용을 절감시키게 된다.In addition, the present invention is to separate the earth anchor 40 fixed to the inner concrete wall 50 from the inner concrete wall 50 before constructing the outer concrete wall 70, and then to construct the outer concrete wall 70 Since the prestress between the thumb pile 10 for supporting and installing the support and the inner concrete wall 50 and the cut wall W is removed, the thumb pile 10 for supporting and installing the support can also be extracted and recovered, thereby reducing cost.

또한, 어스앵커(40)와 내측콘크리트벽체(50)와의 연결을 해제하게 되므로 구조물 옆의 추가적인 굴착작업시 지하에 매설된 어스앵커(40)의 파손으로 인하여 내측콘크리트벽체(50)에 영향을 주지않게 된다.In addition, since the connection between the ground anchor 40 and the inner concrete wall 50 is released, the inner concrete wall 50 is not affected by the damage of the ground anchor 40 buried underground during additional excavation work next to the structure. It does not.

10; 지보재설치겸용 엄지말뚝 20; 토류판
30; 어스앵커 40; 콘크리트패널
10; Thumb pile 20 for both support and installation; Earth plate
30; Earth Anchor 40; Concrete panel

Claims (7)

절토벽에 간격을 두고 설치되는 지보재설치겸용 엄지말뚝들;
상기 지보재설치겸용 엄지말뚝들 중 서로 인접하는 두 개의 지보재설치겸용 엄지말뚝들 사이에 수직 방향으로 삽입되어 절토벽을 막는 토류판들;
상기 지보재설치겸용 엄지말뚝들과 토류판을 커버하도록 상기 지보재설치겸용 엄지말뚝에 접촉 지지되어 콘크리트벽체를 형성하는 콘크리트패널들;
상기 콘크리트패널들을 지보재설치겸용 엄지말뚝에 고정하도록 상기 콘크리트패널과 지보재설치겸용 엄지말뚝을 관통하여 상기 절토벽 내부에 고정되는 어스앵커들;을 포함하며,
상기 지보재설치겸용 엄지말뚝은 서로 간격을 두고 나란하게 위치하는 두 개의 디귿자 형강들과, 상기 두 개의 디귿자 형강들의 길이 방향으로 서로 간격을 두고 상기 두 개의 디귿자 형강들을 연결하는 연결부재들을 포함하며, 상기 연결부재들 사이로 상기 어스앵커가 관통하는 것을 특징으로 하는 벽체구조물.
Thumb piles for supporting gimbals installed spaced apart from cut walls;
Among the support piles for supporting and installing thumb pads, which are inserted in the vertical direction between two adjacent piles for supporting and supporting thumb cutting to prevent cutting walls;
Concrete panels for contacting and supporting the thumb piles for supporting and installing the thumb piles to form a concrete wall;
It includes; Earth anchors that are fixed to the inside of the cut wall by penetrating the concrete panel and the thumb pile for both supporting and installing the concrete panel to fix the concrete panels to the thumb pile for supporting and installing;
The supporting pile for installation and installation includes two dike-shaped sections that are positioned side by side at a distance from each other, and connecting members connecting the two dike-shaped sections at a distance from each other in the longitudinal direction of the two dike-shaped sections, wherein the A wall structure characterized in that the earth anchor penetrates between the connecting members.
제 1 항에 있어서, 상기 연결부재는 직선 바이며, 상기 연결부재들은 상기 두 개의 디귿자 형강들 사이에 위치하는 것을 특징으로 하는 벽체구조물.The wall structure according to claim 1, wherein the connecting member is a straight bar, and the connecting members are positioned between the two de-shaped steels. 지반에 지보재설치겸용 엄지말뚝들을 간격을 두고 박는 단계;
상기 지반을 굴착하여 지보재설치겸용 엄지말뚝들을 기준으로 절토벽을 형성하고 상기 지보재설치겸용 엄지말뚝들 중 서로 인접하는 두 개의 지보재설치겸용 엄지말뚝 사이에 토류판들을 삽입하는 토류판설치단계;
상기 지보재설치겸용 엄지말뚝에 접촉되는 절토벽에 어스앵커를 설치하는 어스앵커설치단계;
상기 지보재설치겸용 엄지말뚝들과 토류판들을 커버하도록 콘크리트패널들을 각각 수직으로 위치시켜 수평 방향으로 배열하되, 상기 지보재설치겸용 엄지말뚝들에 상기 콘크리트패널을 접촉 지지하고 상기 어스앵커를 상기 지보재설치겸용 엄지말뚝과 콘크리트패널을 관통하여 상기 어스앵커를 긴장시켜 상기 콘크리트패널을 상기 지보재설치겸용 엄지말뚝에 고정하는 패널설치단계;를 포함하며,
상기 지보재설치겸용 엄지말뚝은 서로 간격을 두고 나란하게 위치하는 두 개의 디귿자 형강들과, 상기 두 개의 디귿자 형강들의 길이 방향으로 서로 간격을 두고 상기 두 개의 디귿자 형강들을 연결하는 연결부재들을 포함하며, 상기 연결부재들 사이로 상기 어스앵커가 관통하는 것을 특징으로 하는 벽체구조물 시공방법.
Steps to put the thumb piles for both the installation and support of the ground at intervals;
A ground plate installation step of excavating the ground to form a cut wall based on the thumb piles for supporting and installing the support and inserting earth plates between two thumb piles adjacent to each other of the thumb piles for the supporting and mounting;
An earth anchor installation step of installing an earth anchor on a cut wall that is in contact with the support pile and the thumb pile;
The concrete panels are vertically positioned so as to cover the thumb piles and earth plates for the supporting plate installation and arranged in a horizontal direction, but the concrete panel is contacted and supported by the supporting pile thumb plates and the earth anchor is used for the supporting plate installation thumb. It includes; a panel installation step of fixing the concrete panel to the support pile and the thumb pile by tensioning the earth anchor through the pile and the concrete panel;
The supporting pile for installation and installation includes two dike-shaped sections that are positioned side by side at a distance from each other, and connecting members connecting the two dike-shaped sections at a distance from each other in the longitudinal direction of the two dike-shaped sections, wherein the A method of constructing a wall structure, characterized in that the earth anchor penetrates between the connecting members.
지반에 지보재설치겸용 엄지말뚝들을 간격을 두고 박는 단계;
상기 지반을 굴착하여 지보재설치겸용 엄지말뚝들을 기준으로 절토벽을 형성하고 상기 지보재설치겸용 엄지말뚝들 중 서로 인접하는 두 개의 지보재설치겸용 엄지말뚝 사이에 토류판들을 삽입하는 토류판설치단계;
상기 지보재설치겸용 엄지말뚝에 접촉되는 절토벽에 어스앵커를 설치하는 어스앵커설치단계;
상기 지보재설치겸용 엄지말뚝들과 토류판들을 커버하도록 콘크리트패널들을 각각 수직으로 위치시켜 수평 방향으로 배열하되, 상기 지보재설치겸용 엄지말뚝들에 상기 콘크리트패널을 접촉 지지하고 상기 어스앵커를 상기 지보재설치겸용 엄지말뚝과 콘크리트패널을 관통하여 상기 어스앵커를 긴장시켜 상기 콘크리트패널을 상기 지보재설치겸용 엄지말뚝에 고정하는 패널설치단계;
상기 지반을 설정된 깊이에 이를 때까지 상기 토류판설치단계, 어스앵커설치단계, 패널설치단계를 반복하여 내측콘크리트벽체를 시공하는 단계;
상기 내측콘크리트벽체의 하단인 지하바닥에 버림콘크리트를 타설하는 단계;
상기 버림콘크리트에 기초콘크리트를 타설하는 단계;
상기 내측콘크리트벽체에 간격을 두고 거푸집을 설치하되, 상기 내측콘크리트벽체의 하단 콘크리트패널의 정착부 아래까지 거푸집을 설치하고 상기 거푸집에 콘크리트를 타설하여 단위외측콘크리트벽체를 시공하는 단계;
상기 단위외측콘크리트벽체의 바로 위에 위치하는 어스앵커와 콘크리트패널의 연결을 해제하고, 상기 단위외측콘크리트벽체에 이어 위로 거푸집을 설치하되, 위에 위치하는 콘크리트패널의 정착부 아래까지 거푸집을 설치하고 상기 거푸집에 콘크리트를 타설하여 단위외측콘크리트벽체를 시공하는 단계를 상기 내측콘크리트벽체에 이르기까지 반복하여 외측콘크리트벽체를 시공하는 단계;를 포함하는 벽체구조물 시공방법.
Steps to put the thumb piles for both the installation and support of the ground at intervals;
A ground plate installation step of excavating the ground to form a cut wall based on the thumb piles for supporting and installing the support and inserting earth plates between two thumb piles adjacent to each other of the thumb piles for the supporting and mounting;
An earth anchor installation step of installing an earth anchor on a cut wall that is in contact with the support pile and the thumb pile;
The concrete panels are vertically positioned so as to cover the thumb piles and earth plates for the supporting plate installation and arranged in a horizontal direction, but the concrete panel is contacted and supported by the supporting pile thumb plates and the earth anchor is used for the supporting plate installation thumb. A panel installation step of penetrating through the pile and the concrete panel and tensioning the earth anchor to fix the concrete panel to the thumb pile for installation and support;
Repeating the earth plate installation step, the earth anchor installation step, and the panel installation step until the ground reaches a predetermined depth to construct an inner concrete wall;
Pouring discarded concrete on the basement floor, which is the lower end of the inner concrete wall;
Pouring foundation concrete on the discarded concrete;
Installing a formwork spaced apart from the inner concrete wall, installing a formwork below the fixing part of the lower concrete panel of the inner concrete wall, and pouring concrete into the formwork to construct a unit outer concrete wall;
Release the connection of the earth anchor and the concrete panel located directly above the unit outer concrete wall, and install the formwork on top of the unit exterior concrete wall, but install the formwork below the fixing part of the concrete panel located above and install the formwork A method of constructing a wall structure, including; constructing an outer concrete wall by repeating the step of constructing concrete on the outer concrete wall of the unit to the inner concrete wall.
제 4 항에 있어서, 상기 외측콘크리트벽체를 시공한 다음 상기 지보재설치겸용 엄지말뚝들을 인발하여 제거하는 단계를 더 포함하는 벽체구조물 시공방법.5. The method of claim 4, further comprising the step of constructing the outer concrete wall and then removing and removing the thumb piles for supporting and installing the support. 제 4 항에 있어서, 상기 거푸집은 다수 개의 거푸집용 콘크리트패널들을 포함하는 것을 특징으로 하는 벽체구조물 시공방법.The method of claim 4, wherein the formwork comprises a plurality of formwork concrete panels. 제 4 항에 있어서, 상기 내측콘크리트벽체와 외측콘크리트벽체는 한 쌍의 대칭을 이루며, 상기 내측콘크리트벽체의 상단과 외측콘크리트벽체의 상단에 슬래브를 연결하는 것을 특징으로 하는 벽체구조물 시공방법.The method of claim 4, wherein the inner concrete wall and the outer concrete wall form a pair of symmetry, and a slab is connected to the top of the inner concrete wall and the top of the outer concrete wall.
KR1020180114209A 2018-09-21 2018-09-21 Wall structure and method for constructing the same KR102197094B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180114209A KR102197094B1 (en) 2018-09-21 2018-09-21 Wall structure and method for constructing the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180114209A KR102197094B1 (en) 2018-09-21 2018-09-21 Wall structure and method for constructing the same

Publications (2)

Publication Number Publication Date
KR20200034436A true KR20200034436A (en) 2020-03-31
KR102197094B1 KR102197094B1 (en) 2020-12-30

Family

ID=70002325

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180114209A KR102197094B1 (en) 2018-09-21 2018-09-21 Wall structure and method for constructing the same

Country Status (1)

Country Link
KR (1) KR102197094B1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200399769Y1 (en) * 2005-06-17 2005-10-28 (주)건영엔지니어링 Steel frame revetment using earth anchor
KR100794203B1 (en) * 2007-09-21 2008-01-11 주식회사 창미이엔지 Structure of breast retaining wall for river
KR101014018B1 (en) * 2008-05-07 2011-02-14 주식회사 다산컨설턴트 Composite Wall Using Angled Channel
KR101410471B1 (en) * 2014-01-16 2014-06-23 주식회사 백산이앤티건설 Method for buttom-up removal of underground retaining wall by using h-piles remained in earth retaining work of existed building
KR101785677B1 (en) * 2017-04-15 2017-10-17 류근호 Construction method of retaining wall using precast slope panel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200399769Y1 (en) * 2005-06-17 2005-10-28 (주)건영엔지니어링 Steel frame revetment using earth anchor
KR100794203B1 (en) * 2007-09-21 2008-01-11 주식회사 창미이엔지 Structure of breast retaining wall for river
KR101014018B1 (en) * 2008-05-07 2011-02-14 주식회사 다산컨설턴트 Composite Wall Using Angled Channel
KR101410471B1 (en) * 2014-01-16 2014-06-23 주식회사 백산이앤티건설 Method for buttom-up removal of underground retaining wall by using h-piles remained in earth retaining work of existed building
KR101785677B1 (en) * 2017-04-15 2017-10-17 류근호 Construction method of retaining wall using precast slope panel

Also Published As

Publication number Publication date
KR102197094B1 (en) 2020-12-30

Similar Documents

Publication Publication Date Title
KR102082333B1 (en) Prestressed pile and Self reliance retaining wall construction method using the same
KR102312008B1 (en) Two Rows type Self reliance retaining wall construction method Using the Prestressed pile
KR101973565B1 (en) Sheathing method for constructing both sheathing wall and cutoff collar by welding cutoff plate to phc pile with longitudinal plate
US20150086278A1 (en) Systems and methods to reinforce excavation walls
JP4599423B2 (en) Embankment structure and construction method thereof
KR20200124949A (en) Anchor Tension way sheathing structure and sheathing method of construction
JP2016528406A (en) Beam connection structure of temporary retaining works for earth retaining
JP2008150947A (en) Wall structure in which permanent anchor is executed, and construction method of wall structure in which permanent anchor is executed
KR100726984B1 (en) Temporary system for land-side protection wall
GB2059484A (en) A temporary retaining system for an excavation
KR101696854B1 (en) Various assembling construction methods of E shaped precast concrete block retainning wall
JP2005009210A (en) Reinforced structure of masonry wall and its reinforcing method
JP2000265458A (en) Floor slab connecting structure for underground structure with precast pile underground wall
KR100770250B1 (en) Construnction method of retaining wall and retaining wall structure using the same
KR101599931B1 (en) Retaining Wall using Precast Panels and PHC Piles having Steel Bands, and Constructing Method of such Retaining Wall
JP2004293281A (en) Construction method for permanent anchor-applied wall structure and permanent anchor-applied wall structure
KR20200034436A (en) Wall structure and method for constructing the same
JP3465026B2 (en) Forming method of pressure plate type foundation
JP3706997B2 (en) Base seismic isolation method for existing buildings
KR101787366B1 (en) A Retaining wall using Precast pile and Construction method thereof
KR102214872B1 (en) Structure using support beam and method for constructing the same
KR100597530B1 (en) A railing install method
KR20210119935A (en) Underground structure using strut and method construturing the same
KR101623342B1 (en) Earth retaining structure utilizing in-situ soil and earth retaining structure construction Method
JP2005350884A (en) Method for widening road and the like, and wall surface panel

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant